1
|
21/05/2022 |
Project Electrical Division
|
Electrical work in corridors Block C, Flat No-5 |
5,99,047 |
11,981 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222732_1
Electrical work in corridors Block C, Flat No-5
2022_PWD_222732_1
|
2
|
21/05/2022 |
Project Electrical Division
|
Protection system / Upgradation of electrical installations |
5,94,855 |
11,897 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222713_1
Protection system / Upgradation of electrical installations
2022_PWD_222713_1
|
3
|
21/05/2022 |
South East Road Division 1
|
Providing running and maintaining Anti Smog Gun on hire basis at various locations under Sub-Division SER-11 |
65,27,304 |
1,30,546 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222696_1
Providing running and maintaining Anti Smog Gun on hire basis at various locations under Sub-Division SER-11
2022_PWD_222696_1
|
4
|
21/05/2022 |
Project Electrical Division
|
Supplying and replacement of Indoor Stairlift installed at Saket Court Complex, New Delhi |
5,85,308 |
11,706 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222712_1
Supplying and replacement of Indoor Stairlift installed at Saket Court Complex, New Delhi
2022_PWD_222712_1
|
5
|
21/05/2022 |
South East Road Division 1
|
Providing running and maintaining Anti Smog Gun on hire basis at various locations under Sub-Division SER-12 |
65,27,304 |
1,30,546 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222698_1
Providing running and maintaining Anti Smog Gun on hire basis at various locations under Sub-Division SER-12
2022_PWD_222698_1
|
6
|
21/05/2022 |
Health Project Electrical Division
|
Replacement/Repair of Air circuit breakers in Substation installed at Guru Nanek Eye Hospital, New Delhi |
5,30,486 |
10,610 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222697_1
Replacement/Repair of Air circuit breakers in Substation installed at Guru Nanek Eye Hospital, New Delhi
2022_PWD_222697_1
|
7
|
21/05/2022 |
North Electrical Maintenance Division
|
Requirement of multipurpose hall and Two lab and One library for smooth running of academics at GGSSS Bankner Delhi-40 (School ID -1310049) (Bldg. ID- 13101408) (EOR ID - 20191798) |
11,32,409 |
22,648 |
30/05/2022 03:00 PM |
30/05/2022 03:30 PM |
2022_PWD_222721_1
Requirement of multipurpose hall and Two lab and One library for smooth running of academics at GGSSS Bankner Delhi-40 (School ID -1310049) (Bldg. ID- 13101408) (EOR ID - 20191798)
2022_PWD_222721_1
|
8
|
21/05/2022 |
South East Building Maintenance Division
|
Repair and Renovation of DSEU Campus Delhi Institute of Tool Engineering (D.I.T.E.), Okhla Phase- II, New Delhi during 2022-23. (Civil & Electrical works) |
95,13,085 |
1,90,262 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222714_1
Repair and Renovation of DSEU Campus Delhi Institute of Tool Engineering (D.I.T.E.), Okhla Phase- II, New Delhi during 2022-23. (Civil & Electrical works)
2022_PWD_222714_1
|
9
|
21/05/2022 |
Health Project Electrical Division
|
Providing various E & M services at new Pharmacy Block at GNEC, New Delhi. |
4,53,394 |
9,068 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222716_1
Providing various E & M services at new Pharmacy Block at GNEC, New Delhi.
2022_PWD_222716_1
|
10
|
21/05/2022 |
South East Building Maintenance Division
|
Construction of Toilet block, Temporary shade and other miscellaneous civil works in Fire Station Okhla Phase-I, New Delhi during 2022-23 |
5,32,753 |
10,655 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222691_1
Construction of Toilet block, Temporary shade and other miscellaneous civil works in Fire Station Okhla Phase-I, New Delhi during 2022-23
2022_PWD_222691_1
|
11
|
21/05/2022 |
North Building Division
|
Construction of boundary wall on vacant land measuring 3093 Sq. Mtr. (approx 3700 Sq. Yard) bearing Khasra No.47 & 48/1 in Village- Ibrahimpur District North |
85,97,488 |
1,71,950 |
30/05/2022 03:00 PM |
30/05/2022 03:30 PM |
2022_PWD_222705_1
Construction of boundary wall on vacant land measuring 3093 Sq. Mtr. (approx 3700 Sq. Yard) bearing Khasra No.47 & 48/1 in Village- Ibrahimpur District North
2022_PWD_222705_1
|
12
|
21/05/2022 |
South East Road Division 2
|
Construction of wall for Agra Canal Nallah near MLA office to avoid any accident on Road No. 13 A under jurisdiction SER-2/22. |
25,18,923 |
50,378 |
30/05/2022 03:00 PM |
30/05/2022 03:30 PM |
2022_PWD_222710_1
Construction of wall for Agra Canal Nallah near MLA office to avoid any accident on Road No. 13 A under jurisdiction SER-2/22.
2022_PWD_222710_1
|
13
|
21/05/2022 |
South East Road Division 2
|
Raising and repairing of footpath on SA Road |
39,61,347 |
79,227 |
30/05/2022 03:00 PM |
30/05/2022 03:30 PM |
2022_PWD_222706_1
Raising and repairing of footpath on SA Road
2022_PWD_222706_1
|
14
|
21/05/2022 |
North East Road & Buidling Division
|
Construction of puff panel store room near pump house and record room on the roof of J Block in DC office complex, Nand Nagri, Delhi |
19,16,670 |
38,333 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222670_1
Construction of puff panel store room near pump house and record room on the roof of J Block in DC office complex, Nand Nagri, Delhi
2022_PWD_222670_1
|
15
|
21/05/2022 |
South West Elect Maintenance Division
|
Electrical work |
13,43,521 |
26,870 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222673_1
Electrical work
2022_PWD_222673_1
|
16
|
21/05/2022 |
Health Central Maintenance Division
|
Providing & Placing Airport chairs in waiting hall near ward-14, Near New Medical Block, Gynae emergency entrance, Gynae waiting hall, Near Casualty, Radiotherapy waiting hall and in the department of Radio diagnosis at Lok Nayak Hospital, New Delhi |
31,27,866 |
62,557 |
30/05/2022 03:00 PM |
30/05/2022 03:30 PM |
2022_PWD_222699_1
Providing & Placing Airport chairs in waiting hall near ward-14, Near New Medical Block, Gynae emergency entrance, Gynae waiting hall, Near Casualty, Radiotherapy waiting hall and in the department of Radio diagnosis at Lok Nayak Hospital, New Delhi
2022_PWD_222699_1
|
17
|
21/05/2022 |
Elect Maint Division (South East) Sub Div 2
|
Comprehensive Maintenance of Dahua make CCTV System installed at SDM office, Tughlakabad |
1,61,028 |
3,221 |
27/05/2022 03:00 PM |
27/05/2022 11:35 AM |
2022_PWD_222693_1
Comprehensive Maintenance of Dahua make CCTV System installed at SDM office, Tughlakabad
2022_PWD_222693_1
|
18
|
21/05/2022 |
South West Building & Dwarka Court Maintenance Division
|
Misc. repairing and renovation work at PWD Electric Maintenance (South West), GNCTD, J.B. Tito Marg, Andrews Ganj, New Delhi. |
24,93,647 |
49,873 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222675_1
Misc. repairing and renovation work at PWD Electric Maintenance (South West), GNCTD, J.B. Tito Marg, Andrews Ganj, New Delhi.
2022_PWD_222675_1
|
19
|
21/05/2022 |
South West Building & Dwarka Court Maintenance Division
|
Replacement of Gypsum board false ceiling by P/F G.I. Metal Flase Ceiling and repair/re-strenthening of damaged portion of slab, corridor area of C & D Wing 7th floor Dwarka Court Complex |
66,88,311 |
1,33,766 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222681_1
Replacement of Gypsum board false ceiling by P/F G.I. Metal Flase Ceiling and repair/re-strenthening of damaged portion of slab, corridor area of C & D Wing 7th floor Dwarka Court Complex
2022_PWD_222681_1
|
20
|
21/05/2022 |
Central & New Delhi Road Division
|
Providing and fixing Overhead Signages, Direction Signages, Road Name Signage, Place Identification Signage and Cautionary/Mandatory Signages on Various Roads under Sub Division-1 of Division C&ND- Roads, New Delhi |
95,41,564 |
1,90,831 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222546_1
Providing and fixing Overhead Signages, Direction Signages, Road Name Signage, Place Identification Signage and Cautionary/Mandatory Signages on Various Roads under Sub Division-1 of Division C&ND- Roads, New Delhi
2022_PWD_222546_1
|
21
|
21/05/2022 |
Central & New Delhi Road Division
|
Providing and fixing Overhead Signages and Direction Signages in Ring Road Bypass from Geeta Colony Flyover to Mangi Bridge, CNG Crematorium Road, Court Road, Club Road, Under Hill Road, Flag Staff Road Shamnath Marg, Raj Niwas Road & Mahatma Gandhi Road from Nigam Bodh Ghat subway to Timarpur Red Light under Sub Division-3 of Division C&ND- Roads, New Delhi. |
96,22,321 |
1,92,446 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222537_1
Providing and fixing Overhead Signages and Direction Signages in Ring Road Bypass from Geeta Colony Flyover to Mangi Bridge, CNG Crematorium Road, Court Road, Club Road, Under Hill Road, Flag Staff Road Shamnath Marg, Raj Niwas Road & Mahatma Gandhi Road from Nigam Bodh Ghat subway to Timarpur Red Light under Sub Division-3 of Division C&ND- Roads, New Delhi.
2022_PWD_222537_1
|
22
|
21/05/2022 |
Tees Hazari, Vidhan Sabha & LG House Maintenance Division
|
Servicing and repairing of Toughened Glass Door and Compactors/Optimizer at Tis Hazari Courts, Delhi |
11,26,702 |
22,534 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222667_1
Servicing and repairing of Toughened Glass Door and Compactors/Optimizer at Tis Hazari Courts, Delhi
2022_PWD_222667_1
|
23
|
21/05/2022 |
Tees Hazari, Vidhan Sabha & LG House Maintenance Division
|
Misc. Civil repair works in Court Rooms, Chambers and Branches |
41,98,835 |
83,977 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222666_1
Misc. Civil repair works in Court Rooms, Chambers and Branches
2022_PWD_222666_1
|
24
|
20/05/2022 |
AE (C) (West) Road 13
|
Repair of damaged footpath at Shaheed Bhagat Singh Marg (Jail Road) from Hari Nagar Depot. to Lajwanti Chowk under Sub Division WR-11 |
64,46,503 |
1,28,930 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222633_1
Repair of damaged footpath at Shaheed Bhagat Singh Marg (Jail Road) from Hari Nagar Depot. to Lajwanti Chowk under Sub Division WR-11
2022_PWD_222633_1
|
25
|
20/05/2022 |
SRD Project Division 1
|
Construction of slip road for smooth traffic movement at Chhatta Rail SPM Marg. (Recall of Tender) |
25,46,748 |
50,935 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222655_1
Construction of slip road for smooth traffic movement at Chhatta Rail SPM Marg. (Recall of Tender)
2022_PWD_222655_1
|
26
|
20/05/2022 |
SRD Project Division 1
|
Laying C.C. Road, Type-IV, Temple side of BSNL qtr at Kalibari Marg, New Delhi Constituency (AC-40), under Mukhyamantri Sadak Punarnirman Yojna (Recall of Tender) |
9,09,738 |
18,195 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222658_1
Laying C.C. Road, Type-IV, Temple side of BSNL qtr at Kalibari Marg, New Delhi Constituency (AC-40), under Mukhyamantri Sadak Punarnirman Yojna (Recall of Tender)
2022_PWD_222658_1
|
27
|
20/05/2022 |
SRD Project Division 1
|
Establishment of resource centres at SKV Pandara Road, New Delhi |
41,08,264 |
82,165 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222662_1
Establishment of resource centres at SKV Pandara Road, New Delhi
2022_PWD_222662_1
|
28
|
20/05/2022 |
SRD Project Division 1
|
Renovation/ repair of Mediation Centre, Parliament Street, New Delhi |
13,40,307 |
26,806 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222660_1
Renovation/ repair of Mediation Centre, Parliament Street, New Delhi
2022_PWD_222660_1
|
29
|
20/05/2022 |
Health Maint Elect Division Central Sub Div 4
|
Repairing and replacement of Non functional APFC Panel and accessories |
3,86,802 |
7,736 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222661_1
Repairing and replacement of Non functional APFC Panel and accessories
2022_PWD_222661_1
|
30
|
20/05/2022 |
Central & New Delhi Building Maintenance Division
|
Construction of New SPS workshop cum classroom G+1 at Sir C.V. Raman ITI Dheerpur Delhi. (Civil & Electrical Works) |
4,04,62,900 |
8,09,258 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222638_1
Construction of New SPS workshop cum classroom G+1 at Sir C.V. Raman ITI Dheerpur Delhi. (Civil & Electrical Works)
2022_PWD_222638_1
|
31
|
20/05/2022 |
Health Maint Elect Division (South West) Sub Div 4
|
Providing various EandM services in Room No 201 at OPD Block at GENC, New Delhi |
1,43,412 |
2,868 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222654_1
Providing various EandM services in Room No 201 at OPD Block at GENC, New Delhi
2022_PWD_222654_1
|
32
|
20/05/2022 |
South Road Division 1
|
Opening of additional cut at SSB Point and closing of existing cuts on M.G. Road and providing Crash Barriers at the damaged location on M.G. Road under Sub-Division SR-15 |
94,76,385 |
1,89,528 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222646_1
Opening of additional cut at SSB Point and closing of existing cuts on M.G. Road and providing Crash Barriers at the damaged location on M.G. Road under Sub-Division SR-15
2022_PWD_222646_1
|
33
|
20/05/2022 |
Horticulture South Division
|
Providing and Planting of different types plants |
5,31,000 |
10,620 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222583_1
Providing and Planting of different types plants
2022_PWD_222583_1
|
34
|
20/05/2022 |
Horticulture South Division
|
Providing Displaying and Planting of Summer seasonal flowering plants |
5,23,015 |
10,460 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222593_1
Providing Displaying and Planting of Summer seasonal flowering plants
2022_PWD_222593_1
|
35
|
20/05/2022 |
North West Electrical Maintenance Division
|
Replacement of Fire Hydrant riser and Fire Fighting accessories |
9,71,857 |
19,437 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222601_1
Replacement of Fire Hydrant riser and Fire Fighting accessories
2022_PWD_222601_1
|
36
|
20/05/2022 |
North West Electrical Maintenance Division
|
Providing Maintenance Van During Monsoon |
14,88,120 |
29,762 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222604_1
Providing Maintenance Van During Monsoon
2022_PWD_222604_1
|
37
|
20/05/2022 |
Horticulture South Division
|
Providing and displaying of diff. types of seasonal and foliage plants |
4,53,563 |
9,071 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222602_1
Providing and displaying of diff. types of seasonal and foliage plants
2022_PWD_222602_1
|
38
|
20/05/2022 |
West Electrical Maintenance Division
|
1. Providing of M.S. Pipe at Various underpasses. 2. Providing Maintenance Van along with dewatering pumps emergency staff where ever required under West Electrical Division |
23,86,178 |
47,724 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222642_1
1. Providing of M.S. Pipe at Various underpasses. 2. Providing Maintenance Van along with dewatering pumps emergency staff where ever required under West Electrical Division
2022_PWD_222642_1
|
39
|
20/05/2022 |
SRD Project Division 1
|
Repairing and Improvement of Approach Road-I from Road No.-47 to Nichlosan Road under Sub Division-1/SRDP-I |
36,95,314 |
73,906 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222644_1
Repairing and Improvement of Approach Road-I from Road No.-47 to Nichlosan Road under Sub Division-1/SRDP-I
2022_PWD_222644_1
|
40
|
20/05/2022 |
Project Electrical Division
|
Supplying, Installation, Testing & Commissioning of Various Types of Pump Sets at Vijay Ghat, Mangi Bridge & Salimgarh Underpass Pump Houses |
19,51,324 |
39,026 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222631_1
Supplying, Installation, Testing & Commissioning of Various Types of Pump Sets at Vijay Ghat, Mangi Bridge & Salimgarh Underpass Pump Houses
2022_PWD_222631_1
|
41
|
20/05/2022 |
Horticulture South Division
|
Providing and displaying of ornamental foliage potted plants |
4,18,949 |
8,379 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222608_1
Providing and displaying of ornamental foliage potted plants
2022_PWD_222608_1
|
42
|
20/05/2022 |
Health Maint Elect Division Central Sub Div 4
|
Comprehensive Maintenance of Sagar make Modular LED Display and Exit Sign Boards at GNEC |
5,83,020 |
11,660 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222620_1
Comprehensive Maintenance of Sagar make Modular LED Display and Exit Sign Boards at GNEC
2022_PWD_222620_1
|
43
|
20/05/2022 |
AE (C) (West) Road 13
|
Repair of damaged footpath at Shaheed Bhagat Singh Marg Jail Road from Hari Nagar Depot. to Lajwanti Chowk under Sub Division WR 11 |
64,46,503 |
1,28,930 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222626_1
Repair of damaged footpath at Shaheed Bhagat Singh Marg Jail Road from Hari Nagar Depot. to Lajwanti Chowk under Sub Division WR 11
2022_PWD_222626_1
|
44
|
20/05/2022 |
Health Maint Elect Division East Sub Div 1
|
Hiring of Inspection of Vehicle in O/o SE (E) |
|
5,000 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222648_1
Hiring of Inspection of Vehicle in O/o SE (E)
2022_PWD_222648_1
|
45
|
20/05/2022 |
North West Electrical Maintenance Division
|
Electrical work for new rooms and replacement of air conditioners and providing Fans, Fittings in MP Hall Table Tennis Sports Complex at SV, FU-Block, Pitampura, Shalimar Bagh, Delhi. (School ID-1411008) |
12,13,631 |
24,273 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222632_1
Electrical work for new rooms and replacement of air conditioners and providing Fans, Fittings in MP Hall Table Tennis Sports Complex at SV, FU-Block, Pitampura, Shalimar Bagh, Delhi. (School ID-1411008)
2022_PWD_222632_1
|
46
|
20/05/2022 |
North West Electrical Maintenance Division
|
Replacement of old burnout cables at Central verge under NWESD-III |
66,84,678 |
1,33,694 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222606_1
Replacement of old burnout cables at Central verge under NWESD-III
2022_PWD_222606_1
|
47
|
20/05/2022 |
Central & New Delhi Electrical Maintenance Division
|
SITC of VRV/ VRF Air Condition Plant |
24,26,707 |
48,534 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222639_1
SITC of VRV/ VRF Air Condition Plant
2022_PWD_222639_1
|
48
|
20/05/2022 |
Other Project Electrical Division
|
Supply and fixing of Solar Hybrid Street Light System at Prison Head Quarter of Mandoli Jail |
5,73,456 |
11,469 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222588_1
Supply and fixing of Solar Hybrid Street Light System at Prison Head Quarter of Mandoli Jail
2022_PWD_222588_1
|
49
|
20/05/2022 |
North East Road & Buidling Division
|
Road restoration of Road No. 63, Road No. 66, Tanki Road and Loni Road cut by DJB under PWD NE (B&R) Division dg. 2022-23. |
76,33,623 |
1,52,672 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222611_1
Road restoration of Road No. 63, Road No. 66, Tanki Road and Loni Road cut by DJB under PWD NE (B&R) Division dg. 2022-23.
2022_PWD_222611_1
|
50
|
20/05/2022 |
Maint Sub Div Elect M 3531
|
Rewinding re-installation testing and commissioning of worn out 500 KVA HT Transformer |
|
|
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222622_1
Rewinding re-installation testing and commissioning of worn out 500 KVA HT Transformer
2022_PWD_222622_1
|
51
|
20/05/2022 |
Health Central Elect Maintenance Division
|
Up gradation of existing electrical panel board cable and providing new feeder pillar for Old Boys Hostel at MAMC, New Delhi |
22,38,908 |
44,778 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222600_1
Up gradation of existing electrical panel board cable and providing new feeder pillar for Old Boys Hostel at MAMC, New Delhi
2022_PWD_222600_1
|
52
|
20/05/2022 |
Electrical West Sub Division 2 (M 1312)
|
Replacement and Retrofitting of Breakers in existing Sub Station panel board |
5,78,348 |
11,567 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222586_1
Replacement and Retrofitting of Breakers in existing Sub Station panel board
2022_PWD_222586_1
|
53
|
20/05/2022 |
East Building Division
|
Renovation of PWD Enquiry offices at 405 DA flats Kalyanwas |
17,00,428 |
34,009 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222591_1
Renovation of PWD Enquiry offices at 405 DA flats Kalyanwas
2022_PWD_222591_1
|
54
|
20/05/2022 |
East Building & Players Building Electrical Division
|
Operation and Maintenance of Sub Station, DG Set and Pump House |
59,00,416 |
1,18,008 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222590_1
Operation and Maintenance of Sub Station, DG Set and Pump House
2022_PWD_222590_1
|
55
|
20/05/2022 |
East Building Division
|
Providing services for Security Guard and Non Technical Assistant at CWG Providing and fixing Fencing of boundary wall Providing and fixing Kota stone and Minor works |
22,72,440 |
45,449 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222596_1
Providing services for Security Guard and Non Technical Assistant at CWG Providing and fixing Fencing of boundary wall Providing and fixing Kota stone and Minor works
2022_PWD_222596_1
|
56
|
20/05/2022 |
Project Electrical Division
|
Hiring of Tractor PTO Driven Positive Displacement Rotary Lobe Pump at various locations during Monsoon Season |
79,60,950 |
1,59,219 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222618_1
Hiring of Tractor PTO Driven Positive Displacement Rotary Lobe Pump at various locations during Monsoon Season
2022_PWD_222618_1
|
57
|
20/05/2022 |
Health Central Elect Maintenance Division
|
Routine, operation and maintenance of Stacker and Puzzle car Parking system |
36,90,888 |
73,818 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222624_1
Routine, operation and maintenance of Stacker and Puzzle car Parking system
2022_PWD_222624_1
|
58
|
20/05/2022 |
Health Central Elect Maintenance Division
|
Day to day Running Maintenance & Operation of Electrical and Mechanical services of MAIDS Phase- II Building, New Delhi |
99,66,547 |
1,99,331 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222617_1
Day to day Running Maintenance & Operation of Electrical and Mechanical services of MAIDS Phase- II Building, New Delhi
2022_PWD_222617_1
|
59
|
20/05/2022 |
South Bldg & Saket Court Maintenance Division
|
Providing G.I. pipe line between Bore well near DPS School and underground tank at District Court Complex, Saket |
5,03,298 |
10,066 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222625_1
Providing G.I. pipe line between Bore well near DPS School and underground tank at District Court Complex, Saket
2022_PWD_222625_1
|
60
|
20/05/2022 |
Health Maint Elect Division East Sub Div 1
|
Providing & fixing of Submersible pumps, pipes with its accessories |
5,21,985 |
10,440 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222623_1
Providing & fixing of Submersible pumps, pipes with its accessories
2022_PWD_222623_1
|
61
|
20/05/2022 |
Elect Maint Division (South East) Sub Div 3
|
Supplying and Replacement of box type starter panel, wornout pipe and valves |
1,23,623 |
2,472 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222613_1
Supplying and Replacement of box type starter panel, wornout pipe and valves
2022_PWD_222613_1
|
62
|
20/05/2022 |
Elect Maint Division (South East) Sub Div 3
|
Rewiring and replacement of defective/wornout light fittings, AC and Water Cooler with RO system in VREC Jangpura AC-41, Lajpat Nagar and VREC Meethapur New Delhi. |
4,35,458 |
8,709 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222612_1
Rewiring and replacement of defective/wornout light fittings, AC and Water Cooler with RO system in VREC Jangpura AC-41, Lajpat Nagar and VREC Meethapur New Delhi.
2022_PWD_222612_1
|
63
|
20/05/2022 |
AE (C) (West) Road 13
|
Repairing of drain on Kendriya Vidyalaya, Vikaspuri, Division WR-1 during 2022-2023 |
58,91,994 |
1,17,840 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222485_2
Repairing of drain on Kendriya Vidyalaya, Vikaspuri, Division WR-1 during 2022-2023
2022_PWD_222485_2
|
64
|
20/05/2022 |
SRD Project Division 2
|
Raising and replacement of damage/missing kerb stone, making Noising, Pedestrian crossing path at central verge at Sarawati marg, Ganga mandir marg, Gurudwara road, Arya samaj road, Khajoor road and other misc work. |
50,30,706 |
1,00,614 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222599_1
Raising and replacement of damage/missing kerb stone, making Noising, Pedestrian crossing path at central verge at Sarawati marg, Ganga mandir marg, Gurudwara road, Arya samaj road, Khajoor road and other misc work.
2022_PWD_222599_1
|
65
|
20/05/2022 |
SRD Project Division 2
|
Improvement of footpath at Deshraj Bhatia Marg and construction of R.C.C. Wall near Khatta ( MCD garbage dumping) at Qutub Road. |
38,10,314 |
76,206 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222605_1
Improvement of footpath at Deshraj Bhatia Marg and construction of R.C.C. Wall near Khatta ( MCD garbage dumping) at Qutub Road.
2022_PWD_222605_1
|
66
|
20/05/2022 |
South Road Division 2
|
Providing services of JCB, Dumper, Mobile Crane(Hydra), Beldar for day to day repair work and Disposal / Removal of Malba for Sub Division-I,II,III and IV |
29,52,567 |
59,051 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222598_1
Providing services of JCB, Dumper, Mobile Crane(Hydra), Beldar for day to day repair work and Disposal / Removal of Malba for Sub Division-I,II,III and IV
2022_PWD_222598_1
|
67
|
20/05/2022 |
South West (Elect) Sub Div 3 (M 1523)
|
Up-gradation and replacement of all electronics parts including PCB kit for indication control, PCB kit for digital indicating, PCB kit for hooter, 12-0-12 & 6-0-6 Transformer`, Relays, Sensor, Digital and soldering with sleeves sensing device of Jyoti Controls make. |
3,98,026 |
7,961 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222595_1
Up-gradation and replacement of all electronics parts including PCB kit for indication control, PCB kit for digital indicating, PCB kit for hooter, 12-0-12 & 6-0-6 Transformer`, Relays, Sensor, Digital and soldering with sleeves sensing device of Jyoti Controls make.
2022_PWD_222595_1
|
68
|
20/05/2022 |
Health North Project Division
|
Internal renovation/refurnishing of various spaces of Sanjay Gandhi Memorial Hospital such as library, accounts section office and quality control cell for Civil work |
39,50,005 |
79,000 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222587_1
Internal renovation/refurnishing of various spaces of Sanjay Gandhi Memorial Hospital such as library, accounts section office and quality control cell for Civil work
2022_PWD_222587_1
|
69
|
20/05/2022 |
HC&ND Elect Sub Division (M 4511)
|
Providing Extension Boards in various room. |
|
|
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222581_1
Providing Extension Boards in various room.
2022_PWD_222581_1
|
70
|
20/05/2022 |
SRD Project Division 2
|
Restoration of various roads cut by JIO Digital Fiber Pvt. Ltd, Delhi Jal Board and other illegal cutting by different agencies under Jurisdiction of Sub Division –III of SRD Project Division II, PWD New Delhi during 2022-23 |
47,52,100 |
95,042 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222592_1
Restoration of various roads cut by JIO Digital Fiber Pvt. Ltd, Delhi Jal Board and other illegal cutting by different agencies under Jurisdiction of Sub Division –III of SRD Project Division II, PWD New Delhi during 2022-23
2022_PWD_222592_1
|
71
|
20/05/2022 |
Elect Maint Division (South East) Sub Div 2
|
Providing Peon and messenger in EMSD-II, Giri Nagar, Kalkaji |
5,13,648 |
10,273 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222589_1
Providing Peon and messenger in EMSD-II, Giri Nagar, Kalkaji
2022_PWD_222589_1
|
72
|
20/05/2022 |
Maint Sub Div Elect M 3532
|
Dismantling checking of existing ceiling fans and replacement of fan down rods at Lakshmi Bai College Ashok Vihar Delhi |
|
|
25/05/2022 03:00 PM |
25/05/2022 03:30 PM |
2022_PWD_222579_1
Dismantling checking of existing ceiling fans and replacement of fan down rods at Lakshmi Bai College Ashok Vihar Delhi
2022_PWD_222579_1
|
73
|
20/05/2022 |
South Bldg & Saket Court Maintenance Division
|
Making arrangement of water through stainless steel water tankers |
5,65,200 |
11,304 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222566_1
Making arrangement of water through stainless steel water tankers
2022_PWD_222566_1
|
74
|
20/05/2022 |
South East Road Division 2
|
Providing and operation of water tanker on various roads under SER-25 |
11,04,840 |
22,097 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_221360_2
Providing and operation of water tanker on various roads under SER-25
2022_PWD_221360_2
|
75
|
20/05/2022 |
Health West Project Division
|
Construction of Shed For Manifold Room and Waste Compositing Plant in Guru Gobind Singh Govt. Hospital, Raghubir Nagar, New Delhi 110027 |
20,54,383 |
41,088 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222577_1
Construction of Shed For Manifold Room and Waste Compositing Plant in Guru Gobind Singh Govt. Hospital, Raghubir Nagar, New Delhi 110027
2022_PWD_222577_1
|
76
|
20/05/2022 |
South East Road Division 2
|
Providing and operation of water tanker on various roads under SER-21 |
11,04,840 |
22,097 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_221359_2
Providing and operation of water tanker on various roads under SER-21
2022_PWD_221359_2
|
77
|
20/05/2022 |
South East Road Division 2
|
Supply of material for day to day maintenance |
9,62,090 |
19,242 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_220777_2
Supply of material for day to day maintenance
2022_PWD_220777_2
|
78
|
20/05/2022 |
Health West Project Division
|
Supply of potable (Delhi Jal Board) water through water tankers to meet day to day water requirement |
11,63,520 |
23,270 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222570_1
Supply of potable (Delhi Jal Board) water through water tankers to meet day to day water requirement
2022_PWD_222570_1
|
79
|
20/05/2022 |
Shahadra Road Division
|
Making arrangement of raising the Road surface to avoid water logging at Apsara Border MCD Toll Plaza, G.T. Road |
28,86,532 |
57,731 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_222571_1
Making arrangement of raising the Road surface to avoid water logging at Apsara Border MCD Toll Plaza, G.T. Road
2022_PWD_222571_1
|
80
|
20/05/2022 |
Health South West Elect Maintenance Division
|
Maintenance and Services for PC installed at Division Office and All Sub Division Offices |
11,09,958 |
22,199 |
28/05/2022 03:00 PM |
28/05/2022 03:30 PM |
2022_PWD_222575_1
Maintenance and Services for PC installed at Division Office and All Sub Division Offices
2022_PWD_222575_1
|
81
|
20/05/2022 |
North Building Division
|
Providing for Services Day to Day Maintenance |
17,04,456 |
34,089 |
30/05/2022 03:00 PM |
30/05/2022 03:30 PM |
2022_PWD_222567_1
Providing for Services Day to Day Maintenance
2022_PWD_222567_1
|
82
|
20/05/2022 |
North Electrical Maintenance Division
|
Providing, Installation, Testing and Commissioning of Bio-remediation Waste Water Treatment Plant using Inert Solid Removal (ISR) technology of capacity 0.75 MLD and Construction of under Ground Water Tank of Capacity 2.0 Lakh Ltr. Near Chhatarsal Stadium, Mall Road, Delhi |
2,76,68,531 |
5,53,371 |
30/05/2022 03:00 PM |
30/05/2022 03:30 PM |
2022_PWD_222565_1
Providing, Installation, Testing and Commissioning of Bio-remediation Waste Water Treatment Plant using Inert Solid Removal (ISR) technology of capacity 0.75 MLD and Construction of under Ground Water Tank of Capacity 2.0 Lakh Ltr. Near Chhatarsal Stadium, Mall Road, Delhi
2022_PWD_222565_1
|
83
|
20/05/2022 |
Project Electrical Division
|
Comprehensive maintenance of Sagar Make moving message display boards & emergency signal convertor |
13,29,576 |
26,592 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222560_1
Comprehensive maintenance of Sagar Make moving message display boards & emergency signal convertor
2022_PWD_222560_1
|
84
|
20/05/2022 |
South East Road Division 2
|
Providing and operation of water tanker on various roads under SER-23 |
11,04,840 |
22,097 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_221361_2
Providing and operation of water tanker on various roads under SER-23
2022_PWD_221361_2
|
85
|
20/05/2022 |
South East Road Division 2
|
Providing and operation of water tanker on various roads under SER-22 |
11,04,840 |
22,097 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_221351_2
Providing and operation of water tanker on various roads under SER-22
2022_PWD_221351_2
|
86
|
20/05/2022 |
South East Road Division 2
|
Supply of material for day to day maintenance |
15,98,023 |
31,960 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_220773_2
Supply of material for day to day maintenance
2022_PWD_220773_2
|
87
|
20/05/2022 |
South East Road Division 2
|
Supply of material for day to day maintenance |
22,74,257 |
45,485 |
27/05/2022 03:00 PM |
27/05/2022 03:30 PM |
2022_PWD_220783_2
Supply of material for day to day maintenance
2022_PWD_220783_2
|
88
|
20/05/2022 |
South East Elect Maintenance Division
|
RMO Various E&M Services in 72 Nos. Flats GK-I under Sub-Division-II, PWD,South East, Giri Nagar, Kalkaji, New Delhi |
23,08,896 |
46,178 |
30/05/2022 03:00 PM |
30/05/2022 03:30 PM |
2022_PWD_222562_1
RMO Various E&M Services in 72 Nos. Flats GK-I under Sub-Division-II, PWD,South East, Giri Nagar, Kalkaji, New Delhi
2022_PWD_222562_1
|
89
|
20/05/2022 |
South East Road Division 1
|
Providing & fixing PC lite poly carbonate sheet multi wall sheet panelling for noising barrier on Barapullah Elevated road starting from INA Metro Station, under PWD SubDivision SER-14 of Division SER-1 |
27,81,252 |
55,625 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222561_1
Providing & fixing PC lite poly carbonate sheet multi wall sheet panelling for noising barrier on Barapullah Elevated road starting from INA Metro Station, under PWD SubDivision SER-14 of Division SER-1
2022_PWD_222561_1
|
90
|
20/05/2022 |
South East Road Division 1
|
Repair of footpath and Toe wall on Ring Road between AIIMS to Moolchand |
96,46,440 |
1,92,929 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222559_1
Repair of footpath and Toe wall on Ring Road between AIIMS to Moolchand
2022_PWD_222559_1
|
91
|
20/05/2022 |
HC&ND Elect Sub Division (M 4513)
|
Supplying Replacement of various E&M accessories at Various Pump House |
5,89,945 |
11,799 |
25/05/2022 03:00 PM |
25/05/2022 03:30 PM |
2022_PWD_222554_1
Supplying Replacement of various E&M accessories at Various Pump House
2022_PWD_222554_1
|
92
|
20/05/2022 |
HC&ND Elect Sub Division (M 4513)
|
Providing and fixing of Display Boards in various Locations |
5,81,448 |
11,629 |
25/05/2022 03:00 PM |
25/05/2022 03:30 PM |
2022_PWD_222555_1
Providing and fixing of Display Boards in various Locations
2022_PWD_222555_1
|
93
|
20/05/2022 |
South East Road Division 1
|
Thermoplastic paint from Nehru Nagar to Bhairon Marg T Point on Ring Road |
37,84,591 |
75,692 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222556_1
Thermoplastic paint from Nehru Nagar to Bhairon Marg T Point on Ring Road
2022_PWD_222556_1
|
94
|
20/05/2022 |
HC&ND Elect Sub Division (M 4513)
|
Replacement of LED Fittings in Various Location |
5,47,430 |
10,949 |
25/05/2022 03:00 PM |
25/05/2022 03:30 PM |
2022_PWD_222557_1
Replacement of LED Fittings in Various Location
2022_PWD_222557_1
|
95
|
20/05/2022 |
South East Road Division 1
|
Thermoplastic paint on all roads |
90,31,409 |
1,80,628 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222558_1
Thermoplastic paint on all roads
2022_PWD_222558_1
|
96
|
19/05/2022 |
Project Electrical Division
|
Servicing, Operation & Comprehensive Maintenance of VRV units/Package type Plants/WTAC/STAC/Cassette type AC units & Water Coolers/Desert Cooler installed at Hon'ble LG House, LG Secretariat, Minister Bungalows & Session House |
23,37,396 |
46,748 |
25/05/2022 03:00 PM |
25/05/2022 03:30 PM |
2022_PWD_222503_1
Servicing, Operation & Comprehensive Maintenance of VRV units/Package type Plants/WTAC/STAC/Cassette type AC units & Water Coolers/Desert Cooler installed at Hon'ble LG House, LG Secretariat, Minister Bungalows & Session House
2022_PWD_222503_1
|
97
|
19/05/2022 |
HC&ND Elect Sub Division (M 4513)
|
Supplying and fixing of valves, fire extinguishers and hose reel in various Govt. Officers Flat at D-II, Vasant Kunj, New Delhi |
5,88,439 |
11,769 |
25/05/2022 03:00 PM |
25/05/2022 03:30 PM |
2022_PWD_222550_1
Supplying and fixing of valves, fire extinguishers and hose reel in various Govt. Officers Flat at D-II, Vasant Kunj, New Delhi
2022_PWD_222550_1
|
98
|
19/05/2022 |
HC&ND Elect Sub Division (M 4513)
|
Repairing/replacement of ducting, grills, diffuser and insulation etc. for Air/Smoke ventilation system in basement of A Block |
5,98,754 |
11,975 |
25/05/2022 03:00 PM |
25/05/2022 03:30 PM |
2022_PWD_222553_1
Repairing/replacement of ducting, grills, diffuser and insulation etc. for Air/Smoke ventilation system in basement of A Block
2022_PWD_222553_1
|
99
|
19/05/2022 |
Central & New Delhi Road Division
|
Providing and fixing Overhead Signages and Direction Signages in Ring Road I.P. Metro Station to Shantivan Crossing, Shantivan Crossing to Mangi Bridge, I.P. Marg, Vikas Marg, Azad Bhawan, JLN Marg &Ghata Masjid Road under Sub Division-3 of Division C&NDRoads, New Delhi.. |
95,02,614 |
1,90,052 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222528_1
Providing and fixing Overhead Signages and Direction Signages in Ring Road I.P. Metro Station to Shantivan Crossing, Shantivan Crossing to Mangi Bridge, I.P. Marg, Vikas Marg, Azad Bhawan, JLN Marg &Ghata Masjid Road under Sub Division-3 of Division C&NDRoads, New Delhi..
2022_PWD_222528_1
|
100
|
19/05/2022 |
Central & New Delhi Road Division
|
Providing and fixing Overhead Signages and Direction Signages in Ring Road Bypass from Gulab Vatika to Geeta Colony Flyover, BSZ Marg, Nishad Raj Marg, Sachivalaya Road, I.G. Slip Road, Velodrome Road & Satyagrah Marg under Sub Division-3 of Division C&NDRoads, New Delhi |
96,54,092 |
1,93,082 |
26/05/2022 03:00 PM |
26/05/2022 03:30 PM |
2022_PWD_222515_1
Providing and fixing Overhead Signages and Direction Signages in Ring Road Bypass from Gulab Vatika to Geeta Colony Flyover, BSZ Marg, Nishad Raj Marg, Sachivalaya Road, I.G. Slip Road, Velodrome Road & Satyagrah Marg under Sub Division-3 of Division C&NDRoads, New Delhi
2022_PWD_222515_1
|