Street Light Inspection Detail
Inspection - 17/09/2025
Inspection - 16/09/2025
Inspection - 15/09/2025
Installed Working Repaired / Rectified Yet to be repaired
Total as on 17/09/2025 87966 41315 162 1031
Date
Click on office name to view previous inspection
Division Name Installed Working Repaired / Rectified Yet to be repaired Target Date Remarks
East Maintenance Zone
M 251 North East & Shahdara Electrical Division 7067 0 0 0
M 253 East Building & Players Building Electrical Division 5406 5280 48 78 22/09/2025 9 light fittings are defective/faulty for which repairing work in progress. In 69 Fittings can not be made functional due to short circuit & damage of cable by other Department and unknown anti social elements at different locations for which repairing work in Progress.
M 351 Central & New Delhi Electrical Maintenance Division 3858 3822 36 0 17/09/2025 It is certified that as on 17.09.2025 at 5.30 pm. 3858 nos of LED fittings are functioning. On 17.09.2025 total 36 nos fittings have been reported malfunctioned at Outrum Line due to Cable fault, all have been rectified and functional. Hence, Today 36 nos LED fittings have been made functional.
M 451 Project Electrical Division 9844 0 0 0
North Maintenance Zone
M 131 West Electrical Maintenance Division 13866 13442 57 367 20/09/2025 The non functioning lights are being rectified as these are not functioning due to various reason like damaged of cable by third party, theft, accident etc. The lights shall be made functional by 20.09.2025. 16.09.2025 (Evening) = 13493 Non function on 17.09.25 Morning = -51 Function Light on 17.09.25 Morning = 13442
M 353 North West Electrical Maintenance Division 11072 0 0 0
M 352 North Electrical Maintenance Division 7738 7376 12 350 25/09/2025 (Today as on 17.09.2025 - 95.48% Street light fittings are functional) Total street light functional as on 16.09.2025 - 7384 Nos. - 8 Nos. = 7376 Nos as on 17.09.2025 morning (8 Nos. fittings non functional due to chock, bulb, LED driver, theft of pole, cable, some points supply disconnected for safety reasons due as there is waterloging around of poles because of Drain work and other reasons ) a) Time consumption for repair for fittings is high due to heavy traffic.
South Maintenance Zone
M 452 South East Elect Maintenance Division 10733 0 0 0
M 453 South Electrical Maintenance Division 6742 0 0 0
M 152 South West Elect Maintenance Division 11640 11395 9 236 30/09/2025 Major work need to be done such as replacement of defective cables, fittings & accidental poles damaged by third party etc. However day to day maintenance has been attended on regular basis by TATA/BRPL/BYPL & rectified accordingly.
Grant Total 87966 41315 162 1031