राष्ट्रीय राजधानी क्षेत्र, दिल्ली सरकार
S. No.क्र. सं. | Name of Workकार्य का नाम | Date of Startकार्य आरम्भ करने की तिथि | Date of Completionकार्य समाप्त करने की तिथि | Cost (In Lac) |
Expenditure (In Lac) |
Progress | Agency | Status | Viewदेखें |
---|---|---|---|---|---|---|---|---|---|
1 | C/o 700 Beds Indira Gandhi Hospital at Sector-9, Dwakra, New Delhi on turn-key basis | 27/08/2014 | 26/02/2017 | 54511.43 | 0.00 (Jan'21) | 93.00 % (Jan'21) | Larson & Toubro Limited | Minor finishing works are under progress. |
Detail Report
Graph / Photo |
2 | setting up of Semi- permanent / temporary ICU Hospital at shalimar Bagh (G+3) (14530Beds) Kirar (G+4) (458 Beds)and Sultanpuri (G+3) (525Beds) Package-I (Electrical) | 23/09/2021 | 22/02/2022 | 50680.19 | 1021.01 (May'22) | 0.00 (May'22) | SAM India Builtwell |
Detail Report
Graph / Photo |
|
3 | setting up of Semi permanent/temporary i.c.u at CNBC (G+4)(1912 beds) and GTB Hospital complex (G+4 ) (1912 Beds) Package-II (Electrical) | 23/09/2021 | 22/02/2022 | 40775.18 | 1258.28 (Jun'22) | 0.00 (Jun'22) | SAM India Builtwell | GTB : The erection of PEB structure and deck slab in main ward block nearing completion, while the same in Arrival & Diagnostic blocks in progress. The fire paint, internal partition etc. are in progress. The work is delayed due to revision in drawings by consultant, ban on construction works due to pollution during November-December followed by covid wave. CNBC : The erection of PEB structure and deck slab are nearing completion. The fire paint, internal partition, external wall etc. are in progress. The work is delayed due to revision in drawings by consultant as per requirement of MS, CNBC, ban on construction works due to pollution during November-December followed by covid wave. |
Detail Report
Graph / Photo |
4 | CONSTRUCTION OF NEW HOSPITAL AT SIRASPUR, NEW DELHI (ON EPC MODE -I) INCLUDING ALL CIVIL, ELECTRICAL, MECHANICAL, HORTICULTURE AND MEDICAL SERVICES. | 10/08/2020 | 09/05/2023 | 38439.53 | 4181.35 (Jun'22) | 0.00 (Jun'22) | Ramacivil India Construction Private Limited | Progress slow down due to Covid-19 Epademic. |
Detail Report
Graph / Photo |
5 | C/o East Delhi Campus of Guru Gobind Singh Indraprastha University at Surajmal Vihar, Shahdara, Delhi SH Co Academic Bldg, Auditorium Bldg, Sports Hall, Boys, Girls, Teachers Hostel, Type II III IV and V Qtrs ic Ext Dev. works, Int Elect Inst, Ext Lighting, lifts, fire fighting system, fire alarm with PA System, D.G. Sets, Elect Sub Stn, HVAC works | 09/08/2017 | 09/11/2019 | 23127.43 | 2854.01 (Jun'22) | 0.00 (Jun'22) | NKG Infrastructure Limited | Physical Progress of the work is 96%. |
Detail Report
Graph / Photo |
6 | C/o Stage-I of Phase-II, Delhi Technological University at Bawana Road, Delhi (SH: C/o Academic Blocks AB-3 & AB-4, Boys Hostel H-5 & Girls Hostels HG-5 & HG-6 and all external and internal services including external development and landscaping, and allied civil and E&M works). | 23/09/2019 | 23/12/2020 | 22769.91 | 1391.84 (Jun'22) | 0.00 (Jun'22) | SAM India Builtwell | Work is in progress. Work delayed due to NGT ban and Covid-19 pandamic. The progress of work 98%. |
Detail Report
Graph / Photo |
7 | Additional and Remodeling Work for Cancer Block, Maternity Block and Screening OPD At Satyawadi Raja Harish Chandra Hospital, Narela For Delhi Govt. (Delhi) | 09/08/2020 | 08/05/2023 | 21785.66 | 492.91 (Jun'22) | 0.00 (Jun'22) | Parnika Commercial and Estates Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
8 | Construction of 144 Nos Temporary Courtroom in the existing court complexes of Saket Stilt plus 3 Tis Hazari Stilt plus G plus 3 and Karkardooma G plus 4 | 04/10/2019 | 03/07/2020 | 14316.00 | 30.29 (Apr'22) | 0.00 (Apr'22) | Quality Buildcon Pvt. Ltd. | Karkardooma (44 Courtrooms G 4): The building at Karkardooma inaugurated on 13th May 2022. Not physically occupied yet. Saket (2 blocks of 23 Courtrooms each G 5): Work of rectification of defects in both blocks is in progress inside the building. Work of external development work is completed. Work for obtaining clearance from Delhi Fire Service is underway. Some addtional work of polishing of consoles and strengthening of wooden long benches is under progress as per instructions of court authorities. Decision regarding 2 rooms at 5th floor of Block-1 is to be given by DHC. Tis Hazari (50 Courtrooms G 6): 1) All Structure work completed. 2) LGSF work is almost complete. 3) Final coat of polishing and painting work is in progress. 4) Work of sanitary installations and CP fittings is almost complete. 5) Development works pertaining to sewerage line, drainage, external lighting etc. mostly completed and work for linking of sewer line to existing line is being taken up. 6) Final RCC of roadwork is in progress. 7) All the external windows and ventilators including Structural Glazing work is almost completed. 8) False Ceiling works almost complete and defect removal is in progress. 9) The furniture items have been made available at site and final placing of furniture is being taken up. |
Detail Report
Graph / Photo |
9 | Addition & Remodelling work for Bhagwan Mahavir Hospital at Pitampura Delhi including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. | 10/12/2019 | 01/06/2020 | 13992.80 | 777.85 (Jun'22) | 0.00 (Jun'22) | Kamladitya Construction Private Limited | Work in progress |
Detail Report
Graph / Photo |
10 | Construction of Hospital Block at Guru Gobind Singh Govt. Hospital located at Raghubir Nagar, New Delhi | 18/10/2019 | 10/04/2021 | 13447.15 | 261.25 (May'22) | 0.00 (May'22) | Roshan Real Estate Pvt Ltd. | Work is under progress. |
Detail Report
Graph / Photo |
11 | Construction of Mother and Child Block and Screening OPD Block at Dr. Baba Saheb Ambedkar Hospital at Rohini, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. | 04/03/2020 | 03/09/2021 | 10708.84 | 765.44 (Jun'22) | 0.00 (Jun'22) | Quality Buildcon Pvt. Ltd. | work in progress |
Detail Report
Graph / Photo |
12 | Construction of Pucca School Building (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Kohat Enclave, New Delhi (Package - 4). SH : Civil & Electrical work. | 15/05/2021 | 14/05/2022 | 7689.40 | 2.13 (Apr'22) | 0.00 (Apr'22) | B. L. INFRA PROJECTS PRIVATE LIMITED | On dated 26.06.2021, it was directed by Hon'ble Deputy Chief Minister of Delhi and Hon'ble Minister of PWD to hold the work and proposed Sports facility at Kohat Enclave. Now, Chief Engineer (Projects) vide letter No. 23(42)/22/CE(Projects) /PWD/West/292(E) dated 18.04.2022 directed to resume the construction work of school at Kohat Enclave on direction of Education Department. (i) Block-A & B Raft done. Column upto plinth level in progress. Block-C PCC done, raft done, pedestal done. Column & beam upto plinth level done. |
Detail Report
Graph / Photo |
13 | C/o Trauma Centre and Utility Block at Sanjay Gandhi Memorial Hospital at Mangolpuri, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. | 04/09/2019 | 03/03/2021 | 7122.09 | 529.86 (Mar'22) | 0.00 (Mar'22) | PNSC Infrastructure Pvt. Ltd | work in progress. |
Detail Report
Graph / Photo |
14 | Construction of (G+3) Pucca School Buildings at Tehkhand | 18/07/2021 | 17/07/2022 | 7047.98 | PNSC Infrastructure Pvt. Ltd | (i) Work has been awarded to contractor. (ii) Hon'ble PWD Minister has approved Architectural Drawings in the meeting on 23.08.2021 (iii)Submission drgs for DUAC/Fire/Local body are under preparation. (iv) Structural design : Str. drawing are under preparation. |
Detail Report
Graph / Photo |
||
15 | Construction of proposed New Buildings for expansion of Rao Tula Ram Memorial Govt. Hospital at Jaffarpur, Delhi. | 06/08/2019 | 29/10/2020 | 6563.40 | 128.14 (May'22) | 0.00 (May'22) | PNSC Infrastructure Pvt. Ltd | Work is under progress. |
Detail Report
Graph / Photo |
16 | Construction of (G+3) Pucca at Jaunapur, Site –II (Aya Nagar) New Delhi 110047 | 18/07/2021 | 17/07/2022 | 6137.90 | 0.30 (Feb'21) | 0.00 (Feb'21) | PNSC Infrastructure Pvt. Ltd | (i). Work has been awarded to contractor. (ii) Architectural Drawing : Revised drgs are under preparation as per direction of Hon'ble PWD Minister. (iii) Structural design : Str. drawing will be prepared after approval of Architectural drawing by competent authority. (iv). DUAC /Fire approval: Drgs will be uploaded online after approval of Architectural drawing by competent authority. |
Detail Report
Graph / Photo |
17 | C/o 272 Nos. Additional SPS Class rooms i/c MP Hall, labs, toilets and Staircases, internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. Sector-16 Rohini (School ID: 1413070), GGSSS Sector-1 Avantika Rohini (School ID :1413069) & Sarvodaya Co-ed. Vidyalaya Sector-2 Rohini (School ID : 1413027) (Package-3) | 14/01/2019 | 09/11/2019 | 4874.05 | 4140.18 (Jun'22) | 0.00 (Jun'22) | Shri kamal singh | Work in progress |
Detail Report
Graph / Photo |
18 | C/o of 244 Nos. Additional SPS Class rooms, MP Hall, Labs, toilets and Staircases i/c internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at SKV Kanjhawala(School ID 1413025) , SV Jaunti ( School ID 1413181) and Govt. Co- ed Sr. Sec. School Nizampur (School ID 1413009 ) ( Package -09 ) | 20/01/2019 | 15/11/2019 | 4603.38 | 3517.82 (Jun'22) | 0.00 (Jun'22) | Sh. Kamal Singh | Work in progress |
Detail Report
Graph / Photo |
19 | Const 182 Nos. of additional SPS class rooms (Package-C) | 17/03/2019 | 11/12/2019 | 3699.32 | 2782.40 (Mar'22) | 0.00 (Mar'22) | SPS Infrabuild Pvt. Ltd. | Work is in Progress. |
Detail Report
Graph / Photo |
20 | Const 190 Nos. of additional SPS class rooms in various schools under East and North East Education Division, PW | 24/12/2018 | 19/09/2019 | 3675.76 | 2397.91 (Jun'22) | 0.00 (Jun'22) | RAMA Contractor | Development Work is in Progress. |
Detail Report
Graph / Photo |
21 | Const 180 Nos. of additional SPS class rooms (Package-B) | 17/03/2019 | 11/12/2019 | 3636.43 | 2110.79 (Jul'22) | 0.00 (Jul'22) | RAMA Contractor | Work is in Progress. |
Detail Report
Graph / Photo |
22 | Const 174 Nos. of additional SPS class rooms in various schools (Package-E) | 17/03/2019 | 11/12/2019 | 3553.31 | 2860.77 (Mar'22) | 0.00 (Mar'22) | SPS Infrabuild Pvt. Ltd. | Finishing & Development Work is in Progress. |
Detail Report
Graph / Photo |
23 | Up gradation and Construction of an additional multi- story building in the premise of Forensic Science Laboratory, Rohini, Delhi. | 14/11/2019 | 13/02/2021 | 3541.69 | 394.14 (Jun'22) | 0.00 (Jun'22) | Tewatia Construction Pvt. Ltd. | work in progress |
Detail Report
Graph / Photo |
24 | Const 184 Nos. of additional SPS class rooms in various schools under East and North East Education Division, PW | 17/03/2019 | 11/12/2019 | 3455.84 | 2767.78 (Mar'22) | 0.00 (Mar'22) | RAMA Contractor | Work is in Progress. |
Detail Report
Graph / Photo |
25 | Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II.(Package-F) | 27/01/2019 | 23/10/2019 | 3347.23 | 3590.52 (May'22) | 0.00 (May'22) | BCC DEVELOPERS AND PROMOTERS PVT LTD | Work in progress. |
Detail Report
Graph / Photo |
26 | Civil work and Internal E.I. work | 24/04/2007 | 23/07/2009 | 3002.21 | Globe Civil Project Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
27 | SKV Sangam Vihar J Block Sch. ID 1923346 | 17/03/2019 | 11/12/2019 | 3002.10 | 1990.33 (May'22) | 0.00 (May'22) | Devinder Singh | Work is in progress |
Detail Report
Graph / Photo |
28 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Dariyapur Kalan, Delhi | 30/05/2020 | 29/05/2021 | 2936.58 | 1617.06 (Jun'22) | 0.00 (Jun'22) | Tewatia Construction Pvt. Ltd. | Structure work completed. Partition work with bricks in progress. Tile, plaster and granite work is in progress. Truss work of MP Hall is in progress. |
Detail Report
Graph / Photo |
29 | Construction of Pucca School Building G plus 3 with ancillary facilities including internal water supply sanitary installation, internal electrical installation and development of sites RWHS STP etc at Sector 05 Rohini Delhi | 29/05/2020 | 28/05/2021 | 2931.78 | 1816.09 (May'22) | 0.00 (May'22) | The Krishna Construction Co. | Work in progress |
Detail Report
Graph / Photo |
30 | Construction of DTC Bus Depot in resettlement colony at Sawada Ghevra, Delhi | 05/04/2022 | 04/12/2022 | 2915.78 | 1.58 (Jul'22) | 0.00 (Jul'22) | SVK Infrastructures | Tender for the work invited and work awarded on 04.03.2022. Letter of commencement issued on 05.04.2022. Site clearing, leveling work completed. Foundation work of retaining wall has started. |
Detail Report
Graph / Photo |
31 | SH Co 169 Nos. of additional SPS class rooms at Sarvodaya Co.Ed SSS Munirka Sch. ID 1719125 G Co.ed MS C4 Vasant Vihar Sch. ID 1720174 SV Vasant Vihar Sch. ID 1720024 and G Co.Ed SV, Sector 13 R.K.Puram Sch. ID 1719130 under Education Maint. SW | 17/10/2019 | 12/07/2020 | 2849.35 | 1382.32 (Mar'22) | 0.00 (Mar'22) | A. K. Builders | work in progress. |
Detail Report
Graph / Photo |
32 | Expansion / Remodeling of Deep Chand Bandhu Govt. Hospital at Kokiwala Bagh, Ashok Vihar, Delhi. Including water supply, sanitary, drainage and electrical works etc. | 28/06/2019 | 22/06/2020 | 2806.33 | Roshan Real Estate Pvt Ltd. | Work in progress |
Detail Report
Graph / Photo |
||
33 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Libaspur, Delhi | 30/05/2020 | 29/05/2021 | 2653.59 | 2197.38 (Jun'22) | 0.00 (Jun'22) | Tewatia Construction Pvt. Ltd. | Work in progress. |
Detail Report
Graph / Photo |
34 | Construction of Pucca School building (G+3) with ancillary facilities including internal water supply, sanitary installations, internal electrical installation and development of site, RWHS, STP, Furniture etc at Sector 18, Rohini. (SH: Civil and Electrical Composite Work). | 23/05/2020 | 23/05/2021 | 2606.13 | 641.74 (Jun'22) | 0.00 (Jun'22) | Tewatia Construction Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
35 | SKV Hari Nagar, Ashram, School ID : 1924043 | 14/01/2019 | 10/09/2019 | 2464.23 | 1928.29 (May'22) | 0.00 (May'22) | Reliance Elektrik works | Work is in progress |
Detail Report
Graph / Photo |
36 | Co 136 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 1 | 20/01/2019 | 16/09/2019 | 2420.66 | 2768.21 (Mar'22) | 0.00 (Mar'22) | M C Constructions Company | Work in Progress. |
Detail Report
Graph / Photo |
37 | Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II. SH: C/o 162 Nos. of additional SPS class rooms at G Co.Ed.SS, Sec-16A, Dwarka (School ID-1821242), Shahid Captain Amit Verma Govt. S(Co.Ed)V, Inderpuri (School ID-1720121) & SKV, Rajnagar-I (School ID-1824027) under Education Maintenance South West Division, PWD Delhi including internal & external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package-H) | 19/12/2018 | 15/08/2019 | 2420.05 | 2724.70 (Mar'22) | 0.00 (Mar'22) | Multi Tech Construction Co. | Work in progress. |
Detail Report
Graph / Photo |
38 | Construction of conventional Bus Depot no. I & II on ground floor at Sector A-1, A-4, Narela, Delhi | 23/08/2021 | 22/05/2022 | 2373.12 | 125.00 (Jun'22) | 0.00 (Jun'22) | M/s PK Gupta & Co. | Earth & foundation work is in progress... |
Detail Report
Graph / Photo |
39 | SBV Jonapur, School ID: 1923359 | 08/12/2018 | 04/08/2019 | 2342.87 | 552.12 (May'22) | 0.00 (May'22) | Reliance Elektrik works | Work is in progress |
Detail Report
Graph / Photo |
40 | RPVV Lajpat Nagar, School ID : 1925334 | 08/12/2018 | 04/08/2019 | 2303.62 | 2228.74 (May'22) | 0.00 (May'22) | Reliance Elektrik Works, | Work is in progress |
Detail Report
Graph / Photo |
41 | C o 138 Nos Addl SPS Classrooms in GGSSS Rani Bagh Sch ID 1411043 GGSSS Trinagar Narang Colony Sch ID 1411037 ic Lab staircases toilets and ramps internal water supply sanitary installations internal electrification and fire fighting arrangements | 01/03/2019 | 26/09/2019 | 2120.02 | 0.00 (Apr'22) | 95.00 % (Apr'22) | The Krishna Construction Co. | Work in progress |
Detail Report
Graph / Photo |
42 | GGSSS Dera Village School ID: 1923023 | 08/12/2018 | 04/08/2019 | 1877.31 | 1613.97 (Jun'22) | 0.00 (Jun'22) | Varun Gupta & Co. | In progress |
Detail Report
Graph / Photo |
43 | Construction of Govt Sr Sec Pucca School building G plus 3 with ancillary facilities including internal water supply internal electrical installation sanitary installations development of site STP and RWH etc at Sector 27 Rohini. | 31/05/2020 | 30/05/2021 | 1874.70 | 0.00 (Apr'22) | 10.00 % (Apr'22) | SSP Promoters and Builders Private Limited | WORK IN PROGRESS |
Detail Report
Graph / Photo |
44 | Furniture Work RECALL | 04/11/2019 | 18/12/2019 | 1858.08 | 6.26 (Sep'21) | 0.00 (Sep'21) | Rajdhani Furnitures PVT. LTD. |
Detail Report
Graph / Photo |
|
45 | Renovation / Development work in Building for Education Department at Boulverd Road, Delhi | 07/04/2022 | 04/08/2022 | 1842.64 | 230.97 (Jun'22) | 0.00 (Jun'22) | DND Infra Private Limited | Work in progress. |
Detail Report
Graph / Photo |
46 | Const. of 112 Nos. addl SPS classrooms GGSS, Mukundpur Village Sch. ID 1207230 - 36 Nos., GBSSS Bakhtawarpur Sch. ID 1309266 -56 Nos. incl. 01 No. M.P Hall Equi. to 08 Nos. Class Rooms and SV Lancer Road Sch. ID 1207032 -20 Nos. under North Edu. Divn | 08/06/2019 | 02/02/2020 | 1799.01 | 0.00 (Nov'21) | 69.00 % (Nov'21) | C. PARKASHAN Co. | Work in progress |
Detail Report
Graph / Photo |
47 | C/o 52 Nos. (G+3) equivalent SPS class rooms including stilt, 1 lift, 8 toilet blocks & 4 staircase at A C C GSBV at Jhilmil Colony, Delhi & 48 Nos. (G+3) equivalent SPS class rooms including 3 nos staircase, lift and 4 toilet blocks at Mustafabad School, Delhi including internal & external water supply, sanitary installations, melectrical installations, development of site, boundary wall, UGR, RWH, Fire Fighting system etc | 01/04/2022 | 24/02/2023 | 1798.93 | K. L. ARORA & SON | Demolition work is in progress. 90% demolition completed and Layout for excavation has done in A C C GSBV at Jhilmil Colony, Delhi. |
Detail Report
Graph / Photo |
||
48 | C/o of 104 Nos. Additional SPS Class rooms, Labs, toilets and Staircases i/c internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangments etc. at SBV Keshav Puram (ID-1411029), SKV Keshav Puram A Block (ID-1411021) & SKV Bharat Nagar (ID-1411031). (Package-I) | 29/12/2018 | 26/07/2019 | 1743.19 | 3722.23 (May'22) | 0.00 (May'22) | AMAR CONSTRUCTION COMPANY | Work in progress |
Detail Report
Graph / Photo |
49 | Development of Synthetic Athletic Track with Football field and Synthetic Hockey Turf in Rajiv Gandhi Sports Complex Singhu Delhi | 08/03/2021 | 02/11/2021 | 1583.17 | 115.52 (May'22) | 0.00 (May'22) | Shiv Naresh Sports Pvt. Ltd., E-23, Karampura. New Delhi-110015 | Hockey field & synthetic Athletic Track is completed. Certificate from FIH has also been received. Certificate from IAAF is awaited. Structure work for change rooms is in progress. Work is suffering due to non-availability of fund in Sports Head. Physical Progress is 82%. |
Detail Report
Graph / Photo |
50 | C/o 48 nos. additional (G+3) SPS equivalent classrooms including 3 nos staircase, 2 nos lifts and 8 nos toilet block at St. Eknath SKV J&K Block Dilshad Garden and 36 nos. additional (G+3) SPS equivalent classrooms including 2 nos Staircase, 4 nos toilet blocks & 1 lift and 1 MP hall at DIET J&K block Dilshad Garden, Delhi including internal & external water supply, sanitary installations, electrical installations, development of site, UGR, RWH, Fire Fighting system etc | 26/03/2022 | 19/02/2023 | 1553.88 | K L Arora & Son | 100% demolition completed. Temporary room work is in progress. The excavation and footing work in progress |
Detail Report
Graph / Photo |
||
51 | Construction of 80 Nos G plus 3 equivalent SPS Class Rooms at Govt Co Ed Sr Secondary School Gandhi Brahampur Delhi including 8 toilet blocks, 4 nos staircase 1 lift and internal and external water supply sanitary installations, electrical installations, development of site, RWH & UGR fire fighting system etc. | 26/03/2022 | 19/02/2023 | 1377.43 | K. L. ARORA & SON | Demolition work & completion delay due to tree cutting permission from forest department. |
Detail Report
Graph / Photo |
||
52 | C/o 76 Nos. (G Plus 3) SPS equivalent classrooms at RSKV Mandawali No. 2 (School ID 1002023) including 5 staircase, 8 toilet blocks, 1 lift and internal & external water supply, sanitary installations, electrical installations, development of site, UGR, RWH, Natural STP & Fire Fighting System etc | 02/04/2022 | 25/02/2023 | 1359.28 | K. L. ARORA & SON | Demolition work is in progress. 90% demolition completed. Layout for excavation in progress. |
Detail Report
Graph / Photo |
||
53 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at GSSS (Co ed) at Rana Pratap Bagh, Delhi | 30/05/2020 | 29/05/2021 | 1335.04 | 1023.53 (May'22) | 0.00 (May'22) | The Krishna Construction Co. | Structure work of building completed, Plaster work & brick completed. Water proofing work completed, Granite work and tile work completed. Toilet fittings, C.I. Work, CPVC work, painting work is in progress. False ceiling, SS work and Boundary wall work in progress. |
Detail Report
Graph / Photo |
54 | Construction of 72 Nos. equivallent classrooms (G+3) including internal electrical works sanitary installations, watter supply, fire fighting and external development works etc for Govt. Co-ed. Sr. Sec. School at PSP-10, Industrial area Phase-V, Rohini, Kirari, Delhi (Civil and Electrical) | 12/03/2022 | 04/02/2023 | 1275.84 | 0.60 (May'22) | 0.00 (May'22) | M/s SURENDRA KUMAR | Work recently awarded, pile load test is under process. |
Detail Report
Graph / Photo |
55 | C/o 700 Beds Indira Gandhi Hospital at Sector-9, Dwarka, New Delhi (SH: Providing and Placing of Medical Furnitures at Indira Gandhi Hospital, Dwarka, New Delhi) | 11/07/2021 | 23/09/2021 | 1244.16 | Godrej & Boyce Mfg. Co. Ltd. | Work is under progress. |
Detail Report
Graph / Photo |
||
56 | GGSS No. 3 Sec IV, Ambedkar Nagar | 03/03/2016 | 15/07/2016 | 1212.87 | Devinder Singh | completed |
Detail Report
Graph / Photo |
||
57 | C/o 700 Beds Indira Gandhi Hospital at Sector-9, Dwarka, New Delhi (SH: Providing and Placing of Non-Medical Furnitures at Indira Gandhi Hospital, Dwarka, New Delhi). | 11/07/2021 | 23/09/2021 | 1118.83 | M/s Rajdhani Furnitures Pvt. Ltd. | Work is under progress. |
Detail Report
Graph / Photo |
||
58 | Comprehensive consultancy Services for Construction of Delhi Sports University at Village Ghevra Delhi | 06/04/2022 | 05/04/2025 | 1099.29 | SIKKA ASSOCIATES REGD. | The work has been awarded to the agency. The presentation of the proposed University has been made with Dy. CM of GNCTD Delhi as on dt. 08.04.2022 & 13.05.2022. |
Detail Report
Graph / Photo |
||
59 | C/o 76 Nos (G+3) equivalent SPS Class Rooms including 2 nos stilt, 8 nos toilet, 4 nos staircase, 1 no lift, RWH & UGR in SKV Vishwamitra, Old Seemapuri, Delhi. (SH : SPS type building i/c internal & external water supply, sanitary installations, electrical installations, development of site, fire fighting system etc.) | 18/04/2022 | 13/03/2023 | 1090.67 | K. L. ARORA & SON | Demolition work in progress. 72% demolition completed and layout for excavation in progress. |
Detail Report
Graph / Photo |
||
60 | Construction of 55 Nos. Aam Admi Mohalla Clinic at various locations under South-East (M), Circle, New Delhi during 2018-19. | 15/12/2018 | 12/06/2019 | 827.90 | 290.07 (Oct'19) | 17.00 % (Oct'19) | S. P. Construction | Work in progress |
Detail Report
Graph / Photo |
61 | Construction of 30 Nos. Aam Admi Mohalla Clinic at various places under south building (M) Division/South District. | 10/01/2019 | 08/07/2019 | 585.53 | 91.21 (Mar'21) | 0.00 (Mar'21) | P S ASSOCIATES | work in progress |
Detail Report
Graph / Photo |
62 | Construction of New Academic Block (G Plus 3) with Future Extention of One Floor at Lakshmibai College, Ashok Vihar, Delhi (Civil and Electrical) Composite work | 28/01/2022 | 27/12/2022 | 579.95 | R.K ENTERPRISES | Work is in progress 3% |
Detail Report
Graph / Photo |
||
63 | Providing and Fixing Customized Furniture and Interior works | 24/09/2020 | 22/11/2020 | 533.13 | 0.00 (Jan'21) | 15.00 % (Jan'21) | M/s Rajasthan Decorators | Work is in progress |
Detail Report
Graph / Photo |
64 | Supplying, Installation, Testing and Commissioning of HVAC and Mechanical Ventilation system. (HVAC Package-2 | 30/09/2014 | 26/05/2015 | 474.90 | 61.36 (May'19) | 0.00 (May'19) | Work completed on 31/12/2017 final payment yet to be made |
Detail Report
Graph / Photo |
|
65 | Remodeling of Drain with Development of Kuccha Portion along the ESI Hospital Road and Road along B-Block Jhilmil under Sub Division M-2112 during 2021-22 | 02/04/2022 | 28/09/2022 | 462.00 | PRATAP SINGH |
Detail Report
Graph / Photo |
|||
66 | Construction of Boundary Wall and other basic work for establishing of Driving training Institute in Village Malikpur Dist. South West, Delhi | 25/01/2022 | 24/05/2022 | 435.79 | 72.02 (Jun'22) | 0.00 (Jun'22) | M/s Satish Builders | Earth & foundation work is in progress... |
Detail Report
Graph / Photo |
67 | C/o classrooms, labs & Toilets i/c Internal & External Water Supply, Sanitary & Electric Installations, Development of SiteAnd Firefighting System etc. at Government Co-ed Secondary School Maidan Garhi, New Delhi (School Id-1923033) | 02/03/2022 | 26/11/2022 | 382.04 | M/s. Satyam Construction | Work to be started |
Detail Report
Graph / Photo |
||
68 | Building work i/c Water Supply, Sanitary installation,Development Work and providing EI & Fire fighting system | 26/05/2015 | 25/05/2016 | 316.66 | Sudesh Kumar | Work is in progress. Delay due to non-receipt of funds & revised A/A & E/S from Client Department and covid-19 pandemic since March 2020. Balance works in final stage of completion. |
Detail Report
Graph / Photo |
||
69 | Construction of Aam Aadmi Mohalla Clinic (Primary Health Centre) at various places under North East Circle, PWD, Delhi | 27/12/2018 | 26/04/2019 | 296.85 | 335.77 (Aug'21) | 0.00 (Aug'21) | Ram Krishan Yudhister Parkash | work completed |
Detail Report
Graph / Photo |
70 | Construction of 21 nos. Aam Aadmi Mohalla Clinic (Primary Health Centres) at various places in the jurisdiction of Shahdara Circle, PWD, Delhi (Civil and Electrical Work). | 28/02/2019 | 27/06/2019 | 294.21 | 58.25 (Feb'22) | 0.00 (Feb'22) | AASRA Martech Pvt.Ltd. | Work in progress. |
Detail Report
Graph / Photo |
71 | Civil and Electrical work. | 05/05/2019 | 04/03/2020 | 292.64 | Dheeraj Singh & Company | Work just awarded |
Detail Report
Graph / Photo |
||
72 | Air Pistol & Rifle 10m Shooting Hall cum all internal finishing fixtures fitting and development of complete setup of electronic type targets, shooting equipment etc. complete | 18/03/2022 | 13/09/2022 | 290.26 | Dev Enterprises | Work just awarded |
Detail Report
Graph / Photo |
||
73 | Consultancy Services for Comprehensive Architectural Planning and Designing for Construction of Technical Campus at Village Bakkarwala Delhi | 16/01/2022 | 15/10/2024 | 288.00 | Arcop Associates Pvt. Ltd. | Work has been awarded to the agency. Presentation for the proposed University has been made with the Dy. CM & Minister. |
Detail Report
Graph / Photo |
||
74 | Construction prefab hut for HQ at PTS Wazirabad, Delhi | 21/07/2018 | 20/11/2018 | 285.56 | Aliyan Constaruction Company | work completed |
Detail Report
Graph / Photo |
||
75 | Conversion of existing normal size swimming pool within the premises of Shaheed Amir Chand Sarvodaya Vidyalaya Ludlow Castle No 2 Sham Nath Marg, Delhi into all weather swimming pool | 23/12/2020 | 20/06/2021 | 262.79 | Maa Narayan Constuction Co. | Structural work almost completed. Work of raising of level of swimming pool under progress. Tensile structure work is in progress. Physical Progress is 48%. Work is also suffering due to non-availability of fund in Sports Head. |
Detail Report
Graph / Photo |
||
76 | Vertical Extension of Teaching Block No.1 of B.R. Ambedkar College, Wazirabad Road, Delhi | 16/01/2018 | 15/07/2018 | 172.40 | 127.50 (Jan'22) | 0.00 (Jan'22) | JABIR HUSSAIN | work completed |
Detail Report
Graph / Photo |
77 | C/o East Delhi Campus of Guru Gobind Singh Indraprastha University at Surajmal Vihar, Shahdara, Delhi. (SH: Providing & fixing industrial kitchen equipments in Boy's, Girl's & Teacher's Hostel) | 02/12/2021 | 01/03/2022 | 157.41 | Simple Enterprises | WORK DOES NOT PERTAIN TO THIS DIVISION |
Detail Report
Graph / Photo |
||
78 | Providing and Installing Fire Fighting, Fire Alarm system and Public Address system | 10/08/2014 | 09/04/2015 | 155.31 |
Detail Report
Graph / Photo |
||||
79 | Construction and Commissioning of Mohalla Clinics at various places in North-East Delhi under the Jurisdiction of PWD Sub- Division M-2221 (2nd call). | 25/01/2019 | 24/05/2019 | 140.44 | 216.46 (Oct'21) | 0.00 (Oct'21) | Uma Shankar | work in progress |
Detail Report
Graph / Photo |
80 | Construction of prefab hut for HQ of Meghalaya Police along with development work located at PTS Wazirabad, Delhi | 15/07/2018 | 14/11/2018 | 134.50 | 138.77 (Jan'22) | 0.00 (Jan'22) | Aliyan Constaruction Company | work completed |
Detail Report
Graph / Photo |
81 | Construction of Migrant workers support centre at the office joint labour commissioner Vishwakarma Nagar Jhilmil colony Delhi (Civil and Electrical Work) | 23/04/2022 | 22/01/2023 | 124.05 | Dheeraj Singh & Company |
Detail Report
Graph / Photo |
|||
82 | Renovation and Interior works for Rouse Avenue Court Complex at DDU Marg, New Delhi. (SH :- Providing and fixing work stations, Cabin partitions, Office furniture and interior finishing and Electrical works for DSLSA.) | 06/08/2021 | 05/10/2021 | 112.91 | Millennium Furniture | Work is in progress |
Detail Report
Graph / Photo |
||
83 | Changes in infrastructure of CHB to develop it as OHB Model Home.(Civil and Electrical work) | 24/10/2019 | 23/02/2020 | 112.72 | Vashistha and Sons Construction Co PAN Number: ANFV6477F 9 Methapur , New Delhi - 110044 |
Detail Report
Graph / Photo |
|||
84 | Attending Day-to-Day complaint in Mandoli Jail complex and residential area including Supply of Material, Horticulture Operation, STP operation and tank and drain cleaning | 08/06/2022 | 07/06/2023 | 112.05 | M/s Gejwal Construction Company | Work is in progress |
Detail Report
Graph / Photo |
||
85 | Making the Building disable friendly under Accessible India campaign at RTRM Hospital Jaffarpur Kalan New Delhi. | 01/06/2020 | 27/11/2020 | 106.37 | 0.00 (Jan'21) | 30.00 % (Jan'21) | Aliyan Constaruction Company | Work is under progress. |
Detail Report
Graph / Photo |
86 | Providing and supplying tree planters in various places, New Delhi under MLA LAD Fund Scheme | 04/11/2019 | 18/12/2019 | 91.97 | 91.97 (Mar'21) | 0.00 (Mar'21) | Rajeshwar Dayal Pandey |
Detail Report
Graph / Photo |
|
87 | Construction of Shed with Boxing Ring at Sports Complex, East Vinod Nagar, Delhi | 08/05/2017 | 04/09/2017 | 84.89 | 19.39 (Jul'20) | 0.00 (Jul'20) | Anish Ahmed | Work in Progress |
Detail Report
Graph / Photo |
88 | Providing and Fixing of compactors in Hall No 2 of Original Branch situated in the basement of A Block of Delhi High Court New Delhi | 25/05/2021 | 23/07/2021 | 83.82 | 66.62 (Oct'21) | 0.00 (Oct'21) | Rajdhani Furnitures PVT. LTD. | work in progress |
Detail Report
Graph / Photo |
89 | Up-gradation of swimming pool and other misc. civil works including electrical work | 11/08/2021 | 08/12/2021 | 83.39 | 48.02 (Mar'22) | 0.00 (Mar'22) | M/s Tanishq Ions | In Progress. |
Detail Report
Graph / Photo |
90 | Renovation of gate no. 1 & 3 with GRC mouldings/cornices). (Civil & Electrical Works) | 25/06/2022 | 23/08/2022 | 78.59 | 15.43 (Jun'22) | 0.00 (Jun'22) | Uma Shankar |
Detail Report
Graph / Photo |
|
91 | Construction of 04 Nos Aam Aadmi Mohalla Clinic Primary Health Centres at various Places in the jurisdiction of Shahdara Circle PWD Delhi Civil Furniture Electrical Works Ist Recall | 23/12/2021 | 20/02/2022 | 77.72 | 20.18 (Mar'22) | 0.00 (Mar'22) | Gee Internationals | In Progress. |
Detail Report
Graph / Photo |
92 | Repair and Renovation of toilets of Hon ble Judges Chambers and Public ladies toilet in A Block G plus 3 and staff toilet G plus 6 near to copying agency in J block at KKD Court Delhi Civil and Electrical works | 13/03/2022 | 19/08/2022 | 76.84 | 31.46 (Apr'22) | 0.00 (Apr'22) | Uma Shankar |
Detail Report
Graph / Photo |
|
93 | Renovation of Library Block of IGDTUW, Kashmere Gate under SRD Division-I, Sub-Division-III, New Delhi.(SH-Civil and Electrical works). | 09/07/2018 | 08/01/2019 | 75.80 | 77.23 (Jan'22) | 0.00 (Jan'22) | Kamal Construction Co. | Work in progress |
Detail Report
Graph / Photo |
94 | Changes in Infrastructure of Model Home to convert it as CHB and JJB in front of Building (Civil and Electrical work). | 24/10/2019 | 23/01/2020 | 71.13 | AJAY CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|||
95 | Providing and laying RMC in the campus of N, J1, J2, J3, K, L and M Block at Sujan Singh Park, New Delhi under MLA LAD Fund Scheme. | 27/10/2019 | 07/12/2019 | 70.87 | 79.44 (May'21) | 0.00 (May'21) | Gyanchand |
Detail Report
Graph / Photo |
|
96 | Augmentation of Old and Outlived Sub-Station equipments at LBSH, Khichripur, Delhi Sub Head S.I. T.C. of Substation Equipments | 13/10/2018 | 12/04/2019 | 69.44 | 35.42 (Mar'19) | 50.00 % (Mar'19) | Ajay M/c Tools | work in progress ( 2nd RA ) |
Detail Report
Graph / Photo |
97 | Construction of 10 Nos FRP Gazebo rubens and 06 Nos of porta cabin Chaupal at various places of New Delhi Constituency AC40, under MLA LAD Fund Scheme | 26/11/2019 | 24/01/2020 | 68.77 | 34.44 (Dec'21) | 0.00 (Dec'21) | Tripurari Prasad Singh |
Detail Report
Graph / Photo |
|
98 | Construction of boundary wall at Tikri Khurd (Narela Project) for Delhi District Courts, New Delhi | 19/12/2021 | 18/04/2022 | 68.04 | Durga Construction Co. | Work is in progress |
Detail Report
Graph / Photo |
||
99 | Construction of Recreation Hall at PTS, Wazirabad, Delhi | 16/02/2019 | 15/06/2019 | 63.80 | 81.48 (Mar'21) | 0.00 (Mar'21) | Shekhar | work completed |
Detail Report
Graph / Photo |
100 | Comprehensive maintenance of 310 DA staff qtrs. Supply of materials and providing services of manpower for day to day maintenance work of 310 DA staff qtrs. KKD Court Divn. under SD M-2313 Karkardooma Delhi dg. 2021 22 | 07/02/2022 | 06/02/2023 | 63.52 | 21.66 (Jun'22) | 0.00 (Jun'22) | N.M. CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
101 | Comprehensive maintenance, Supply of material and providing services of manpower for day to day maintenance work of lawyer’s chamber blocks (ie. D,E,F,G& H- Blocks) Under SubDivision M-2311, KKD Court, PWD, Delhi | 22/01/2022 | 21/01/2023 | 62.58 | 25.68 (May'22) | 0.00 (May'22) | N.M. CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
102 | Construction of rain water harwasting system in Main Court Buildings i e in A B C I J K L Blocks and Lawyers Chamber Blocks D E F G H at KKD Court Shahdara Delhi Balance Work | 18/12/2021 | 17/03/2022 | 59.22 | Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 | In Progress. |
Detail Report
Graph / Photo |
||
103 | Making casting of factory made modular cupboard with fire retardant and boiling water proof Boilo Board in Alhmad rooms of C Block of KKD Court Complex Delhi 2nd Recall | 14/03/2022 | 11/06/2022 | 59.19 | Srishti Assosiates |
Detail Report
Graph / Photo |
|||
104 | Maintenance and repair work in Mandoli Jail complex, Delhi-110093 during year 2022-23. SH: External and Internal finishing work of Non- Residential Buildings and Residential quarters.2nd call | 10/06/2022 | 09/03/2023 | 57.65 | Aamir Khan | The work is awarded to the agency but PG not submitted by the agency |
Detail Report
Graph / Photo |
||
105 | Misc repair work under SRD Project Division I Sub Division III PWD New Delhi Recall | 23/09/2019 | 22/03/2020 | 56.09 | 70.01 (Feb'21) | 0.00 (Feb'21) | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
106 | AA to SKV No. 01 Gandhi Nagar Delhi dg 2018 19 | 17/03/2019 | 16/07/2019 | 55.57 | 32.21 (Jun'20) | 0.00 (Jun'20) | Arif | 90% work in progress |
Detail Report
Graph / Photo |
107 | Construction of New boundary wall (with State of Art) of Govt. Boys Sr. Sec. School, Varun Marg, Defence Colony, New Delhi-24 (School ID- 1924014) | 15/03/2022 | 17/07/2022 | 55.34 | R N Construction | Work is in progress |
Detail Report
Graph / Photo |
||
108 | Making casting of factory made modular cupboard with fire retardant and boiling water proof Board in Court rooms North East District of KKD Court Complex Delhi | 21/11/2021 | 18/02/2022 | 54.92 | Millennium Furniture |
Detail Report
Graph / Photo |
|||
109 | Expansion of 8 no Vulnerable Witness Courts at 5th and 6th floor B Block KKD Courts Delhi and other electrical installations | 19/03/2022 | 17/05/2022 | 53.14 | 28.31 (May'22) | 0.00 (May'22) | SABUR ALAM |
Detail Report
Graph / Photo |
|
110 | Civil and Electrical Works. | 13/06/2019 | 12/09/2019 | 51.83 | 15.96 (Nov'20) | 0.00 (Nov'20) | Abhikalp Constructions Syndicate | work in progress |
Detail Report
Graph / Photo |
111 | Construction of 5 nos arch shaped FRP pergola, 4 nos FRP porta cabin and 25 nos FRP Security Cabin at various places of New Delhi constituency AC 40 under MLA LAD Scheme | 26/11/2019 | 24/01/2020 | 51.22 | 5.64 (May'22) | 0.00 (May'22) | Tripurari Prasad Singh |
Detail Report
Graph / Photo |
|
112 | Replacement of Carpets in Courts of A block Extension block and wooden texture laminated flooring in Chambers of Extension block at Delhi High Court New Delh | 27/06/2017 | 26/07/2017 | 50.20 | Bansal Builder | Agreement closed PG forfeited |
Detail Report
Graph / Photo |
||
113 | Waterproofing treatment and Heat resistant tile work at terrace of A, C & I block | 08/06/2022 | 05/09/2022 | 50.04 | M. N. Construction Co. |
Detail Report
Graph / Photo |
|||
114 | C o Boundary wall finished with GRC Tile MS grills Concertina coil MS Gate and security guard room for proposed Govt Sr Sec School at PSP 10 Industrial area Phase V Kirari Rohini Delhi | 29/07/2021 | 28/10/2021 | 49.75 | 48.44 (May'22) | 0.00 (May'22) | Deepa Engineering Co. | WORK IN PROGRESS |
Detail Report
Graph / Photo |
115 | Renovation of 10 Nos faculty rooms of Anatomy at MAMC | 22/05/2021 | 22/05/2023 | 49.64 | 14.10 (Jun'22) | 0.00 (Jun'22) | SABUR ALAM | work completed |
Detail Report
Graph / Photo |
116 | Providing and fixing three seater stainless steel bench at ACI Block, Karkardooma Court Complex, Delhi | 26/02/2022 | 27/03/2022 | 48.15 | GEEKEN SEATING COLLECTION PVT LTD |
Detail Report
Graph / Photo |
|||
117 | Improvement of the existing bituminous road with granite stone block toward dedicated area from gate no. 1 to DJ parking toward C-Block and upto first face of B-Block toward gate no.1 and Renovation of corridor of court no-1 3rd floor C-Block KKD Court, Delhi | 25/06/2022 | 23/08/2022 | 47.61 | Manish construction and co |
Detail Report
Graph / Photo |
|||
118 | Upgradation of Type V Judges flats No. 401 601 701 and 702 and Servant Qtrs. 401 601 701 and 702 at Karkardooma Court Complex Delhi. (Civil and Electrical Work) | 05/10/2021 | 02/04/2022 | 46.05 | Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 |
Detail Report
Graph / Photo |
|||
119 | Providing and fixing Fire Check door fitting in SVBPGH | 20/03/2021 | 19/04/2021 | 45.28 | Amodh Construction | Work is Progress |
Detail Report
Graph / Photo |
||
120 | Construction of RCC Lift Duct and external development in the front of proposed Lift area | 17/04/2022 | 14/08/2022 | 43.84 | TKN Developers |
Detail Report
Graph / Photo |
|||
121 | Providing mandatory fire provisions including fire check doors and repair of fire fighting system at Pt.M.M.M. Hospital, Malviya Nagar, New Delhi. (Civil works)z | 07/03/2021 | 10/04/2021 | 43.62 | Sohan Lal Chhitoria and Sons | Work in progress |
Detail Report
Graph / Photo |
||
122 | SITC of Building Management System | 12/09/2020 | 11/03/2021 | 43.49 | 130.52 (Jan'21) | 50.00 % (Jan'21) | Digital Controls & Automation | Material supplied by the firm. Installation work in progress. |
Detail Report
Graph / Photo |
123 | P/F Vitrified tile flooring, false ceiling, wall paneling and IRC Fabric, Construction of underground R.C.C water tank, installation of 01 no. Borewell and other miscellaneous works at DSEU, Vivek Vihar, Delhi dg. 2022-23). (Civil & Electrical Works). | 13/06/2022 | 10/09/2022 | 41.34 | Uma Shankar |
Detail Report
Graph / Photo |
|||
124 | A/R and M/O Delhi High Court, New Delhi dg. 2021-22 (SH: Providing services of plumbing, carpentry jobs etc.) | 01/08/2021 | 31/07/2022 | 40.87 | 32.98 (Jun'22) | 0.00 (Jun'22) | TRENDY SECURITY SERVICES | Work in progress |
Detail Report
Graph / Photo |
125 | Improvement of lighting in various OTs at GTB Hospital Complex, Shahdara, Delhi. | 03/03/2019 | 02/05/2019 | 40.46 | 19.10 (May'19) | 0.00 (May'19) | CARONA ELECTRICALS | Work completed |
Detail Report
Graph / Photo |
126 | Toilets renovation works | 09/07/2021 | 06/10/2021 | 40.06 | 15.36 (Mar'22) | 0.00 (Mar'22) | Saeed Builders | In progress. |
Detail Report
Graph / Photo |
127 | Improvement Multi Model intigration System at Karkardooma Court Metro Station under M-2111 dg. 2022-23. | 03/07/2022 | 30/09/2022 | 38.77 | Ram Kirpal Singh |
Detail Report
Graph / Photo |
|||
128 | EOR in Sanjay Gandhi Memorial Hospital, Delhi. (SH Construction of Badminton Court, Fixing of grill gate, rain water harvesting well to recharge ground water and other misc. works). | 28/08/2019 | 27/11/2019 | 37.39 | SUSHIL KUMAR | work is in slow progress |
Detail Report
Graph / Photo |
||
129 | Up-gradation and enhancement of aesthetic view of Swimming pool premises located at Captain Hanifuddin G.G.S.S.S. Mayur Vihar Phase-1, Pocket-4, Delhi. | 03/06/2022 | 31/08/2022 | 35.06 | Dheeraj Singh & Company | Work just awarded. |
Detail Report
Graph / Photo |
||
130 | CO of Toilet for primary wing support staff visitor and attached toilet to principal room renovation of water tank platform and toilet repairing of b wall and other misc civil works | 15/08/2020 | 14/12/2020 | 34.45 | CSM CONSTRUCTION |
Detail Report
Graph / Photo |
|||
131 | Providing and laying interlocking paver block and RMC in the campus of Police Colony at Tilak Marg, New Delhi under MLA LAD Fund Scheme. | 27/10/2019 | 25/12/2019 | 33.92 | 42.37 (Apr'22) | 0.00 (Apr'22) | Gyanchand |
Detail Report
Graph / Photo |
|
132 | Construction of Casualty Block at Lal Bahadur Shastri Hospital, Khichripur, Delhi. Sub Head Providing ductable type air conditioning system | 09/07/2019 | 08/10/2019 | 33.85 | SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. | work in Progress 6th RA 18182135 |
Detail Report
Graph / Photo |
||
133 | Providing, installation, testing, and commissioning of Code Blue System (NCS) for Old and New block at MAIDS, New Delhi | 11/08/2019 | 10/11/2019 | 33.77 | Med Freshe Pvt. Ltd. | Work in progress Med Freshe Pvt. Ltd. |
Detail Report
Graph / Photo |
||
134 | Construction of SAKHI- ONE STEP CENTRE at campus of GBSSS, Malviya Nagar, New Delhi. (Civil and Electrical Works) | 16/12/2021 | 15/04/2022 | 32.92 | 14.29 (Jun'22) | 0.00 (Jun'22) | AKSHAY KUMAR DAGAR |
Detail Report
Graph / Photo |
|
135 | Strengthening of damaged beams columns slabs during 2021 22 at SKV No 1 Mansarovar Park Shahdara Delhi 32 School ID 11061655 (Balance work) | 05/04/2022 | 03/07/2022 | 32.79 | 22.88 (Jun'22) | 0.00 (Jun'22) | Cembond Construction Pvt. Ltd |
Detail Report
Graph / Photo |
|
136 | Construction of Rain Water Harvesting Pit inside HLTB Complex Tahirpur Delhi | 21/11/2021 | 18/02/2022 | 32.74 | 26.42 (Jun'22) | 0.00 (Jun'22) | Sushil Kumar |
Detail Report
Graph / Photo |
|
137 | Providing and fixing retro reflective informatory sign boards at various location of New Delhi constituency AC40 under MLA LAD Fund Scheme | 25/10/2019 | 22/01/2020 | 32.70 | 12.66 (Mar'21) | 0.00 (Mar'21) | Rajesh Kumar Gupta |
Detail Report
Graph / Photo |
|
138 | Construction of Porta Cabin for PWD Sub Divn. Office of Civil and Electrical including enquiries of both and Development of lab collection centre and shed covering | 06/01/2021 | 05/04/2021 | 31.62 | 0.00 (Jan'21) | 5.00 % (Jan'21) | Nation Star Enterprises | Work is under progress. |
Detail Report
Graph / Photo |
139 | Installation of hard drawn wire fabric at D Block and B Block residential quarters for monkey protection in Fire Station Connaught Place New Delhi. | 08/02/2019 | 07/03/2019 | 31.58 | 39.47 (Jul'19) | 90.00 % (Jul'19) | Vasdev | Work in progress |
Detail Report
Graph / Photo |
140 | C/o 144 Nos. temporary court room in the existing court complexes of Saket (stilt +G+3), Tis Hazari (Stilt + G +3) and Karkardooma (G+4). SH: SITC of 1250 KVA dry Type Transformer at Saket Court. | 09/06/2022 | 06/09/2022 | 31.45 | Ramesh Electric Works | Tender Called Opening Date 09.05.2022 |
Detail Report
Graph / Photo |
||
141 | Renovation of Kotwali Building at Chandni Chowk, Police Station under SRD Division-I, Sub-Division-III, PWD, New Delhi. | 25/06/2018 | 24/10/2018 | 31.39 | 0.00 (Feb'19) | 39.16 % (Feb'19) | Kamal Construction Co. | Work Completed and final bill paid |
Detail Report
Graph / Photo |
142 | Providing and fixing modular partition panel and supplying furniture for extension of administrative block at RTRM Hospital, Jaffarpur Kalan, New Delhi | 22/10/2021 | 20/12/2021 | 31.27 | GEEKEN SEATING COLLECTION PVT. LTD. | Work is under progress. |
Detail Report
Graph / Photo |
||
143 | AR and MO Delhi High Court New Delhi dg 2021 22 SH Providing services of plumbing carpentry jobs etc | 09/07/2021 | 08/07/2022 | 31.07 | Krishna Kumar | Work in progress |
Detail Report
Graph / Photo |
||
144 | SITC of additional CCTV and allied equipment at GTB Hospital, Shahdara, Delhi | 16/10/2018 | 15/12/2018 | 30.64 | 15.29 (Feb'19) | 50.00 % (Feb'19) | San Infotech Services | work in progress 2nd RA 1696099 |
Detail Report
Graph / Photo |
145 | Providing and fixing furniture at Ground Floor and 1st Floor | 15/08/2021 | 29/08/2021 | 30.45 | 33.54 (Mar'22) | 0.00 (Mar'22) | DURIAN INDUSTRIES LIMITED | In progress. |
Detail Report
Graph / Photo |
146 | Renovation of toilets in J, K & L Block at Karkardooma Court, Delhi (Balance work) (IstRecall) | 30/12/2021 | 29/03/2022 | 30.36 | Ravinder Kumar Gupta | In Progress. |
Detail Report
Graph / Photo |
||
147 | Making through way from Barrack to Toilet in all Ward of CJ- 11, 12, 13, 14 and 16 in Prison Complex Mandoli, Delhi | 28/07/2021 | 24/11/2021 | 30.00 | M/s Gejwal Construction Company | Work is in progress |
Detail Report
Graph / Photo |
||
148 | Strengthening work in various buildings M N O block in Judges Residential Complex at KKD Court Shahdara Delhi dg 2021 22 | 17/12/2021 | 15/04/2022 | 29.81 | Cembond Construction Pvt. Ltd | In Progress. |
Detail Report
Graph / Photo |
||
149 | Upgradation of General store, Quality Cell, Old Doctors Hostel, Kitchen and Misc. work | 09/02/2022 | 08/07/2022 | 29.38 | 22.59 (May'22) | 0.00 (May'22) | SATYA RAM | Work is under progress. |
Detail Report
Graph / Photo |
150 | Comprehensive Maintenance of Old Saint Stephens College Building Kashmere Gate, CPO Building, Old Court Building, NCC Offices Buildings, Novelty Fire Station, Fire Station Jama Masjid, Disability Commissioner Office, Lok Nayak Setu Office Compl | 17/11/2019 | 16/11/2020 | 29.01 | 36.24 (Feb'21) | 0.00 (Feb'21) | K.P. Singh & Co. |
Detail Report
Graph / Photo |
|
151 | False ceiling work in Ward Area | 23/05/2021 | 22/07/2021 | 28.86 | Royal Construction Co. | work is progress |
Detail Report
Graph / Photo |
||
152 | Supplying, installation, testing and commissioning of X Ray baggage machine system at Rouse Avenue Court Complex, New Delhi. | 29/03/2022 | 27/04/2022 | 28.67 | Vehant Technologies. Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
||
153 | Rehabilitation work in Police Station at Chandni Mahal, Asaf Ali Road, Delhi. | 29/09/2019 | 26/03/2020 | 27.08 | 33.83 (Mar'21) | 0.00 (Mar'21) | Shah Pandya & Shot Crete |
Detail Report
Graph / Photo |
|
154 | Renovation of court no 51 & 53 B-Block at Karkardooma Court, Delhi | 13/06/2022 | 11/08/2022 | 26.85 | Uma Shankar |
Detail Report
Graph / Photo |
|||
155 | Construction of yard for Malkhana of Police Station Chandni Mahal, Darya Ganj under SRD Division-I, Sub-Division-III, New Delhi. | 30/07/2018 | 29/10/2018 | 25.67 | 23.27 (Sep'19) | 0.00 (Sep'19) | Krishan Kumar | Work in progress |
Detail Report
Graph / Photo |
156 | Providing and laying Flushing and water supply line al-round at Police housing campus Delhi-110093 (Balance work) 5th call | 29/03/2022 | 27/05/2022 | 23.94 | PUSHPENDER SINGH YADAV | Work is in progress |
Detail Report
Graph / Photo |
||
157 | Providing and Fixing Net to stop the reach of items thrown from outside Periphery of Jail to inmates in Prison Complex Mandoli, Delhi | 19/04/2022 | 17/07/2022 | 23.37 | M/s Gejwal Construction Company | Work is in progress |
Detail Report
Graph / Photo |
||
158 | Providing and laying bituminous concrete surface at BR Campus, Race course, New Delhi under MLA LAD fund Scheme. 3rd CALL | 26/11/2019 | 25/12/2019 | 22.88 | 25.04 (Nov'21) | 0.00 (Nov'21) | Rajesh Kumar Gupta |
Detail Report
Graph / Photo |
|
159 | Development Cricket ground football field and chain link fencing at newly taken over plot for sports complex at village kair in the Assembly constituency Najafgarh, Delhi. (SH: Comprehensive maintenance of cricket ground for one year) | 01/04/2021 | 31/03/2022 | 22.80 | Devender Pal Singh | work Completed. Final bill under preparation. |
Detail Report
Graph / Photo |
||
160 | Providing and fixing of overhead water tank in LCB I II A Block Medical Health Centre and Administrative Block Delhi High Court New Delhi | 24/09/2021 | 22/12/2021 | 22.29 | KRISHAN KUMAR MISHRA | Work in progress |
Detail Report
Graph / Photo |
||
161 | Renovation of B Voc Labs | 20/05/2019 | 19/08/2019 | 22.14 | M.Y Construction | 40% Work could not start due to electrical tender not in force. |
Detail Report
Graph / Photo |
||
162 | Supplying and replacement of Outlived Air Handling Units at JPCH Shastri Park, Delhi | 22/07/2019 | 21/09/2019 | 21.72 | US Engineers | Tender is in process |
Detail Report
Graph / Photo |
||
163 | Providing and Fixing of MS tubular Window with Acrylic plastic Sheet | 14/11/2019 | 12/03/2020 | 21.53 | 26.89 (Mar'21) | 0.00 (Mar'21) | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
164 | Renovation of toilet blocks & miscellaneous civil works- Balance work | 26/06/2022 | 23/09/2022 | 21.44 | Sanjeev Kumar |
Detail Report
Graph / Photo |
|||
165 | Supply, Installation, Testing and Commissioning of IP based CCTV systems along with integration with existing Pelco Make systems at Basement Parking of Rouse avenue court, DDU Marg, New Delhi. | 29/03/2022 | 27/04/2022 | 21.25 | Sonal Enterpries Pvt. Ltd. | Work in Progress |
Detail Report
Graph / Photo |
||
166 | Up-gradation of Type-V Judge’s flats No- G-1 Type-VI Judge’s flats No-507 and Servant Qtrs. G-1 & 507 at Karkardooma Court Complex, Delhi. (SH:- Civil Work). | 02/05/2022 | 30/06/2022 | 21.17 | Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 |
Detail Report
Graph / Photo |
|||
167 | Supply, Installation, testing and commissioning of LED Light diode display board for Temporary Court block at Karkardooma Court Complex, New Delhi | 05/03/2022 | 03/04/2022 | 20.91 | Neelam Elevator Care | Work in progress |
Detail Report
Graph / Photo |
||
168 | Waterproofing treatment and Heat resistant tile work at terrace of J K and L block and replacement cum repairing of door and window of lift rooms at A C I J and L block Karkardooma Court Complex | 08/06/2022 | 05/09/2022 | 20.86 | Karan Walia |
Detail Report
Graph / Photo |
|||
169 | Providing and fixing of shade at 3rd floor Arbitration Centre Delhi High Court New Delhi | 18/12/2021 | 16/01/2022 | 19.23 | 51.47 (Mar'22) | 0.00 (Mar'22) | R L WADHWA | Work in progress |
Detail Report
Graph / Photo |
170 | SITC of CCTV in various Mohalla Clinic under sub division M3513 | 13/04/2022 | 12/05/2022 | 18.93 | YASH ENTERPRISES |
Detail Report
Graph / Photo |
|||
171 | Renovation of toilets in J K and L Block at Karkardooma Court Delhi Balance work | 06/11/2021 | 03/02/2022 | 18.82 | Phoenix Constructions | In Progress. |
Detail Report
Graph / Photo |
||
172 | Provision of chequrred tiles, raising of boundary wall and other misc civil work | 26/06/2022 | 25/07/2022 | 18.67 | Sanjeev Kumar |
Detail Report
Graph / Photo |
|||
173 | SITC of VRV/ VRF Air Condition Plant | 12/06/2022 | 11/07/2022 | 18.55 | Airtemp Engineers |
Detail Report
Graph / Photo |
|||
174 | Supply and fixing of energy efficient LED fittings in order to replace the existing and obsolete conventional MH and T 5 fittings in CJ 11 and CJ 12 at Prison Complex Mandoli, DelhiDelhi | 29/05/2022 | 27/06/2022 | 17.89 | Modern Enterprises | Tender Recall |
Detail Report
Graph / Photo |
||
175 | Replacing of damaged G.S sheets with G.I profile sheets. (1st recall) | 01/04/2022 | 29/06/2022 | 17.32 | 13.14 (Jun'22) | 0.00 (Jun'22) | SABUR ALAM |
Detail Report
Graph / Photo |
|
176 | Const. of office building for Sub Division III SRD Project Divn I at Road No. 47 near Metro Pillar No. 29, Kashmere Gate, Delhi | 23/09/2019 | 21/12/2019 | 17.04 | 21.26 (Jul'20) | 0.00 (Jul'20) | K.P. Singh & Co. |
Detail Report
Graph / Photo |
|
177 | Supplying, installation, testing and commissioning of DFMD and HHMD at Rouse Avenue Court Complex, New Delhi | 05/03/2022 | 03/04/2022 | 16.82 | Smiths Detection Systems Pvt. Ltd. | Work in Progress |
Detail Report
Graph / Photo |
||
178 | Construction of Conference Hall and Waiting/Reception Hall in Office of Commissioner for Persons with Disabilities at Mata Sundari Road under SRD Division-I, Sub-Division-III, PWD, New Delhi. (SH-Civil Renovation Work). | 09/08/2018 | 08/11/2018 | 16.72 | 15.33 (Oct'19) | 5.60 % (Oct'19) | Intkhab Alam | Work in progress |
Detail Report
Graph / Photo |
179 | A/R & M/O GNEC, New Delhi. dg. 2016-17 (SH: Up-Keeping and maintenance of services of GNEC and providing and service of computer operator, Dak Messenger, plumber, carpenter, mason sewerman etc under HMD (Central) SD-3) | 13/04/2017 | 12/10/2017 | 16.04 | 7.45 (Mar'19) | 46.00 % (Mar'19) | Anup Enterprises |
Detail Report
Graph / Photo |
|
180 | Miscellaneous requisite work in Central Jail No 11, 12, 13, 14, 15 and 16 in Prison Complex Mandoli, Delhi- 110093 | 15/10/2020 | 11/02/2021 | 15.37 | 0.00 (Dec'20) | 22.00 % (Dec'20) | M/s Manomay | Work is progress |
Detail Report
Graph / Photo |
181 | SH- Kota stone flooring, repair to boundary wall including grit plaster and concertina wire fencing, repair and maintenance of toilets, P F steel windows, renewing broken glass panes with polycarbonate sheet etc. | 07/11/2018 | 04/02/2019 | 15.26 | 17.61 (Apr'22) | 0.00 (Apr'22) | Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 | in progress. |
Detail Report
Graph / Photo |
182 | Providing and supplying plastic moulded table in porta cabins reading room at various places of New Delhi Constituency AC40 under MLA LAD Fund Scheme. | 25/10/2019 | 08/12/2019 | 15.17 | DECOR MODULAR SYSTEM PVT LTD |
Detail Report
Graph / Photo |
|||
183 | Upkeep Service | 05/10/2019 | 04/10/2020 | 15.15 | 18.80 (Feb'21) | 0.00 (Feb'21) | Ashish Gupta |
Detail Report
Graph / Photo |
|
184 | Providing tactile pathway to Resource centre Separate stainless Steel main gate Providing and placing water storage tanks Distempering painting and finishing work and misc civil work | 29/05/2022 | 26/08/2022 | 14.87 | Sushil Kumar |
Detail Report
Graph / Photo |
|||
185 | Providing and fixing sufficient light in basement and other low light/ dark area for security purpose at Rouse Avenue Court Complex, DDU Marg, New Delhi | 11/06/2022 | 10/07/2022 | 14.87 | BHAGWAT ASSOCIATES | Tender Opened PG Letter issued |
Detail Report
Graph / Photo |
||
186 | Construction of porta cabin for camp office of Honble Minister at DJB (BPS/UGR) at C-6, Vasant Kunj, New Delhi | 04/01/2022 | 03/02/2022 | 14.34 | 4.87 (Jun'22) | 0.00 (Jun'22) | SHRI DATTA KRUPA ENTER PRISES |
Detail Report
Graph / Photo |
|
187 | Construction of Underground sump at ITI Jija Bai for Women, Sirifort, New Delhi (Civil and Electrical work) | 23/10/2021 | 22/12/2021 | 13.91 | 11.75 (Apr'22) | 0.00 (Apr'22) | SHRI DATTA KRUPA ENTER PRISES |
Detail Report
Graph / Photo |
|
188 | Repair/ improvement of berm, footpath and drain at Jaipur Golden Hospital, Sector-3, Rohini | 27/04/2022 | 26/07/2022 | 13.86 | Dharambir Singh |
Detail Report
Graph / Photo |
|||
189 | Construction of permanent shed on pavement near Gyne OPD registration | 18/08/2020 | 17/10/2020 | 13.73 | SS Enterprises | work in progress. |
Detail Report
Graph / Photo |
||
190 | Providing and fixing PU Tactile tiles for visually impaired persons in Saket and Tis Hazari Temporary Court sites (PU tiles peel and stick type to be fixed over existing flooring) | 22/03/2022 | 19/06/2022 | 13.69 | M/S DEVDUTT SHARMA | Work is in progress |
Detail Report
Graph / Photo |
||
191 | Providing and installation of 10 Nos. passenger lift in Four Storey Building at DIPSAR, M.B. Road New Delhi. | 25/06/2019 | 24/08/2019 | 13.59 | Sanjeev Kumar Goel | work in progress |
Detail Report
Graph / Photo |
||
192 | EOR to Govt. Sarvodaya Kanya Vidyalaya a S.P. Road, Nangloi, New Delhi. SH Providing new gate for main entrance, near activity room, providing and fixing grill in front of primary section providing shed for water through near primary section | 02/04/2018 | 15/09/2030 | 13.58 | L V Enterprises |
Detail Report
Graph / Photo |
|||
193 | Shifting of X Ray machine at Gate No 6 and provision of porta cabin at gate No 6 and covering of vehicle session at gate No 03 | 20/05/2019 | 03/07/2019 | 13.40 | 13.90 (Jan'20) | 0.00 (Jan'20) | Rajeev Kumar | site not available for work 60% |
Detail Report
Graph / Photo |
194 | Renovation of gents and ladies toilet and guniting of ceiling of ground, 1st, 4th, 5th and 6th floor of I block, College of Art at Tilak Marg, New Delhi | 14/11/2019 | 11/02/2020 | 13.30 | 14.80 (Mar'21) | 0.00 (Mar'21) | Amiruddin |
Detail Report
Graph / Photo |
|
195 | Expansion of 8 no. Vulnerable Witness Courts at 5th and 6th floor, B-Block KKD Courts Delhi including Audio-Video System and other electrical installations. (Furniture work) | 19/05/2022 | 17/06/2022 | 13.23 | 4.42 (Jun'22) | 0.00 (Jun'22) | Jain Electric Works |
Detail Report
Graph / Photo |
|
196 | Construction of Porta Cabin for storage purpose on Terrace of Family Court, Saket, New Delhi. | 26/06/2019 | 25/07/2019 | 13.07 | 8.01 (Mar'21) | 0.00 (Mar'21) | P S ASSOCIATES | work in progress |
Detail Report
Graph / Photo |
197 | Repair Renovation of old damaged porta cabins at I block and other miscellaneous work | 08/03/2022 | 06/05/2022 | 12.65 | AMIR ISRAR |
Detail Report
Graph / Photo |
|||
198 | Rehabilitation of distress open staircase at Admn. Block. (ii) Conversion of Existing class room into PGs Accommodation. Balance | 17/09/2020 | 05/12/2020 | 12.59 | sabur alam | Work in progress. |
Detail Report
Graph / Photo |
||
199 | Rehabilitation of distress open staircase at Admn. Block. Conversion of Existing class room into PG s Accommodation. Balance work of PG s Accommodation. | 17/09/2020 | 05/12/2020 | 12.59 | 4.16 (May'22) | 0.00 (May'22) | sabur alam | Work is Progress |
Detail Report
Graph / Photo |
200 | Setting up of Dining Hall at HLTB Complex, Tahirpur, Delhi under KKD Court Divn.. M-231 dg. 18-19. | 10/02/2019 | 10/05/2019 | 12.52 | 13.79 (Jan'20) | 0.00 (Jan'20) | Daya Sagar Sharma | work in progress |
Detail Report
Graph / Photo |
201 | Installation of Rain Water Harvesting system at Sarvodaya bal vidyalaya, Fatehpur Beri, New Delhi (School ID 1923014, Building ID 19231036, EOR ID 20172367). | 03/03/2019 | 02/05/2019 | 12.15 | 10.84 (Nov'20) | 0.00 (Nov'20) | RECKONN | work in progress |
Detail Report
Graph / Photo |
202 | Construction of temporary shed at Community hall Welcome Delhi (Civil and Electrical work) | 02/02/2022 | 03/03/2022 | 12.04 | Sanjeev Kumar | In progress. |
Detail Report
Graph / Photo |
||
203 | Providing new stainless steel gate at entry, internal painting of building, P/F signage board, wooden flooring and wall panelling in principal & conference room & misc. civil works in DIET, J & K pocket, Dilshad Garden, Delhi | 26/12/2021 | 23/02/2022 | 11.65 | Sanjeev Kumar | In progress. |
Detail Report
Graph / Photo |
||
204 | Civil Electrical Works | 10/12/2021 | 07/02/2022 | 11.21 | Rainbow Constructions | In Progress. |
Detail Report
Graph / Photo |
||
205 | Urgent Security related works in CJ- 15 (High Security Prison) in Prison Complex Mandoli, Delhi | 20/01/2022 | 20/03/2022 | 11.19 | M/s Gejwal Construction Company | Work is in progress |
Detail Report
Graph / Photo |
||
206 | Providing and fixing down comer and manually operated electronic FA system | 19/09/2019 | 18/10/2019 | 11.18 | 0.00 (Jan'21) | 98.00 % (Jan'21) | M/s Royale Meridian India Pvt Ltd | Work completed. |
Detail Report
Graph / Photo |
207 | Provision for Rain Water Harvesting Systems in Govt. Girls Sec. School (Urdu Medium) Lambi Gali, Hauz Qazi under SRD Division-I, Sub-Division-III, PWD, New Delhi dg. 2018-19. | 11/07/2019 | 10/09/2019 | 11.10 | 1.62 (Mar'21) | 0.00 (Mar'21) | Shakur Ahmed & Sons |
Detail Report
Graph / Photo |
|
208 | Provision for Rain Water Harvesting System in Sarvodaya Kanya Vidyalaya No. 1 (Hindi Medium) at Jama Masjid, Delhi dg. 18-19 (School ID-2127024.) under SRD Division-I, Sub-Division-III, PWD, New Delhi | 11/03/2019 | 10/05/2019 | 11.09 | 13.85 (Mar'20) | 0.00 (Mar'20) | Mohd. Asad | work in progress |
Detail Report
Graph / Photo |
209 | Construction of Rouse Avenue Court Complex at DDU Marg, New Delhi. (SH :- Providing office cabins for Branches ). | 13/01/2022 | 13/04/2022 | 11.08 | R L WADHWA | work is in progress |
Detail Report
Graph / Photo |
||
210 | Miscellaneous Civil works | 10/05/2022 | 08/07/2022 | 10.73 | Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 |
Detail Report
Graph / Photo |
|||
211 | Renovation of staff room toilets and pantry and other misc civil work in Chemistry Lab at Vivekanand College Vivek Vihar Delhi | 29/05/2022 | 27/06/2022 | 10.53 | Sundriyal Construction |
Detail Report
Graph / Photo |
|||
212 | Construction of Old Age Home at Kanti Nagar Installation of fire doors in the building | 04/03/2021 | 02/04/2021 | 10.22 | 11.71 (Aug'21) | 0.00 (Aug'21) | A. V. ENTERPRISES | In progress. |
Detail Report
Graph / Photo |
213 | Upgradation of Type-II, Type-III and Type-IV Flat No. B-415, 97, 80, 118, 149, 407 ,168, 234, 309, 303, 330, 485, 469, 621, 497, 605 ,85, 387, 33 etc. C-734, 741, 756 etc, D-21, D-7, D-30 DA Flats Timarpur Delhi-- Electrical Work, EI and Fans | 28/02/2022 | 27/08/2022 | 10.14 | Dashmesh Enterprises |
Detail Report
Graph / Photo |
|||
214 | Construction one no additional toilet at 14/2 Tilak Marg and Renovation of kitchen, toilets and other civil miscellaneous repair works at 36 Ashoka Road under SRD Project Division-I, Sub-Division-IV, PWD, New Delhi | 11/08/2019 | 10/10/2019 | 9.97 | 11.78 (Nov'20) | 0.00 (Nov'20) | Sher Singh |
Detail Report
Graph / Photo |
|
215 | Earth filling and making play ground in vacant land behind shopping center in residential complex of Prison Complex Mandoli, Delhi | 06/10/2021 | 04/12/2021 | 9.18 | RAM KUMAR SHARMA | Work is in progress |
Detail Report
Graph / Photo |
||
216 | Construction of Two Store Room and renovation of Voter Centre Building Deoli (AC-47), Sector-IV, Pushp Vihar, New Delhi-110017. (Civil and Electrical work) | 27/01/2022 | 26/03/2022 | 9.07 | 11.06 (Jun'22) | 0.00 (Jun'22) | Vision Constructions |
Detail Report
Graph / Photo |
|
217 | Provision for Rain Water Harvesting System in Govt Girls Sr Sec School at Gali Baraf Wali Kinari Bazar Delhi during 2018 19 School ID-1208023 under SRD Division I Sub-Division III PWD New Delhi | 11/07/2019 | 10/09/2019 | 8.86 | 9.64 (May'22) | 0.00 (May'22) | Shakur Ahmed & Sons |
Detail Report
Graph / Photo |
|
218 | Provision for Rain Water Harvesting System in Sarvodaya Kanya Vidyalaya No. 2 at Zeenat Mahal, Lal Kuan, Delhi (School ID-2127179) under SRD Division-I, Sub-Division-III, PWD, New Delhi | 14/07/2019 | 13/09/2019 | 8.76 | Shakur Ahmed & Sons |
Detail Report
Graph / Photo |
|||
219 | Providing services of plumbing, carpentry jobs etc RECALL | 04/11/2019 | 03/11/2020 | 8.68 | 8.68 (Mar'21) | 0.00 (Mar'21) | Good Luck Enterprises |
Detail Report
Graph / Photo |
|
220 | Distempering painting and Finishing works of various Schools under sub divn M 2313 of KKD Court Division M 231 during 2021 22 (Balance work) | 16/12/2021 | 15/03/2022 | 8.33 | 7.20 (Jun'22) | 0.00 (Jun'22) | M T Builders | In Progress. |
Detail Report
Graph / Photo |
221 | A R and M O to 405 DA Flats Kalyanvas Delhi 91 dg 2018 19 | 18/06/2018 | 14/06/2019 | 8.03 | 5.04 (Nov'20) | 0.00 (Nov'20) | SABUR ALAM | work in progress 40% |
Detail Report
Graph / Photo |
222 | A/R and M/O to I.G.D.T.U.W. at Kashmere Gate, Delhi During 2018-19. (SH-Upkeep Service). | 25/09/2018 | 24/09/2019 | 8.01 | 1.56 (Jan'20) | 0.00 (Jan'20) | Ashish Gupta | Work in progress |
Detail Report
Graph / Photo |
223 | Provision for Rain Water Harvesting System in Sarvodaya Bal Vidyalaya at Pataudi House, Darya Ganj, Delhi (School ID-2127003.) under SRD Division-I, Sub-Division-III, PWD, New Delhi | 25/06/2019 | 24/08/2019 | 7.90 | 6.08 (Nov'19) | 0.00 (Nov'19) | SUDHIR KUMAR SHARMA |
Detail Report
Graph / Photo |
|
224 | Furniture work | 25/10/2019 | 08/12/2019 | 7.84 | 7.84 (Mar'21) | 0.00 (Mar'21) | DURIAN INDUSTRIES LIMITED |
Detail Report
Graph / Photo |
|
225 | Construction of public toilet near mortuary, providing shed for blood bank and other misc. works. | 18/03/2020 | 17/05/2020 | 7.80 | Sudhakar Samal | work in progress |
Detail Report
Graph / Photo |
||
226 | Provision for Rain Water Harvesting System in Govt. Boys Sr. Sec. School No. 2 (Hindi Medium) at Jama Msjid, Delhi (School ID-2127006.) under SRD Division-I, Sub-Division-III, PWD, New Delhi | 25/06/2019 | 24/08/2019 | 7.66 | 6.42 (Jan'20) | 0.00 (Jan'20) | SUDHIR KUMAR SHARMA |
Detail Report
Graph / Photo |
|
227 | Wall paneling wooden flooring and toilet renovation work Civil and Electrical works | 11/06/2022 | 10/07/2022 | 7.36 | N.M. CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|||
228 | Preparation of one room of 2nd and 3rd floor in front of lift gallery and replacement of gallery window of I Block, College of Art at Tilak Marg, New Delhi | 14/11/2019 | 12/01/2020 | 7.35 | 9.10 (Feb'21) | 0.00 (Feb'21) | Amiruddin |
Detail Report
Graph / Photo |
|
229 | Installation of rain water harvesting system | 02/06/2018 | 01/08/2018 | 7.23 | 6.04 (Jul'19) | 0.00 (Jul'19) | Mohd Akram | work in progress 70% |
Detail Report
Graph / Photo |
230 | Installation of Open Gym and Joy Rides in the grounds of Mandoli Prison Residential Complex and for Creche in CJ- 16 in Mandoli Prison Complex Delhi. (2nd Call) | 23/03/2022 | 06/05/2022 | 7.08 | Abhishek Enterprises | Work is in progress |
Detail Report
Graph / Photo |
||
231 | A/R and M/O I.G.D.T.U.W. at Kashmere Gate, Delhi During 2018-19. (SH-Repair and Renovation work of University Staff Quarters at IGDTUW, Kashmere Gate under SRD Division-I, Sub-Division-III, PWD, New Delhi). | 29/03/2019 | 28/06/2019 | 7.01 | Prithvi creation | work in progress |
Detail Report
Graph / Photo |
||
232 | Renovation of D Block 1st Floor MP Hall | 28/11/2019 | 26/01/2020 | 6.80 | 6.89 (Sep'20) | 0.00 (Sep'20) | Mohd Amjad |
Detail Report
Graph / Photo |
|
233 | Operation and Maintenance of 3x110 TR Capacity HVAC System and Servicing Overhauling and Comprehensive running maintenance of WTAC, Water coolers and Split AC units | 01/04/2019 | 31/12/2019 | 6.53 | 7.48 (May'20) | 0.00 (May'20) | M/s Naj Refrigeration & Air Conditioning Works |
Detail Report
Graph / Photo |
|
234 | Distempering, painting and Finishing works at Various Schools under sub division M-2313 of KKD Court Division (M-231) during 2022-23 | 29/06/2022 | 27/08/2022 | 5.83 | M/S FAIZAN ALI |
Detail Report
Graph / Photo |
|||
235 | Providing and fixing dustbin at Karkardooma Court Complex, Delhi | 13/06/2022 | 12/07/2022 | 5.66 | N.M. CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|||
236 | Raising of boundary wall of Lal quarter Kidwai Nagar residential area under MLA LAD Fund Scheme RECALL | 04/11/2019 | 18/12/2019 | 5.60 | 4.89 (Sep'20) | 0.00 (Sep'20) | B P Rai and Sons |
Detail Report
Graph / Photo |
|
237 | Anti termite treatment of Hostel building and P F commercial ply and Mattress on beds of Hostel block Ist recall | 21/11/2021 | 19/01/2022 | 5.42 | 6.18 (Mar'22) | 0.00 (Mar'22) | Verma Pesticides & Pest Control Services Pvt. Ltd. | In progress. |
Detail Report
Graph / Photo |
238 | Providing infrastructure to Rouse Avenue Court Complex at DDU Marg, New Delhi during 2020-21. (SH :- Providing internal furnishing for De-Stress Room and Automatic Hand Sanitizer). | 25/10/2020 | 24/11/2020 | 5.41 | 0.00 (Jan'21) | 30.00 % (Jan'21) | R L WADHWA | work is in progress |
Detail Report
Graph / Photo |
239 | Construction of Rain water Harvesting System at Govt Boys Sr Secondary School Dev Nagar New Delhi Building ID 21281284 | 30/05/2019 | 13/07/2019 | 5.19 | 4.90 (Jan'20) | 0.00 (Jan'20) | Prem Sagar | Work completed final bill paid |
Detail Report
Graph / Photo |
240 | Maintenance of PCs and their accessories in Health Maintenance Division Office (S-W) and all Sub Divisions under this Division office. | 27/01/2020 | 26/01/2021 | 5.04 | STAR COMPUTER SYSTEMS | The Tender has been Cancel. |
Detail Report
Graph / Photo |
||
241 | Construction of Rain water Harvesting System in Sarovodya Kanya Vidyalaya Baba Ram Dev at Prasad Nagar New Delhi Building ID 21281295 | 30/05/2019 | 13/07/2019 | 4.97 | 5.56 (Nov'19) | 0.00 (Nov'19) | Prem Sagar | Bill paid |
Detail Report
Graph / Photo |
242 | Making arrangement for sanitized the Judges residential complex and Lawyers chamber blocks D E F G H preventive measures for Corona Virus COVID 19 in Karkardooma Court Complex Delhi. Sanitization work and providing hand sanitizer | 31/01/2022 | 31/03/2022 | 4.93 | 5.35 (Jun'22) | 0.00 (Jun'22) | PURIFIRES INDIA | In Progress. |
Detail Report
Graph / Photo |
243 | Providing and fixing work stations for PSA Branch at VIIth floor Admin Block of Delhi High Court New Delhi | 18/04/2022 | 17/05/2022 | 4.83 | R L WADHWA | Work in progress |
Detail Report
Graph / Photo |
||
244 | E.O.R. to repair and replacement of sewer line, rain water disposal line and other misc. repair work in Police Station, Darya Ganj, Delhi dg. 2018-19 (SH- Improvement of drainage system under SRD Division-I, Sub-Division-III, PWD, New Delhi). | 26/02/2019 | 25/04/2019 | 4.59 | 5.27 (Jun'19) | 0.00 (Jun'19) | Prashant Gupta | work in progress |
Detail Report
Graph / Photo |
245 | Anti termite treatment of Hostel building and PF commercial ply and Mattress on beds of Hostel block | 29/09/2021 | 27/11/2021 | 4.41 | Vashistha and Sons Construction Co PAN Number: ANFV6477F 9 Methapur , New Delhi - 110044 |
Detail Report
Graph / Photo |
|||
246 | EOR to Police Colony, Rajinder Nagar, New Delhi during 2018-19.(SH- Covering of open drain in Police Colony). | 30/05/2018 | 28/07/2018 | 4.37 | 5.48 (Aug'19) | 0.00 (Aug'19) | G.S construction | wip |
Detail Report
Graph / Photo |
247 | Misc. civil repair work | 15/09/2019 | 14/12/2019 | 4.36 | 5.44 (Oct'21) | 0.00 (Oct'21) | Shabbi Abbas |
Detail Report
Graph / Photo |
|
248 | Cons. of toilet in front of SCP Canteen and Requirement of bathroom and toilet in Community Centre. | 23/03/2020 | 22/05/2020 | 4.12 | 5.14 (Mar'21) | 0.00 (Mar'21) | Panchu ram |
Detail Report
Graph / Photo |
|
249 | RMO of water coolers , Split or Window or Ductable ACs installed at Lawyers block , Utility Block , Lockup building and Main Court Building at District Court Complex saket New delhi -110017. | 03/02/2019 | 02/02/2020 | 3.91 | 1.61 (Jul'19) | 0.00 (Jul'19) | ARORA ELECTRICAL WORKS |
Detail Report
Graph / Photo |
|
250 | EOR to National Law University, Sec-14, under Sub Div-III, SWBMD, New Delhi during 2018-19.(SH- Cleaning of sewerline by using super sucker machine). | 05/06/2018 | 02/09/2018 | 3.81 | 3.81 (Dec'18) | 70.00 % (Dec'18) | Surender Singh Chahal | work in progress |
Detail Report
Graph / Photo |
251 | Replacement of broken kota stone flooring and wooden racks, false ceiling and white washing of MFA final year Sculpture Studio, College of Art at Tilak Marg, New Delhi | 15/11/2019 | 14/12/2019 | 3.73 | 4.31 (Apr'21) | 0.00 (Apr'21) | Sher Singh |
Detail Report
Graph / Photo |
|
252 | A R and M O L N Hospital, New Delhi dg 2017 18 (SH Misc day to day Work for Pediatric Ward Surgical Block Skin Ward Administrative Block Burn Ward, Medical Ward Ward No. 19 and Gynae Ward at Lok Nayak Hospital, New Delhi | 07/02/2021 | 06/02/2022 | 3.47 | T. S. Enterprises | work completed |
Detail Report
Graph / Photo |
||
253 | Providing and fixing dustbin at Karkardooma Court Complex Delhi | 10/12/2021 | 08/01/2022 | 3.10 | Saman Mehboob | In Progress. |
Detail Report
Graph / Photo |
||
254 | Provision of Security Guard for Watch and ward at Old Age Home, Chattarpur under Sub Division-II, PTS Malviya Nagar, New Delhi during 2019-20. | 21/06/2019 | 20/06/2020 | 3.05 | 3.05 (Mar'21) | 0.00 (Mar'21) | Universal Security & Placement Services (Regd.) | work in progress |
Detail Report
Graph / Photo |
255 | A/R and M/O to I.G.D.T.U.W. at Kashmere Gate under Sub-Division-III, SRD Division-I, PWD, New Delhi During 2017-18 (SH-Specialized waterproofing treatment in the profile sheet gutter of workshop behind MAE Block). | 21/04/2018 | 20/05/2018 | 2.62 | 0.00 (Jul'18) | 2.90 % (Jul'18) | Garg Waterproofing Company | Work Completed and final bill paid |
Detail Report
Graph / Photo |
256 | Installation of 1 no bore well at Fire Station Tahirpur Delhi dg 2021 22 Civil and Electrical Works (2nd Recall) | 19/03/2022 | 17/04/2022 | 2.62 | Mohd. WAZID |
Detail Report
Graph / Photo |
|||
257 | Providing and erecting permanent barricading around dangerous building in Kasturba Kustha Ashram Tahirpur Delhi 1st recall | 11/12/2021 | 09/01/2022 | 2.50 | Akhil Okharwal | In Progress. |
Detail Report
Graph / Photo |
||
258 | Installation of Stainless Steel Grill on the window for safety and security of Valuable assets | 13/06/2022 | 12/07/2022 | 2.29 | 2.84 (Jun'22) | 0.00 (Jun'22) | Mohd Azam |
Detail Report
Graph / Photo |
|
259 | Installation of 1 no bore well at Fire Station Tahirpur Delhi dg 2021 22 Civil Electrical Works Ist Recall | 08/01/2022 | 06/02/2022 | 2.25 | MUZAMMIL ALI |
Detail Report
Graph / Photo |
|||
260 | Construction of security gates near entrance road of Church of Divine Mercy in Shakurbasti Assembly Constituency AC-15 under MLALAD scheme, during 2021-2022. (3rd call) | 24/03/2022 | 23/05/2022 | 2.19 | A J & CO. |
Detail Report
Graph / Photo |
|||
261 | Installation of 1 no. bore well at Fire Station, Tahirpur Delhi dg. 2021 22. Civil and Electrical Works | 21/11/2021 | 20/12/2021 | 2.16 | Sudesh Jain |
Detail Report
Graph / Photo |
|||
262 | Replacement of 04 Nos. Air conditioners at Land & Estate Branch Lucknow Road, Old Sectt, Delhi-54 | 22/06/2022 | 06/07/2022 | 2.08 | CHETAN SHARMA |
Detail Report
Graph / Photo |
|||
263 | A/R and M/O other PWD Roads under SRD Division -I, PWD, New Delhi during 2019-20. (SH- Painting of Kerb Stones on various roads for Independence Day under Sub Division-II.) | 13/08/2019 | 27/08/2019 | 2.06 | 2.27 (Nov'19) | 0.00 (Nov'19) | MOHD AFTAB |
Detail Report
Graph / Photo |
|
264 | A/A to RCL Tahirpur Sunder Nagri, Delhi during 2021-22.SH:- Providing and erecting permanent barricading around the dangerous buildings in Kasturba Kustha Ashram Tahirpur Delhi | 03/09/2021 | 02/10/2021 | 1.95 | Sanjeev Kumar | In progress. |
Detail Report
Graph / Photo |
||
265 | SPS type building i/c internal internal & external water supply, sanitary installations, electrical installations, development of site, fire fighting system & providing furniture etc. | 25/03/2022 | 23/04/2022 | 1.90 | MKSC Design India Private Limited | Work in Progress |
Detail Report
Graph / Photo |
||
266 | Provision of New gate and laying C.C path at the entrance of VSKV Old Seemapuri | 04/09/2021 | 03/10/2021 | 1.85 | 0.88 (Mar'22) | 0.00 (Mar'22) | Sanjeev Kumar |
Detail Report
Graph / Photo |
|
267 | Hiring of New Digital Photocopier Machine Model Sharp AR-6020N New Model on Rental basis with ADE Duplex Printer and Scanner | 05/09/2021 | 04/09/2023 | 1.81 | 0.45 (Jun'22) | 0.00 (Jun'22) | Frank Copier Pvt. Ltd. |
Detail Report
Graph / Photo |
|
268 | Measuring and Mapping of Veterinary Polyclinic and SPCA building of Shahdara District A.H. Unit. | 23/06/2022 | 07/07/2022 | 0.74 | Kesari & Associates |
Detail Report
Graph / Photo |
|||
269 | Soil investigation and bearing capacity of soil | 19/08/2021 | 28/08/2021 | 0.50 | Allied Engineers |
Detail Report
Graph / Photo |
|||
270 | Providing and fixing fire Check door in DDU Hospital | 11/03/2021 | 10/04/2021 | R U Enterprise | Work is Progress |
Detail Report
Graph / Photo |
|||
271 | Repairing of aluminium doors & Shutters. | 19/08/2014 | 03/09/2014 |
Detail Report
Graph / Photo |
|||||
272 | Providing and laying RCC drain cover in open surface drain in basement. | 16/08/2014 | 15/09/2014 | 2.58 (Mar'21) | 0.00 (Mar'21) |
Detail Report
Graph / Photo |
|||
273 | Providing calcium silicate false ceiling & HRD fabrication in opening balcony at second floor. | 16/09/2014 | 15/10/2014 |
Detail Report
Graph / Photo |
|||||
274 | Finishing of exterior wall in 20 nos. CBI flats. | 08/12/2014 | 26/12/2014 | Pradeep Kumar Sharma |
Detail Report
Graph / Photo |
||||
275 | P/F Manhole cover & Drain cover. | 08/01/2015 | 07/02/2015 | M. N. Construction Co. |
Detail Report
Graph / Photo |
||||
276 | Providing Security Guard for watch and ward for Sub Divn. Office & Vacant Flats at Mayur Vihar Ph-II and Division Office. | 18/08/2014 | 01/01/2015 |
Detail Report
Graph / Photo |
|||||
277 | Repair of toilet roof at Rajkiya Sarvodaya Kanya Vidyalaya Kondli Delhi-110091. | 08/01/2015 | 04/02/2015 |
Detail Report
Graph / Photo |
|||||
278 | Providing services of labour for day to day maintenance under Sub-Division M-2334. | 31/05/2014 | -- |
Detail Report
Graph / Photo |
|||||
279 | Providing and fixing PVC doors in bathrooms in qtrs. in place of old damaged ones. | 18/09/2014 | 17/10/2014 |
Detail Report
Graph / Photo |
|||||
280 | Replacement of Damaged roof of Sub Divn. Office M-233. | 11/11/2014 | 10/12/2014 | 35.49 (Aug'21) | 0.00 (Aug'21) |
Detail Report
Graph / Photo |
|||
281 | Cleaning of sewer line, manhole & gully traps etc. | 22/12/2014 | 21/01/2015 |
Detail Report
Graph / Photo |
|||||
282 | Providing and fixing door in toilet at G.G.S.S.S. Vasundhara Enclave Delhi School ID-1002185. | 24/01/2015 | 23/02/2015 | M. N. Construction Co. |
Detail Report
Graph / Photo |
||||
283 | Repair of toilet roof at Rajkiya Sarvodaya Kanya Vidyalaya Kalyan Puri Delhi. | 08/01/2015 | 07/02/2015 | M. N. Construction Co. |
Detail Report
Graph / Photo |
||||
284 | Providing and fixing polycarbonate in available. | 19/12/2014 | 18/01/2015 |
Detail Report
Graph / Photo |
|||||
285 | Improvement of Open Space in Circle Office & Division Office. | 06/02/2015 | -- | Rajeev Sharma |
Detail Report
Graph / Photo |
||||
286 | Misc. work at RSKV Mayur Vihar Ph-1 Pkt-IV. | 17/01/2015 | 16/02/2015 | Pradeep Kumar Sharma |
Detail Report
Graph / Photo |
||||
287 | Providing and fixing FRP door shutters in place of old damaged flush door shutters. | 18/09/2014 | 17/10/2014 |
Detail Report
Graph / Photo |
|||||
288 | Providing and fixing Acrylic sheet in windows, kerb stone, painting work and misc. civil work. | 08/02/2015 | 08/03/2015 |
Detail Report
Graph / Photo |
|||||
289 | Repair to damaged windows, renewing glass panes with acrylic plastic sheet & signage work. | 06/02/2015 | 15/03/2015 |
Detail Report
Graph / Photo |
|||||
290 | Water proofing treatment of first floor toilet. | 15/12/2014 | 14/01/2015 |
Detail Report
Graph / Photo |
|||||
291 | Providing and fixing door & window shutters in pooling booth centre at GGSSS Kondli Gharoli. | 06/02/2015 | 20/02/2015 |
Detail Report
Graph / Photo |
|||||
292 | Wall tile and other misc. civil work in Sports Complex at East Vinod Nagar. | 27/02/2015 | 26/03/2015 |
Detail Report
Graph / Photo |
|||||
293 | Providing & fixing door and installation of PVC overhead tank for fire safety. | 17/01/2015 | -- |
Detail Report
Graph / Photo |
|||||
294 | Misc. Civil Works. | 16/03/2015 | 30/03/2015 | Shekhar |
Detail Report
Graph / Photo |
||||
295 | Providing ramps in Schools & miscellenious works. | 12/02/2015 | 26/02/2015 |
Detail Report
Graph / Photo |
|||||
296 | P/F Floor tile & broken tile. | 20/11/2015 | 12/12/2015 |
Detail Report
Graph / Photo |
|||||
297 | Providing and laying cement concrete. | 12/03/2015 | 25/03/2015 | Indal Yadav |
Detail Report
Graph / Photo |
||||
298 | Providing railing for Park. | 23/11/2015 | 05/12/2015 |
Detail Report
Graph / Photo |
|||||
299 | Renovation of D.D.E. office by changing sanitary & plumbing fixtures in office toilet and internal finishing works | 04/07/2016 | 03/09/2016 | 0.00 (Aug'16) | 40.00 % (Aug'16) | Work completed |
Detail Report
Graph / Photo |
||
300 | Construction of Double storeyed SPS type rooms for Cal lab,Library,Science labs,toilet for HOS & staff at Govt. Co.Ed.Edn.Dichaon Kalan,New Delhi. | 18/12/2017 | 15/06/2019 | 34.21 (Jun'19) | 100.00 % (Jun'19) | work in progress. |
Detail Report
Graph / Photo |
||
301 | Re-boring of Tubewell at Bijwasan (Bharthal), SBV-1821032, New Delhi. | 25/06/2016 | 24/07/2016 | WORK RESCIENED. |
Detail Report
Graph / Photo |
||||
302 | C/o Boundary wall on the newly taken over plot at village Dera Mandi, New Delhi. | 25/03/2016 | 24/07/2016 | 0.00 (Aug'16) | 75.00 % (Aug'16) | DOSE PERTAIN TO THIS DIVISION |
Detail Report
Graph / Photo |
||
303 | Arrangement of Drinking water facility by bore well at GBSSS No. 1, Khanpur, New Delhi. (School ID : 1923020) | 10/05/2016 | 09/06/2016 | 0.00 (Jul'16) | 50.00 % (Jul'16) | Tender re-call and date of opening 24-09-2016 |
Detail Report
Graph / Photo |
||
304 | EOR to Raja Ram Mohan Rai, Hauz Rani, New Delhi. (SH: laying of one borewell & installation of 1 Nos. R.O. System | 23/05/2016 | 23/06/2016 | 0.00 (Jul'16) | 70.00 % (Jul'16) | Dose not pertain to this Division |
Detail Report
Graph / Photo |
||
305 | EOR to Govt.Sarvodaya Vidyalaya Gokhle Marg School,No.2,Mori Gate,Delhi. | 15/04/2016 | 14/10/2016 | 0.00 (Jul'16) | 10.00 % (Jul'16) | Completed |
Detail Report
Graph / Photo |
||
306 | EOR to slabs beams, coloums chajjas by short creting replacement of old & damaged roof treatment and other misc repair work at Sarvodaya Kanya Vidyala,Ahataa Kedara Idgah road Delhi. | 15/04/2016 | 14/07/2016 | 0.00 (Jul'16) | 15.00 % (Jul'16) | Completed |
Detail Report
Graph / Photo |
||
307 | Improvement of ground with drainage system and providing paver blocks, kota stone flooring in classroom & varandah, repair to boundary wall & other Misc. work at Idhgh road-GGSS | 05/04/2016 | 04/06/2016 | 0.00 (Jul'16) | 80.00 % (Jul'16) | Completed |
Detail Report
Graph / Photo |
||
308 | Providin gand fixing interlocking tiles, polycarbonate sheet and green board in classrooms. | 17/01/2016 | 30/04/2016 | 0.00 (Jul'16) | 80.00 % (Jul'16) | polycarbonate |
Detail Report
Graph / Photo |
||
309 | providing rain water harvesting Pit, laying interlocking paver block in the ground and raising of boundary wall of Govt., Girls Sr. Sec. School. | 01/05/2016 | 30/06/2016 | 0.00 (Jul'16) | 0.01 % (Jul'16) | work in progress |
Detail Report
Graph / Photo |
||
310 | E.O.R. to G.G.S.S.S at C block Dilshad Garden Delhi | 10/04/2016 | 09/06/2016 | 0.00 (Jul'16) | 0.01 % (Jul'16) | Estimate re-submitted to SE(N) vide letter No.23(05)/EE(N)/DB/PWD/15-16/ 2270 |
Detail Report
Graph / Photo |
||
311 | Construction of new boundary wall | 24/04/2016 | 20/07/2016 | 21.77 (May'17) | 100.00 % (May'17) |
Detail Report
Graph / Photo |
|||
312 | Repair and renovation of toilets | 17/06/2016 | 15/08/2016 | 0.00 (Sep'16) | 91.00 % (Sep'16) | Detailed estimate under process. |
Detail Report
Graph / Photo |
||
313 | Renovation of Classrooms, Corridor, Principal Room & Staff Room. | 16/06/2016 | 13/09/2016 | 0.00 (Sep'16) | 53.00 % (Sep'16) | T.S. under process. |
Detail Report
Graph / Photo |
||
314 | Re-boring of Tubewell at Bijwasan (Bharthal), SBV-1821032, New Delhi. | 16/10/2016 | 15/11/2016 | forfeited |
Detail Report
Graph / Photo |
||||
315 | Installation of R.O System at Dr. Ambedkar Nagar ,Sector-V , No-2-GGSSS-1923050. | 20/08/2016 | 15/09/2016 | 0.00 (Aug'16) | 0.01 % (Aug'16) | work completed |
Detail Report
Graph / Photo |
||
316 | C/o 20 Nos. SPS type class rooms including toilet blocks, staircase and electrical installations, fan etc. at Sarvodaya (Co-ed) Sr. Sec. School, Netaji Nagar, (School I.D.) 1719102, Building I.D. 17191327). New Delhi | 04/11/2014 | 30/09/2015 | 85% Work is in Progress |
Detail Report
Graph / Photo |
||||
317 | Up gradation to Delhi Govt. D-II Flats, Vasant Kunj, New Delhi. | 05/02/2017 | 04/08/2017 | 100.57 (Jul'18) | 100.00 % (Jul'18) | completed |
Detail Report
Graph / Photo |
||
318 | Providing Services of Security Guard at T.V. Branch Enquiry Office | 10/04/2017 | 09/04/2018 | 2.52 (Apr'18) | 90.00 % (Apr'18) | Work completed |
Detail Report
Graph / Photo |
||
319 | Acoustic treatment system and renovation of multipurpose hall. | 20/10/2017 | 17/01/2018 | 40.27 (Nov'21) | 0.00 (Nov'21) | 65% (Work is delayed due to ongoing electrical work as well as Covid-19) |
Detail Report
Graph / Photo |
||
320 | Acoustic work. | 02/02/2018 | 01/04/2018 | 67.40 (Jul'18) | 100.00 % (Jul'18) | work in progress |
Detail Report
Graph / Photo |
||
321 | Repair of toilet blocks, Finishing of offices and other misc.works at beggar home Lamur Delhi-36 | 28/05/2021 | 27/05/2022 | Work in Progress |
Detail Report
Graph / Photo |
||||
322 | A/R and M/O to Residential and Non Residential building under Building Maintenance Sub Division (SW) - 4, PWD, B-6, NCC Building, Safdarjung Enclave, New Delhi during 2018-19.(SH Engaging labour for Day to Day Maintenance). | 17/05/2018 | 16/05/2019 | 94.01 (Mar'20) | 0.00 (Mar'20) | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||
323 | Construction of New block Forensic Science Laboratory, Rohini, New Delhi | 06/03/2020 | 05/09/2021 | 212.87 (Aug'21) | 0.00 (Aug'21) | work in progress |
Detail Report
Graph / Photo |
||
324 | A/R and M/O to residential and Non residential Building under Sub Div-II of SWBMD at ITI Campus, Pusa, New Delhi during 2018-19.(Sh- Misc repair work and finishing work in quarters). | 23/05/2018 | 21/11/2018 | 14.29 (Jul'19) | 0.00 (Jul'19) | work in progress. |
Detail Report
Graph / Photo |
||
325 | AR and MO to District Court Resid. Complex Saket, ND-18-19 (SH Cleaning, mopping of common area, like lift lobby, staircase, basement, community centre, footpath area, terrace, servant qtr. etc. by mopping machine at Resid. Complex Saket Court, ND). | 25/09/2018 | 24/09/2019 | 0.49 (Nov'18) | 25.00 % (Nov'18) | work in progress |
Detail Report
Graph / Photo |
||
326 | Comprehensive Maintenance , Operation of Multi Level underground parking along with associated Electrical , Mechanical services installed at Delhi High Court, Sher Shah Suri Marg, New Delhi dg. 2018-19. | 02/11/2018 | 01/11/2019 | 214.77 (Sep'19) | 0.00 (Sep'19) | Work in progress |
Detail Report
Graph / Photo |
||
327 | Construction of Boundary wall at Sayurpur Village, New Delhi. (SH- Providing fixing grills and concertina coil at boundary wall). | 10/07/2018 | 09/09/2018 | work in progress |
Detail Report
Graph / Photo |
||||
328 | A/R and M/O to Educational Building under SWBMD, B-6, NCC Building, Safdarjung Enclave, New Delhi during 2018-19. (Sh -Internal and external finishing and other misc works). | 03/08/2018 | 01/10/2018 | 0.25 (May'22) | 0.00 (May'22) | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||
329 | REMODELLING AND UPGRADING OF EXISTING DEEP CHAND BANDHU HOSPITAL AT KOKIWALA BAGH, ASHOK VIHAR, PH-IV, DELHI. | 28/06/2019 | 22/06/2020 | 0.00 (Mar'19) | 0.01 % (Mar'19) | Agency has gone in the arbitration. work in progress |
Detail Report
Graph / Photo |
||
330 | EOR to Govt. Co-ed. Sr. Sec. School at Daulatpur and Govt. Co-ed. Sr. Sec. School at Malikpur, New Delhi. (Sh- C/o Rain Water Harvesting System). | 04/03/2019 | 02/05/2019 | 69.90 (Aug'19) | 0.00 (Aug'19) | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||
331 | GGSSS DDA Flat, Kalkaji, Phase-II, School ID: 1925041 | 14/01/2019 | 10/10/2019 | 0.00 (Sep'21) | 65.00 % (Sep'21) | Work is in progress |
Detail Report
Graph / Photo |
||
332 | GGSSS No. 3, Kalkaji School ID : 1925039 | 14/01/2019 | 10/10/2019 | 10365.03 (Nov'21) | 0.00 (Nov'21) | Work is in progress |
Detail Report
Graph / Photo |
||
333 | SKV Mandi Village, School ID : 1923064 | 14/01/2019 | 10/10/2019 | 5342.69 (Dec'21) | 0.00 (Dec'21) | Work is in progress |
Detail Report
Graph / Photo |
||
334 | GBSSS, No. 2, Kalkaji, , School ID: 1925011 | 23/01/2019 | 19/10/2019 | 4661.03 (Feb'22) | 0.00 (Feb'22) | Work is in progress |
Detail Report
Graph / Photo |
||
335 | GBSS, Garhi, Jharia Maria School ID : 1924042 | 23/01/2019 | 19/10/2019 | 4662.60 (Mar'22) | 0.00 (Mar'22) | Work is in progress |
Detail Report
Graph / Photo |
||
336 | GBSSS Dera Village School ID: 1923360 | 08/12/2018 | 04/08/2019 | 0.00 (Feb'21) | 63.00 % (Feb'21) | In progress |
Detail Report
Graph / Photo |
||
337 | Co-Ed. SSS Lajpat Nagar, School ID: 1925335 | 08/12/2018 | 04/08/2019 | 0.00 (Sep'21) | 60.00 % (Sep'21) | Work is in progress |
Detail Report
Graph / Photo |
||
338 | GBSSS Jungpura, School ID : 1924004 | 08/12/2018 | 04/08/2019 | 2754.99 (Dec'21) | 0.00 (Dec'21) | Work is in progress |
Detail Report
Graph / Photo |
||
339 | GGSSS, DDA Flats, Phase II, Kalkaji, School ID: 1925045 | 14/01/2019 | 10/09/2019 | 0.00 (Sep'21) | 56.00 % (Sep'21) | Work is in progress |
Detail Report
Graph / Photo |
||
340 | Govt. Co.-Ed., Middle School, Sarai Kale Khan, Vidut Nagar, School ID: 1925418 | 14/01/2019 | 10/09/2019 | 1983.32 (Mar'22) | 0.00 (Mar'22) | Work is in progress |
Detail Report
Graph / Photo |
||
341 | SKV,, Jonapur- BNK, School ID: 1923003 | 08/12/2018 | 04/08/2019 | 0.00 (Sep'21) | 65.00 % (Sep'21) | Work is in progress |
Detail Report
Graph / Photo |
||
342 | EOR to GBSSS Bijwasan, Govt. Sarvodaya Co-ed Sr. Sec. School Kitchner Road (Malcha Marg), DIET Sec-07 R.K. Puram etc New Delhi.(Sh- Construction of Rain Water Harvesting System). | 22/02/2019 | 24/04/2019 | 47.84 (Jul'19) | 80.00 % (Jul'19) | WORK IN PROGRESS. |
Detail Report
Graph / Photo |
||
343 | AR and MO to Delhi Sachivalaya at IG Stadium Complex New Delhi dg 2018 19 | 10/11/2018 | 09/05/2019 | 1.02 (Jul'19) | 0.00 (Jul'19) | Work in Progress 95% |
Detail Report
Graph / Photo |
||
344 | Construction of 30 Nos. Porta Cabin Aam Admi Mohalla Clinics under Sub division- I,II,III and IV under South West Building Maintenance Division New Delhi. (SH Civil works and Electrical works). | 06/12/2018 | 02/08/2019 | 308.01 (May'22) | 0.00 (May'22) | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||
345 | SKV Surajmal Vihar (School Id- 1001102) | 24/12/2018 | 19/09/2019 | Handed over to HOS. |
Detail Report
Graph / Photo |
||||
346 | SKV, Kiran Vihar (School Id- 1001106) | 24/12/2018 | 19/09/2019 | Building work completed. Development work in progress. |
Detail Report
Graph / Photo |
||||
347 | Govt. Co-ed SSS Preet Vihar (School Id- 1002351) | 24/12/2018 | 19/09/2019 | 0.00 (Apr'19) | 1.50 % (Apr'19) | Inventory submitted to HOS. 28 rooms handed over on 30.10.2021 balance class rooms will be hand over 10.05.2022 |
Detail Report
Graph / Photo |
||
348 | SKV Radhey Shyam Park (School Id- 1003153) | 17/03/2019 | 11/12/2019 | Structure work completed. Finishing work is in progress. Flooring, plastering and other miscellaneous work are under progress. |
Detail Report
Graph / Photo |
||||
349 | RPVV Gandhi Nagar (School Id- 1003261) | 17/03/2019 | 11/12/2019 | 12491.60 (Nov'20) | 0.00 (Nov'20) | 48 rooms handed over to HOS on 25.03.2022. In 42 Additional Rooms In Block-C structure work completed. Flooring work including corridor are completed & other miscellaneous works are under progress. In Block-D, structure work is completed and misc. work is under progress. |
Detail Report
Graph / Photo |
||
350 | SBV, Rajgarh Colony (School Id- 1001110) | 17/03/2019 | 11/12/2019 | 0.00 (Apr'19) | 0.50 % (Apr'19) | External development work is in progress. In MP Hall, stage flooring & wall paneling works completed. In Block-C, Grinding work of Kota flooring, finishing & misc. works are in progress. External GRC tile work is under progress. |
Detail Report
Graph / Photo |
||
351 | GGSSS Mayur Vihar Ph-3 (Kondali Gharauli) (School Id- 1002352) | 17/03/2019 | 11/12/2019 | 0.00 (Jan'21) | 1.00 % (Jan'21) | Building work completed and development is in progress. |
Detail Report
Graph / Photo |
||
352 | SKV Patparganj (School Id- 1002031) | 17/03/2019 | 11/12/2019 | 12491.60 (Nov'20) | 0.00 (Nov'20) | Structure work completed. GRC, Flooring, Plastering and development work in progress. |
Detail Report
Graph / Photo |
||
353 | GGSSS Khichripur (School Id- 1002037) | 17/03/2019 | 11/12/2019 | 0.00 (Jan'21) | 30.00 % (Jan'21) | Block-A : (20 rooms) : Structure work complete and internal finishing is in progress. Block-B : (24 Rooms) : Structure work complete and internal finishing is in progress. Block-C : (28 Rooms) : Structure work complete and internal finishing is in progress. Block-D : (4 Rooms) : Development work under progress. Work delay due to late handover of the site of Block D. |
Detail Report
Graph / Photo |
||
354 | Raising of main gate, C/o guard room, repair of ground water tank, providing and fixing IRC fabric jali inside the Class rooms etc. | 30/06/2019 | 29/08/2019 | 1.60 (Mar'21) | 0.00 (Mar'21) | work completed |
Detail Report
Graph / Photo |
||
355 | Construction of Recreation Room, Coys room, Officers Quarters and Shed. | 30/06/2019 | 29/08/2019 | 51.12 (Jul'20) | 0.00 (Jul'20) | work completed |
Detail Report
Graph / Photo |
||
356 | Construction of 2 nos.Viewers stand in Parade ground at PTS, Wazirabad, Delhi | 30/06/2019 | 19/07/2019 | 8.39 (Jan'20) | 0.00 (Jan'20) | work completed |
Detail Report
Graph / Photo |
||
357 | Attending complaints of routine maintenance of service centre PTS, Wazirabad, Delhi. | 30/06/2019 | 29/06/2020 | 7.20 (Mar'20) | 0.00 (Mar'20) | work completed |
Detail Report
Graph / Photo |
||
358 | Renovation of 10 Nos toilet blocks, Construction of 3 nos. R.C.C. tank of size 8 x 5 mtr. and 6 nos. M.S. grill gates. | 30/06/2019 | 29/08/2019 | 52.31 (Aug'20) | 0.00 (Aug'20) | work completed |
Detail Report
Graph / Photo |
||
359 | External plaster work of Judges Flats Including tile work in over head water storage tank of block D AND E, Steel works and other Misc. work | 24/10/2019 | 23/01/2020 | work in progress |
Detail Report
Graph / Photo |
||||
360 | External plaster work including painting. | 16/06/2019 | 15/09/2019 | work in progress |
Detail Report
Graph / Photo |
||||
361 | Redevelopment of rain water harvesting pits and cleaning of storm water lines at Residential and Non-Residential Complex, Saket Court, New Delhi. | 25/07/2019 | 24/09/2019 | work in progress |
Detail Report
Graph / Photo |
||||
362 | Reconstruction of collapsed boundary wall of CBD plot at Shahdara, Delhi owned by Urban Development Department. | 24/07/2019 | 22/09/2021 | in progress. |
Detail Report
Graph / Photo |
||||
363 | Repairing of Fire Door and Replacement of Damaged Door/Fittings and Other Misc Works | 30/03/2021 | 29/04/2021 | 27.50 (Aug'21) | 0.00 (Aug'21) | work in progress. |
Detail Report
Graph / Photo |
||
364 | construction of oxygen gas plant room and car parking shed for staff | 05/05/2021 | 03/06/2021 | Work is progress |
Detail Report
Graph / Photo |
||||
365 | False ceiling work in Ward Area. (2nd CALL) | 25/03/2021 | 23/05/2021 | Work is progress |
Detail Report
Graph / Photo |
||||
366 | Making Building and Campus Barrier free for accessibility of disabled persons at Dr. BR Sur Homeopathic, Hospital, Nanakpura, New Delhi | 18/06/2021 | 15/09/2021 | Work is in progress |
Detail Report
Graph / Photo |
||||
367 | A Finishing Work. B Cleaning of Sewer line Water Storage Tank. C Providing and Supplying building material for day to day maintenance | 02/09/2021 | 01/04/2022 | Work in progress |
Detail Report
Graph / Photo |
||||
368 | Replacement of existing water closet with single piece water closet set, P/F floor and wall tile in toilets, replacement of damaged window and misc. civil works | 18/11/2020 | 28/11/2020 | In Progress. |
Detail Report
Graph / Photo |
||||
369 | Furnishing of new lecture theatre over OT at Dr. BSA Medical College and Hospital Sector-6, Rohini Delhi. | 06/03/2021 | 05/05/2021 | work in progress |
Detail Report
Graph / Photo |
||||
370 | Construction of Hospital at Hastsal, New Delhi | 17/06/2021 | 16/06/2023 | Work is in progress |
Detail Report
Graph / Photo |
||||
371 | AR and MO Pt. Madan Mohan Malviya Hospital Malviya Nagar, New Delhi dg. 2020-21 Comprehensive maintenance of automatic stainless steel scrub station (07 Unit) installed at O.T. area. | 07/01/2021 | 16/01/2022 | 2.08 (Jun'22) | 0.00 (Jun'22) | work in progress |
Detail Report
Graph / Photo |
||
372 | Providing and Fixing Cubical Curtain in OPD Erection of shed for waiting area of COVID-19 suspected Patients and other Misc. work at NHMC and Hospital | 02/02/2021 | 02/04/2021 | Work is Progress |
Detail Report
Graph / Photo |
||||
373 | Renovation of Labour room, Public toilet at 5th floor in MCH block and other misc. works | 17/03/2021 | 16/07/2021 | 9.25 (May'22) | 0.00 (May'22) | work in progres |
Detail Report
Graph / Photo |
||
374 | Renovation of Department of Surgery and Department of Gyne and Obs | 20/02/2021 | 20/04/2021 | Work is progress |
Detail Report
Graph / Photo |
||||
375 | C/o Staircase (Structural steel) for fire Exist in College Building and PG Accommodation Block and providing fixing mandatory fire check doors at NHMC Hospital | 07/03/2021 | 21/04/2021 | Work is Progress |
Detail Report
Graph / Photo |
||||
376 | Providing and fixing Fire Check doors and fittings in ASBGH | 11/03/2020 | 10/04/2021 | Work is Progress |
Detail Report
Graph / Photo |
||||
377 | Repair of damaged parapet wall, ceiling plaster of residential staff Quarters and other Misc. work.0 | 15/03/2021 | 15/04/2021 | 5.64 (May'22) | 0.00 (May'22) | Work is Progress |
Detail Report
Graph / Photo |
||
378 | Misc Civil repairing work in Lift pit, lift shaft and machine room in OBH and GH at residential campus GTBH | 04/09/2021 | 03/10/2021 | Site is not being provided by Electrical Department. |
Detail Report
Graph / Photo |
||||
379 | Construction of (G+3) Pucca at SKV, Sultanpur, New Delhi 110030 | 18/07/2021 | 17/07/2022 | (i) Work has been awarded to contractor. (ii) Hon'ble PWD Minister has approved Architectural Drawings in the meeting on 23.08.2021 (iii) Fire approval received and Submission drg. has been submitted in South MCD for approval from Local Body (iv) Structural design : Str. drawing are under preparation. |
Detail Report
Graph / Photo |
||||
380 | Construction of (G+3) Pucca School Buildings at Sarita Vihar | 18/07/2021 | 17/07/2022 | (i) Work has been awarded to contractor. (ii) Hon'ble PWD Minister has approved Architectural Drawings in the meeting on 23.08.2021 (iii)Submission drgs for DUAC/Fire/Local body are under preparation. (iv) Structural design : Str. drawing are under preparation. |
Detail Report
Graph / Photo |
||||
381 | Construction of (G+3) Pucca School Buildings at Satbari | 18/07/2021 | 17/07/2022 | (i) Work has been awarded to contractor. (ii) Hon'ble PWD Minister has approved Architectural Drawings in the meeting on 23.08.2021 (iii)Submission drgs for DUAC/Fire/Local body are under preparation. (iv) Structural design : Str. drawing are under preparation. |
Detail Report
Graph / Photo |
||||
382 | Construction of Boundary wall at Plot No. FA 6 for District office and bataliyan, Women training college, Police line and Advanced research and Training Institute of Delhi Police Officers Narela, Delhi 110040 | 20/01/2022 | 20/05/2022 | Work in Progress |
Detail Report
Graph / Photo |
||||
383 | Development of play ground and construction of boundary wall. (Balance Work) | 20/01/2022 | 20/05/2022 | Work in Progress |
Detail Report
Graph / Photo |
||||
384 | Provision of Iron Steel Gate in the Residential Campus, GTB Hospital, Shahdara, Delhi | 27/11/2021 | 26/01/2022 | Work is in progress |
Detail Report
Graph / Photo |
||||
385 | Renovation of Various Rooms (Room No. 417 to 439) in the department of Pathology 4th floor of the UCMS college Block, GTB Hospital, Shahdara, Delhi | 28/12/2021 | 26/06/2022 | Major work could be not started due the Electrical work not started till date. |
Detail Report
Graph / Photo |
||||
386 | Renovation of Various Rooms and laboratories (Room No. 324 to 341) in the department of Forensic Medicine 3rd floor of the UCMS college Block, GTB Hospital, Shahdara, Delhi | 28/12/2021 | 27/04/2022 | Work could be not started due the Electrical work not started till date. |
Detail Report
Graph / Photo |
||||
387 | Construction of additional SPS type classrooms in Govt Schools Directorate of Education under Priority II | 05/09/2019 | 04/09/2020 | 0.11 (Nov'19) | 0.00 (Nov'19) | work in progress |
Detail Report
Graph / Photo |
||
388 | Construction of 460 Beds Mother and Child Hospital Block at LBS Hospital Khichripur, Delhi | 23/09/2019 | 23/09/2019 | 658.28 (Jun'22) | 0.00 (Jun'22) | Work is in progress. |
Detail Report
Graph / Photo |
||
389 | Construction of Mother and Child Block and Screening OPD Block at Dr. BSA Hospital at Rohini, Delhi, i/c Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. (Supply of Furniture). | 06/03/2020 | 05/09/2021 | 221.89 (Mar'22) | 0.00 (Mar'22) | work in progress |
Detail Report
Graph / Photo |
||
390 | Providing the services of Security Guard for day to day maintenance at D-II flats. | 02/08/2019 | 01/08/2020 | work in progress |
Detail Report
Graph / Photo |
||||
391 | Providing security guards at Division Office M-222 (NE), Sub Division M-2222, Sub Division M-2221, Sub Division Office Loni Road and Division M-222 | 30/06/2019 | 29/05/2020 | 23.93 (Mar'21) | 0.00 (Mar'21) | work completed |
Detail Report
Graph / Photo |
||
392 | Attending day to day complaints | 24/06/2019 | 23/06/2020 | 10.22 (Oct'20) | 0.00 (Oct'20) | work completed |
Detail Report
Graph / Photo |
||
393 | Construction of multipurpose court, levelling and preparing the layer of good earth on the play ground in Delhi Police Public School at PTS, Wazirabad, Delhi | 30/06/2019 | 29/08/2019 | 26.71 (Mar'21) | 0.00 (Mar'21) | work in progress |
Detail Report
Graph / Photo |
||
394 | Pumping out rainwater to avoid water logging at DC office complex,Weavers Complex Nand Nagri and SDM Court Seelampur Delhi. | 30/06/2019 | 29/10/2019 | 5.86 (Jan'20) | 0.00 (Jan'20) | work completed |
Detail Report
Graph / Photo |
||
395 | A/A in Sanjay Gandhi Memorial Hospital, Mangolpuri, Delhi. (SH Renovation of ENT OPD, OST Centre, CMO room in main casualty, patient toilet in ward-4, change of floor tiles in digital X-ray room and change of windows in physiotherapy department etc. | 12/09/2019 | 09/01/2020 | 16.74 (May'22) | 0.00 (May'22) | work is in slow progress |
Detail Report
Graph / Photo |
||
396 | C/o Trauma Centre and Utility Block at SGMH at Mangolpuri, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. (Hiring of Photocopier Machine.) | 04/09/2019 | 03/03/2021 | work in progress |
Detail Report
Graph / Photo |
||||
397 | C/o Pucca School Building (Four Storeyed) with ancillary facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Libaspur, Delhi. | 30/05/2020 | 29/05/2021 | 0.00 (Nov'21) | 34.00 % (Nov'21) | Structure work completed. Brick work and plastering work completed in Part-A, B, C, D and in Part -E is in progress. Boundary wall work, granite work, tile works are in progress. |
Detail Report
Graph / Photo |
||
398 | C/o Pucca School Building (Four Storeyed) with ancillary facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Daryapur kalan, Delhi. | 30/05/2020 | 29/05/2021 | 0.00 (Nov'21) | 30.00 % (Nov'21) | Structure work completed. Partition work with bricks in progress. Tile, plaster and granite work is in progress. Truss work of MP Hall is in progress. |
Detail Report
Graph / Photo |
||
399 | C/O Pucca School Building (G+3) of Govt. Sr Sec. School (Co-Ed) at Rana Pratap Bagh (School ID: 13091907), Delhi.(SH: Main Civil Work). | 02/09/2020 | 29/05/2021 | 0.00 (Nov'21) | 39.00 % (Nov'21) | Structure work of building completed, Plaster work & brick completed. Water proofing work completed, Granite work and tile work completed. Toilet fittings, C.I. Work, CPVC work, painting work is in progress. False ceiling, SS work and Boundary wall work in progress. |
Detail Report
Graph / Photo |
||
400 | Bhola Nath Nagar, No.3-GGSSS (ID : 1001023) (DIET BUILDING) | 17/03/2019 | 11/12/2019 | 0.00 (Jan'21) | 1.00 % (Jan'21) | Cleaning in progress. Inventory submitted to HOS to 20.05.2022 |
Detail Report
Graph / Photo |
||
401 | Jhilmil Colony-SBV Avinash Chadda (ID: 1001105 ) (Addl. Rooms) | 01/04/2022 | 24/02/2023 | Demolition work is in progress. 90% demolition completed and Layout for excavation has done in A C C GSBV at Jhilmil Colony, Delhi. |
Detail Report
Graph / Photo |
||||
402 | Consultancy Services for Construction (on EPC mode) of New Block for expansion of Deen Dayal Upadhyay Govt. Hospital of Hari Nagar, Delhi. | 28/05/2020 | 27/11/2022 | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||||
403 | Providing vehicle on hire charge basis for official purpose | 25/02/2022 | 24/02/2023 | Work in progress. |
Detail Report
Graph / Photo |
||||
404 | Construction of 16 Nos. additional SPS class rooms (G+3) in GGSSS, Qadipur, Delhi ( Sch Id 1309265) (SH: C/o main SPS type building including internal & external water supply, sanitary installation, electrical installations, development of site i/c Fire fighting system etc. at GGSSS Qadipur Delhi -110036. (Sch. ID: 1309265) | 14/04/2022 | 11/10/2022 | Work in progress. |
Detail Report
Graph / Photo |
||||
405 | Constn. of Peripheral wall around the A, B ,C and D Type in the residential campus, GTB Hospital, Shahdara, Delhi | 20/03/2022 | 19/07/2022 | Work not started yet. |
Detail Report
Graph / Photo |
||||
406 | Renovation of Girls common Room, Boys common Room and Drivers Room ground Floor of UCMS College GTB Hospital, Shahdara, Delhi | 20/03/2022 | 05/05/2022 | Work is in progress |
Detail Report
Graph / Photo |
||||
407 | Mechanized cleaning of Underground and Overhead RCC/ PVC water storage tanks at Rajiv Gandhi Super Specialty Hospital, Tahirpur, Delhi. | 26/04/2022 | 25/04/2023 | Work in progress. |
Detail Report
Graph / Photo |
||||
408 | Urgent Misc Civil repairing work in CMO Room No. 56 and 56A at GTB Hospital, Shahdara, Delhi for preparation of 3rd wave of COVID-19 | 02/03/2022 | 02/04/2022 | Work is in progress |
Detail Report
Graph / Photo |
||||
409 | Construction of Additional 17 nos Class room with Light Gauge Steel Framed structure including electrical installations & Providing and erecting 2.00 metre high temporary wall with precoated galvanised iron profile sheets at SBBM, SV Shankaracharya Marg , Delhi | 14/04/2022 | 13/07/2022 | Work could not be started due to pending decision of DDE for partition wall between two schools. |
Detail Report
Graph / Photo |
||||
410 | Repair of IHBAS side Impaired Wall From start of Girls hostel to end of Nurse hostel in residential campus, GTB Hospital, Shahdara, Delhi | 22/05/2022 | 11/06/2022 | Work in progress. |
Detail Report
Graph / Photo |
||||
411 | Waterproofing and urgent repairing of damaged deteriorated RCC OH tank on roof of Block-5 and Block-3 in Rajiv Gandhi Super Specialty Hospital Tahirpur, Delhi. | 03/05/2022 | 30/06/2022 | Not started yet. |
Detail Report
Graph / Photo |
||||
412 | Refurbishment of damaged RCC Beam, Projections, Vertical fins and Chajja at External face of Old Boys Hostel block in residential campus at Guru Teg Bahadur Hospital, Shahdara, Delhi. | 22/05/2022 | 21/08/2022 | Work is in progress |
Detail Report
Graph / Photo |
||||
413 | Renovation of damage toilet block of Ground Floor 1st floor and 2nd floor toilet of ITI Narela with other misc Works at ITI Narela Delhi | 08/03/2022 | 06/05/2022 | Work in progress |
Detail Report
Graph / Photo |
||||
414 | Providing Security and Disaster Management Arrangement at Rouse Avenue Court Complex, DDU Marg, New Delhi. (SH: Providing Steel Wire Fabric, Barbed Wire Fencing with Concertina Coil, MS Barricading and Emergency Evacuation Plan). | 10/01/2022 | 10/04/2022 | Work is in progress |
Detail Report
Graph / Photo |
||||
415 | Providing and Fixing of MS Gate at Main Entrances of Hospital, Low Height Gate at Entrance of RRC Centre and Gate for PSA Rajiv Gandhi Super Specialty Hospital, Tahirpur, Delhi | 05/01/2022 | 19/02/2022 | Work in progress. |
Detail Report
Graph / Photo |
||||
416 | Renovation of FNA OPD (Room No. 130) 1st floor at GTB Hospital, Shahdara, Delhi | 04/01/2022 | 03/02/2022 | Work is in progress |
Detail Report
Graph / Photo |
||||
417 | Hiring of Inspection Vehicle along with Driver in the office of Executive Engineer Health Project Division (East), PWD, Tahirpur, Delhi during 2021-22 | 10/02/2022 | 09/11/2022 | Work is in progress. |
Detail Report
Graph / Photo |
||||
418 | Construction of Pucca School building (G+3) with ancillary facilities including internal water supply, sanitary installations, internal electrical installation and development of site , RWHS, STP , Furniture etc at Ladpur Village . (SH:- Civil & Electrical composite work). | 18/07/2021 | 17/07/2022 | Work could not be started due to change in Architectural drawing by the then Hon'ble PWD Minister. Fire NOC issued on dt. 13.05.2022. Local body approval is awaited. |
Detail Report
Graph / Photo |
||||
419 | Hiring of Inspection Vehicle along with Driver for LBS Hospital Project work in the office of Assistant Engineer Health Project Sub-Division (East)-III, PWD, Khichripur, Delhi-110091 during 2021-22 | 29/01/2022 | 28/10/2022 | Work is in progress. |
Detail Report
Graph / Photo |
||||
420 | Construction of Peripheral wall around the A, B ,C and D Type in the residential campus, GTB Hospital, Shahdara, Delhi | 20/03/2022 | 19/07/2022 | Work not started yet. |
Detail Report
Graph / Photo |
||||
421 | Provision of Wiremess door, flush door, SS Grills, Aluminum work and others misc civil work of the Nurse Hostel of Residential Campus, GTB Hospital, Shahdara, Delhi | 21/02/2022 | 04/04/2022 | Work is in progress |
Detail Report
Graph / Photo |
||||
422 | Providing Services of Computer Operator, MTS etc. under various PWD Offices of North Building Division and office of SA North | 01/02/2022 | 26/01/2023 | Work in progress |
Detail Report
Graph / Photo |
S. No.क्र. सं. | Description | Details |
---|
S. No.क्र. सं. | Remarks | As On | Revised On |
---|
S. No.क्र. सं. | Upload Date | Description |
---|
S. No. | Date | Location | Remarks | Physical Progress (%) | View | ||
---|---|---|---|---|---|---|---|
Last | Upto | Photo | Doc |
S. No.क्र. सं. | Remarks | Date | Document |
---|
This is the Portal of Public Works Department, Govt. of NCT of Delhi, developed with an objective to enable a single window access to information and services being provided by the different wing of PWD Delhi. It is an initiative towards E-Governance Plan. यह लोक निर्माण विभाग, राष्ट्रीय राजधानी क्षेत्र (दिल्ली सरकार) का पोर्टल है जिसे इस उद्देश्य के साथ विकसित किया गया है जिससे लोक निर्माण विभाग, दिल्ली के विभिन्न स्कन्धों (विंग) द्वारा प्रदान की जा रही सूचनाओं तथा सेवाओं को एकल खिड़की के माध्यम से जाना जा सके | यह ई - गवर्नेंस योजना की दिशा में पहल है |
12th Floor, MSO Building,
I. P. Estate, New Delhi – 110002
Toll Free: 1800 11 00 93
© 2021 All Rights Reserved. Version 33.6.7 / 22-06-2022
This portal is designed, developed and maintained by M/s Calibre Websol Pvt. Ltd.
मैसर्स कैलिबर बेबसोल प्रा० लिमिटेड ने इस पोर्टल का विकास तथा अनुरक्षण / अभिकल्पन डिजाइन किया है
Session expire