Circular
S.No. Date Description Download
1 27-01-2020 Draft Proposal of Restructuring of PWD Delhi. Download
2 23-01-2020 Exemption for Government building from operation of Municipal Laws to regulate their erection (the composition of the Building Committee, PWD) Download
3 21-01-2020 Delhi Legislative Assembly Election 2020 is to be held on 08.02.2020 and the election process will be completed upto 12.02.2020 Download
4 21-01-2020 Exemption for Government building from operation of Municipal Laws to regulate their erection (the composition of the Building Committee, PWD) Download
5 20-01-2020 Furnishing of details of Assistant Engineers Maintenance, PWD Roads in Delhi Download
6 20-01-2020 Submission of Online Quarterly Report under Section 25 (ii) of RTI Act 2005 for the Quarter Ending 31.12.2019. Download
7 17-01-2020 List of Development /Construction works – regarding General Elections to Legislative Assembly of NCT of Delhi, 2020 Download
8 15-01-2020 Modified Policy / revised Standard Operating Procedure (SOP's) w.r.t. Road Restoration and Grant of Online Permision of Road Digging through PDM Software. Download
9 13-01-2020 Transfer & Posting of Junior Engineer(Civil) Download
10 09-01-2020 Transfer & Posting of Senior Accounts Officers. Download
11 09-01-2020 Required the list of works under progress as well as the works going to start in near future. Download
12 08-01-2020 Transfer & Posting of Sh. Ramakant Prasad, as Senior Architect(Projects). Download
13 07-01-2020 Implementation of Model Code of Conduct- General Election to Legislative Assembly of NCT of Delhi, 2020- Regarding Download
14 06-01-2020 Transfer & Posting of Junior Engineer(Electrical) Download
15 02-01-2020 Compliance of Hon'ble Supreme Court of India order in WP(C) No. 13029/1985, titled M.C. Mehta Vs UOI & Ors. Download
16 02-01-2020 Transfer/Posting Of Executive Engineer(Civil) Download
17 02-01-2020 Transfer/Posting Of Sh. Ashwini Kumar Deshwal, Assistant Director (Hort.) Download
18 01-01-2020 Advisory regarding Quality Aspects on PWD,GNCTD works. Download
19 31-12-2019 Payment to Contractual/Outsourced Employees. Download
20 31-12-2019 A/A and E/S for Expansion & Remodeling of Dr. Hedgewar Arogya Sansthan from 200 bedded to 550 bedded Hospital at the cost of Rs 210.24 Crore (Revised) Download
21 31-12-2019 Administrative approval and Expenditure sanction for Construction of new Hospital at Siraspur at the cost of Rs 487.54 (Revised) Download
22 31-12-2019 Transfer/Posting Of Sh. Rama Shankar Dubey, Office Suprintendent Download
23 30-12-2019 Joseph A.I (Sr. Accounts Officer) shall stand relieved from 31.12.2019 (A/N) Download
24 24-12-2019 Transfer/Posting Of Assistant Engineer(Elect.) Download
25 24-12-2019 Transfer/Posting Of Assistant Engineer(Elect.) Download
26 23-12-2019 Minimum wages Download
27 23-12-2019 Transfer/Posting Of Executive Engineer(Civil) Download
28 23-12-2019 Transfer/Posting Of Assistant Engineer(Civil) Download
29 23-12-2019 Transfer/Posting Of Assistant Engineer(Civil) Download
30 23-12-2019 Extension of Flyover from Ashram Flyover to DND Flyover. SH FOBs, Ramps, Footpath, Road Work include Road Signage, Street Light Works, Drainage & allied Works. Download
31 20-12-2019 Transfer/ Posting of Office Superintendents Download
32 19-12-2019 Implentation of the RTI Act 2005/SPIOs & FAAs in O/o E-in-C, PWD, GNCTD. Download
33 19-12-2019 Transfer & Posting of Finance Officers Download
34 19-12-2019 Composition of Review Committee in respect of Group "B" (Gazetted) Officers. Download
35 19-12-2019 Furnishing of status report regarding disbursement of arrears of minimum wages at enhanced rates for the month of October, 2019, disbursement f wages at enhanced rates for the month of November, 2019 and disbursement of bonus as per bonus advisory dated 15.10.2019 issued by Labour Department in respect of outsourced staff. Download
36 18-12-2019 Forwarding of various PUCs received from different Deptts./Agencies. Download
37 18-12-2019 Implentation of the RTI Act 2005/SPIOs & FAAs in PWD, GNCTD Download
38 18-12-2019 Transfer & Posting of Senior Draftsman(Civil). Download
39 18-12-2019 Transfer & Posting of Draftsman(Civil). Download
40 18-12-2019 Transfer & Posting of Junior Engineer(Electrical) Download
41 18-12-2019 Allotment List of Type-IV for the Month of December 2019 Download
42 18-12-2019 Allotment List of Type-III for the month of December 2019 Download
43 18-12-2019 Allotment List of Type-III for the month of December 2019 Download
44 18-12-2019 Allotment List of Type-I for the month of December 2019 Download
45 18-12-2019 Allotment List of Type-II for the Month of December 2019 Download
46 18-12-2019 Allotment List of Type-I for the month of December 2019 Download
47 17-12-2019 Periodical review under FR 56(j)/56(i) and Rule 48 of CCS (Pension) Rules, 1972 in r/o Group A & B officers of PWD, GNCTD. Reg. Download
48 16-12-2019 Safai Karmacharis Expressing concerns over the Sewer Deaths in Delhi. Download
49 16-12-2019 Review of Mechanism to Ensure Probity of Government Servants- Strengthening of Administration - Periodical review under FR 56(j)/FR 56(I) and Rule 48 of CCS (Pension) Rule 1972. Download
50 16-12-2019 Regarding Payment of New Minimum Wages and Arrear of D.A. applicable to Outsourced/ Contractual staff of PWD Download
51 16-12-2019 Transfer & Posting of Sh. Nikhil Soni, Assistant Architect Download
52 16-12-2019 Regarding issue of Cemtralized guidelines to all PWD units throughout Delhi for permitting M/s Presto Infosolutions Pvt. Ltd. New Delhi for installation of Wi-Fi equipments and laying of OFC on PWD on and around Street Light Poles. Download
53 13-12-2019 Inter-pool exchange of General Pool Residential Accommodation and Departmental Pool Residential Accommodation. Download
54 13-12-2019 Celebration of Constitution Day on 26th November,2019 and year-long activities on Citizens Duties from 26.11.2019 to 26.11.2020 Download
55 13-12-2019 Regarding issue of Centralized Guidelines to all PWD units throughtout Delhi for Permitting M/s Presto Infosolutions Pvt. Ltd. New Delhi for Installation of Wi-Fi Equipments and Laying of OFC on PWD onand around street light poles. Download
56 12-12-2019 Channel of Submission of Proposal of Service Matters of Officers/ officials of PWD Officers Posted in PWD from CPWD. Download
57 12-12-2019 Composition of Dispute Redressal Committee (for all claims in dispute) Download
58 06-12-2019 Guidelines on Memo Forwarding Arbitration awards for Consideration of E-in-C/Ministry/Secretariat. Download
59 06-12-2019 Transfer & Posting of Sh. P.K. Tripathi, as Director (Hort.) Download
60 04-12-2019 E-RTI Online Training Program Dated 11.12.2019 at 2:00 PM to 5:30 PM. Download
61 03-12-2019 Joining Report of PURSHOTTAAM DASS, Senior Draughtsman(C) Download
62 03-12-2019 "Annual Health Check-up Scheme" Download
63 03-12-2019 Transfer & Posting of Draftsman(Elect). Download
64 29-11-2019 Regarding to Pay New Minimum Wages and Arrear for Revised Minimum wages to Outsourced Staff in PWD. Download
65 29-11-2019 Forwarding of Various PUCs received form different Depts./ Agencies. Download
66 28-11-2019 Corrigendum-Transfer of Sh. Rup Lal, Executive Engineer(E) may be read as South West Health Electriccal Dicvision instead of South West Electrical Division. Download
67 28-11-2019 Cleaning Of Sewer line and Sewerage System-Safety Measures Regarding. Download
68 27-11-2019 Guidelines on Memo forwarding Tender for Consideration of RWAB/DWAB. Download
69 26-11-2019 Compliance for Hon'ble Supreme Court Writ Petition No. 13029/1985 regarding Air Pollution - Daily Report Download
70 22-11-2019 Transfer & Posting of Junior Engineer(Civil) Download
71 22-11-2019 Transfer & Posting of Junior Engineer(Electrical) Download
72 20-11-2019 Details of Pending Payment of Final Bills. Download
73 19-11-2019 Prohibitory Order u/s 144 CrPc Download
74 15-11-2019 Next Online Bidding for Type-I,II III & IV in December, 2019 Download
75 13-11-2019 Use of Dust Suppressants with Water Sprinkling to Control Road Dust. Download
76 11-11-2019 Disposal of C&D Waste Download
77 09-11-2019 Opening of Office on Holiday i.e. 10/11/2019 and 12/11/2019 Download
78 08-11-2019 Compliance for Hon'ble Supreme Court Writ Petition No. 13029/1985 regarding Air Pollution Download
79 07-11-2019 Payment of Bonus to Contract/Outsourced Workes/Employees engaged by PWD, Delhi under Payment of Bonus Act,1965-regarding. Download
80 05-11-2019 Transfer/ Posting of Office Superintendents Download
81 05-11-2019 Unauthorized Printing and Sale of Morth Specification for Road and Bridge Works and other IRC Codes & Specifications Download
82 05-11-2019 Review exercise undertaken under FR(56(j)/similar provisions-Furnishing of Information Regarding. Download
83 04-11-2019 Payment of Bonus to Contractual employees/workers. Download
84 04-11-2019 Compliance of Payment of Final Bill of Contractor Download
85 01-11-2019 Celebration of 58th PWD Day- Outstanding achievement and meritorious services rendered by the officers & staff of PWD for E-in-C Medal and Certificate of Merit. Download
86 31-10-2019 Transfer/Posting Assistant Accounts Officer Download
87 25-10-2019 Possibility of using available reinforcement bars from the site of World Class Skill Centre at Jonapur, Delhi. Download
88 25-10-2019 Transfer/Posting Of Executive Engineer(Civil) Download
89 23-10-2019 Transfer/Posting Of Executive Engineer(Elect.) Download
90 23-10-2019 Transfer/Posting Of Architect Download
91 22-10-2019 Transfer/Posting Of Executive Engineer(Civil) Download
92 21-10-2019 Transfer/Posting Of Assistant Engineer(Civil) Download
93 21-10-2019 Allotment List of Type-III for the month of October 2019 Download
94 21-10-2019 Allotment List of Type-II for the Month of October 2019 Download
95 21-10-2019 Allotment List of Type-I for the Month of October 2019 Download
96 21-10-2019 Allotment List of Type-IV for the Month of October 2019 Download
97 18-10-2019 Transfer/Posting Assistant Accounts Officers Download
98 17-10-2019 Half Day Holiday on 17th Oct 2019 on account of Phool Walon Ki Sair Download
99 10-10-2019 Office Memorandum Regarding DE-2 Form Mandatory for Allotment of DA Flat (Type-IV and above) Download
100 30-09-2019 Readiness list of Executive Engineer(Civil) Download
101 27-09-2019 Periority of SO(Horticulture). Download
102 27-09-2019 Transfer & Posting of Senior Draftsman(Elect). Download
103 27-09-2019 Transfer & Posting of Senior Draftsman(Civil) Download
104 26-09-2019 Forwarding of various PUCs received from different Depts./ Agencies. Download
105 26-09-2019 Transfer And Joining Download
106 25-09-2019 Transfer/Posting Of Assistant Engineer(Electrical) Download
107 24-09-2019 Readiness List Of Assistant Account Officer and Office Superintendent . Download
108 24-09-2019 Transfer & Posting of Junior Engineer(Civil) Download
109 23-09-2019 Instructions to carry out regular inspections/checks to stamp out the misuse of Govt. Residential Accommodation i.e. Overstaying, Subletting, Unauthorized occupation & Unauthorized construction. Download
110 20-09-2019 Rehability and strenghthening of Nehru Nagar Flyover(ROB) near Ashram on Ring Road,New Delhi. Download
111 20-09-2019 Trasfer/Posting of Senior Architect Download
112 19-09-2019 Transfer/Posting Assistant Accounts Officer Download
113 18-09-2019 How to Celebrate 14 September Hindi Day 2019 Download
114 18-09-2019 Office of the Commissioner of Police:Delhi Download
115 18-09-2019 Readiness list of Assistant Engineer(Civil/Elect.)as on 30.09.2019. Download
116 17-09-2019 Transfer/Posting of Senior Draftsman(Elect.) Download
117 17-09-2019 Transfer/Posting of Senior Draftsman(Civil) Download
118 13-09-2019 Next Online Bidding for Type-I,II III & IV in October, 2019 Download
119 13-09-2019 Regarding Office Memorandum for Regular Inspections/Checks to stamp out the misuse of Govt. Residential Accommodation i.e Overstaying, Subletting, Unauthorized Occupations and Unauthorized Construction Download
120 12-09-2019 Regarding commencement of system of payment of salary to the employees of the Delhi Government through electronic mode. Download
121 06-09-2019 24th Annual Convention and National Seminar on "Development of New Greenfield Townships" to be held in December 2019. Download
122 06-09-2019 List of SC/ST enterpreneurs willing to carry out supply orders/service Contracts. Download
123 05-09-2019 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.533,90,79,516 for new block for Medicine,Maternity and Advanced Paediatric centre at L.N Hospital New Delhi. Download
124 04-09-2019 IBC Journal Download
125 04-09-2019 Directorate is bringing out Newsletter every month to share and disseminate the activities and achievements of the Department to the Public, Clients, Stakeholders and to entire CPWD fraternity through CPWD website. Download
126 04-09-2019 Regarding the death of 03 workers during cleaning of sewer in delhi on 28/06/2019(Delhi Jal Board) Download
127 03-09-2019 Providing Free Wi-Fi to the Citizens of Delhi(At bus stops and parks etc). Download
128 03-09-2019 Supply,Installation,Testing and Commissioning of CCTV Cameras in Delhi(Phase-II).(Proposal to double the number of installation of CCTV Cameras in RWA/MA). Download
129 02-09-2019 Transfer and Posting Download
130 29-08-2019 Skill Development of Workmen in the Highway Construction Sector. Download
131 29-08-2019 Seniority List of JE's (Civil) Working in PWD Road Division's Delhi as on Aug-2019 Download
132 29-08-2019 List of JE's (Elect.) Working in PWD Delhi as on Aug 2019 Download
133 29-08-2019 Training Calendar of CPWD Academy for 2019-2020 Download
134 28-08-2019 Minutes of Meeting with CPWD Employee Union on 2/08/2019 Download
135 26-08-2019 Transfer & Posting of JE(Civil) Download
136 26-08-2019 Transfer Order Download
137 22-08-2019 Encouragement for use of Hindi Language Download
138 20-08-2019 Restructuring of Horticulture Unit of PWD Delhi Download
139 19-08-2019 Allotment List of Type-IV for the month of August 2019 Download
140 19-08-2019 Allotment List of Type-I for the month of August 2019 Download
141 19-08-2019 Allotment List of Type-II for the month of August 2019 Download
142 19-08-2019 Allotment List of Type-III for the month of August 2019 Download
143 16-08-2019 Forwarding of various PUCs received from different Deptts./Agencies Download
144 16-08-2019 Forwarding of various PUCs received from different Department/Agencies. Download
145 14-08-2019 Pr.Chief Engineer(Projects) declares "Lab Furniture" as Specialized Work which is not included in the specialized list of CPWD Works Manual 2019. Download
146 13-08-2019 Presentation on Construction materials. Download
147 09-08-2019 Temp.Additional Charge of E-in-C,PWD Download
148 08-08-2019 Regarding provision for grant of incentives in academics to NCC Cadets as per their grading obtained during the training. Download
149 07-08-2019 PIMS update details certificate Download
150 07-08-2019 Appointment of Shri P K Tomar, PM(F-5) as a Nodal officer for providing the necessary information and data to IUT/UMTC from PWD. Download
151 06-08-2019 Proactive approach in disposing off First Appeal under RTI Act 2005. Download
152 05-08-2019 Meeting Notice-Review Cases of 56(j) Download
153 05-08-2019 Notice for presentation on Indira Gandhi Hospital Project Download
154 05-08-2019 Remodeling of old damaged brick masonry drain of N.S.Hardikar Marg(from ORR-26 to Avantika Chowk)with new RCC drain,Rohini,Delhi. Download
155 05-08-2019 Construction of Foot Over Bridge with staircase and lift for pedestrain on Multan Nagar Metro Pillar No.224 to 225,at Delhi Rohtak Road, NH-10, New Delhi.(SH;-Civil and Electrical Work) Download
156 05-08-2019 Construction of Foot Over Bridge at Shiv Parvati Mandir, Pul Prahaladpur,M.B.Road,New Delhi. Download
157 03-08-2019 Amendments to the Delhi Administration allotment of Government Residences (General Pool Debarment Period) Rules, 1977 Download
158 02-08-2019 Meeting Notice-on shifting of officers as per reallocation of office spaces at MSO Bldg. Download
159 02-08-2019 Transfer & Posting Against Existing Vacancy. To be taken on roll w.e.f 25/07/2019(F.N) Download
160 02-08-2019 Payment to be made to contractual/Outsourced workers in different departments/organization under GNCTD- non furnishing of information 0.regarding disbursement of wages. Download
161 01-08-2019 Meeting Notice-Celebration of 58th PWD Day,outstanding achievement and meritorious services rendered by the officers and staff of PWD for award of E-in-C Medal and Certificates of Merit. Download
162 31-07-2019 Strengthening of Road No. 58 (Maharaja Surajmal Marg) from RUB Vivek Vihar to Junction of Road No. 72RD(0m to 2220m.). Download
163 30-07-2019 Material for preparation of speech on the occasion of Independence Day - 2019 regarding. Download
164 29-07-2019 Transfer and Posting order of several Junior Engg. (Civil) Download
165 29-07-2019 Regarding enhancement of the annual family income criteria. Download
166 26-07-2019 Transfer/Posting of Junior Engineer(Civil) Download
167 26-07-2019 Construction of Foot Over Bridge at Monastery Market Budh Vihar on Ring Road near ISBT Kashmere Gate under Sub-Division-3 of Division C & ND-Roads,New Delhi(Civil & Elect. Work) Download
168 26-07-2019 Recovery of department dues from M/s Jal Suraksha Engineers. Download
169 24-07-2019 Outstanding achievement and meritorious services rendered by the officers and staff of PWD by E-in-C Medal and Certificates Download
170 24-07-2019 Transfer/Posting in the grade of Executive Engineer(Civil & Elect.) Download
171 24-07-2019 Transfer/Posting of ADG Maintenance Download
172 24-07-2019 Voluntary Contribution towards Construction of additional two floors in existing IRC Building at R.K. Puram, New Delhi Download
173 22-07-2019 Engagement Of Consultants On Contract Basis Download
174 22-07-2019 Transfer and Posting order of AE(Civil) Download
175 22-07-2019 Transfer and Posting order of Deputy Director (Hort.) Download
176 19-07-2019 Quality Assurance Setup. Download
177 17-07-2019 Sanction regarding Strengthing of Pankha road Bhagwan Mahaveer Marg Download
178 17-07-2019 Amended Circular Regarding Cheques and Demand Draft against the License fees, Damage charges etc. of the Govt. quarters, Community Centers, Park Booking etc. Download
179 15-07-2019 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.244.35 Crore for expansion/remodelling of Satyawadi Raja Harish Chandra Hospital into a 773 beded hospital. Download
180 15-07-2019 Strengthening of administration - Periodical reviex under FR 56(j) and Rule 48 of CCS (Pension) Rules, 1972 in respect of Group A Officers. Download
181 15-07-2019 Review exercise undertaken under FR 56(j)/similar provisions-Furnishing of information regarding. Download
182 15-07-2019 Possibility of using available reinforcement bars in I.P. University Project from the site of World Class Skill Centre at Jonapur, South Delhi. Download
183 12-07-2019 Sanction WORKs. Download
184 12-07-2019 The transfer and posting order of surplus staff due to revision of sanction strength (2019-20) yet to be issued by the concerned zone of PWD. Download
185 11-07-2019 Senior Draftman(Civil)-Posting Download
186 10-07-2019 Government Servant to refrain from sharing any information/statement/opinion to the Press/ Social Media. Download
187 10-07-2019 Forwarding of various letters/orders/circulars etc. Download
188 09-07-2019 Meeting Notice - Comprehensive maintenance Ring Road and Outer Ring Road. Download
189 08-07-2019 Information regarding Outsourced-Clerical and Outsourced work-charged-staff employed in various offices in PWD. Download
190 08-07-2019 Circular Regarding Cheques and Demand Draft against the License fees, Damage charges etc. of the Govt. quarters Download
191 05-07-2019 Sanction for Redevelopment of Bipin Chandra Pal Marg, at C.R. Park, New Delhi Download
192 05-07-2019 Sanction for Constructio of RCC Central Verge/ Crash Barrier at Road No.64 (SDN Hospital to DLF More) Tahirpur, Delhi. Download
193 05-07-2019 Minutes of Meeting - A meeting was held under the chairmanship of Engineer-in-Chief Download
194 05-07-2019 Execution of all works of PWD costing more than Rs. 100 Crores on DPC Mode. Download
195 05-07-2019 Transfer / Posting of Junior Engineer (Civil) Download
196 04-07-2019 Celebration of 165th CPWD DAY on July 12, 2019 - Housing Barakhana. Download
197 01-07-2019 Meeting Notice - Performance based tender for comprehensive maintenance. Download
198 01-07-2019 Meeting Notice - Annual Action Plan for the FY 2019-20. Download
199 01-07-2019 Meeting Notice - Outsourced Staff Download
200 01-07-2019 Appointment of Nodal Officer regarding "Fatal Road Accidents Investigation Team". Download
201 01-07-2019 Status of updation of PWD website. Download
202 28-06-2019 Strengthening and other misc. Work on Road No. 64 (from DLF more to SDN Hospital) Delhi. Download
203 28-06-2019 Transfer/Posting of the following E.E. (Civil/Elect.) Download
204 28-06-2019 Forwarding of Various letters/orders etc. Download
205 28-06-2019 Corrigendum regarding circulation letter of Minutes of the 36th Board Meeting of the DBOCWW Board. Download
206 28-06-2019 Using Unmanned Aircraft System (UAS) Download
207 28-06-2019 Indian Medical Association (IMA) is a pan-India voluntary organization of doctors practicing modern system of medicine. Download
208 27-06-2019 Transfer / Posting of Superintending Engineer (Civil) Download
209 27-06-2019 Demand based Training Programmes for state DES Officers / Officials. Download
210 27-06-2019 Strengthening of Road No. 68 (from Road No. 66 T-Point to Junction of Road No. 69). Download
211 26-06-2019 Appointment of Nodal Officer regarding submission of infrastructure projects i.e. Bridges, Flyover, Underpass etc. to DUAC on behalf of PWD, GNCTD. Download
212 25-06-2019 Submission of Progress Report to Directorate of Education Download
213 24-06-2019 Farewell Invitation Download
214 21-06-2019 Organizing of Government Achievements & Schemes Expo - 2019 at Pragati Maidan, New Delhi from 1st to 3rd August, 2019. Download
215 20-06-2019 Allotment List of Type-IV for the month of June 2019 Download
216 20-06-2019 Allotment List of Type-III for the month of June 2019 Download
217 20-06-2019 Allotment List of Type-I for the month of June 2019 Download
218 20-06-2019 Allotment List of Type-II for the month of June 2019 Download
219 19-06-2019 Forwarding of various PUCs received from different Deptts. / Agencies. Download
220 19-06-2019 NOTICE INVITING APPLICATIONS FOR EMPANELMENT OF ARBITRATORS IN PWD, GNCT Delhi Download
221 19-06-2019 Sanction strength for the financial year 2019-20. Download
222 17-06-2019 Notice for presentations to be made by committee for "Performance Based Tender". Download
223 17-06-2019 Valid Registration of 'Principal Employer' under The Contract Labour (Regulation & Abolition) Act 1970. Download
224 14-06-2019 Posting order of Sh. Sanjay Kumar Bansal, Junior Engineer (Civil) Download
225 14-06-2019 Transfer & Posting of Assistant Engineers (Elect.) on Promotion. Download
226 14-06-2019 Transfer & Posting of Assistant Engineers (Elect.) on Ad-hoc promotion. Download
227 14-06-2019 Transfer & posting order of Assistant Engineer (Civil) Download
228 12-06-2019 Prog. No. A-255: Workshop on "RTI Act. - Focused Analysis of the Law of Information & Challenge before PIO while Implementation the Act. & Landmark Decision of CIC & Prevention of Sexual Harassment of Women at Workplace" From 11th to 13th July 2019, at New Delhi. Download
229 11-06-2019 Rotational Transfer/Readiness List of Asst. Acct. Officer in PWD Download
230 10-06-2019 Valid Registration of Principal Employer under the Contract Labour (Regulation & Abolition ) Act 1970. Download
231 07-06-2019 Temporarily posting of SUPERINTENDING ENGINEERS (CIVIL) Download
232 06-06-2019 Forwarding of various letters/orders etc. Download
233 06-06-2019 List of Advocates for the District Courts of Delhi Download
234 04-06-2019 Distribution of works under Chief Engineer other works. Download
235 04-06-2019 Improvement of riding surface of flyovers namely Nand Nagri Flyover, Loni Flyover, Gokalpuri and Khajuri Gol Chakkar Flyover on Wazirabad Road (Road No. 63 & 59). Download
236 04-06-2019 Sanction Strength for the financial year 2019-20. Download
237 03-06-2019 Additional charge of Principal chief Engineer Download
238 03-06-2019 Additional charge of DD Download
239 03-06-2019 Scheme for Promotion of Adventure Sports & Similar Activities amongst Central Government Employees - Programmes to be organized by Youth Hostel Association of India. Download
240 03-06-2019 Additional charge of Principal chief Engineer - Date change Download
241 31-05-2019 Transfer and Posting in the grade of Chief Engineer Download
242 31-05-2019 Readyness list of A.E. Civil & Electrical Download
243 31-05-2019 Reconstitution of Transfer/Posting of Junior Engineer (Civil & Elect.) and S.O.(Hort.) and Hard Case Committee for redressal of grievances of transfer/posting of junior Engineers (Civil & Elect.) and S.O. (Hort.). Download
244 31-05-2019 Details Required of PIO's and FAAs under various officers in PWD. Download
245 31-05-2019 NOTICE INVITING APPLICATIONS FOR EMPANELMENT OF ARBITRATORS IN PWD, GNCT Delhi Download
246 30-05-2019 One Day Training Program on 'Architectural Hardware in Buildings' on 11th June, 2019 at IBC HQ, Sector VI, R.K. Puram, New Delhi - 110022 - Postponed to 14th June, 2019. Download
247 29-05-2019 Contributiom/Donation for CPWD officer's wives Association for families of CPWD who are in distress. Download
248 29-05-2019 Next Online Bidding for Type-I,II III & IV in June, 2019 Download
249 28-05-2019 C/o Residential Complex for Judicial Officers Quarters at Sector-19, Dwarka, New Delhi. Download
250 27-05-2019 Mode of Execution of Maintenance Works Download
251 24-05-2019 Executive Development Program --- Call for Nominations Download
252 24-05-2019 Notice for presentation on "Performance based Tender" Download
253 23-05-2019 Forwarding of various PUCs received from different Deptts. / Agencies. Download
254 22-05-2019 C/o Residential Complex for Judicial Officers Quarters at Sector-19, Dwarka, New Delhi. Download
255 20-05-2019 Availability of "Surplus Excavated Earth" at site of South Asian University, Maidan Garhi, Chattarpur, New Delhi. Download
256 20-05-2019 Disposition list of LDCs and UDCs in Northern Region Download
257 17-05-2019 Information Brochure 2019-20 of WRDM, IITR for PG Admission Download
258 16-05-2019 Forwarding of various PUCs received from different Deptts. / Agencies. Download
259 16-05-2019 Complaint against procurement of desktop computers, printers and other accessories. Download
260 13-05-2019 Removal of M/s BCC Developers & Promoters Pvt. Ltd., Class-I contractor (Composite) from the approved list of Class-I Contractor (Composite). Download
261 13-05-2019 Notice for presentations on "Redistributed Sanctioned Strength" in various PWD Unit. Download
262 08-05-2019 Online submission of proposals of departments seeking exemption of ECI under MCC Download
263 08-05-2019 Forwarding of letter Download
264 08-05-2019 Forwarding of various letters Download
265 08-05-2019 Regarding violation of MCC and other election related issues Download
266 06-05-2019 Forwarding of various PUCs received from different Deptts. / Agencies. Download
267 06-05-2019 Highlighting the achievements & schemes of Delhi Government through 'Government Achievements and Schemes Expo - 2019'. Download
268 06-05-2019 Notice for presentations to be made by Committee for "Performance Based Tender" Download
269 06-05-2019 Presentation for 77 Corridors & 100 Intersections. Download
270 03-05-2019 CORRIGENDUM - WORK DISTRIBUTION Download
271 02-05-2019 One Day Training Program on Architectural Hardware in Buildings on 11th June,2019 at IBC HQ, Sector VI,R.K.Puram, New Delhi-110022 Download
272 02-05-2019 The Ministry of Water Resources, River Development and Ganga Rejuvenation, Government of India will Organize 6th India Water Week - 2019 (IWW-2019) during September 24th-28th, 2019 at Vigyan Bhawan, New Delhi. Download
273 30-04-2019 Modified Corrigendum Download
274 29-04-2019 Grievances of workers Meeting Regarding. Download
275 29-04-2019 Regarding Creation of posts of Technical Officers and enhacement in the post of Assistants. Download
276 26-04-2019 Grievances of Workers Download
277 25-04-2019 Modified setup of salary DDOs Download
278 22-04-2019 Revised schedule of presentations to be made by various officers (PWD). Download
279 22-04-2019 Mid Term Session and Seminar on "Construction Management Tools, Modern Technologies and Materials in Built Environment" on June 21-22,2019 at Pune. Download
280 18-04-2019 3 Days PWD Web Training on Joining PWD from CPWD for Assistant Engineer (Civil) and Assistant Engineer (Elect.) Download
281 18-04-2019 Regarding Approved Post Download
282 16-04-2019 Advisory for departments sending proposals for consideration of the Screening Committee constituted for examining cases requiring clearance from ECI. Download
283 16-04-2019 Transfer/Posting of shri Rajeev Saxena EE(Elect.), west Electrical Division, PWD (on Ad-hoc promotion) Download
284 15-04-2019 On promotion of Sh. Anil Kumar Ahuja is hereby posted in PWD Download
285 12-04-2019 Deployment of PWD officials for single Window System in office of the RO's-General Election to the Lok Sabha, 2019. Download
286 12-04-2019 Deployment of PWD officials for single window system in office of the RO's- General Election to the Lok Sabha, 2019. Download
287 12-04-2019 Deployment of PWD officials for single window system in office of the RO's- General Election to the Lok Sabha, 2019. Download
288 12-04-2019 The staff deployed on Election Duty for the General Election to Lok Sabha-2019 Download
289 12-04-2019 Modified setup of salary DDOs Download
290 12-04-2019 Divisions of housing along with remaining works, records and staff are merged with Education Project Divisions Download
291 11-04-2019 Regarding implementation of code of conduct Download
292 11-04-2019 Violation of the Model code of Conduct Download
293 09-04-2019 Forwarding of various PUCs received from different Deptts./ Agencies Download
294 09-04-2019 Issue of administrative approval & expenditure sanction Download
295 08-04-2019 Non-compliance of Model Code of Conduct Download
296 08-04-2019 For providing departmental contents, articles and photographs for Magazine "DILLI" in Hindi Language Download
297 05-04-2019 Redistribution of sanctioned strength among different units of PWD Delhi. Download
298 04-04-2019 Reallocation of office spaces at MSO Bldg.under occupation of PWD. Download
299 03-04-2019 All for CEs and CEs PWD make it convenient to attend the above presentations. This is as per instructions of E-in-C. Download
300 03-04-2019 Presentations to be made by Committees formed for efficient functioning of affairs of PWD, Delhi. Download
301 03-04-2019 Corridor improvement of Outer Ring Road from IIT to NH-8 & its influence areas: Construction of (1) Flyover on portal Structure linking Existing Munirka Flyover in the East to the point beyond Army RR Hospital in the West on the Outer Ring Road and (2) Underpass at junction of BJ Marg and inner Ring Road. Download
302 02-04-2019 Notice for presentations to be made by Committees formed for efficient functioning of affairs of PWD, Delhi. Download
303 01-04-2019 Transfer/Posting of Asstt. Administrative officer- Mr Sanjeev Mathur Download
304 01-04-2019 Notice for presentations to be made by Superintending Engineers. Download
305 01-04-2019 Notice for presentations to be made by Chief Engineers. Download
306 29-03-2019 Meeting of all stake holders to implement ECI guidelines/regarding "defacement of public/govt.property". Download
307 29-03-2019 Temporary Posting order of Additional Director General (ADG) Download
308 29-03-2019 Violation of the Model Code of Conduct Download
309 28-03-2019 General Election to Lok Sabha,2019 and General Election to the legislative Assemblies of Andhra pradesh, Arunachal Pradesh, Odisha & Sikkim and Bye-election to fill the clear vacancies in Assembly Constituencies of various States-Grant of Paid Holiday Download
310 28-03-2019 Non-Compliance of model code of conduct Download
311 27-03-2019 Additional charge arrangement Download
312 26-03-2019 Instruction regarding forwarding of proposals directly to CEO-Delhi office by various departments/agencies/PSUs for approval/clearance/NOCs etc. viz. NIT, Tenders, award of works etc Download
313 26-03-2019 Senior Draftsman(Civil) is posted in the office. Download
314 25-03-2019 List of Development/ construction works - regarding General Elections to Lok Sabha, 2019. Download
315 25-03-2019 Sh. P.S. Chauhan, Assistant Engineer (Civil), the Engineer-in-Chief, PWD has allowed him to continue on his temporary posting order issued vide No. NO.-27(2)/PWD/E-in-C/Director/2019-953 (H) dated 22.02.2019 Download
316 25-03-2019 Sh. Nourti Ram Tardaka, Assistant Engineer (Civil), the Engineer-in-Chief, PWD has allowed him to continue on his temporary posting order issued vide No. NO.-27(2)/PWD/E-in-C/Director/2019-953 (H) dated 22.02.2019 Download
317 22-03-2019 No state guest facility to ministers/non- officials visiting gujrat due to model code of conduct. Download
318 22-03-2019 The staff posted in the office of the Returning Officer 07-SDPC District Magistrate (South) on diverted capacity or requistioned under Section 159 of Representation of the People Act. Download
319 20-03-2019 3 Days PWD Web Training on joining PWD form CPWD for Assistant Engineer(Civil) and Assistant Engineer (Elect.). Download
320 19-03-2019 General Election to the House of the People (Lok Sabha) 2019 Download
321 19-03-2019 Sanctioned of Post Download
322 18-03-2019 Installation and supply of equipment for open gym Download
323 18-03-2019 Transfer and Posting order of AE(Civil) Download
324 15-03-2019 General Election to Lok Sabha-2019-Implementatiom of Model Code of Conduct Download
325 15-03-2019 General Elections to Lok Sabha, 2019 Download
326 15-03-2019 Regarding outsourcing of security services/Engagement of Civil Defence Volunteers. Download
327 15-03-2019 List of Development/construction works-regarding General Elections to Lok Sabha, 2019. Download
328 14-03-2019 Street Scaping of Ring Road from AIIMS to Ashram-5.30 Kms. Download
329 13-03-2019 Enforcement of Model Code of Conduct - NOC for publication of public notices/tender notices/display advertisement and jingles/TVCs for airing/broadcast of government advertising thereof. Download
330 13-03-2019 Immediate action to be taken for enforcement of Model Code of Conduct after announcement of General Election to House of the People(Lok Sabha) 2019. Download
331 13-03-2019 Cancellation of transfer order in respect of sh. Vijay Singh AEE(Civil) Download
332 13-03-2019 Temporary order in respect of Sh. Rajeev Saxena EE (Elect.) Download
333 12-03-2019 Immediate action to be taken enforcement of Model Code of Conduct after announcement of General Elections to House of the People (Lok Sabha), 2019 and State Legislative Assemblies in the States of Andhra Pradesh, Arunachal Pradesh, Odisha and Shikkim and certain bye-elections-regarding. Download
334 12-03-2019 General Election to Lok Sabha 2019 - Press Note, ECI's Instructions and regarding Screening Committee for MCC Download
335 12-03-2019 General Election to Lok Sabha 2019 - Press Note and ECI's Instructions Download
336 08-03-2019 Transfer / Posting order of Assistant Engineer (Civil) Download
337 08-03-2019 Transfer / Posting order of Assistant Engineer (Civil) Download
338 05-03-2019 Transfer / Posting order of Assistant Director (Hort.) Download
339 05-03-2019 Transfer / Posting order of Assistant Engineer (Elect.) Download
340 05-03-2019 Transfer / Posting order of Executive Engineer (Civil) Download
341 05-03-2019 Transfer / Posting order of Superintending Engineer (Elect.) Download
342 01-03-2019 Additional Charge of Dy. Director (Vig.) to Sh. K.A. Mohamad Mohideen EE (P). Download
343 28-02-2019 Transfer/Posting Order of Assistant Engineers (Civil). Download
344 28-02-2019 Modification in General Conditions of Contract (GCC) -2014. Download
345 28-02-2019 Regarding request for nominations - MCRHRDIT Capacity Building programmes. Download
346 28-02-2019 Corrigendum regarding circulation letter of Minutes of the 36th Board Meeting of the DBOCWW Board Download
347 27-02-2019 Mode of Execution of Maintenance Works. Download
348 27-02-2019 Transfer/Posting order of Sh. H.D. Kanswal , Accounts Officer. Download
349 26-02-2019 Transfer/ Posting order of Smt. Harvinder Kaur, Office Superintendent. Download
350 22-02-2019 Diversion Of one Subdivision from the O/o EE, Education, East & North East to O/o EE, Education, South & South East. Download
351 22-02-2019 Transfer / Posting Order of Assistant Engineers (Civil) Download
352 22-02-2019 Transfer / Posting Order of Assistant Engineers (Elect.) Download
353 20-02-2019 Declaration of Head of Office in the O/o Engineer-in-Chief , PWD and O/o the Pr.Chief Engineer (Project), PWD. Download
354 20-02-2019 Temporary Posting order of Executive Engineers (Civil). Download
355 20-02-2019 Meeting of Medical Committee convened on 25-02-2019 Download
356 20-02-2019 Re-designation and redistribution of jurisdiction of Project Units in PWD. Download
357 18-02-2019 Temporarily Posting of Sh. Manoj Kumar Sonkar , SE(Elect.) Download
358 18-02-2019 List of J.Es( Elect.) Working in P.W.D. Delhi As on 31-01-2019. Download
359 18-02-2019 Incentive scheme for original Hindi notation / drafting in government functioning. Download
360 15-02-2019 Regarding outsourcing of security services. Download
361 15-02-2019 Special (no-Free) invitation:8th annual conference on Bridges,Flyovers and Elevated MRTS Structures. Download
362 15-02-2019 Temporarily Posing Order of Assistant Director (Hort.) Download
363 15-02-2019 1st National Conference on Traffic Technologies at CAPT Bhopal (BPR&D) on 21st & 22nd February,2019. Download
364 14-02-2019 Compilation of information relating to SCs/STs/OBCs employees sought by Govt. of India. Download
365 14-02-2019 Regarding Supply, installation,testing and commissioning of CCTV surveillance system including Comprehensive Maintenance at Tihar , Rohini and Mandoli Prison Complex for the year 2018-19 to 2023-24. Download
366 13-02-2019 Resurfacing of (1) Road along A- block Jhilmil,and (2) ESI Hospital Road (3) Shiva Khand Road (4) Road along B- block Jhilmil (5) Sant Lal Gupta Marg (6) Road from Booster pumping Station (7) Link Road,under Sub-Division M-2112. Download
367 13-02-2019 Temporary order in respect of Executive Engineer(Elect.) Download
368 13-02-2019 Surplus/Availability of RCC twin Duct. Download
369 13-02-2019 Additional charge of CE(Health). Download
370 13-02-2019 Transfer/ Posting Order of JE(Civil). Download
371 13-02-2019 Formation of Committees for efficient functioning of affairs of PWD,Delhi. Download
372 12-02-2019 Forwarding of various Letters. Download
373 11-02-2019 Transfer/Posting Order of Assistant Engineer (Civil). Download
374 06-02-2019 Exercise of Powers by Project Managers in the grade of Superintending Engineer. Download
375 06-02-2019 Transfer/Posting Order of Sh. Parveen Chander Tandon,Office Superintendent Download
376 06-02-2019 Transfer/Posting Order of Executive Engineer (Elect.) Download
377 06-02-2019 Additional charge of Dy. Director (N.I) Download
378 04-02-2019 Transfer/Posting order of Senior Draftsman (Civil). Download
379 01-02-2019 Transfer / Posting Order of JE (Civil) Download
380 01-02-2019 Re-distribution of Charge Download
381 31-01-2019 23rd Edition of International Engineering and technology Fair (IETF) 2019, 3-5 February 2019 at Pragati Maidan,NEW Delhi. Download
382 31-01-2019 Transfer / Posting Order of Assistant Engineer (Civil). Download
383 29-01-2019 Renovation of Room No. 23 & Room No. 16 in Forensic Science Laboratory Building, Rohini, Delhi Download
384 29-01-2019 Executive Training Programme for Building Professional on "External Cladding Systems" to be held on 26th & 27th February 2019 at IBC HQ, Sector-VI, R.K. Puram, New Delhi, being organized by Indian Building Congress (IBC). Download
385 28-01-2019 Construction of Foot Over Bridge with staircase and lift for pedestrian crossing near Mohan Singh Market at Tamil Sangam Marg (Road ID No. 141) New Delhi . Download
386 28-01-2019 Construction of Foot Over Bridge with staircase and lift for pedestrian at Baba Gang Nath Mandir on Nelson Mandela Marg , New Delhi . Download
387 28-01-2019 Forwarding of Circulars regarding various Workshops. Download
388 28-01-2019 Transfer posting order of EE . Download
389 25-01-2019 Transfer / Posting Order of Chief Engineers (Civil) Download
390 25-01-2019 Transfer / Posting Order of Assistant Executive Engineer (Civil) Download
391 24-01-2019 Sh. Sushil Kumar Bali, Assistant Engineer (Civil) was posted in Office of Spl. Commissioner (Road Safety), GNCTD Transport Department and Sh. Sunil Kumar, Assistant Engineer (Civil) is temporarily posted in the Office of Engineer-in-Chief, PWD as Assistant Engineer (Plg.) Download
392 24-01-2019 Transfer / Posting Order of Sh. Ashok Kumar, Office Superintendent Download
393 22-01-2019 Forwarding of Various Circulars. Download
394 22-01-2019 Forwarding of various Advisory/Circular/Letters. Download
395 21-01-2019 Strengthening of Wazirabad Flyover and Slip Road under Sub-Division-1 of PWD C&ND Roads, New Delhi. Download
396 21-01-2019 Construction of 66 feet Libaspur Gurudwara Road including providing street light fittings. Download
397 18-01-2019 Transfer/ Posting order of AEE(Civil). Download
398 17-01-2019 National Workshop on Central Public Procurement Portal (CPPP), New Delhi on 21st January, 2019. Download
399 17-01-2019 Implementation of e-office effectively in your office and to send the status of e-office implementation directly to Deptt. of Information Technology under intimation to this office. Download
400 17-01-2019 Additional charge of Sh. Ashok Kumar Meena EE(Elect.) Download
401 17-01-2019 Additional Charge of EE(Elect.) Download
402 16-01-2019 Transfer / Posting Order of Superintending Engineer (Civil) & (E&M). Download
403 16-01-2019 Transfer / Posting Order of Assistant Engineers (Civil). Download
404 16-01-2019 Transfer / Posting Order of Executive Engineer (Civil). Download
405 16-01-2019 Readiness list of JE (Civil) in PWD and rotational transfer from Road unit to Building unit & Vice Versa Download
406 14-01-2019 Transfer & Posting of Shri Shyam Singh, AD(H). Download
407 14-01-2019 Forwarding of Various letters. Download
408 11-01-2019 Additional charge of F.O. Download
409 10-01-2019 Transfer / Posting order of EE (Civil) Download
410 09-01-2019 Temporary Posting of Chief Engineer. Download
411 09-01-2019 Temporary Posing Of Superintending Engineer(Civil) & E(&M). Download
412 09-01-2019 Additional Charge of Flyover Elect. Division F13. Download
413 09-01-2019 Temporary Posing of Sh. Amrik Singh,Office Superintendent. Download
414 09-01-2019 Re-designation and redistribution of jurisdiction of Project Units in PWD. Download
415 08-01-2019 Taking on Payroll Download
416 08-01-2019 Additional charge of EE(Elect.) Download
417 08-01-2019 Allotment List of Type-I for the Month of December 2018 Download
418 08-01-2019 Allotment List of Type-II for the Month of December 2018 Download
419 07-01-2019 Allotment List of Type-III for the month of December 2018 Download
420 07-01-2019 Forwarding of Various Letters/Orders/MoM. Download
421 07-01-2019 Transfer / Posting Order of Assistant Engineers (Civil) Download
422 07-01-2019 Transfer / Posting Order of Executive Engineer (Civil) Download
423 04-01-2019 Disposal facility of silt at Village Singhola (Khampur/Tikri) near DJB sewage treatment plant for temporary disposal of silt. Download
424 04-01-2019 Transfer/Posting Order of Office Superintendent. Download
425 03-01-2019 Posting Of Sh. S.S.Dagar in Place of Sh. Manoj Kumar. Download
426 03-01-2019 Presentation of Products. Download
427 03-01-2019 Allotment List of Type-IV for the month of December 2018 Download
428 03-01-2019 Allotment List of Type-IV for the month of December 2018 Download
429 02-01-2019 Construction of Foot over Bridge with staircase and lift for pedestrian at Moti Lal Nehru Camp, Outer Ring Road (Road ID-776), New Delhi. Download
430 31-12-2018 Additional charge of charge of E-in-C. Download
431 31-12-2018 Construction of Foot over Bridge with staircase and lift for pedestrian at Rao Tula Ram Marg near Petrol Pump New Delhi. Download
432 31-12-2018 Renovation/ up-gradation of One room for Teacher Training in 58 schools of DoE(Non-Pilot Schools), the list of 58 schools enclosed herewith. Download
433 28-12-2018 Minutes of Meeting Download
434 28-12-2018 Petition of SHRI RAJIV PATHAK FLAT NO-169 NEW PRIYADARSHINI CGHS PLOT NO-19 SECTOR-05 DWARKA NEW DELHI DELHI-110075 Download
435 28-12-2018 Workshop on 1. "Public Procurement,E-Procurement,Govt. e-Marketplace(Gem)&PFMS" From 17th to 19th Jan 2019. 2. "Accounts&Administration" From 7th to 9th Feb.2019. Download
436 27-12-2018 Forwarding of Various letters/orders/Circulars/endorsements etc. Download
437 26-12-2018 Transfer / Posting Order of Assistant Director (Horticulture) Download
438 21-12-2018 Transfer / Posting Order of Assistant Accounting Officer Download
439 21-12-2018 Transfer / Posting of AE(Civil). Download
440 21-12-2018 Transfer / Posting of Sh. Shiv Kumar Mishra EE(Elect.) Download
441 21-12-2018 Transfer / Posting of Executive Engineer(Civil). Download
442 21-12-2018 Street Scaping of Ring Ring Road from Mayapuri to Moti Bagh Junction,Delhi. Download
443 21-12-2018 Street Scaping and Beautification of road,Road no.41& 41-A from Wazirpur Depot Crossing (NSP) to Rithala Metro Station. Download
444 21-12-2018 Improvement of Sewadham Road from road No.-63 to UP Border Delhi. Download
445 21-12-2018 Street Scaping of Shivdaspuri Marg and Patel Road (from Moti Nagar T-Point to Pusa Road about), Delhi. Download
446 21-12-2018 Street Scaping and beatification of Vikas Marg No. 75A & 75B Laxmi Nagar Chungi Karkari More during 2018-19. SH: Black top road and footpath, development drainage, signage, rain water harvesting,land scaping, civil structures and other Misc. personal work. Download
447 21-12-2018 Street Scaping and beatification of Narwana Road Mother Dairy to Punch Mahal Niwas-2.30.Kms. Download
448 20-12-2018 Transfer Posting of JE(Civil). Download
449 20-12-2018 Jaipur Productivity Center, Jaipur is pleased to announce its 113th Residential Programme on "Emotional Intelligence for Managerial & Personal Effectiveness " from February 11-15,2019 at Hotel La Paz Gardens,Vasco-da Gama. Download
450 20-12-2018 Transfer / Posting of Executive Engineer (Civil). Download
451 19-12-2018 Additional Charge of Sh. Mathura Prasad, Chief Engineer(Civil). Download
452 19-12-2018 Minutes of Meeting. Download
453 19-12-2018 Office Order of Sh. Arun Kumar,Office Superintendent. Download
454 18-12-2018 Transfer / Posting order of Dy. Director (Hort.) Download
455 18-12-2018 Transfer / Posting order of EE (Civil) Download
456 17-12-2018 Street Scaping and beautification of Road No. 43 from Britannia Chowk to Outer to Ring Roads,West Enclave,Pritampura,Delhi(except RD 2100 to 2600 Sample stretch) Download
457 13-12-2018 Strengthening of Road including Repair of Footpath of Satguru Ram Singh (Road no. 36) Marg from Mayapuri Chowk to SD Public School under PWD Division West Road-2 Sub Division WR-21 During 2018-19 Download
458 13-12-2018 Preliminary Estimate for Construction of Underpass along Mathura Road at Ashram Chowk for of A/A & E/S. Download
459 13-12-2018 Preliminary Estimate for Construction of Bridge on Najafgarh Drain at Basaidarapur alongwith road improvement on either side of bridge drainage scheme,footpath etc for accord of A/A &E/S. Download
460 12-12-2018 Nomination of Delegates for 23rd Annual Convention & National Seminar" Rapid Building Construction-Emerging Technologies" to be held on 28-30 December,2018 in Patna. Download
461 12-12-2018 Office Order of Director(Hort.). Download
462 12-12-2018 Additional charge of (Health) Mathura Prashad . Download
463 12-12-2018 Office Order of AD (Hort.) Download
464 12-12-2018 Office Order of Sh. Nand Lal, Executive Engineer(EE) Civil. Download
465 12-12-2018 Office order of (FN) Janardan Sharma(EE) . Download
466 12-12-2018 Office order of AD(Hort.) Download
467 12-12-2018 Office Order of EE(Elect.) Download
468 12-12-2018 Office Order of Sh. Raj Kumar Assistant Director(Hort.) Download
469 11-12-2018 Preparation of files of T.B.R.(Standing Order). Download
470 10-12-2018 Additional charge of PM F-5 to CPM F-1 on EL,leave . Download
471 07-12-2018 Periodical Review under FR 56(J) and Rule of CCS Pension Rule 1972. Download
472 06-12-2018 AEs(C/E) & JEs (C/E) of CPWD presently posted in PWD. Download
473 06-12-2018 Request for Nomination in Two day workshop on "Contract Management, Arbitration & Dispute Resolution" on 10th & 11th January 2019 at Hotel Le Meridian,New Delhi-110001 Download
474 04-12-2018 "REPAIR AND REHABILITATION OF CONCRETE STRUCTURES INCLUDING WATERPROOFING MATERIALS AND TECHNIQUES" 23-25 JANUARY 2019 AT NCB- HYDERABAD. Download
475 04-12-2018 Invitation to praticipate and nominate delegates for GeoSmart India 2019, 11-13 February,Hotel Pullman,New Delhi. Download
476 04-12-2018 December 19-20: Secretary,Ministry of Housing and Urban Affairs to speak at 3rd Conference on Affordable Housing in India. Download
477 03-12-2018 Adjustment of LTC Bills. Download
478 30-11-2018 Training Programme on "Durability & Service Life Design of Concrete Structures" to be held at NCB-Ballabgarh from 11-12 December 2018. Download
479 30-11-2018 One day Conclave on "Use of Technical textfile,Fly & C&D waste in Civil construction. Download
480 30-11-2018 Two days tecnical training workshop on "Construction Quality Control & Site Inspection" 9th & 10th January,2019 - Mumbai , 11th&12th January,2019 - New Delhi. Download
481 29-11-2018 Workshop on "Inspection,Investigation and Repair/Rehabilitation of Bridgs and Flyovers" to be held at Chennai on 8th and 9th December 2018 Request for nominate Delegates. Download
482 29-11-2018 Next Online Bidding for Type-I,II III & IV in December, 2018 Download
483 28-11-2018 Additional Charge of CPM Health. Download
484 28-11-2018 Transfer / Posting order of Cheif Engineer (North) Download
485 28-11-2018 Nomination of Delegates for 23rd Annual Convention & National Seminar Rapid Building construction & Emerging Technologyies to be held on 28-30 December, 2018 in Patna. Download
486 27-11-2018 Construction of Foot over Bridge at Metcalf House Main Gate of Ring Road under Sub-Division-3 of Division CND-Road,New Delhi Download
487 22-11-2018 Forwarding of various letters/orders/Circulars/endorsements. Download
488 22-11-2018 implementation of the recommendations of the Seventh Pay Commission regarding(i) Introduction of Dress Allownace in place of Uniform/Stitching/Washing Charge,etc. and(II) Revision in rates of Cycle(Maintenenace)Allownace. Download
489 20-11-2018 Minutes of Meeting held in the O/o Hon'ble Minister of PWD for proper repair of roads under jurisdiction of PWD by 15.12.18 Download
490 20-11-2018 Maintenance and Upkeep of PWD Roads Download
491 16-11-2018 For compliance of timeline of 10 days for acceptance of goods/service for procurement through GeM portal-reg. Download
492 16-11-2018 Office Order Of Assistant Engineers (Civil). Download
493 16-11-2018 Transfer /Post Order of Office Superintendents in PWD. Download
494 16-11-2018 Residential "Development for Office Secretaries, Personal Assistants & Office Staff,Focus: e- Age" from January 07-11,2019 at Hotel Lapaz Gardens, Vasco-da-Gama(Goa). Download
495 16-11-2018 Workshop on Leadership,Team Behavior and Stress Management from 28th to 30th No. 2018. "RTI Act and Sexual Harassment of Woman at Workplace Act" from 13th to 15th Dec.2018. Download
496 15-11-2018 Implementation of the recommendation of 7th on CPC on over Time Allowance. Download
497 15-11-2018 Information pertaining to Insurance of Govt. vehicles/Staff Car in pursuance of meeting held on 07.03.2018 and 19.06.2018 Download
498 14-11-2018 Transfer Posting Order of Assistant Director (Horticulture). Download
499 14-11-2018 Additional Charge Of Chief Engineer. Download
500 12-11-2018 Providing and fixing of split type Air Conditioner in newly constructed Port Cabin in Biology and Chemistry Division at Forensic Science Laboratory Building,Rohini,Delhi. Download
501 12-11-2018 Providing porta-cabin on the roof of 1st floor near room no.201 at Forensic Science Laboratory Building,Rohini, Delhi . Download
502 09-11-2018 Implementation of Transfer and Posting orders in the grade of Assistant Engineer(Civil) Download
503 06-11-2018 Transfer / Posting Order of AE (Civil) Download
504 05-11-2018 Transfer Posting Order of AE(Elect.) Download
505 05-11-2018 Transfer Posting Order of AE(Civil) Download
506 02-11-2018 Transfer Posting Order of AE(Civil) Download
507 02-11-2018 NOTICE INVITING TENDER Download
508 01-11-2018 Minutes of Weekly Review Meeting on 29.10.2018 Download
509 01-11-2018 ATR REG Cabinet Decision No.2652(Item-2) dated 18.10.2018-Minimum rates of wages for outsourced workers/Staff deployed in various Departments of Govt. Of NCT of Delhi. Download
510 31-10-2018 Transfer/Posting Order Of EE(Elect.). Download
511 30-10-2018 Forwarding of Various Letters / Orders Download
512 29-10-2018 International Course on Dissemination of HDM-4-Reg.Nomination. Download
513 29-10-2018 Works to be financed from Central Road Fund Administrative approval of one work amounting to Rs.42.21 Cror for "Construction of bridge on Supplementary drain on NH-10 Nangloi,Delhi to cover Complete width of 60 m with road improvement in 100 m length on either of bridge including making of drainage scheme,footpath etc.(after dismantling the existing bridge)during financial Year 2018-19 in the NCT of Delhi Download
514 29-10-2018 Transfer/Posting order of EE(Civil). Download
515 29-10-2018 Tranfer/Posting order Of EE(Civil). Download
516 26-10-2018 Observance of Vigilance Awareness week 2018-Intractive Session on 29th October, 2018 at 11:30 AM in the Conference Room of Engineer-in Chief,PWD,GNCTD. Download
517 26-10-2018 Minutes of Weekly Review Meeting on 22.10.2018 Download
518 26-10-2018 Transfer Posting of AE(Civil). Download
519 26-10-2018 Transfer Posting Of Sh. Madan Lal Azad, EE(Civil). Download
520 23-10-2018 Regarding Payment of Bonus to Outsourced Staff. Download
521 23-10-2018 Providing and fixing of railing on central verge at Mall Road from Kingsway Camp Chowk to Azadpur H Point under Sub Division NR-12 Download
522 23-10-2018 Providing & fixing of jersey Barrier and other Minor Engineering Works at Princess Road from Model Town I Red Light to PCR Gate under Sub Division NR-12 Download
523 23-10-2018 Providiing and Fixing of steel grill in the central verge at Shah Alam Bandh road from rotary to G.T..Road under Sub Division NR-11 Download
524 23-10-2018 International Seminar on "Construction and Rehabilitation of Rigid Pavement - Current Practice and way Forword" to be held at india Habitat Center,New Delhi on 18-19 January,20-19 Download
525 23-10-2018 The information related to the records available in the office as a result of the spread in the Public Works Department. Download
526 22-10-2018 Inviting Tender Download
527 22-10-2018 Forwarding of various Letters/Endorsements/Circulars. Download
528 22-10-2018 Notice of Implementation Units for the Annual Plan of Year 2019-20 Download
529 22-10-2018 Presentation of High Performance Speciality Chemicals. Download
530 18-10-2018 Construction of Foot over Bridge with staircase and lift for pedestrian across Aurobindo Marg (ID-96) Near Mosque/Church,New Delhi. Download
531 18-10-2018 Revoking the Suspension of Business of M/S Sethi Construction in East Zone,PWD. Download
532 18-10-2018 Assistant in Architectural Department are Posted Download
533 18-10-2018 Status of Delhi Govt. Buildings/Hospitals/Dispensary/Police Stations regarding Accessibility requirement for persons with disabilities Download
534 17-10-2018 Transfer/Posting of (JE). Download
535 17-10-2018 Training Programme on "Repair and Rehabillation of Concrete Structurees including Water Proofing Materials and Tecniques" to be held at NCB-Ballabgarh from 14-16 November 2018 Download
536 17-10-2018 Improvement of drainage System on GT Road from Ghanta Ghar to Najafgarh Drain,Delhi under Sub Division-2 C&ND-R. Download
537 17-10-2018 Preliminary estimate for construction of bridge on Supplementary Drain on NH-10,Nangloi,Delhi to cover complete width of 60m with road imrovement in 100meter length on either side of bridge including making of drainage scheme,footpath etc. complete(after dismantling the exisiting bridge. Download
538 16-10-2018 Transfer/Posting Assistant in Architectural Department. Download
539 16-10-2018 Transfer/Posting Of Sinior Draftman(Civil). Download
540 16-10-2018 Minutes Of Weekly Review Meeting on 15-10-2018. Download
541 15-10-2018 Training on New Feature/Facility on PWD Portal. Download
542 15-10-2018 Transfer / Posting order of Assistant Engineer (Civil) Download
543 15-10-2018 No Dig India show 2018 International conference & Exhibition on Advancing Trechless Standarization. Download
544 15-10-2018 Residential programme on Transformation Leadership change Management from December 17-21-2018 at Udaipur. Download
545 15-10-2018 Corrigendum Download
546 15-10-2018 Transfer / Posting order of Senior Draftsman Download
547 12-10-2018 POWERS TO APPOINT PRIVATE ARCHITECTS/CONSULTANTS. Download
548 12-10-2018 Administrative approvel and expenditure Section. Download
549 12-10-2018 MLALAD Scheme. Download
550 12-10-2018 Approved Panel of Arbitrators. Download
551 12-10-2018 CORRIGENDUM TRANSFER & POSTING oF AE(Civil) Download
552 11-10-2018 Minutes of Weekly Review meeting on 08.10.2018 Download
553 11-10-2018 Submission of Monthly Account in text file shape to PAO-22. Download
554 09-10-2018 Regarding Deduction on TDS on GST. Download
555 08-10-2018 Rain Water hervesting structures (RWH) as per DJB/NGT orders at Deen Dayal Upadhyaya Collage,Sector-3 Dwarka,New Delhi-110078 Download
556 08-10-2018 Forwording of Letters/Orders/Circulars. Download
557 08-10-2018 Guidelines for deduction and deposit of TDS by the DDOs under GST Law. Download
558 05-10-2018 Preliminary Estimate for the work: Electrification in Porta Cabin at Dr. Bhim Rao Ambedkar Collage,Wazirabad Road, Delhi-110094. Download
559 05-10-2018 Installation of Rain Water Harvesting system in Acharya Narendra Dev Collage, Govindpuri,Kalkaji, New Delhi-110019 during 2018-19. Download
560 05-10-2018 EOR to Acharya Narendra Dev Collage, Govindpuri,Kalkaji, New Delhi During 2018-19( SH: Annual white wash,painting and other repair works) Download
561 05-10-2018 Minutes of First Review Meeting on 01.10.2018 Download
562 05-10-2018 Readiness List of Office Superintendent completing three or more years in present office on 31.08.2018 Download
563 04-10-2018 List of Participant for Arbitration Training Program on 5th & 6th Oct, 2018. Download
564 04-10-2018 CORRIGENDUM TRANSFER & POSTING AE(Elect.). Download
565 04-10-2018 Request for delegate nomination: Eighth Annual Confrance on Operation,Maintainance and Tolling in the Road Sector, November 13-14 at Le Meridian,New Delhi. Download
566 04-10-2018 Advistory Guidelines for execution/maintanance of Horticulture works in PWD. Download
567 04-10-2018 TRANSFER & POSTING AE(Cvil) Download
568 03-10-2018 Invitation to Asia largest integrated shows on Traffic infratech Expo and parking infratech expoBombay Exhibition centre mumbai at 10:00 AM October 25-27-2018. Download
569 03-10-2018 Panel of Arbitrators. Download
570 03-10-2018 Guidlines for deduction and deposit of TDS by the DDOs under GST Law. Download
571 28-09-2018 Additional Charge of Mr. P.K. Parmar. Download
572 27-09-2018 GPS attendance "PWD Online" Mobile App. Download
573 27-09-2018 Rudiment Consultancy Service - Two Days Workshop on "Construction Quality Control & Site Inspection " October 2018 Download
574 26-09-2018 Frowarding of letters/orders/Circulars. Download
575 26-09-2018 Huge Balance lying Outstanding under Deposit Heads of the Division. Lapsed Deposits not Credited into Government Account. Download
576 26-09-2018 Huge Balances lying Outstanding under Deposit Heads of the Divisions. Download
577 26-09-2018 Lepsed deposits not credited into Government Account. Download
578 26-09-2018 Presentation of uPVC doors and windows. Download
579 25-09-2018 Constitution of a committe to supervise, the construction/renovation work carrid out by PWD & DTTDC from the initial stage to handling over/taking over the building of Govt. School. Download
580 25-09-2018 Consultant Appoinment Committe reconstituted . Download
581 25-09-2018 Hard Case Committe for redressal of grievances in respact of transfer and posting of Engineers of PWD. Download
582 25-09-2018 WORKSHOP ON "RESERVATION IN SERVICE" FROM 11th to 13th OCTOBER,2018 "PUBLIC PROCUREMENT,E-PROCUREMENT,Govt. e-Marketplace(Gem)" FROM 25th to 27th OCTOBER, 2018 Download
583 25-09-2018 TRAINING PROGRAMME ON "DESIGN CONSTRUCTION AND QUALITY CONTROL PRACTICE FOR CONCRETE ROADS FOR HIGHWAY & LOW VOLUME ROADS" TO BE HELD AT NCB-BALLABGARH FROM 23-25 OCTOBER 2018. Download
584 25-09-2018 Two Days Executive Development Programe on "PLANING,DESIGN,INTALLATION OPRATION AND MAINTENANCE MANAGEMENT OF HVAC SYSTEM IN BUILDINGS" ON 28-29,November,at IBC HQ,Sector VI,R.K. Puram, NewDelhi-110022 Download
585 24-09-2018 Post of Cheif Engineer (Elect.) from O/o CPM (Hiegher Education) is diverted to O/o Health Maintanance Zone. Download
586 24-09-2018 Issue of Administrative Approval & Expenditure Sanction Download
587 24-09-2018 Transfer / Posting Order of Assistant Engineer (Elect.) Download
588 24-09-2018 Comprehensive Test on Manual of office procedure(MOD) for 2018 Download
589 24-09-2018 Transfer / Posting Order of Executive Engineer (Civil) Download
590 24-09-2018 List of Permissible Works as per existing Guidlines 2012. Download
591 24-09-2018 Excess expenditure incurred over allotted budget by various Divisions of PWD and I&FC (IAR in r/o Pay & Accounts Officer No. XXII, Govt. of NCT of Delhi, MSO Building, I.P. Estate, New Delhi for the period 2012-13 to 2016-17 Download
592 20-09-2018 ADDITIONAL CHARGE OF CE NORTH A.K PANDIT TO CE SOUTH SH VEER SAIN Download
593 20-09-2018 Transfer/Poisting of the Following EE (Civil). Download
594 20-09-2018 HINDI DIVAS AYOJAN - 24/09/2018 at 4PM. Download
595 20-09-2018 TRANSFER/POSTING OF THE AE(CIVIL). Download
596 19-09-2018 Forwording of letters/orders/Curculars. Download
597 18-09-2018 Training-cum-orientation programme for the cheque Drawing DDos on 20.09.2018. Download
598 18-09-2018 Comprehension Test on Right to Information Act, 2005 for 2018 Download
599 17-09-2018 International Conference on Innovation in Concrete to meet Housing and Infrastructure Challenges"from 19-22 Sept 2018 at Bangalore. Download
600 14-09-2018 Deligation of Administrative powers to Director Horticulture Download
601 14-09-2018 Two days Training Course on practical use of FIDIC Conditions of Contracts on 28th&29th September 2018 at Raunaq Room,PHD Chamber Of Commerce and Industry,New Delhi. Download
602 13-09-2018 Notice Inviting Tender Download
603 13-09-2018 Construction of flyover at Shastri Park Intersection (6 lane) and Seelampur (2 lane). SH: Ramps, Footpath, Road Work including Road Signage, Street Light works, Drainage & allied works. Download
604 13-09-2018 Strengthening of D B Gupta Road between Kalka Das Chowk to Ajmeri Gate under SRD Division II, Sub Division-I, New Delhi during 2018-19. Download
605 13-09-2018 Backfilling Material Download
606 13-09-2018 Strengthening of D B Gupta Road between Kalka Das Chowk to Anand Parbat T-Point under SRD Division II, Sub Division-I, New Delhi during 2018-19. Download
607 12-09-2018 Proposal for emotional wellness campaign(free workshop) Download
608 12-09-2018 Joining of Sh. Raj Singh Gaget Posted as AE(P), O/o CCTV,WiFi, Street Light against. Download
609 12-09-2018 Review of Expenditure as on 31.08.2018. Download
610 12-09-2018 Charge of OSD to Sh. Sanjeev Rastogi. Download
611 12-09-2018 110th Residential Programme on "Finance for Non Financial Officials/Managers" form November 12-16,2018 at Hotal Lapaz Gardens, Vasco-da-Gama(Goa). Download
612 12-09-2018 2-Day Non-Residential Training Programme on "CORROSION IN REINFORCED CONCRETE STRUCTURES AND ITS REMEDIAL MEASURES" 01-02 November 2018 at NCB-Hyderabad. Download
613 11-09-2018 Call For Nomination-11th CIDC VISHWAKARMA AWARDS 2019 Download
614 11-09-2018 Forwording of letters/Endorsement/Orders. Download
615 11-09-2018 Office Memorandum (Systemetic Improvment no.8/2018) Download
616 11-09-2018 Presentation of Asian Paints Limited . Download
617 10-09-2018 Forwording of letters/orders. Download
618 10-09-2018 Supplying,Installation,Testing and Commissioning of CCTV Cameras in Delhi. Download
619 10-09-2018 Construction of Boundary Wall of Vacant Land at Karawal Nagar. Download
620 10-09-2018 Admission to the 13th Batch (2918-19) of one year (Part-time) Post Graduate Diploma course in Disaster Preparedness and Rehabilitation,affiliated to Guru Govind Singh Indraprastha University(GGSIPU),Delhi. Download
621 10-09-2018 Safty Convention 2018 on Safty Challenges of MSME Sector during September 26-28,2018 at New Delhi. Download
622 07-09-2018 S.I.T.C. of self contain drinking water cooler SATYAWADI RAJA HARISHCANDRA HOSPITAL. Download
623 06-09-2018 Regarding use of Government vehicle. Download
624 06-09-2018 Technical Paper on "Use of Recycled Asphalt material for sustainable road construction". Download
625 05-09-2018 To ensure expenditure within allotted budget and to maintain Financial discipline . Download
626 05-09-2018 Audit Paras printed in the Audit Report of the controller and auditors general of India pertaining to the year March, 2006 to March,2016 and during 2016 . Download
627 05-09-2018 Transfer/Posting of Office Superintendent. Download
628 04-09-2018 Fwd: Defect Liability/Maintenance Period for the National Highways and centrally sponsored Road & bridge work to be implemented on EPC mode_Amendment-reg. Download
629 04-09-2018 Residental programme on Knowledge management From October 22-062018 at Jaipur. Download
630 04-09-2018 Vigilance An Eagle Eye to Curb Curruption From 24th September, 2018to28th September 2018 to Goa. Download
631 04-09-2018 Revision of rates of Licence Fee on Up gradation of Type-IV of Residential (General Pool) Accommodation of PWD Govt. og NCT of Delhi. Download
632 04-09-2018 Use of Govt. Vehicle irrespective of number of charges they are holding. Download
633 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort) Download
634 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
635 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
636 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
637 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
638 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
639 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
640 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
641 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
642 30-08-2018 Information pertaining to Insurance of Govt. vehicles/Staff Cars in Pursuance of meeting held on 07.03.2018 and 19.06.2018. Download
643 30-08-2018 Nirman of Upargam Setu on Shastri Park Chaurahe. Download
644 30-08-2018 Monthly Expenditure Report of Capital Works of Hospitals, AAMC & Health Projects. Download
645 30-08-2018 ExpenDiture management and rationalization of expenditure. Download
646 30-08-2018 Transfer & Posting Executive Engineers(Civil). Download
647 30-08-2018 Administrative approvel and Expendature sanction For Rs. 168.58 Crore for remodelling of 94 Delhi Govt. Dispensaries into polyclinic. Download
648 29-08-2018 Revision of rates of Licence Fee on Up gradation of Type-IV of Residential (General Pool) Accommodation of PWD Govt. of NCT of Delhi Download
649 29-08-2018 Administrative approvel and Expendature saction for of Rs.168.58 Crore for remodelling of 94 Delhi Govt Dispensaries into polyclinic. Download
650 29-08-2018 Readiness list of Office Superintendent completing three or more years in present on 31.08.2018. Download
651 28-08-2018 Nomination of Delegates for 79th Annual Session of the Indian Roads Congress to be held at Nagpur (Maharastra)from 23rd to 26th November 2018. Download
652 28-08-2018 Training Programme On "Cement and Concrete Construction practices for Effective Redressal of Custmer Complaints" to be held at NCB-Ballabgarh from 18-20 September 2018. Download
653 28-08-2018 Request for Nomination of sutable officers/officials for MBA (Disaster Management) Weekend programme by CDMS, Guru Gobind Singh Indraprastha University. Download
654 28-08-2018 Training WorkShop SUbsurface Utility Engineering Detection& Mapping of UnderGround Utilities September 18-19,2018 NAC Grounds, Cyberabad,Hyderabad, India. Download
655 28-08-2018 Sanction Order for Rs. 1,7023659/-(Rs. One Crore Seventy Lakh Twenty Three Thousand Six Hundred Fifty Nine Only) for Providing Stacker and Puzzle Car Parking System in Phase-II Building of MAIDS. Download
656 28-08-2018 Sanction Order for Rs. 14,18,500/-(Fourteen Lakh Eighteen Thousand Frive Hundred Only) for Vertical Garden in Phase-II Building of MAIDS under Hort. Sub Div Health-III, Hort. Div. Health, PWD, New Delhi dg.2018-19 Download
657 28-08-2018 Expenditure management and rationalization of Expenditure. Download
658 28-08-2018 Regarding various Hindi competitions 2018-19 Download
659 28-08-2018 Transfer / Posting Order of Executive Engineer (Elect.) Download
660 28-08-2018 Amendment in Delhi Allotment of Government Residences (General Pool) Rules 1977 Download
661 28-08-2018 Delhi Allotment of Government Residences (General Pool) (Amendment) Rules, 2018 Download
662 27-08-2018 Release of 2nd installment of funds of Rs. 186.48 crore, from UDF , for the project of construction of integrated Transit Corridor Development . Download
663 27-08-2018 Transfer/Posting of AD(Hort.)/Div.-VI. Download
664 27-08-2018 Transfer/Posting Of CE Health(M). Download
665 24-08-2018 Invitation of Entries for IBC Award for Excellence in Built Environment -2016-17 Download
666 24-08-2018 Forwarding of letters/orders. Download
667 24-08-2018 Forwarding of various Letters/Circulars/Endorsements etc. Download
668 24-08-2018 E-RTI Online Training Program Dated 28.08.2018 at 2:00 to 5:00 PM Download
669 24-08-2018 Imparting training for sensitising PWD (GNCTD) Staff/Officers regarding Accessibility Requirements for person with disability. Download
670 24-08-2018 Transfer / Posting Order of Assistant Administrative Officers (on promotion) Download
671 23-08-2018 Transfer& Posting Of Assistant Engineers. Download
672 23-08-2018 Readiness list of Assistant Engineer (civil/Elect.)as on 31.08.2018. Download
673 23-08-2018 Schedule for Imparting Traning for sensitising PWD (GNCTD) Staff / Officers regarding accessibility requirements for person with disabilities. Download
674 23-08-2018 Transfer/Posting in r/o Assistant Executive Engineer(Civil). Download
675 21-08-2018 Forwarding of letters / orders. Download
676 21-08-2018 Policy on the shifting of HT (11 KV ,33KV &66KV) / LT400V) Electricity Transmission Lines posting threat to human lives - Modification of Cabinet decision No.1588 dated . 09.11.2009 thereof. Download
677 20-08-2018 Schedule for Imparting Training for Sensitising PWD (GNCTD) Staff/Officers regarding Accessibility Requirments for Persons with Disabilties Download
678 16-08-2018 Hindi usage promotion month 2018 ayojan Download
679 16-08-2018 Transfer/Posting in r/o Assistent Engineer. Download
680 16-08-2018 Holiday on 17th August 2018 Download
681 14-08-2018 The unclaimed malba lying on Public roads is to be removed by the Municipal Corporation Download
682 14-08-2018 Review of outcome Budget (2018-19)-1st Quarter June April to June 2018-use of Mobile App for monitoring of PWD Projects. Download
683 14-08-2018 Huge Balances lying Outstanding under Deposit Heads of the Divisions. Download
684 14-08-2018 Lapsed Deposits Not credited into Government Account. Download
685 14-08-2018 E-RTI Online Training Program Dated 28.08.2018 at 2.00 to 5.00 PM Download
686 14-08-2018 Hugh Balances lying outstanding under Deposit Heads of the Divisions. Download
687 14-08-2018 Transfer / Posting order of Executive Engineers and Assistant Engineers. Download
688 14-08-2018 Outstanding Deposits in r/o divisions upto the month of March 2017.(AGCR Para no.4 and internal Audit Para no.2) Download
689 13-08-2018 Submission of monthly Account in text file shape to PAO-22. Download
690 13-08-2018 Redevlopment of Chandni Chowk Road in between Lal Jain Mandir to Fateh Puri Mosque 'Redevlopment of Chandni Chowk Project' Download
691 13-08-2018 Procedure/SOP for release of Grant-in-Aid under Centrally Sponsored Schemes. Download
692 10-08-2018 International seminar on "Earthquake/wind resilience in Bldg and bridge with vibration control - base isolation and dampers "during 14th & 15th September 2018 Download
693 10-08-2018 Information regarding payment due summary for transaction on GeM. Download
694 10-08-2018 Transfer/Posting of Assistent Engineer. Download
695 09-08-2018 Transfer posting order of Special Secretary. Download
696 09-08-2018 Seeking support on nominations for" CIO-eGLP" from 23rd Aug. to 2nd Sep. 2018. Download
697 09-08-2018 Refresher Course on "Concrete Bridge Design wring code of practice for Concrete Road Bridges (IRC 112)" Starting from 18th August 2018. Download
698 09-08-2018 Implementation of "The Construction and Demolition Waste Management Rule-2016" - regarding Download
699 09-08-2018 Minutes Of Meeting Issues related to Digging & Restoration of Roads. Download
700 08-08-2018 Renovation of Medical Record Department (MRD) in GIPMER . Download
701 08-08-2018 Replancement of old/outlived power factor panel at Sub-Station-1,2 and 3 in GIPMER. Download
702 08-08-2018 UP-gradation of LAN networking system for NKN internet at Registration counter at GIPMER. Download
703 08-08-2018 Transfer / Posting of AE(Elec.) Download
704 08-08-2018 Allotment List of Type-II for the Month of July 2018 Download
705 08-08-2018 Allotment List of Type-I for the Month of July 2018 Download
706 07-08-2018 Allotment List of Type-III for the month of July 2018 Download
707 06-08-2018 Reasonable Rent Certificate for Govt. Building of NCTD. Download
708 06-08-2018 Impanelmentation of "The Construction and Demolition Waste Management Rules 2016" Download
709 06-08-2018 Regarding GPF Statement for the year 2017-18 Download
710 06-08-2018 Transfer / Posting order of Sh. Anil Rastogi Download
711 03-08-2018 Allotment List of Type-IV for the month of July 2018 Download
712 03-08-2018 Allotment List of Type-IV for the month of March 2018 Download
713 03-08-2018 Allotment List of Type-IV for the month of July 2018 Download
714 03-08-2018 Additional Charge of SE (East) Download
715 03-08-2018 Release fo Funds for Execution of works under the MLALAD Scheme i.e. "Strengthening and Augmentation of Infrastructure i.e. Roads, Streets, Localities, Street Lights etc. in each Assembly Constituency" for the year 2018-19 (during 6th Vidhan Sabha) Download
716 03-08-2018 A/A & E/S of Rs. 42,664/- towards surface dressing and cleaning of Property No. 7/55, Church Road, Jwala Nagar, Shahdara, Delhi for opening of Polyclinic. Download
717 03-08-2018 Transfer / Posting Order of Assistant Engineer (Civil) Download
718 01-08-2018 Watch and ward of Govt. Land at Dheerpur Pocket H2 (C) Delhi during 2018-19. Download
719 01-08-2018 Watch and ward of Govt. Land / Plot at Satbari, Bahapur & Sector-19, Dwarka, New Delhi during 2018-19. Download
720 01-08-2018 Guidelines/ Norms for access permission to Fuel Station and Properties along National Highways- amendments. Download
721 31-07-2018 Nomination Sh.P.K.Parmar, CPM(flyover) , PWD for the Technical Committee constitude by Board of Directors, DTTDC. Download
722 30-07-2018 Notice Inviting Tender Download
723 30-07-2018 Regarding condition assessment and recommendations on Repair & Restoration Measures of FSL Building (4 Storey) at Sector-14, Rohini, Delhi. Download
724 26-07-2018 Construction of bridge and its approaches over River Yamuna downstream of existing bridge of Wazirabad Delhi . Download
725 26-07-2018 Review of Expenditure Download
726 26-07-2018 Usages of C&D Recycled Materials for Construction Activities by the PWD in the NCT of Delhi. Download
727 26-07-2018 Workshop on 1. Technical Workshop on "Implementations of 7th CPC & Allied Matters" From 23rd to 25th August, 2018. 2. "Leadership, Team Behaviour and Stress Management" from 6th to 8th September, 2018. Download
728 25-07-2018 Forwarding of various Letters/Circulars/Endoresements etc . Download
729 25-07-2018 Regarding IGI Airport , Terminal-1,Terminal-2 and Terminal-3 , including Aerocity , New Delhi . Download
730 24-07-2018 Transfer/posting of AAO Download
731 24-07-2018 Transfer/Posting of AAO Download
732 24-07-2018 A/A & E/S for the work "Detailed Feasibility Study and geometric design for construction of ROB/RUB on Cost-sharing basis on Railway crossing No. LC-12(Delhi-Ambala line) on Khera Kalan to Khera Khurd Road . Download
733 23-07-2018 Manual Scavengers and their Rehabilitation Rules 2013. Download
734 23-07-2018 Manual Scavengers and their Rehabilitation Rules 2013.(part-2) Download
735 23-07-2018 Modification in guidelines for approval of Non-ISI new products . Approval of RMC plants in CPWD . Download
736 20-07-2018 Regarding IGI Airport , Terminal-1,Terminal-2 and Terminal-3 , including Aerocity , New Delhi . Download
737 20-07-2018 Delegation of Powers to Chief Engineer - Regional Officer (CE-RO)/SE-RO/ELO at MoRT&H Regional Office - Clarification -Regarding . Download
738 19-07-2018 Decided to transfer / posting Office Superintendent (on promotion) Download
739 17-07-2018 Providing and installation of Uninterupted Power supply (UPS) System for RoomNo. 10 to Room No. 13 at Forensic Science Laboratory Building, Rohini, Delhi. Download
740 17-07-2018 Residential Development Programme for office Secretaries personal Assistants & office Staff, Focus: e-Age from September 05-9-2018 at Hotel Lapaz Gardens, Vasco-Da-Gama (Goa). Download
741 17-07-2018 Transfer / Posting Order of Assitant Engineers (Civil) Download
742 17-07-2018 Transfer / Posting Order of AE (Civil) Download
743 17-07-2018 Residential development programme for office secretaries personal assistants & office staff , focus . e- Age from September 05-09-2018 at Hotel Lapaz Gardens,Vasco-dohama (Goa ) Download
744 16-07-2018 Revision rate of Licence fee of the Govt. of Delhi Residential (General Pool) Accommodation with w.e.f. 01.07.2017 Download
745 16-07-2018 Administrative approval and Expenditure saction for Construction of new Hopital at Burari at the cost of Rs. 265.80 Crore (Revised) Download
746 16-07-2018 Transfer / Posting Order of Office Superintendent (on promotion) Download
747 13-07-2018 Submission of Monthly Expenditure through E-Lekha. Download
748 12-07-2018 Minutes of the 3rd Meeting of Expenditure Finance Committee for the Financial Year 2018-19held on July 6, 2018 at 11:30 A.M. - Corrigendum Download
749 11-07-2018 Public private partnerships (PPP) in Urban Infrastructure and service Delivery August 09-11,2018. Download
750 11-07-2018 Minutes of the meeting of the Council of Ministers dated 03.07.2018 Download
751 11-07-2018 Regarding Zone-wise Desilting report. Download
752 11-07-2018 Proposal for insertion of additional points in the proposal for amendment of existing Guideline for Member of Legislative Assembly Local Area Development Scheme (MLALADS) 2012 Download
753 11-07-2018 Invitation of tender for execution of Works on National Highways and Centrally Sponsored Road Projects Download
754 11-07-2018 Transfer / Posting Order of Assistant Engineers Download
755 11-07-2018 Two days Conference & Exhibition on "Cable Supported Structures (Building and Bridges)" to be held on 13th & 14th July, 2018 at The Royal Plaza Hotel, Ashok Road New Delhi, being organized by Indian Concrete Institute, New Delhi Centre (ICI-NDC). Download
756 11-07-2018 Minutes of the 3rd Meeting of Expenditure Finance Committee for the Financial Year 2018-19 held on July 6, 2018 at 11:30 A.M. Download
757 09-07-2018 34th National Convention of Environmental Engineers & National Seminar On "Environmental Pllution and Climate Change" during August 10-11-2018 at New Delhi. Download
758 09-07-2018 Traning Programme on Quality Control and Quality Assurance in Cencrete Construction including Extreme Wearher Concreting" to be held at NCB-Ballabgarh from 06-10 August 2018. Download
759 06-07-2018 A Seminar on "Environmental Protection and Safety during Construction" to be held on 13th & 14th July 2018 at Main Auditorium, India International Center, Max Mueller Marg, New Delhi, being organized by International Road Federation (IRF). Download
760 06-07-2018 Quarterly Review of Expenditure 2018-19 Download
761 06-07-2018 Participation in the workshop on ""Noise Pollution Control - "Silence Speaks Volumes"- regarding. Download
762 05-07-2018 Transfer / Posting Order of Assistant Architect Download
763 05-07-2018 Transfer / Posting Order of Assistant Director (Official Language) Download
764 05-07-2018 Change from Rigid to Flexible pavement in on-going Contracts. Download
765 05-07-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs. 172.79 Crore for addition & remodelling works at Bhagwan Mahavir Hospital at Pitampura, New Delhi. Download
766 04-07-2018 Minutes of First Monday Review Meeting. Download
767 04-07-2018 Presentation for Reinforcement steel of Shyam Steel Industries Ltd. Download
768 04-07-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.172.03 Crore for construction of Hospital Block at Guru Gobind Singh Govt. Hospital at Raghubir Nagar , New Delhi. Download
769 04-07-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs. 194.91 Crore for expansion/ remodelling of Dr Baba Shahib Ambedkar Hospital Rohini , New Delhi. Download
770 04-07-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs. 117.78 Crore for construction of Trauma Center & Utility Block at Sanjay Gandhi Memorial Hospital at Mangolpuri, New Delhi. Download
771 04-07-2018 Replacement of the existing old conventional type HPSV lamp streel light on PWD roads by energy efficient LED lamp street fittings adopting the ESCO mode - reg. Download
772 04-07-2018 Two Day Executive Training Program for Building Professionals on "Internal Cladding Systems" on 18-19 July, 2018 at IBC HQ, Sector VI R.K. Puram, New Delhi -11022. Download
773 04-07-2018 Relieving of Junior Engineers on transfer. Download
774 04-07-2018 Transfer posting of office superintendents on promotion in PWD Download
775 03-07-2018 Utilization of recycled C&D product-status. Download
776 03-07-2018 Replacement of the existing old conventional type HPSV lamp street light on PWD roads by energy efficient LED lamp street fittings adopting the ESCO mode. Download
777 03-07-2018 Forwarding of drawings online for approval of local body/DUAC/Fire NOC. Download
778 02-07-2018 Disposal of Construction & Demolition waste and utilization of recycle material. Download
779 02-07-2018 Payment of Processing Fee of C&D Waste at C&D waste Plant Shastri Park in EDMC. Download
780 02-07-2018 MINUTES OF MEETING regarding progress of de-silting under the chairmanship of Hon'ble Minister PWD , Goverment of NCT of Delhi in his Confrence Room at level 7th , Delhi Secertariat, I.P. Estate, New Delhi. Download
781 02-07-2018 Appointment of Consultant for Comprehensive Consultancy Service for Planning, Designing and Development of New Campus of Ambedkar University Delhi (PAHSE-I Works) at Dheerpur, Delhi-110059 Download
782 02-07-2018 Minutes of meeting held in the Conference Hall of the Principal Accounts Office, A-Block, Vikas Bhawan, I.P. Estate, New Delhi on 21.06.2018 at 07:00 PM. Download
783 28-06-2018 Quarterly Review of Wxpenditure, 2018-19 Download
784 28-06-2018 Minutes of the meeting held in the Conference Hall of the Principal Accounts office, A-Block, Vikas Bhawan, I.P. Estate, New Delhi on 21-06-2018 at 04:00 PM Download
785 28-06-2018 Regarding null and void of the sanction order dated 26/04/2018 for installation of DFMD, HSND and Advance Ex-Ray Bag Scanner in Forensic Science Labouratory Rohini, Delhi-110085 Download
786 27-06-2018 Draft Model EPC Bidding Document for Construction Sector by NITI Aayog Download
787 27-06-2018 Prohibit use of laser beams by an individual , group of persons, organizers, owners, occupiers and/ or employee of Banquets, Hotels, Restaurants, Buildings and land in different celebrations/ events or otherwise in the jurisdiction of Sub-Division of Palam, IGI Airport, New Delhi. Download
788 25-06-2018 Central Flood ontrol Room of Irrigation and Flood Control Department. Download
789 25-06-2018 Minutes of inter-sectoral co-ordination committee meeting for prevention & control of vector borne diseases convened under Chairmanship of Dy. Commissioner, South Zone. Download
790 25-06-2018 Regarding "Deposit Work Procedure" (for Minor Works) with PWD-allotment of funds to PWD Divisions under Head Non-Plan (Minor Works), during the current financial year 2018-19 Download
791 22-06-2018 Next Bidding for Type-I to IV in July, 2018 Download
792 22-06-2018 Online Bidding for Type-I,II III & IV in July, 2018 Download
793 22-06-2018 Next Online Bidding for Type-I,II III & IV in July, 2018 Download
794 22-06-2018 Procurement of universally designed construction material, accessories and other products. Download
795 22-06-2018 Specification Committee for Wi-fi project in Delhi. Download
796 22-06-2018 Transfer / Posting order of Senior Draftsman (Civil/Elect.) and Draftsman (Civil/Elect). Download
797 20-06-2018 Transfer / Posting order of Executive Engineers (Civil) Download
798 20-06-2018 Minutes of meeting of FOB/Subway Committee was held on 06.06.2018 at 11.00AM under the Chairmanship of Pr. Secretary, PWD at 5th Level, B-wing, Delhi Sectt. Download
799 20-06-2018 Detailed Feasibility study and geometric design for construction of ROB/RUB on Cost-sharing basis on Railway crossing No. LC-12 (Delhi-Ambala Line) on Khera Kalan to Khera Khurd Road. Download
800 19-06-2018 Upgradation and construction of an additional multi-storey building in the premises of Forensic Science Laboratory, Rohini, Delhi. Download
801 19-06-2018 Final Report of Delhi Drainage Master Plan. Download
802 19-06-2018 Integrated Transist Corridor Development and Street Network/Connectivity Plan for the corridor/influence zone alongwith detailed design of all intersections and mid-section based on traffic and feasibility studies for the corridor / network (Appointment of feasibility consultant). Name of Corridor sarai Kale Khan to IGI Airport icluding areas covering"Redevelopment of General Pool Residential Accommodation (GPRA) colonies at Kidwai Nagar, Nauroji Nagar, Netaji Nagar, Sarojini Nagar, Mohmmadpur, Thyagrajnagar, Kasturba Nagar & Sriniwaspuri" and AIIMS Trauma Centre in Delhi. Download
803 19-06-2018 Committee to frame SOP/framework for installation, operation, monitoring of CCTVs in public spaces and other related issues. Download
804 19-06-2018 Transfer / Posting Order of Superintending Engineer (Civil) Download
805 19-06-2018 Review of issues of Development and Maintenance of School Infrastructure. Download
806 18-06-2018 DPCC Order regarding air pollution. Download
807 18-06-2018 Option of EEs / AEEs / AEs. Download
808 15-06-2018 C & D West Material Download
809 15-06-2018 Transfer/Posting Order of Executive Engineer(Civil). Download
810 12-06-2018 CSIR-CRRI Training Booklet 2018-19 Download
811 12-06-2018 Upgradation and construction of an additional multi-storey building in the premises of Forensic Science Laboratory, Rohini, Delhi Download
812 08-06-2018 Remodeling of Maujpur Drain from Road No. 66 to Ghonda Chowk and Main Brahmpuri Road Drain, from Ghonda Chowk to MCD Dhalav(Length 4780 mtr). Download
813 06-06-2018 Regarding RMO of Air-Conditioning, comprehensice maintainance of cold Rooms & CCTV System in FSL Building, Rohini, Delhi. Download
814 06-06-2018 Transfer / Posting Order of Executive Engineer (Civil) Download
815 05-06-2018 Regarding RMO of Lifts & R.O Plant in FSL Building, Rohini, Delhi Download
816 05-06-2018 Regarding RMO of Fire Alarm and PA System, FireFighting equipments, Pumping sets, Electric Sub-station & D.G. set in FSL Building, Rohini, Delhi. Download
817 05-06-2018 Transfer / Posting Order of Office Superintendents Download
818 05-06-2018 Minutes of First Monday Review Meeting. Download
819 01-06-2018 Safety measures at project and work sites. Download
820 01-06-2018 Construction of two numbers of vehicular half undepasses between Wazirabad & Jagatpur and one number pedestrian subway near Gandhi Vihar on Outer Ring Road, Delhi. Download
821 31-05-2018 Transfer / Posting order of Executive Engineers (Civil) Download
822 30-05-2018 Widening of IGNOU Road and construction of RCC drain and footpath at IGNOU Road from Z more to M. B. Road T-Point. Download
823 29-05-2018 Presentation Notice Download
824 28-05-2018 Construction of two cluster bus depots including boundary wall at Sector-37,Rohini,Delhi Download
825 23-05-2018 Transfer and Posting Download
826 22-05-2018 For information about the Miss Call facility being provided by the Art Culture and Language Department Download
827 21-05-2018 Construction of rain water harvesting structure in DA Flats, Sindhora Khurd & Gulabi Bagh, Delhi under Sub-division M-3221 & M-3222 Download
828 21-05-2018 Regarding release of fund under MLALAD Scheme - submission of proposals Download
829 18-05-2018 PROCUREMENT OF RMC FOR PWD WORKERS FROM VARIOUS RMC PLANTS. Download
830 18-05-2018 Transfer / Posting of Officer Superintendent - Sh. Sanjay Dua Download
831 18-05-2018 Minutes of the 2nd Meeting of Expenditure Finance Committee for the Financial Year 2018-19 held on May 15,2018 at 11:30 A.M. Download
832 18-05-2018 Transfer and Posting Download
833 17-05-2018 Order from Labour Department GNCTD under DBOCW Rules - 2002 Download
834 17-05-2018 Adoption of DSR-2016 in place of DSR-2014 for Capital Works in GNCT of Delhi. Download
835 17-05-2018 Corrigendum to the sanction order dated 28/03/2018 amounting to Rs. 3,11,050 . Download
836 17-05-2018 Regarding work of MOEI & Fans, Air-conditioning, SVS set CCTV at Regional Forensic Science Laboratory , 7th Floor , Yashwant Place, Chanakyapuri, New Delhi , 2018-19 . Download
837 16-05-2018 Additional Charge of CE South (M) Download
838 16-05-2018 Training Module for disability requirement. Download
839 16-05-2018 Objections/Sufggestions on Draft "Delhi Road Safety Policy" Download
840 16-05-2018 Additional charge of CPM (Education) Project Download
841 15-05-2018 Regarding construction of temporary structure for parking and investigation of vehicles at the plot allotted to FSL at Sector 21 & 23 Rohini, Delhi Download
842 11-05-2018 C/o World Class Skill Centre, Phase- 1 at village Jonpur, South Delhi. Download
843 10-05-2018 Transfer / Posting Order of AE (Civil) Download
844 10-05-2018 Making of Public places like Roads, Parks and Municipal Buildings disabled friendly. Download
845 09-05-2018 Transfer / Posting Order of AE (Civil) Download
846 09-05-2018 Transfer / Posting Order of AE (Elect.) Download
847 08-05-2018 Minutes of First Monday Review Meeting Download
848 08-05-2018 Preliminary estimate of shifting of Electrical Utilities from M.B. Road to Z More at IGNOU Road, New Delhi Download
849 07-05-2018 Minutes of the meeting held in the conference hall of Principal Secretary (UD/Director (Local Bodies) on 25/04/2018 at 4.00 PM Download
850 07-05-2018 Providing wall panelling and florring in Room No. 321 at 3rd floor of Forensic Science Laboratory, Rohini, Delhi. Download
851 07-05-2018 Regarding Installation of DFMD, HSND and Advance Ex-Ray Scanner in Forensic Science Laboratory Rohini, Delhi- 110085 Download
852 04-05-2018 The first Monday Review Meeting shall be held on 07.05.2018 at 11:30 AM in the Conference Room of Engineer-in-Chief,PWD. Download
853 03-05-2018 Transfer/Posting order of EE(Civil) Download
854 02-05-2018 Conferment of powers by 'virtue of office rather than on individual officers by name'. Download
855 02-05-2018 Presentation Notice - held on 03.05.2018 at 03:00 PM in Conference Room of E-in-C Office. Download
856 01-05-2018 Review of Expenditure booked upto 03/2018 for the Fin. Year 2017-18. Download
857 27-04-2018 Revised Policy/Standard Operating Procedure (SOP) w.r.t. road restoration and grant of online permission of Road Digging through PDM software. Download
858 24-04-2018 In pursunance of DG, CPWD order No. 21 of 2018 issue vide No. 28/2/2018-EC,-I(B) dated 09-04-2018 and consequent upon their joining, the transfer/posting in r/o Assistant Executive Engineer (Civil) Download
859 24-04-2018 In pursuance of DG, CPWD order No. 21 of 2018 issue vide No. 28/2/2018- EC,-I(B) dated 09-04-2018 and consequent upon her joining, Ms. Sonali Batta, Assistant Executive Engineer(Elect.) is hereby posted as AE(E), Health Project Elect. Division against existing vacancy Download
860 24-04-2018 In pursuance of DG DG, CPWD order No. 28/23/2017-EC.-I(A) dated 14-03-2018, Sh. Shailendra, Superintending Engineer (Civil) is hereby posted as SE (Civil),South West Circle, PWD against existing vacancy Download
861 20-04-2018 Disposal facility of silt at Village Singhola (Khampur/Tikri) near DJB sewage treatment plant for temporary disposal of silt. Download
862 20-04-2018 Strengthening of various roads and construction of footpath & drain at Authoruty Road Janakpuri,Strengthening of Vedic Marg from Tihar crossing to community hall, B2 Block Sabzi Mandi Road Janakpuri,Mota Singh Marg Janakpuri,Authority Road Janakpuri, Road No. 237 Vikashpuri, Nazafgarh Road to A-71 Rajouri Garden, Ring Road to A-31 Rajouri Garden, 20-Block Tilak Vihar Road, Ashoka Road/Radhaswami Satsang Marg & Tilak Nagar Main Market Road Under PWD Division WR-1,New Delhi.Amounting to Rs. 4,92,81,700/- Download
863 20-04-2018 Transfer / Posting order of EE (Elect.) Download
864 19-04-2018 Readiness list Assistant Engineer (Civil/Elect.) as on 31.03.2018 Download
865 16-04-2018 Relieving officers on transfer. Download
866 16-04-2018 In the matter of Vinod Kumar Jain Vs GNCTD and others OA No. 525/2016 in the National Tribunal Hon'ble Court. Download
867 16-04-2018 In the matter of Vinod Kumar Jain vs GNCTD and others OA No. 525/2016 in the National Tribunal Hon'ble Court. Download
868 16-04-2018 Training Module For Disability Requirement. Download
869 12-04-2018 Allotment List of Type-III for the month of March 2018 Download
870 12-04-2018 Allotment List of Type-II for the month of March 2018 Download
871 12-04-2018 Allotment List of Type-I for the month of March 2018 Download
872 12-04-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.86.31 Crore for expansion / remodelng of Rao Tula Ram Govt. Hospital, Govt. of NCT of Delhi, Jaffarpur, Delhi Download
873 12-04-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.94.38 Crore for expansion / remodelng of Acharyashree Bhikshu Govt. Hopital at Moti Nagar, Delhi Download
874 12-04-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.55.36 Crore for expansion / Aruna Asaf Ali Hopital, Ashok Vihar, Delhi Download
875 12-04-2018 Providing and placing furniture in waiting area of FSL in Ground Floor of Forensic Science Laboratory, Rohini Delhi. Download
876 12-04-2018 Providing aluminium partition and glass door in reception area and providing & fixing prefab detachable uits on 3rd & 4th floor of Forensic Science Laboratory, Rohini, Delhi. Download
877 12-04-2018 Digitization of Government Payments. Download
878 12-04-2018 Land Acquisition under the National Highways Act. 1956-Reg. Download
879 12-04-2018 Transfer / Posting order of Executive Engineer (Civil) Download
880 12-04-2018 Allotment List of Type-IV for the month of March 2018 Download
881 12-04-2018 Gazetted Holiday Download
882 11-04-2018 Request for nomination of candidate for Training programmes organised by CDMS, GGSIPU on Industrial Security, Safety and Disaster management reg. Download
883 11-04-2018 Regarding Public Hearing timing for General Public Download
884 11-04-2018 Direction u/s 5 of the Environment (Protection) Act 1986, read along with the Construction and Demolition Waste Management Rules, 2016 Download
885 11-04-2018 Forwarding of various Letters. Download
886 06-04-2018 Redistribution of works of Remodeling of Delhi Govt. Hospitals and Dispensaries. Download
887 05-04-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs. 69.36 Crore for expansion/ remodeling of Deep Chand Bandu Hospital, Ashok Vihar, Delhi. Download
888 05-04-2018 Construction of Bridge on Najafgarh drain at Tri Nagar/Inderlok, Karampura and Rampura including road improvement, drainage, footpath etc. Download
889 04-04-2018 Construction of bridge and its approaches over River Yamuna downstream of existing bridge at Wazirabad Delhi. Download
890 04-04-2018 Strengthening of Old D.G. Road (ID: 1169) Samalkha Chowk to Kapashera Border under PWD Div. SWR-II New Delhi during 2017- 18. Download
891 04-04-2018 A/A & E/S for construction of East Delhi Campus of GGSIP University at Surajmal Vihar. Download
892 02-04-2018 Grant of Dearness Allowance to Central Government employees - Revised Rates effective from 1.1.2018 Download
893 02-04-2018 Timeline for March (Prelim.), Supplemantry-I and II dates for 2017-18 Download
894 02-04-2018 Transfer / Posting order of Assistant Engineer (Civil) Download
895 02-04-2018 Transfer / Posting order of Assistant Administrative Officer Download
896 28-03-2018 Construction of Bridge on Najafgarh drain at Tri Nagar/Inderlok, Karampura and Rampura including road improvement, drainage, footpath etc. Download
897 28-03-2018 Exchange of land Download
898 28-03-2018 Organizing of Farewell Function in respect of retiring officials in CPWD (including Work Charged/Regular Classified employees) Download
899 28-03-2018 A/A&E/S for Traffic Decongestion plan of Ring Road & Aurobindo Marg (Around East Kidwai Nagar). Download
900 28-03-2018 A/A & E/S towards payment of cost of allotted additional land of DHS for construction of upcoming Delhi Govt. hospital at Madipur, Delhi Download
901 28-03-2018 Strengthening of Road No. 72 Ext. from Road No. 58 to Vihwas Nagar Nallah and Resurfacing of Road No. 72 from Road No. 58 to Road No. 75B Extn. Under Sub-division M-2112 of Shahdara Maint. Division. Download
902 28-03-2018 Transfer/Posting order of EE(Civil) Download
903 28-03-2018 Timeline for March (Prelim.), Supplemantary-I and II dates for 2017-18 Download
904 27-03-2018 Recarpeting of various roads under U.P. Government in Okhla Constituency. Download
905 26-03-2018 Transport Infrastructure Development Corporation Limited (DTIDC). Download
906 23-03-2018 Filling up the vacant posts of Administrative/Ministerial Posts Issued by CPWD. Download
907 21-03-2018 Visit of Hon'ble Prime Minister of India at Durbar Hall, Hotel Taj Diplomatic Enclave - reg. audit/inspection of construction of temporary structure and electrical fittings and issuance of certificate of stability. Download
908 21-03-2018 Resurfacing of road and improvement of footpath of Urdu Bazar Road from Pared Ground NS Marg to Nukkad Bazar crossing. Download
909 20-03-2018 Resurfacing of road and improvement of footpath of Chandni Chowk road from Lal Jain Mandir to Fatehpuri Mosque. Download
910 20-03-2018 Realiving of Smt. Bhumika Mishra EE(Civil) to CPWD. Download
911 20-03-2018 Smt. Bhumika Mishra EE(Civil) stands Realived from PWD to Join CPWD Today i.e. 20.03.2018 afternoon. Download
912 19-03-2018 Centrally Sponsored Scheme (CSS) for the Development of Infrastructure Facilities for the Judiciary-Release of Central Assistance to the Government of National Capital Territory of Delhi for the year 2017-18 Download
913 19-03-2018 Construction of Hostels etc. for National Law University, Sector-14, Dwarka, New Delhi. Download
914 19-03-2018 Posting of Shri Rajeev Saxena AE (Elect.) as AE office of EE, North West Elect. Division. Download
915 19-03-2018 Posting of Shri. U.C. Mishra, Pr. Chief Engineer (Maintenance) on promotion as ADG. Download
916 19-03-2018 Sanction strength for the financial year 2018-19. Download
917 16-03-2018 Strengthening of Vikas Marg 75A & 75B from Laxmi Nagar to Karkari More during 2017-18(covered area- 79+825 Sqm., Lengh-- 3.1 Km. 6 lane). Download
918 16-03-2018 Strengthening of Road From KApashera Chowk to Bijwasan Flyover (ID: 1171) & Bijwasan Flyover to Najafgarh drain (ID: 1173) under PWD Division SWR- II, New Delhi 2017-18 Download
919 16-03-2018 Strengthening of Narwana Road From Mother Dairy T-Point to Punch Mahal Awas during 2017-18 (covered area- 52,500 Sqm, Length-2.5 Km, 6 lane). Download
920 15-03-2018 Regarding Economy in use of paper. Download
921 14-03-2018 Information of daily report of receipts & expenditure. Download
922 14-03-2018 Revised Proforma for the submission of report of Works awarded from 01.04.2017 to till date of all PWD Divisions (Civil/Electrical/Horticulture). Download
923 12-03-2018 Intimation of daily report of receipts & expenditure. Download
924 12-03-2018 Air Pollution-Covering of construction material-minutes of the meeting of the Pr. Secretaries/Secretaries/HODs Chaired by Cheif Secretary on Friday, 16.02.2018 at 2:30 PM. Download
925 08-03-2018 Modification in procedure for restoration of road cuts made by building proponents for grant of construction permits in three DMCs- Ease of Doing Business. Download
926 07-03-2018 Transfer / Posting order of Executive Engineer (Civil) Download
927 06-03-2018 Next Bidding for Type-I to IV in March, 2018 Download
928 06-03-2018 Regarding recently outlining the measures to be taken for dust mitigation for all construction activities. Download
929 05-03-2018 Transfer / Posting order of Engineer in Chief. Download
930 01-03-2018 Transfer / Posting Order of Dy. Director Horticulture Download
931 01-03-2018 Length of PWD Roads (Category wise)- By Type of Surface as on 31.03.2018 (in kms.) Download
932 28-02-2018 Transfer / Posting order of Office Superintendent Download
933 27-02-2018 Regarding Budget Allotment as on 26.02.2018 / Expenditureas on 15.02.2018 / Modified RE - 2018-18 as on 22.02.2018. Download
934 27-02-2018 Minutes of the 3rd Meeting of Expenditure Finance Committee for the Financial Year 2017-18 held on February 6, 2018 at 11:45 A.M. Download
935 27-02-2018 Minutes of the extended 3rd Meeting of Expenditure Finance Committee for the Financial Year 2017-18 held on February 7, 2018 at 2:00 P.M. Download
936 26-02-2018 Transfer/ Posting of Sh. Rajendra Prasad Bairwa, AE(civil) against Sh.Rajiv Srivastva Download
937 23-02-2018 Transfer / Posting order of Senior Architect (East) Download
938 21-02-2018 Notification issued by Minisry of Environment, Forest and Climate change, New Delhi, 25th January 2018. Rules further to ammend the environment (protection) rules 1986 made by Cenral Government. Download
939 21-02-2018 Strengthening of Madhu Vihar Road (Road No. 57 to Joshi Colony T-Point) and Mandawali Road (House Tax Building to Aggarsain Apartment), at I.P. Extension under PWD East (Road). Download
940 21-02-2018 PWD to carry out civil and electrical works at State Level Resourse Centre located at IEDSS Cell, Lajpat Nagar. Download
941 20-02-2018 ATR on this issues discussed & decided in the meeting dated 21.12.2017 of Committee Public Accounts(PAC) Download
942 20-02-2018 S.I.T.C of CCTV Camera for AEBAS Devices at GIPMER. Download
943 20-02-2018 ISSUE of Administrative Approval & Expenditure Sanction. Download
944 20-02-2018 Regarding Readiness lists in respect of the Sr. Draftsmen and Draftsmen of (Civil & Elect.). Download
945 20-02-2018 Construction of cold room in the department of micrology at GIPMER. Download
946 20-02-2018 Construction of missing drain and footpath from Jhoroda stand to Mungeshpur drain and drains upto Bahadurgarh Border with footpath at Border with Foothpath at Border area under PWD Division SWR-II, New Delhi(ID:1231). Download
947 20-02-2018 Posting of Shree Rajnish Kant AE(Elect.) Download
948 16-02-2018 Use of Recycled Products from Construction and Demolition (C&D) Download
949 15-02-2018 Transfer/Posting Order AE(Civil) Download
950 15-02-2018 Expenditure Details Upto 15.02.2018 Download
951 15-02-2018 Revision of rates of Licence Fee of the Govt. of Delhi Residential (General Pool) Accommodation- Reg Download
952 13-02-2018 Construction of cold room in the Department of Microbiology at GIPMER. Download
953 13-02-2018 Construction of missing drain and footpath from Jhoroda Stand to Mungeshpur drain and drains upto Bahadurgarh Border with footpath at Border area under PWD Division SWR-II New Delhi. Download
954 09-02-2018 Transfer/Posting Order of AD(H) Download
955 09-02-2018 Transfer/Posting Order EE(Civil) Download
956 08-02-2018 Regarding construction of temporary structure for parking and investigation of vehicles at the plot allotted to FSL at sector 21 & 23, Rohini, Delhi. Download
957 08-02-2018 A.E. Civil Transfer Posting. Download
958 07-02-2018 Administrative Approval/Expenditure Sanction for the work of "Shifting of Poles/Laying Underground cable at main Burari Road:-1.Shifting of electrical services at Main Burari Road from authority to Shalimar Place. 2.Shifting of electrical services from transport authority of Bengali Colony" during 2017-18. Download
959 07-02-2018 Readiness lists as appended below of Sr. D/M (Civil & Elect.) and D/M (Civil & Elect.) posted in various Field/Planning unit in PWD. Download
960 06-02-2018 Strengthening of Ring Road from Prembari Pul to Punjabi Bagh Flyover under PWD North West Road-1(covered area 1,13,975 sqm) Download
961 06-02-2018 Maintenance and operation of E & M services of Wet Riser.....in SRHC hospital,Narela, Delhi during the year 2017-18 Download
962 02-02-2018 Instruction of Pr. Secretary, PWD to use provisions taken in RE 2017-18 at an optimum cent percent level. Download
963 31-01-2018 Application of New Products- Water Proofing products of M/s STP Ltd. Download
964 31-01-2018 Construction of FOB for passage from Type-III to Type-IV Quarters, D.A. Flats, Haiderpur, Shalimar Bagh, Delhi. Download
965 30-01-2018 Transfer / Posting order of Assistant Engineer (Civil) Download
966 24-01-2018 C/o Maharishi Valmiki College of Education at PSP Area-IV, adjoining Sector-16, Rohini, Delhi-85 (SH.: Security arrengement for Govt. property/plot). Download
967 24-01-2018 Regarding construction of temporary structure for parking and investigation of vehicles at the plot allotted to FSL at Sector 21 & 23 Rohini, Delhi. Download
968 24-01-2018 Regarding Strengthening of damaged false ceiling in gents and ladies toilet from Ground to 4th Floor of Forensic Science Laboratory, Rohini, Delhi. Download
969 23-01-2018 Recarpeting of various roads under U.P.Government in Okhla Constituency Download
970 23-01-2018 Regarding lighting on Republic Day i.e. 26th January 2018 on Forensic Science Lab,Building, Madhuban Chowk,Sec-14,Rohini,Delhi Download
971 23-01-2018 Regarding provide and installation of electrical accessories in work station at Room No. 220(CFU Division) Forensic Science Lab,Building, Madhuban Chowk,Sec-14,Rohini,Delhi Download
972 23-01-2018 Strengthening of Shamnath Marg along with Improvement of Foothpath, Storm Water Drain, Central Verge etc. from I.P. College Xing to Petrol Pump near Boulevard Road under Sub Division-3 of Division C & ND-Roads, New Delhi Download
973 23-01-2018 Sanction Order Download
974 23-01-2018 Regarding installation rain water harvesting system in the Forensic Science Labarotary, Rohini, Delhi. Download
975 23-01-2018 Joining of Sh. Tripal Singh,AE (Civil) is hereby posted as AE(P), O/o SE(North-East) Download
976 22-01-2018 Intimation regarding settlement of para 6(B) part HB regarding misclassification of expenditure of Rs. 17.33 lakh Download
977 22-01-2018 Outstanding balance of Rs. 14.66 Crore under M.H. 8658 MFPSSA and outstanding balance of Rs. 111.90- Crore under MH 8658 CSSA lying with PWD. Download
978 18-01-2018 Transfer Posting Order of Assitant Director (Hort.) Download
979 17-01-2018 Sanction order for Rs. 5,02,10,669/- (Rs. Five Crore Two Lakh Ten Thousand Six Hundred Sixty Nine Only) for Modular Operation Theatre , MGPS System and Audio Visual in Phase-II Project of Maulana Azad Institute of Dental Sciences. Download
980 16-01-2018 Transfer / Posting Order of Sh. P.K. Parmar Download
981 16-01-2018 Clear the pending dues of DJB within 7 days and submit a compliance report for perusal of CM. Download
982 16-01-2018 Regarding installation of camera and up-gradation of existing CCTV system in the Forensic Science Laboratory, Rohini, Delhi. Download
983 16-01-2018 Strengthening of Najafgarh Bijwasan Road (ID: 1173) from Jhatikra Morh to Chhawla Bridge (total length- 5100 Mtrs). Download
984 12-01-2018 Improvement of road surface of Acharya Shri Tulsi Marg(Mehrauli Gurgaon road)(NH-236) New Delhi.(SH: Re-carpeting and thermoplastic paint (covered area -1,65,000 sqm). Download
985 12-01-2018 Construction of drainage system of main Burani Road from Hiranki Bandh to Amrit Vihar upto Irrigation drain at Swaroop Nagar Road under Sub-Division -1, of PWD Division C&ND Roads, New Delhi(Length-5555 meter). Download
986 12-01-2018 Release of funds under Central Road Fund(CRF) during the 2017-2018 in the State of NCT Delhi Download
987 12-01-2018 Release of funds under Central Road Fund(CRF) during the 2017-2018 in the State of NCT Delhi Download
988 10-01-2018 Transfer posting order of DDH Download
989 10-01-2018 Construction of Foot Over Bridge near kardampuri & Yamuna Vihar on Road No.-66, Delhi(Approximate Length =30.00 Metre) Download
990 10-01-2018 Regarding release of funds from ECC account towards remuneration for deployment of 20 Civil Defence Volunteers and for improvement and maintenance of NMV Lane at S.P. Mukherjee Marg Download
991 09-01-2018 Construction of Foot Over Bridge across Sri Aurobindo Marg at Yusuf Sarai Market (Near Gautam Nagar cut) with staircase and lift for pedestrians. Download
992 05-01-2018 Minutes of First Monday Review Meeting (held on 01/01/2018) Download
993 04-01-2018 Regarding installation of camera and up-gradation of existing CCTV system in the Forensic Science Laboratory, Rohini, Delhi. Download
994 03-01-2018 Transfer / Posting Order of Finance Officer, PWD Download
995 01-01-2018 C/o Foot Over Bridge near Oberoi Hotel at Lajpat Rai Marg, New Delhi. Download
996 01-01-2018 C/o Foot Over Bridge with staircase and lift for pedestrian near Harkesh Nagar on Mathura Road (NH-2), New Delhi. Download
997 01-01-2018 Budget Management Download
998 01-01-2018 Mobile App for registering complaints of potholes and other complaints for repair of road. Download
999 28-12-2017 Transfer / Posting order of Assistant Engineer (P). Download
1000 27-12-2017 Clarification on GST regarding. Download
1001 26-12-2017 Guidelines for Installation of CCTV camera System for Security Surveillance under MLALAD Scheme Download
1002 26-12-2017 Strengthening of Road surface for Outer Ring Road from Modi Mill to Chirag Delhi (Masjid Moth) (Lenght 3.80 Km.,covered area 120360 Sqm) Download
1003 26-12-2017 Strengthening of Ring Road from AIIMS to Ashram under Division South East Road-I including Service Road from PG DAV College to Ashram( Length- 4.95 km + 1.54 Km service Road). Download
1004 22-12-2017 Redevelopment of Kidwai Nagar (East),New Delhi - 110023 Download
1005 22-12-2017 Requirement of RO Systems in Various Departments, GIPMER. Download
1006 22-12-2017 Reimbursement of Outstanding Claim lying with PWD under (Ministry of Surface Transport) amounting to Rs. 35,18,24,036.(AGCR Para No. 01) Download
1007 22-12-2017 Transfer / Posting Order of EE(E) Download
1008 21-12-2017 Budget Management Download
1009 21-12-2017 Improvement and strengthening of M.B. Road from Shastri Park to Khajuri Chowk Delhi (covered area- 78750 Sqm, Length- 3.75 km). Download
1010 21-12-2017 Two day Program on Repair & Rehabilitation of Concrete Structures including Water Proofing Techniques and Materials for Engineering Professionals to be held on 30-31 January , at IBC HQ, Sector VI, R.K Puram, New Delhi- 110022 Download
1011 20-12-2017 List of Approved standing council for court cases. Download
1012 20-12-2017 Transfer / Posting Order of Assistant Engineer (Civil). Download
1013 20-12-2017 Transfer / Posting order of Executive Engineer (Elect.). Download
1014 20-12-2017 Non relieving of Assistant Engineer (Civil & Elect.) transferred out from PWD on completion of tenure. Download
1015 19-12-2017 Improvement and strengthening of Eastern Approach Road from Dharmpura T-Point to ISBT Bridge Delhi(covered area 89,600 Sqm). Download
1016 19-12-2017 Minutes of the 2nd Meeting of Expenditure Finance Committee for the Financial Year 2017-18 held on December 11, 2017 at 11:30 A.M. Download
1017 19-12-2017 Regarding handing over of new project to PWD Download
1018 19-12-2017 Additional Charge of Executive Engineer (Elect). Download
1019 18-12-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1020 15-12-2017 Presentation for safety measures during sewer cleaning. Download
1021 14-12-2017 Adoption of Integrity Pact-Standard Operating Procedure - regarding. Download
1022 13-12-2017 Widening of road from 2 lane to 4 lane and C/o footpath, central verge & drain including horticulture work on Vedic Marg, Hari Nagar, New Delhi. Download
1023 12-12-2017 Reporting of Project Manager(CCTV,Wifi & Street Light) Download
1024 11-12-2017 Transfer / Posting order of Executive Engineer (Elect.) Download
1025 11-12-2017 Irregularities in Vendors Registration in PWD. Download
1026 11-12-2017 PWD Sewa An online Complaint System. Download
1027 11-12-2017 Development of Control Room and Public Complaint Management System as per the directions of Hon'ble Supreme Court. Download
1028 11-12-2017 Minutes of First Monday Review Meeting. Download
1029 08-12-2017 Resurfacing of roads (including all loops and slip roads etc) and misc. Repairs of footpath, railing, signages, i/c Horticulture work at Mukarba Chowk Flyover, Delhi. Download
1030 08-12-2017 Transfer / Posting Order of Assistant Director (Horticulture) Download
1031 08-12-2017 Uploading of daily expenditure for e-lekha. Download
1032 07-12-2017 The transfer/posting of the Assistant Director (Horticulture) Download
1033 06-12-2017 The Rights of Persons with Disabilities Act, 2016 Download
1034 06-12-2017 Filling up the two-three post of retired Engineers of CPWD on deputation basis in Food Safety and Standards Authority of India reg. Download
1035 06-12-2017 Strengthening of Captain Gaur Marg from Modi Mill to Ring Road, New Delhi (SH: Bituminous works, Length 2.15 Km). Download
1036 01-12-2017 Transfer / Posting order of Chief Engineer (Civil) Download
1037 01-12-2017 Transfer / Posting Order of Chief Engineer (Elect.) Download
1038 01-12-2017 Transfer / Posting order of AE (Civil) Download
1039 01-12-2017 Regarding construction of Inter connecting corridor between blocks B & D, GIPMER Download
1040 30-11-2017 Application of New Products. (a). Water Proofing products of STP Ltd. (b). Float Glass of Gold Plus Glass Industry Ltd. Download
1041 29-11-2017 Transfer / Posting order of Sh. Manoj Kumar Mahobia Download
1042 29-11-2017 Transfer / Posting order of Chief Engineer (Civil) Download
1043 28-11-2017 Sign boards on PWD roads. Download
1044 21-11-2017 A/A & E/S of the various Proposals received from PWD. Download
1045 21-11-2017 A/A & E/S of the Proposals received from PWD. Download
1046 21-11-2017 Collection of Labour Cess through RTGS/NEFT. Download
1047 20-11-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1048 17-11-2017 Transfer / Posting Order of Accounts Officer, PWD with immediate effect. Download
1049 16-11-2017 The EPCA has lifted ban on construction activities in GNCTD with immediate effect. Download
1050 15-11-2017 Transfer / Posting Order of Assistant Accounts Officer. Download
1051 15-11-2017 Sign Boards on PWD roads. Download
1052 15-11-2017 Regarding the year wise/assembly wise/project details of expenditure incurred under TYADB from 2012-13 to 2016-17 Download
1053 14-11-2017 Details of works awarded by PWD during last three years. Download
1054 13-11-2017 Beautification work of area below Azadpur Flyover under sub Div. NR-12 (SH:Providing Civil, Electrical work and Horticulture work). Download
1055 13-11-2017 Transfer / Posting Order of Chief Engineer (Elect.) Download
1056 10-11-2017 Additional Charge of EE(P), O/o Pr. Chief Engineer(Projects) Download
1057 10-11-2017 Additional Charge as IFA with Engineer-in-Chief and Pr. Chief Engineer Download
1058 10-11-2017 Regarding provide/installation of work station and providing wall panelling in the Room No. 220 (CFU Division) Forensic Science Lab, Building, Madhuban Chowk, Sec-14, Rohini, Delhi. Download
1059 09-11-2017 Mechanized Vacuum Sweeping of Roads. Download
1060 08-11-2017 Strengthening of UP Link Road from Noida Mor to UP Border. (Length 4.00 Km, Covered area 130715 Sqm). Download
1061 08-11-2017 Minutes of the 1st review meeting of Outcome Budget 2017-18 for Industries, Power, PWD & Urban Development Department held under the chairmanship of Hon'ble Chief Minister on 27.07.2017 at 11:30 AM. Download
1062 08-11-2017 Strengthening of Vikas Marg from Sachivalaya to ITO Chungi(44800 Sqm, Strengthening work + 16800 Sqm Bridge Work) total = 61600 Sqm). Download
1063 08-11-2017 Widening of Main Burari Road from chainge 0.00-1.00 Km and strengthening of the road from Outer Ring Road to Burari Morh (Chainge 0.00-3.00 Km) under Sub-Division-1 of C&ND Roads (Covered area- 45400 Sqm). Download
1064 08-11-2017 Additional Charge of Superintending Engineer (QAU). Download
1065 08-11-2017 Additional Charge of Project Manager. Download
1066 07-11-2017 Status of issues raised during 1st Quatarly Review Meeting of Outcome Budget 2017-18 Download
1067 07-11-2017 Access audit of Building under Public Works Department (PWD) Order dated 18.05.2017 of Hon'ble High Court of Delhi in W.P. (C) No. 11711/2015 in the matter of Nipun Malhotra Vs. Govt of Delhi, NCT. Download
1068 07-11-2017 Transfer / Posting Order of Executive Engineer (Civil). Download
1069 07-11-2017 Transfer / Posting Order of Dy. Director (Horticulture). Download
1070 03-11-2017 Strengtehning and Improvemnent of Footpath, Central Verge etc. on JLN Marg under Sub-Division-3 C&ND Roads, New Delhi. Download
1071 03-11-2017 Construction of road including steet light from Durbal Nath Vatika to Rohtak Road(NH-10) & infront of Virat Co-operative Socity at Jwalapuri Colony, Delhi (total covered area-12,724 Sqm=10,920 Sqm for C/o road and 1814 Sqm for drain work + street light work). Download
1072 02-11-2017 Transfer / Posting Order of Executive Engineer(C) Download
1073 01-11-2017 Transfer / Posting Order of Assistant Engineers (Civil) Download
1074 01-11-2017 Constitution of Environmental Cell at the level of Local Authority for Environmental Clearance of PWD Projects measuring above 5,000 sqm and upto 1,50,000 sqm. Download
1075 01-11-2017 A/R & M/O PWD under sub division-3 of division C&ND (Roads) during 2017-18 SH: Providing & Fixing solar studs & spring posts on ring road bypass. Download
1076 30-10-2017 Complaint received regarding non-participation of approved make furniture manufacturer Herman Miller. Download
1077 30-10-2017 Transfer / Posting Order of Superintending Engineer Download
1078 25-10-2017 Declare Thursday, 26th October, 2017 as a Holiday in all Government Offices Under the Government of NCT of Delhi Download
1079 25-10-2017 The Lieutenment Governer of National Capital Territory of Delhi is pleased to declare Thursday, the 2nd November, 2017 as a half day holiday after 2.00 PM in all offices Download
1080 25-10-2017 Sh. Ram Raj Meena presently holding the charge of Superintending Engineer (CCTV ,Wifi and Street-lights) will work also as Superintending Engineer (Planning) for Electrical works under Pr. Chief Engineer(Projects), Chief Project Manager (housing) ,Chief Project Manager (Flyover project) & Chief Project Manager (Education Project) with immediate effect. Download
1081 25-10-2017 Sh. Manohar Lal Sharma, Finance Officer presently working under the Chief Engineer(Project) will work also as Finance Officer to Chief Project Manager (Housing), Chief Project Manager (Flyover Project) & Chief Project Manager (Education Project ) With immediate effect. Download
1082 24-10-2017 Delegation of Financial Powers to PWD Officers. Download
1083 20-10-2017 Additonal Charge of Quality Assurance Unit (QAU) Download
1084 20-10-2017 Transfer / Posting of the following Chief Engineer(Civil) in pursuance to Ministry of housing and urban Affairs, GOI Download
1085 18-10-2017 Immediate requirement of additional budget under MH-5054 Download
1086 17-10-2017 Transfer / Posting Order of Dy. Director (Hort.) Download
1087 16-10-2017 Provision of Contingency and it's utilization Download
1088 16-10-2017 Observance of Vigilance Awareness Week 2017. Download
1089 13-10-2017 Regarding furnishing of Budget figures of all DDOs under PWD. Download
1090 13-10-2017 Online Bidding for Type-I,II III & IV in November 2017 Download
1091 12-10-2017 Posting of Officers for Lead Agency on Road Safety in Delhi. Download
1092 12-10-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1093 11-10-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1094 10-10-2017 DDO wise Budget & Expenditure of 5 years for Annual Audit plan of the year 2018-19. Download
1095 09-10-2017 Providing & Fixing Six Passenger lift for Delhi Govt. Officers Flats at G.K-1, New Delhi.(SH: Civil Works). Download
1096 09-10-2017 A/R & M/O PWD under Sub Division-3 of Division C&ND (Roads) during 2017-18(SH:Providing & Fixing solar studs & spring posts on ring road bypass). Download
1097 06-10-2017 A/R & M/O various school buildings under Sub-Division-4, South East(Building) during 2016-17.(SH: Civil Repair and Finishing Works). Download
1098 06-10-2017 Annual Audit Plan for the year 2018-19. Download
1099 06-10-2017 Details of works awarded by PWD during the last three years. Download
1100 06-10-2017 Figures in respect of units having a budget of more than 100 crore. Download
1101 04-10-2017 UTTIPEC Advisory. Download
1102 04-10-2017 Minutes of First Monday Review Meeting. Download
1103 04-10-2017 Office Order in respect of giving additional charge to Shri S.K. Srivastava, Shri A.K. Garg, Shri U.C. Mishra. Download
1104 03-10-2017 Transfer / Posting Order of Assistant Engineers Download
1105 03-10-2017 Appointment of Advocates as Government pleaders/counsels for the High Court Download
1106 21-09-2017 Mechanized Vacuum Sweeping of Roads. Download
1107 21-09-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1108 19-09-2017 Pending PGMS References. Download
1109 19-09-2017 Meeting to review the redressal of Grievances received from Govt. of India through CPGRAMs Scheduled on 22nd September, 2017 at 11:30 AM. Download
1110 19-09-2017 Provision of Contingency and its utilization. Download
1111 14-09-2017 Transfer / Posting Order of EE (Civil) Download
1112 13-09-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1113 08-09-2017 Transfer / Posting Order of AEs (Civil) Download
1114 08-09-2017 Transfer / Posting Order of AEs (Elect.) Download
1115 06-09-2017 Transfer Order of JEs (Civil / Electrical) Download
1116 05-09-2017 Transfer / Posting Order of Assistant Engineer (Civil). Download
1117 05-09-2017 Transfer / Posting Order of Chief Engineer (Civil) Download
1118 01-09-2017 Minutes of meeting with various department on the issue of registration of construction workers in respect of their Establishment under BOCW Act. 1996 held on 18.8.2017 under the Chairmanship of Secretary-Cum-Labour Commissioner. Download
1119 01-09-2017 Director (Work & Establishment) and Project Manager (Other Project) Additional Charge to be taken by CPM(H). Download
1120 01-09-2017 Additional charges given to Ms. Bhumika Mishra EE(Civil) Download
1121 01-09-2017 Transfer / Posting Order of Superintending Engineer Download
1122 01-09-2017 Transfer / Posting order of Superintending Engineer Download
1123 31-08-2017 Transfer / Posting Order of Senior Architect. Download
1124 30-08-2017 Transfer / Posting Order of AE (Civil) Download
1125 29-08-2017 Transfer / Posting Order of Assistant Architect. Download
1126 29-08-2017 Upgradation of 1 additional post of Chief Engineer (Civil) in PWD to the level of ADG (Civil)-reg. Download
1127 29-08-2017 Posting order of Senior Architect Download
1128 28-08-2017 Prohibition of Employment as Manual Scavengers and their Rehabilitation Act 2013 Download
1129 28-08-2017 One Day Training on zero additional cost concept and essential decision making for creating sustainable projects. Download
1130 28-08-2017 Use of Gem (Government e-Marketplace) while procuring goods and services by Departments in terms of Rule 149 of GFR, 2017. Download
1131 28-08-2017 Minutes of Meeting regarding Expenditure Management and Payment System Download
1132 25-08-2017 Strenghtening and widening of road from Nangloi Stand to Neelwal Road along with drains & footpath including village portion under PWD Division SWR-II, New Delhi. Download
1133 24-08-2017 Shri B. B. Dhar, Unavailability of Arbitrator Download
1134 23-08-2017 Transfer / Posting Order of Superintending Engineer (Civil) Download
1135 21-08-2017 Cleaning of Sewer line and sewerage system-safety measures regarding. Download
1136 21-08-2017 OFFICE ORDER REGARDING DIRECTOR HORTICULTURE Download
1137 16-08-2017 Transfer / Posting order of Assistant Engineer (Civil) Download
1138 16-08-2017 Transfer / Posting order of r/o Senior Architect Smt. Bharati Ghosh Download
1139 14-08-2017 Minutes of Meeting of Medical Committee Convened on 19-06-2017 Download
1140 14-08-2017 Promotion of Digital Payment Transactions regarding Download
1141 14-08-2017 Revised Estimates 2017-18 and Budget Estimates 2018-19 Download
1142 14-08-2017 One Day Training on zero additional cost concepts and essential decision making for creating sustainable projects. Download
1143 10-08-2017 Minutes_Regularization of Deceased Workmen_Judgment of Hon'ble Supreme Court Download
1144 10-08-2017 Calculation of Financial implementaion Download
1145 10-08-2017 Minutes Of First Monday Review Meeting Held On 8 August 2017 Download
1146 08-08-2017 INVITATION TO SEND NOMINATIONS Download
1147 08-08-2017 PIMS Updation Download
1148 02-08-2017 Exercise of Powers Regarding Download
1149 02-08-2017 Skill Development of workers-Recognition of Prior Learning Programme. Download
1150 02-08-2017 Section 6.19 to CPWD Works Manual modify provision Procurement of Goods and Services through Government e-Marketplace (GeM) Download
1151 01-08-2017 Meeting Notice Download
1152 31-07-2017 Exercise of Power Regarding Download
1153 31-07-2017 Meeting & Minutes of Inspection Download
1154 31-07-2017 Monthly Inspection of PWD and buildings by Chief Engineers / Chief Project Managers & Project Managers / Superintending Engineers. Download
1155 31-07-2017 Development Schemes in UTs. Download
1156 31-07-2017 Transfer / Posting order of Assistant Engineers (Civil) Download
1157 28-07-2017 Constitution of Audit Committee in the Department of GNCT of Delhi Download
1158 27-07-2017 STANDING ORDER UNDER RULE 15 OF TBR Download
1159 26-07-2017 Monthly Inspection of PWD and buildings by Chief Engineers / Chief Project Managers & Project Managers / Superintending Engineers. Download
1160 26-07-2017 Exemption for Government building from operation of Municipal Laws to regulate their erection. Download
1161 26-07-2017 Transfer/Posting order of Executive Engineers (Civil) Download
1162 24-07-2017 Provision of Contingency and its utilization Download
1163 24-07-2017 Presentation by Bentley Systems India Pvt. Ltd. Download
1164 21-07-2017 Temporary Transfer / Posting orders of AEE (Civil) Download
1165 19-07-2017 Migration to GST Download
1166 18-07-2017 Transfer / Posting order of Assistant Director Horticulture Download
1167 18-07-2017 Transfer / Posting Order of Assistant Engineers (Civil) Download
1168 17-07-2017 Payment of double overtime wages to the Work Charged Establishment and Regular Classified Establishment employees of CPWD. Download
1169 13-07-2017 Transfer / Posting Order of AE (Civil) Sh. Rajesh Kumar Jain Download
1170 13-07-2017 PRAGATI MEETING Download
1171 12-07-2017 Registartion of TAN Holders under GSTN Portal and Deduction of TDS-(sanjay Verma,Executive Engineer) Nodal officer for orientation programme on 15/07/2017 Download
1172 12-07-2017 Reliving of Sh. Jayesh Kumar, Pr. Chief Engineer (Projects) and taking charge of Pr. Chief Engineer (Projects) by Sh. A.K.Garg Pr. Chief Engineer (Maintenance) as additional Charge Download
1173 11-07-2017 Tentative Guidelines for drainage through Rain Water Harvesting and Artificial Recharging alone National Highways. Download
1174 11-07-2017 Modified readiness list of Assistant Engineers (Civil) / (Elect.) as on 30.06.2017 Download
1175 10-07-2017 Material for preparation of speech on the occasion of Independence Day-2017-ragarding. Download
1176 07-07-2017 Approval of pannel of arbitrators Download
1177 07-07-2017 Appointment of Assistant Architect in the Senior Architect Project Unit, O/o Engineer-In-Chief, PWD Download
1178 06-07-2017 Transfer / Posting order of Executive Engineer Download
1179 06-07-2017 Transfer / Posting order of Officers (EE/AE) Civil Download
1180 05-07-2017 Repatriation Of Shri Ram Pal Singh Tomar, Assistant Director (Hort.) Download
1181 05-07-2017 Transfer / Posting Order of Assistant Architects Download
1182 04-07-2017 Additional Charge Of Dy. CVO Download
1183 03-07-2017 Minutes of First Monday Review Meeting Download
1184 30-06-2017 Redressal of pending grievances in Centralized Grievance Redress and Monitoring System (CPGRAMS) Download
1185 29-06-2017 Transfer / Posting order of Executive Engineer (Civil) Download
1186 29-06-2017 Transfer/Posting Order of Assistant Engineer (Civil) Download
1187 28-06-2017 Transfer/Posting Order of Assistant Engineer (Civil) Download
1188 27-06-2017 Redressal of pending grievances in Centralized Grievance Redress and Monitoring System (CPGRAMS) Download
1189 23-06-2017 Redressal of pending Grievance in Centralized Public Grievance redress and monitoring system (CPGRAMS) Download
1190 23-06-2017 Regarding Restructuring of PWD and current duty charge of the officers of PWD Download
1191 21-06-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1192 20-06-2017 Transfer / Posting order of Superintending Engineer (Elect.) Download
1193 14-06-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1194 14-06-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1195 14-06-2017 Proposal of Transfer & Posting in the grade of Assistant Engineer (Civil & Elect.) Download
1196 13-06-2017 Non relieving of Assistant Engineer (Elect.) transferred out from PWD on completion of tenure. Download
1197 12-06-2017 Readiness list of Assistant Engineers (Elect.)/(Civil) as on 31.03.2017 Download
1198 12-06-2017 Regarding posting of Sh. J.P. Sharma, EE (Civil) Download
1199 09-06-2017 Private Lab irrespective of Distance for tests Download
1200 07-06-2017 Providing & Laying of DI Pipe line from Nangloi Stand to Mungeshpur Drain at Najafgarh Nangloi Road (1230) Under Sub Division II, New Delhi(3940 running meter)- A/A & E/S regarding. Download
1201 07-06-2017 Posting Order Of SE (Civil) Download
1202 06-06-2017 Transfer / Posting order of Executive Engineer (Civil) Download
1203 05-06-2017 Information / data on works Contractors operating in the State of Delhi. Download
1204 05-06-2017 Additional charge of Flyover Project Electrical Division Download
1205 05-06-2017 Minutes of First Monday Review Meeting Download
1206 01-06-2017 Regarding posting of J.P. Sharma EE (Civil) Download
1207 01-06-2017 Posting Order Of Executive Engineer (Elect.) Download
1208 01-06-2017 CIRCULAR Download
1209 01-06-2017 Allotment of Govt. Flats, to the person with Disability under Rule 8 and allotment under Rule 20 on Medical Ground. Download
1210 31-05-2017 Transfer / Posting order of EE (Civil) Download
1211 31-05-2017 Use of GeM (Government e-Marketplace) while procuring goods and services by Departments in terms of Rule 149of GFR, 2017 Download
1212 31-05-2017 Additional Charge Download
1213 30-05-2017 Desilting of Drains Download
1214 29-05-2017 Readiness list of Assistant Engineers (Elect.) / (Civil) as on 31/03/2017 Download
1215 29-05-2017 Additional Charge of Dy. CVO Download
1216 27-05-2017 Housing Project Electrical Division office shifted Download
1217 26-05-2017 Online Bidding for Type-I,II III & IV in June/July 2017 Download
1218 25-05-2017 Exemption of Government Building from operation of Muncipal Laws to regulate their erection. Download
1219 24-05-2017 Appointment of Arbitrator in PWD Download
1220 22-05-2017 Transfer / Posting order of Additional Charge of SE and Chief Engineer Download
1221 22-05-2017 Corrigendum Download
1222 17-05-2017 Pending Litigation Cases / Industrial Disputes regarding Counting of past services rendered by the workman (on muster roll/hand receipt or on temporary status) before their dates of regularization as qualifying services for the purpose of pension. Download
1223 16-05-2017 Transfer / Posting Order of Superintending Engineer Download
1224 16-05-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1225 16-05-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1226 16-05-2017 Transfer / Posting Order of Junior Engineers (Civil) Download
1227 15-05-2017 Regarding Restructuring of PWD and Current Duty Charges of the Officers of PWD Download
1228 12-05-2017 Corrigendum Download
1229 12-05-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1230 11-05-2017 Regarding Restructuring of PWD and Current Duty Charges of the Officers of PWD-Additional charge on transfer posting of Engineers. Download
1231 11-05-2017 Regarding Restructuring of PWD and Current Duty Charges of the Officers of PWD-Additional charge on transfer posting of Engineers. Download
1232 11-05-2017 Transfer / Posting Order of Dy. Director Horticulture Download
1233 11-05-2017 Transfer / Posting Order of Executive Engineer (Elect.) Download
1234 11-05-2017 Regarding Restructuring of PWD and Current Duty Charges of the Officers of PWD-Additional charge on transfer posting of Engineers. Download
1235 09-05-2017 Transfer / Posting order of EE (Elec) Download
1236 09-05-2017 Transfer / Posting order of EE(Civil), EE (Elec), AE (Civil), AE (Elec) Download
1237 09-05-2017 Correction Letter Download
1238 08-05-2017 Correction Letter Download
1239 08-05-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1240 08-05-2017 Entries for Smt. Satya Goel Memorial Award Download
1241 08-05-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1242 08-05-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1243 08-05-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1244 05-05-2017 Transfer / Posting Order of Office Superintendent Download
1245 05-05-2017 Transfer / Posting Order of Assistant Account Officer Download
1246 04-05-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1247 03-05-2017 Transfer / Posting Order of Office Superintendents. Download
1248 02-05-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1249 02-05-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1250 01-05-2017 Transfer / Posting Order of Assistant Engineer Download
1251 26-04-2017 Inclusion of ponding / stagnated water and dark spots in inspection note. Download
1252 17-04-2017 Transfer / Posting Order of A.A.O. Sh. Nagender Prasad Download
1253 17-04-2017 Transfer / Posting Order of Junior Hindi Translator Download
1254 17-04-2017 Sh. Mohd. Shamim Assistant Engineer (E) is Posted in the office of Executive Engineer, Health East Division, temporarily with immediate effect. Download
1255 12-04-2017 Transfer / Posting Order of Deputy Director(Hort.) Jaswant Singh Download
1256 11-04-2017 03 Days Residential training program on ''GIS Application in eGovernance'' Download
1257 11-04-2017 Residential programme on "Leadership & Teamwork for performance Excellence'' from 29th May - 2nd June 2017 at manali Download
1258 11-04-2017 Disbursement of wages to outsourced staff / contract labour at revised minimum wages. Download
1259 10-04-2017 Review meeting notice regarding implementation of revised minimum wages convened by Hon'ble Minister of Labour, GNCTD on 11.04.2017 at 11:00 A.M. at Auditorium, Delhi Secretariat Download
1260 10-04-2017 Benefits extended by EPFO/ESIC Download
1261 06-04-2017 Transfer / Posting Order of Assistant Accounts Officer Download
1262 05-04-2017 Issue of LOCs to the various Divisions of PWD & I&F Department. Download
1263 31-03-2017 Mid Term Session & National Seminar on "Environment Preservation in Sustainable Development" to be held on 7-8 April, 2017 at Chandigarh Download
1264 31-03-2017 NHRC references pending with PWD. Download
1265 30-03-2017 Regarding distribution of budget and compilation of expenditure. Download
1266 30-03-2017 Arbitration case for all CE's Download
1267 30-03-2017 Compatibility of Admixtures With Different Types of Cements For Different Concrete Mixes (Call on Nomination) Download
1268 27-03-2017 Regarding Leave Entitlement and payment issue of contractual labour/Staff Download
1269 24-03-2017 Training Course on "Contract Administration" at National CPWD Academy,Ghaziabad, on 6th & 7th April, 2017 Download
1270 23-03-2017 Office Order Download
1271 23-03-2017 OFFICE MEMORANDUM Download
1272 23-03-2017 Transfer / Posting order of Assistant Accounts Officer Download
1273 17-03-2017 Benefits extended by EPFO/ESIC Download
1274 16-03-2017 Posting Order Of EE (Civil) Download
1275 14-03-2017 Non-Payment of Transport Allowance to various CPWD officers in PWD, GNCTD Download
1276 09-03-2017 Posting Order of AE (Civil) Download
1277 09-03-2017 Status of Installation of C&D Waste Treatment and recycling plants by PWD, GNCTD Download
1278 08-03-2017 Participated and Completed First full Marathon of 42.194 KM. by Assistant Engineer D. P. Jindal working as on PWD F-22 Ramesh Park New Delhi Download
1279 08-03-2017 Closer Office of Flyover F- 15 Download
1280 08-03-2017 Posting Order of closer office F-15 Staff Download
1281 06-03-2017 Posting Order of JE Download
1282 06-03-2017 Transfer / Posting Order of AE (Civil) Download
1283 06-03-2017 Transfer / Posting order of Assistant Administrative Officer Download
1284 03-03-2017 One Day Training Programme on Tile Master on 16th March ,2017 at IBC HQ. Sector VI, R.K.Puram, New Delhi 110022 Download
1285 01-03-2017 Transfer / Posting Order of EE(Civil) Download
1286 28-02-2017 PWD Sewa Mobile App Download
1287 27-02-2017 Training Course on "Practical Use of the FIDIC Contracts" on 7-8 March 2017 at Bengaluru and 9-10 March 2017 at Chennai. Download
1288 27-02-2017 Transfer & Posting Order Of AE (Civil) Download
1289 14-02-2017 Transfer / Posting order of AE (Civil) Download
1290 14-02-2017 Transfer / Posting order of Executive Engineer (Civil) Download
1291 06-02-2017 Transfer / Posting Order Of AE (Civil) Download
1292 03-02-2017 Transfer / Posting Order of AE (Civil) Download
1293 02-02-2017 Transfer / Posting Order of Chief Engineer CE(South) Download
1294 02-02-2017 Transfer / Posting Order of Chief Engineer CE(North) Download
1295 02-02-2017 Transfer / Posting Order of EE (Civil) Download
1296 02-02-2017 Transfer / Posting Order of SE (Civil) Download
1297 25-01-2017 Transfer / Posting Order of EE(Elect.) Download
1298 25-01-2017 Transfer / Posting Order of EE(Civil.) Download
1299 23-01-2017 Transfer / Posting Order of Director (Horticulture) Download
1300 19-01-2017 Nomination of Delegates for Mid Term Session & Seminar on 'Environment Preservation in Sustainable Development' to be held on 7-8 April 2017 at Chandigarh Download
1301 17-01-2017 Transfer / Posting Order of JE (Elect.) Download
1302 17-01-2017 Transfer & Posting Policy for Executive Engineer (Civil) (For other than Project Post). Download
1303 12-01-2017 Issue of LOCs to the various Divisions of PWD & I&F Department. Download
1304 12-01-2017 Transfer & Posting Order of Assistant Director Download
1305 12-01-2017 Transfer & Posting Order of Assistant Administrative Officer Download
1306 11-01-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1307 11-01-2017 Transfer / Posting Order Of EE (Civil) Download
1308 10-01-2017 Transfer & Posting Order of Assistant Account Officer Download
1309 10-01-2017 Transfer & Posting order of Office Superintendent Download
1310 03-01-2017 Payment of Processing Fee of C&D Waste at C&D waste Plant Shastri Park in EDMC Download
1311 27-12-2016 Transfer / Posting Order Of Assistant Engineer (Elect.) Download
1312 27-12-2016 Arbitration Cases in PWD. Download
1313 27-12-2016 Transfer /Posting Order Of Executive Engineer (Civil) Download
1314 23-12-2016 Transfer/Posting Order Of Deputy Director (Hort.) Download
1315 23-12-2016 Online Bidding Dates Month of February/March 2017 Download
1316 22-12-2016 Transfer / Posting of AE (Civil) Download
1317 16-12-2016 Advice of Central Vigilance Commission-Action to be taken by Concerned Department /Autonomous Bpdies regarding. Download
1318 16-12-2016 Examination of pending final bills. Download
1319 16-12-2016 Inspection of works by QAU of PWD, NCTD. Download
1320 16-12-2016 Transfer / Posting order of AE(Civil) Download
1321 13-12-2016 Filling up one post of Chief Engineer Civil group A gazetted non ministerial in andaman Public Works Department Download
1322 06-12-2016 Transfer / Posting Order of Junior Engineers (Civil) Download
1323 02-12-2016 Transfer / Posting Order of Office Superintedents (On Promotion) Download
1324 02-12-2016 Transfer / Posting Order Of Executive Engineer (Civil) Download
1325 29-11-2016 Transfer / Posting Order of AE (Elect.) Download
1326 28-11-2016 Uploading of the details of compassionate appointment dynamic module on the CPWD portal. Download
1327 23-11-2016 Transfer/Posting Order Of Assistant Engineer (Elect.) Download
1328 21-11-2016 Transfer / Posting Order of the Assistant Engineers (Civil) Download
1329 11-11-2016 Transfer & Posting Order Of SE (Civil) Download
1330 11-11-2016 Transfer & Posting Order Of Assistant Directors Download
1331 08-11-2016 Circular of extended date for online Bidding of Type-I,II, III & IV in 20/11/2016 to 05/12/2016 Download
1332 07-11-2016 Transfer / Posting order of EE (Civil) Download
1333 03-11-2016 Central vigilance Commission Integrity Pledge Certificate Of Public Works Department Download
1334 28-10-2016 CPWD Order No.142 Of 2016 Dated 29/09/2016 and Consequent Upon the their joining, Transfer / Posting Order Of Assistant (AD) Download
1335 27-10-2016 Circular of Next Bidding for Type-I,II, III & IV in November 2016 Download
1336 26-10-2016 Transfer and Posting Order of Assistant Engineers (Civil) Download
1337 26-10-2016 CPWD Order No. 99 dated 06/07/2016 & No. 141 Of 2016 and Consiquent Upon the joining Of Executive Engineer (Civil) Download
1338 26-10-2016 CPWD Order No. 97 Dated 02/07/2016 and Consiquent Upon the their joining the Transfer /Posting of Executive Engineer (Electrical) Download
1339 21-10-2016 Requirement of Office Space for allotment to officers of GNCTD Download
1340 26-09-2016 Allotment list of Type-II for the month of September 2016 Download
1341 26-09-2016 Allotment list of Type-III for the month of September 2016 Download
1342 23-09-2016 Transfer / Posting order of AE (Civil) Download
1343 21-09-2016 Transfer / Posting Order Of Assistant Engineer (Elect.) Download
1344 21-09-2016 Allotment list of Type-IV for the month of September 2016 Download
1345 16-09-2016 Transfer / Posting Order of Executive Engineer (Elect.) Download
1346 16-09-2016 Transfer / Posting Order Of Executive Engineer (Civil) Download
1347 16-09-2016 Transfer / Posting order of Assistant (AD) Download
1348 02-09-2016 Transfer / Posting Order of Executive Engineer (Elect.) Download
1349 02-09-2016 Transfer / Posting Order of Executive Engineer (Civil) Download
1350 31-08-2016 Circular Reg next Bidding for Type-I,II,III & V in September 2016 Download
1351 29-08-2016 Transfer / Posting Of Assistant Engineer (Civil) Download
1352 29-08-2016 Transfer / Posting order of Assistant Engineer (Elect.) Download
1353 29-08-2016 Transfer / Posting order of Assistant Director (Hort.) Download
1354 26-08-2016 Transfer / Posting of Assistant Accounts Officer Download
1355 24-08-2016 List of J.Es (civil) working in P.W.D Road Division's Delhi (More than 3 years) Download
1356 23-08-2016 Transfer & Posting of Executive Engineer(Elect.) Download
1357 23-08-2016 Nomination of Seminar Download
1358 11-08-2016 International Conference on "ROADTECH", Sustainable Road & Highways Download
1359 08-08-2016 Training Programme on Architectural Hardware in Buildings on 11 August, 2016 at IBC HQ Download
1360 01-08-2016 Transfer / Posting Order of Assistant Administrative Officer Download
1361 01-08-2016 Transfer / Posting Order of Executive Engineer (Civil) Download
1362 29-07-2016 Transfer / Posting Order of Assistant Engineer civil Download
1363 29-07-2016 Transfer / Posting Order of Executive Engineer Download
1364 28-07-2016 CORRIGENDUM- Modification of this order of even no. 1366 dated 26.07.2016 place of posting / may be read as O/o South West Road 1 Download
1365 28-07-2016 Transfer / Posting Order of Assistant Accounts officer Download
1366 27-07-2016 Transfer / Posting Order of Accounts officer Download
1367 26-07-2016 Transfer / Posting Order of AE (Civil) Download
1368 26-07-2016 Transfer / Posting Order of Office Suprintendents Download
1369 25-07-2016 Transfer / Posting Order of Assistant Director (O.L.) Download
1370 19-07-2016 Transfer / Posting Order of EE (Civil) Download
1371 18-07-2016 Minutes of Meeting of Medical Committee Convened on 19-04-2016 Download
1372 15-07-2016 Transfer / Posting Order of EE (Civil) Download
1373 14-07-2016 Retention of accommodation on re-employment after retirement Download
1374 14-07-2016 Transfer / Posting Order of EE (Elect.) Download
1375 13-07-2016 Requirement of Office Space to allotment in GNCTD Download
1376 12-07-2016 Regarding Regional Works Advisory Board for PWD Works Delhi Download
1377 01-07-2016 Transfer / Posting order in respect of OS Download
1378 30-06-2016 Policy for Addition/alterations/Up-Gradation works in General Pool Residential Buildings under Jurisdiction of PWD Delhi. Download
1379 29-06-2016 Online Bidding for Type-I, II, III & IV for the month of July-2016 Download
1380 29-06-2016 Bidding for Type I,II,III & IV in July 2016 Download
1381 23-06-2016 Transfer / Posting Order of AE (Civil) Download
1382 22-06-2016 Transfer / Posting of EE (Civil) Download
1383 15-06-2016 Example of government building from operation of municipal laws to regulate their eraction Download
1384 14-06-2016 Transfer Posting of Assistant Account officer Download
1385 08-06-2016 Call of Tender from Non-CPWD Contractors Download
1386 31-05-2016 Transfer/Posting of AE.(Civil) Download
1387 30-05-2016 Transfers/Postings of Senior Accounts Officers/Accounts Officers/Assistant Accounts Officers Download
1388 23-05-2016 Transfer and Posting of Office Superintendents Download
1389 23-05-2016 Transfer And Posting Of Executive Engineer (Civil) Download
1390 12-05-2016 Transfer and posting of AE (Elect.) Download
1391 12-05-2016 Transfer and Posting of EE (Civil) Download
1392 11-05-2016 Modified Setup of DDOs After Restructuring Download
1393 03-05-2016 Transfer and Posting of EE (Civil) Download
1394 02-05-2016 Next Online Bidding for Type-I,II,III & IV month of May 2016 Download
1395 29-04-2016 Transfer of Architects from PWD to CPWD Download
1396 29-04-2016 Re-Designation Download
1397 29-04-2016 Readiness list of AE (Civil) Download
1398 29-04-2016 Readiness list of AE (Elect.) Download
1399 25-04-2016 Transfer / Posting Order of Ministerial Staff Download
1400 21-04-2016 Appointment of Nodal Officer for mapping of PWD assets in GSDL. Download
1401 21-04-2016 Retention of govt. flat on Reteriment Download
1402 13-04-2016 Re scheduled The meeting of Medical Committee dated on 19.04.2016 Download
1403 06-04-2016 Deployment of DD(Hort.), AD (Hort.) & SO (Hort.) under PWD Download
1404 01-04-2016 Transfer / Posting Order of AE (Civil) Download
1405 01-04-2016 Occupation of GNCTD Houses by IAS and DANICS officers posted outside GNCTD - Placing of equivalent number of government houses with GNCTD, in lieu thereof Download
1406 30-03-2016 Current Duty Charge of Executive Engineer (E) to Assistant Engineer (E) Download
1407 30-03-2016 Current Duty Charge of Superintending Engineer (E) to Executive Engineer (E) Download
1408 29-03-2016 Current Duty Charge of Assistant Engineer (Civil) to Junior Engineers (Civil) Download
1409 18-03-2016 Transfer / Posting Order of EE (Civil) Download
1410 16-03-2016 Allotment of Govt. Flats to the Persons with Disability under Rule 8 and allotment under Rule 20 on medical ground Download
1411 15-03-2016 Transfer / Posting order of Assistant Accounts Officer Download
1412 10-03-2016 Modification of Letter No. E-in-C/P/29(1)/752 dated 02.02.2016, Transfer / Posting in grade of UDC issued by letter no. E-in-C/PR.DIR.(M)/27(6)/2016/1508 dated : 10.03.2016 Download
1413 10-03-2016 Office Order Download
1414 08-03-2016 Transfer / Posting Order of AE(Elect.) Download
1415 03-03-2016 Transfer / Posting Order of AE (Civil) Download
1416 03-03-2016 Transfer / Posting Order of Assistant Architects Download
1417 01-03-2016 Online Bidding Dates Month of March 2016 Download
1418 25-02-2016 Transfer / Posting Order of AE (Elect.) Download
1419 24-02-2016 Transfer / Posting Order of AE (Civil) Download
1420 23-02-2016 Transfer / Posting order of Office Superintendent Download
1421 17-02-2016 Transfer / Posting in respect of Office Superintendents Download
1422 17-02-2016 Transfer / Posting in the grade of AE (Elect.) Download
1423 17-02-2016 Modification of Allotment Space for Office's Eten. (CCTV,WiFi,Street Light ) Download
1424 16-02-2016 Deposition of Security deposit for temporary allotment of Govt. flats in connection with family events. Download
1425 16-02-2016 Regarding Terms & Condition for booking of Community Centres and Park in Residential Colonies of Delhi Govt. Download
1426 10-02-2016 Additional Charge of SE(E) Download
1427 10-02-2016 Transfer / Posting Order of Junior Engineer(E) Download
1428 10-02-2016 Transfer / Posting Order of Assistant Engineers (E) Download
1429 09-02-2016 Transfer/Posting of AE(Elect.) Download
1430 03-02-2016 Transfer/Posting of Executive Engineer (Civil) Download
1431 03-02-2016 Transfer/Posting of Executive Engineer (Civil) Download
1432 02-02-2016 Transfer / Posting of Ministerial Staff Download
1433 29-01-2016 Upgradation of Type-IV Residential (General Pool) Accommodation of PWD Govt. of NCT of DElhi at Maharaja Lane, into Type-V category Consequential ( Revision/ Enhancement of rates of Lincence Fee) Download
1434 29-01-2016 Transfer/Posting of Chief Engineer (Civil) Download
1435 29-01-2016 Transfer/Posting of Executive Engineer (Civil) Download
1436 29-01-2016 Transfer/Posting of Executive Engineer (Civil) as Superintending Engineer Download
1437 29-01-2016 Introduction of e-Awas module of "Online deduction of licence fee" by DDOs in respect of Govt. Accommodation of GNCTD employees. Download
1438 28-01-2016 Transfer/Posting order of Executive Engineer (Electrical) Download
1439 25-01-2016 Modified Allocation of Office Space Download
1440 22-01-2016 Transfer and Posting of Deputy Director (Horticulture) with Chief Engineer Download
1441 22-01-2016 The transfer / posting of Superintending Engineers as Chief Engineer on Current Duty Charge Download
1442 22-01-2016 Transfer /Posting Order of EE (Civil) Download
1443 21-01-2016 Additional charge of AAO Download
1444 21-01-2016 Modification of allotment space for office's CE (East) Download
1445 20-01-2016 Transfer / Posting order of AE (Civil) Download
1446 20-01-2016 Transfer/Posting order of AE (Civil) Download
1447 20-01-2016 Transfer/Posting order of SE (Civil) Download
1448 19-01-2016 Transfer / Posting Order of SE (Civil) Download
1449 08-01-2016 Transfer / Posting Order of AE (Elect.) Download
1450 07-01-2016 Transfer / Posting Order of Assistant accounts officer Download
1451 31-12-2015 Transfer / Posting Order of AE (Elect) Download
1452 30-12-2015 Transfer / Posting Order of Assistant Director (Hort.) Download
1453 29-12-2015 Transfer / Posting order of AE (Elect.) Download
1454 22-12-2015 Transfer / Posting Order of Dy. Director (Hort.) Download
1455 18-12-2015 Transfer / Posting order of ministerial staff Download
1456 18-12-2015 Transfer / Posting order of Drawing Staff Download
1457 16-12-2015 Transfer / Posting order of AAO Download
1458 16-12-2015 Transfer / Posting order of Executive Engineer (Civil) and Assistant Engineer (Civil) Download
1459 14-12-2015 Transfer / Posting order of AE Download
1460 14-12-2015 Transfer / Posting order of AE Download
1461 14-12-2015 Transfer / Posting order of AE Download
1462 11-12-2015 Transfer / Posting order of AE Download
1463 09-12-2015 This is in continuation to this office letter no. E-in-C/P/29(1)/2015/5457 dated. 18.11.2015, Additional allotment and modification space was made CPM Other Project M 242 Download
1464 07-12-2015 Transfer / Posting order of AE and D'man Grade-I Download
1465 04-12-2015 Transfer / Posting order of Office Superintendent Download
1466 04-12-2015 Filling of one post Superintending Engineer / Additional Chief Engineer on deputation basis in Public Works Department of Govt. of NCT of Delhi Download
1467 03-12-2015 Transfer / Posting order of Office Superintendent Download
1468 02-12-2015 Transfer / Posting order of Assistant Administrative Officers Download
14