S. No.क्र. सं. Name of Workकार्य का नाम Date of Startकार्य आरम्भ करने की तिथि Date of Completionकार्य समाप्त करने की तिथि Cost
(In Lac)
Expenditure
(In Lac)
Progress Agency Status Viewदेखें
1 Elevated Road, Extradosed Bridge, Flyover, Clover Leaves, Loops, Ramps, Footpath, Cycle Track, Road Work including Signages, Street Light Works & Allied Works Pile, Pile Cap, Pier cap, Pier, well foundation and casting of segment 18/04/2015 17/10/2017 96400.00 65950.89 (Feb'21) 0.00 (Feb'21) Larson & Toubro Limited Pile, Pile Cap, Pier cap, Pier, well foundation and casting of segment, pylon, erection of segments is in progress Detail Report
Graph / Photo
2 Underground Tunnel, Underpass, FOB, Loops, Ramps, Footpath, Road Work including Road Signage, Road/Street Lighting works, Tunnel furnishing (FF& FA system, PA system, Automated drainage, integrated tunnel management system etc.), landscaping/horticulture work & allied works 08/11/2017 29/08/2019 77700.00 30431.78 (Feb'21) 0.00 (Feb'21) M/s L&T Ltd. work is in progress Detail Report
Graph / Photo
3 Supply, installation, testing, commissioning of CCTV camera in Delhi. (Sub: Empanelment of firms for supply, installation, testing, commissioning & CAMC of CCTV system in Delhi). 24/11/2018 23/11/2019 42798.32 1098.76 (Mar'19) 0.00 (Mar'19) Bharat Electronics Ltd work partially completed for approximate 1,22,000 nos. CCTV camera out of 1,40,000 Nos.CCTV camera Detail Report
Graph / Photo
4 Corridor improvement of outer ring road from IIT to NH-8 and its influence area (1)C/o flyover from Munirka to Army RR Hospital on outer ring road (2) C/o underpass & skywalk etc. at juncture of BJ Marg, Ring Road 27/11/2014 26/11/2016 27807.81 27597.16 (Sep'19) 70.00 % (Sep'19) Hindustan Construction Co. Ltd RE amounting to Rs. 364.87 Cr. has been approved. Flyover opened for traffic on 16.07.2019. Construction of Underpass work is under progress. Detail Report
Graph / Photo
5 Extension of Ashram Flyover to DND Flyover. 19/06/2020 18/06/2021 12879.00 0.00 (Nov'20) 1.00 % (Nov'20) KCC Buildcon Pvt. LTD The widening of road and drainage work is in progress. The work in central portion could not be taken up due to non-receipt of Phase-II NOC from the Traffic Police. The approval for the tree transplantation and shifting of services utility are being pursuaded. Detail Report
Graph / Photo
6 Construction of Bridge on Najafgarh Drain at Tri Nagar/Inderlok, Karampura and Rampura, Delhi to cover the complete Right of Way (ROW) excluding area of already constructed bridge alongwith road improvement on either side of bridge including making. 16/03/2019 30/09/2021 5388.53 3842.44 (Mar'21) 0.00 (Mar'21) Ram Kumar Contractor work is in progress. Detail Report
Graph / Photo
7 Construction of underpass along Mathura Road at Ashram Chowk New Delhi 05/07/2019 04/07/2020 4907.38 2293.25 (Feb'21) 0.00 (Feb'21) Dharamraj Contracts (I) Pvt. Ltd. The work is in progress and present progress is 50%. Shifting of DJB, BSES, IGL, DTL etc. utilities are being done by the utility owning departments. Detail Report
Graph / Photo
8 W/O Mahrauli Mahipalpur Road. SH: from 4 lanes to 8 lanes and Service Road from Andheria More to Masoodpur Village. 30/10/2012 29/04/2013 3812.11 KCC Buildcon Pvt. LTD . Detail Report
Graph / Photo
9 Construction of Bridge on Najafgarh drain at Basaidarapur along with road improvement on either side of bridge drainage scheme, footpath etc. complete. 01/03/2019 31/08/2020 3463.50 1513.31 (Mar'21) 0.00 (Mar'21) Ram Kumar Contractor

Substructure work under progress.

Girder fabrication and erection under progress.

Detail Report
Graph / Photo
10 Construction of Bridge on Supplementary Drain on NH-10, Nangloi, Delhi to cover complete width of 60 m with road improvement in 100 meter length on either side of bridge including making of drainage scheme, footpath etc. complete (after dismantling ). 06/03/2019 05/12/2020 3350.31 1390.90 (Mar'21) 58.00 % (Mar'21) Ram Kumar Contractor

Working piles (72 nos.) for Phase-1 completed. Pile cap (4 nos.), Pier (4 nos.) & Pier Cap (4 nos.) casted. Fabrication and assembly of Steel Girder in progress.

Detail Report
Graph / Photo
11 Construction of two numbers of vehicular half underpasses between Wazirabad and Jagatpur and one number pedestrian subway near Gandhi Vihar on Outer Ring Road, Delhi. 20/12/2018 19/03/2020 3142.96 1344.66 (Mar'21) 0.00 (Mar'21) K. R. ANAND

Casting of segments of Vehicular Half Underpass in progress.

Finishing work of Pedestrians Subway in progress.

Detail Report
Graph / Photo
12 Strengthening of SSN Marg ID- 392 and 100 Foota Road ID- 1187 New Delhi. 10/09/2020 09/01/2021 1893.62 649.69 (Feb'21) 0.00 (Feb'21) MAHAVIR PRASAD GUPTA AND SONS Detail Report
Graph / Photo
13 Additional bridge on Supplementary drain near SLFS Plant. 14/09/2018 19/03/2020 1128.32 889.75 (Nov'20) 0.00 (Nov'20) R S Sharma Contractors Pvt. Ltd.

Work Completed and Final bill has been done.

Detail Report
Graph / Photo
14 Re-Carpeting of Najafgarh Road from Raja Garden to Uttam Nagar T-Point under Division WR-I PWD New Delhi 06/01/2021 05/05/2021 893.04 Awasthi Construction Co. Detail Report
Graph / Photo
15 Strengthening of SA Road from Outer Ring Road to MB Road T-Point (RD-0 to Rd-5460) (Length 5.46 Km.) 14/03/2017 28/09/2020 886.98 59.71 (Dec'20) 0.00 (Dec'20) SATYA PARKASH AND BROS PVT LTD Detail Report
Graph / Photo
16 Construction of Pedestrian Underpass Subway Across Aurobindo Marg Between Delhi Haat and Entry No 4 of East Kidwai Nagar. 27/10/2020 26/08/2021 856.26 67.00 (Jan'21) 0.00 (Jan'21) M/s Satish Builders Work is in progress. Barricading has been done for excavation in central portion. Detail Report
Graph / Photo
17 Strengthening of Ring Road from Prembari Pull to Punjabi Bagh Flyover under PWD North West Road 1 during 2017 18 29/04/2018 26/08/2018 796.47 MAHAVIR PRASAD GUPTA AND SONS Detail Report
Graph / Photo
18 Construction of 66 feet Libaspur Gurudwara Road including providing street light fittings (SH- Civil and Electrical Work) 02/08/2019 28/01/2020 709.56 548.15 (Nov'20) 0.00 (Nov'20) MOHAN BUILDERS Work in Progress and 75% work has been completed Detail Report
Graph / Photo
19 Construction of 3 Nos. Foot Over bridge on Outer Ring Road between Saraswati Vihar to Prashant Vihar. 21/06/2018 20/03/2019 685.00 324.95 (Mar'21) 0.00 (Mar'21) Raghav Engineers work is in progress. Detail Report
Graph / Photo
20 Strengthening of Ghevra Road, (MDR-138) from NH-10 to Chor Piao under PWD Division West Road-2, Sub-Division WR-22, Delhi 20/11/2019 19/03/2020 618.64 249.26 (Jan'21) 0.00 (Jan'21) A S Infratech Work is in progress Detail Report
Graph / Photo
21 Construction of drainage system of Main Burari Road from Hiranki Bandh to Amrit Vihar upto Irrigation drain at Swaroop Nagar Road under Sub-Division-I, of PWD Division CandND Roads, New Delhi 31/03/2018 30/09/2018 563.91 63.01 (Jul'19) 0.00 (Jul'19) Competent Construction Company Detail Report
Graph / Photo
22 Construction of Two No. Foot Over Bridge across Sri Aurobindo Marg (ID-96) at (i) PTS Bus Stop (ii) T.B. Hospital with staircase and lift including Electrical Installations under Sub Division-II of Division South Road-II, PWD New Delhi. 21/03/2020 20/09/2020 489.85 53.00 (Mar'21) 0.00 (Mar'21) S S Chauhan & Sons Work in Progress. Detail Report
Graph / Photo
23 Widening and Strengthening of Bandh Road of Division SR-1 under Sub-Division SR-13 at New Delhi i/c shifting and installation of Electrical Poles Street lights etc. 01/12/2019 31/05/2020 459.03 Bansal Associates Detail Report
Graph / Photo
24 Construction of Subway in front of Dilshad Garden Metro Station. (3rd Call) 06/10/2019 05/04/2020 422.68 121.30 (Nov'20) 0.00 (Nov'20) Pawan Kumar Work in Progress Detail Report
Graph / Photo
25 Remodeling of Maujpur drain from Road No. 66 to Ghonda Chowk and Main Brahmpuri Road drain from Ghonda Chowk to MCD Dhalav. 28/10/2018 27/04/2019 419.30 144.51 (Mar'21) 0.00 (Mar'21) Gee International work in progress Detail Report
Graph / Photo
26 Thermoplastic painting on various roads under Division M-413, New Delhi dg. 2013-14. 29/10/2013 28/02/2014 404.14 K.L. Arora & Son Detail Report
Graph / Photo
27 Improvement of Khari Bawali and HC Sen Marg 27/09/2013 26/05/2015 382.36 Satya Parkash & Bros. Pvt. Ltd. Detail Report
Graph / Photo
28 Comprehensive Annual maintenance of all roads including Carriageway, Footpaths, Central Verge, Service Roads etc. within the Right of way, Mechanized/Manual Desilting of Drains, Repairing of Pot Holes, Maintenance and Cleaning of FOBs and ...WR-22 15/08/2019 14/08/2020 378.50 95.93 (May'20) 0.00 (May'20) MAHAVIR PRASAD GUPTA AND SONS work is in progress Detail Report
Graph / Photo
29 Nazafgarh Road to A-71, Rajauri Garden, A-31 Rajauri Garden, 20-Block Tilak Vihar Road, Radhaswami Satsang Marg and Tilak Nagar Main Market Road under PWD Division WR-1, New Delhi. 30/01/2019 29/05/2019 370.28 119.29 (Oct'19) 0.00 (Oct'19) Y. D. Builders & Hotel Pvt Ltd Detail Report
Graph / Photo
30 Comprehensive maintenance of Various Road Under PWD Division West Road-2/WR-23 for one year such as Footpaths, Central Verge, Planter, drainage system etc. and other misc. repair works during-2019-20. 15/08/2019 14/08/2020 360.34 240.10 (Jun'20) 0.00 (Jun'20) MAHAVIR PRASAD GUPTA AND SONS Work completed final bill yet to be made Detail Report
Graph / Photo
31 Strengthening of Ring Road from Metcalf House crossing to Timarpur intersection 28/07/2017 27/11/2017 351.90 SATYA PARKASH AND BROS PVT LTD Detail Report
Graph / Photo
32 Strengthening of various roads under Sub Division SR-11/South Road-1 PWD New Delhi.Phirni Road West End Marg Durbal Nath Marg H Block Dakshin Puri Road Maharishi Balmiki Marg and Raja Ram Marg. 06/11/2019 05/02/2020 348.51 193.75 (Feb'21) 0.00 (Feb'21) Chaudhary Construction Company Pvt. Ltd. Detail Report
Graph / Photo
33 Strengthening of road including repair of footpath of Satguru Ram Singh Marg (Road No. 36) from Mayapuri Chowk to S.D. Public School under PWD Division West Road-2, Sub Division WR-21 during 2018-19 14/03/2019 12/05/2019 344.85 230.68 (Sep'19) 0.00 (Sep'19) M C Constructions Company work is in progress Detail Report
Graph / Photo
34 Strengthening of Dera Bhatti Road of Sub-Division SR-13 under Division SR-1 at New Delhi. 27/11/2019 26/02/2020 341.72 478.95 (Nov'20) 0.00 (Nov'20) Bansal Associates Detail Report
Graph / Photo
35 Comprehensive maintenance of Various Road Under PWD Division West Road-2/WR-21 for one year such as Footpaths, Central Verge, Planter, drainage system etc. and other misc. repair works during-2019-20 15/08/2019 14/08/2020 336.56 20.00 (Aug'20) 0.00 (Aug'20) R R ENTERPRISES Work is in progress Detail Report
Graph / Photo
36 Comprehensive maintenance of Various Road Under PWD Division West Road-2/WR-24 for one year such as Footpaths, Central Verge, Planter, drainage system etc. and other misc. repair works during-2019-20 15/08/2019 14/08/2020 335.53 40.00 (Dec'20) 0.00 (Dec'20) MAHAVIR PRASAD GUPTA AND SONS Work completed final bill yet to be made Detail Report
Graph / Photo
37 Construction of drains, footpath Central Verge and improvement of side berm portion of S-Bend road (Maharishi Dayanand Marg ID-539) New Delhi. 24/10/2019 23/01/2020 330.83 60.00 (Mar'21) 0.00 (Mar'21) S S Chauhan & Sons Work in Progress Detail Report
Graph / Photo
38 Comprehensive Maintenance of various Roads under SRD Project Division-I, Sub-Division-I, PWD, Delhi. (SH- Civil Works- Mechanised Desilting of Drains, Mechanised Repairing of Pot Holes, Maintenance and Cleaning of Subways and other misc. Repair wor 27/08/2019 23/08/2020 323.91 196.90 (Aug'20) 0.00 (Aug'20) Awasthi Construcion Co. Detail Report
Graph / Photo
39 Remodelling of drain from 5th Pusta to Ghonda Chowk at Gamri Road Delhi 13/01/2020 05/04/2020 318.40 172.67 (Feb'21) 0.00 (Feb'21) Thermal Enginners & Insulators Pvt. Ltd. Detail Report
Graph / Photo
40 Construction of Foot Over Bridge with staircase and lift for pedestrian on Multan Nagar Metro Pillar No224 to 225, at Delhi Rohtak Road, NH-10, New Delhi. SH- Civil and Electrical Work 22/09/2019 21/03/2020 306.50 0.54 (Aug'19) 0.00 (Aug'19) S S Chauhan & Sons work stop due to Court Case Detail Report
Graph / Photo
41 Resurfacing of Road and Repairing of footpath and Central Verge at Asaf Ali Road and Chaman Lal Marg under Division SRD Project I, under Sub Division II, PWD during 2019 20 New Delhi 23/09/2019 20/03/2020 302.16 154.05 (Feb'21) 0.00 (Feb'21) Chaudhary Construction Company Pvt. Ltd. Detail Report
Graph / Photo
42 Construction of road including street lighting from Durbal Nath Vatika to Rohtak Road (NH-10) West-2, Roads, New Delhi and in front of Virat co-operative society at Jwalapuri colony. 18/03/2018 25/06/2018 299.53 265.52 (Oct'19) 65.00 % (Oct'19) Ramesh Chander work is in progress Detail Report
Graph / Photo
43 Providing and fixing M.S Steel railing at central verge of SSN Marg. 03/11/2019 02/05/2020 295.66 113.95 (Nov'20) 0.00 (Nov'20) B M & Sons Detail Report
Graph / Photo
44 Comprehensive Maintenance of Aacharya Shree Tulsi Marg M.G.Road Aya Nagar Road Ghitorni Road to CPWD Land Ghitorni Village Road M.G.Road to Ghitorni Village Road and Mandi Road under the Jurisdiction SD-15 under SR-1 during 2019-20 01/11/2019 31/10/2020 288.88 S S Chauhan & Sons Detail Report
Graph / Photo
45 Comprehensive Maintenance of various Roads under SRD Project Division-I, Sub-Division-II, PWD, Delhi. (SH- Civil Works- Mechanised Desilting of Drains, Mechanised Repairing of Pot Holes, Maintenance and Cleaning of Subways and other misc. Repair wo 24/08/2019 23/08/2020 285.85 183.38 (Nov'20) 0.00 (Nov'20) Awasthi Construcion Co. Detail Report
Graph / Photo
46 Widening of IGNOU Road and construction of RCC drain and footpath at IGNOU Road from Z more to M.B. Road T-Point. 18/07/2018 16/09/2018 242.58 345.71 (Feb'21) 0.00 (Feb'21) Y. D. Builders & Hotel Pvt Ltd Work in progress Detail Report
Graph / Photo
47 Construction of Subway near Baba Khakshah / Balmiki Mandir at G.T.K. Road near Azadpur SH: Civil and Electrical Works 14/03/2020 08/11/2020 241.84 Dilshad Khan Design & drawing are being prepared Detail Report
Graph / Photo
48 C/o Foot Over Bridge with stair case and lift near Living Style Mall at Road No. 13A Sarita Vihar, New Delhi. 04/07/2020 30/11/2020 225.33 491.52 (Mar'21) 0.00 (Mar'21) S S Chauhan & Sons Detail Report
Graph / Photo
49 Construction of Foot Over Bridge with staircase, electrical works and lift for pedestrian across press Enclave Road near Select City Mall, New Delhi. 31/08/2019 29/02/2020 222.53 187.92 (Jul'20) 0.00 (Jul'20) S. S. Chauhan & Sons Detail Report
Graph / Photo
50 Improvement of riding surface of flyovers namely Nand Nagri flyover, Loni Flyover, Gokalpuri and Khajuri Gol Chakkar Flyover on Wazirabad Road (Road No- 63 and 59) 15/07/2019 14/10/2019 192.33 244.82 (Dec'19) 0.00 (Dec'19) Pawan Kumar Work in progress. Detail Report
Graph / Photo
51 Improvement of Sewadham Road from road No.-63 to UP Border. 01/03/2019 30/04/2019 190.73 226.00 (Jul'19) 0.00 (Jul'19) Pawan Kumar work in progress Detail Report
Graph / Photo
52 Strengthening of Roads Improvement of Footpath and drain providing and fixing retro reflective signage and upgradation of street light horticulture work of various roads in South and North Area of Shalimar Bagh Delhi under PWD Zone M 3 SH Strengt 24/02/2018 23/06/2018 159.28 M C Constructions Company Detail Report
Graph / Photo
53 Providing and laying waste water pipe line from Arvind Nagar pump house Gamri Road to Drain no. 1 at road no. 66 via Maujpur Road Delhi. 26/02/2019 25/06/2019 149.77 182.60 (Nov'20) 0.00 (Nov'20) K. CONSTRUCTION COMPANY work in progress Detail Report
Graph / Photo
54 C/o FOB on Kalidas Marg between Motibagh and Sarai Rohilla near KD Crossing 10/05/2013 05/11/2013 138.34 0.00 (Sep'16) 98.00 % (Sep'16) Fiberfill Engineer work in progress Detail Report
Graph / Photo
55 Upgradation of 21 Nos. staff rooms of GNCTD Schools under Jurisdiction of SRD Project Division-1, PWD dg. 2018-19 30/11/2018 28/01/2019 135.88 147.99 (Feb'21) 0.00 (Feb'21) Munzareen Ahmed work in progress Detail Report
Graph / Photo
56 Balance Compensatory Tree plantation work including development of Entry point at Mukarba Chowk and Maintenance of Existing Horticulture Features. 24/12/2018 23/12/2019 135.72 0.00 (Dec'19) 100.00 % (Dec'19) Vedvan Consultants Pvt. Ltd.

Work completed.

Detail Report
Graph / Photo
57 Construction of RCC drain at Budh Ram Singh Marg and Sameer Bhan Marg 08/12/2018 07/03/2019 130.52 57.26 (Mar'21) 0.00 (Mar'21) Dinesh Chand Sharma

Work in progress

Detail Report
Graph / Photo
58 Construction of footpath and repair of damaged RCC slab of Storm Water drain from Outer Ring Road to Burari Morh, under PWD Sub Division -I of C & ND-R Division New Delhi. 29/09/2017 28/12/2017 129.36 Dilshad Khan Detail Report
Graph / Photo
59 Construction of Foot Over Bridge balance portion at D.B. Gupta Road 28/08/2014 27/12/2014 129.06 K.L. Arora & Son Detail Report
Graph / Photo
60 Redevelopment of drainage system at Lothian SPM Road Junction and Construction of Sump. (SH Civil Works) 28/09/2018 25/01/2019 122.76 93.23 (Oct'19) 0.00 (Oct'19) K.P. Singh & Co. Work in progress Detail Report
Graph / Photo
61 Strengthening of Roads Improvement of Footpath and drain providing and fixing retro reflective signage and upgradation of street light of various roads in Ashok Vihar and Lawrence Road area Delhi SH Strengthening of Roads and Improvement of Fo 24/02/2018 23/06/2018 119.01 M C Constructions Company Detail Report
Graph / Photo
62 Strengthening of Roads Improvement of Footpath and drain providing and fixing retro reflective signage and upgradation of street light horticulture work of various roads in South Pitam Pura Delhi under PWD Zone M 3 SH Strengthening of Roads and 24/02/2018 23/06/2018 103.94 M C Constructions Company Detail Report
Graph / Photo
63 Landscape development work on Aruna Asaf Ali Marg under Sub Division-III of Division South Road-II, PWD, New Delhi. 20/02/2020 19/05/2020 100.23 112.22 (Mar'21) 0.00 (Mar'21) Bhawani Constructions Work in Progress. Detail Report
Graph / Photo
64 Construction of Foot Over Bridge near Kardampuri and Yamuna Vihar on Road No.-66 , Delhi (Approximate Length 30.00 Metre). 09/06/2019 06/09/2019 98.85 140.38 (Mar'21) 0.00 (Mar'21) Dilshad Khan Work in progress. Detail Report
Graph / Photo
65 Making New Carriageway , Drain , Footpath and Planter below Shadipur Flyover under PWD Division West Road-2, Sub-Division WR-21 , New Delhi dg 2019-20. 24/10/2019 23/01/2020 97.92 Bishwa Mohan Jha Work is in progress Detail Report
Graph / Photo
66 Resurfacing of Sadar Thana Road, Foota Road, Bahadur Garh Road, Chelmsford and Faiz Road. 14/09/2016 13/01/2017 88.85 Raj Kumar Sachdeva Permission from the Traffic Police not received. Detail Report
Graph / Photo
67 AR and MO to Various Roads under Sub Division NWR 14 PWD Division NWR 1 dg 2016 17 SH Comprehensive desilting of drains of various categories and sizes along PWD roads 22/04/2017 18/10/2017 86.98 SAHIL GOYAL Detail Report
Graph / Photo
68 Development of various parks by providing and fixing of Tensile Fabric Umbrella in Shakur Basti Assembly Constituency, AC-15 under MLA LAD Fund during 2019-2020. 29/11/2019 27/01/2020 85.87 25.86 (Nov'20) 0.00 (Nov'20) Swaraj Construction Detail Report
Graph / Photo
69 Misc. repair works. 33/EE/PWD M-312/2015-16 12/08/2015 11/07/2016 82.68 0.00 (Aug'16) 87.00 % (Aug'16) Kalyan Chandra Goyal & Co. work in progress 87 % Detail Report
Graph / Photo
70 A/R and M/O to Various Roads under Sub Division NWR-21, PWD Division NWR-2 dg. 2016-17 (SH- Comprehensive desilting of drains of various categories and sizes along PWD roads.) 14/04/2017 10/10/2017 79.95 SAHIL GOYAL Detail Report
Graph / Photo
71 A/R and M/O to Various Roads under Sub Division NWR-24, PWD Division NWR-2 dg. 2016-17 (SH- Comprehensive desilting of drains of various categories and sizes along PWD roads.) 14/04/2017 10/10/2017 79.75 Rajnish Yadav Detail Report
Graph / Photo
72 Strengthening of Roads Improvement of Footpath and drain providing and fixing retro reflective signage and upgradation of street light and horticulture work of various roads in North Pitam Puram Delhi under PWD Zone M 3 SH Strengthening of road 24/02/2018 23/06/2018 79.21 M C Constructions Company Detail Report
Graph / Photo
73 A/R and M/O to Various Roads under Sub Division NWR-23, PWD Division NWR-2 dg. 2016-17 (SH- Comprehensive desilting of drains of various categories and sizes along PWD roads. 22/04/2017 18/10/2017 78.64 Inderjit Singh Detail Report
Graph / Photo
74 Improvement / Providing and fixing of MS railing in Central verge from Peeragrahi chowk to Metro Pillar No. 410 under PWD Division West Road-2/ Sub-Division WR-23, New Delhi during 2019-20 24/10/2019 23/01/2020 72.08 Inderjit Singh Work is in progress Detail Report
Graph / Photo
75 Improvement and Strengthening of Gamri Road from 5th Pusta to Ghonda Chowk Delhi 02/08/2019 29/10/2019 69.82 69.55 (Jan'20) 0.00 (Jan'20) MAHAVIR PRASAD GUPTA AND SONS Work in Progress Detail Report
Graph / Photo
76 Restoration of Road cut by DJB at Abdul Aziz Road from Pusa road crossing to Bank Street, New Delhi 23/12/2016 21/01/2017 68.15 Bishwa Mohan Jha Determined Detail Report
Graph / Photo
77 A/R and M/O to Various Roads under PWD Division NWR-2 dg. 2017-18. (SH- Patch repair of Service Road no. 316 at Mangolpuri Industrial area, Phase-I under Sub Division NWR-21.) 01/04/2018 30/05/2018 67.32 A S INFRATECH Detail Report
Graph / Photo
78 Micro surfacing of various Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Micro surfacing and Improvement of footpath at Arya Samaj Road 20/08/2018 11/02/2019 66.76 70.27 (Jan'21) 0.00 (Jan'21) SATYA PARKASH AND BROS PVT LTD Work in Progress Detail Report
Graph / Photo
79 (Sh- Repair of old damaged brick masonary drain of B-block road, Mangolpuri (from Mangolpuri flyover to Kanjhawala Link Road) under sub division NWR-21.) 29/01/2019 28/05/2019 66.00 SAHIL GOYAL Detail Report
Graph / Photo
80 A/R and M/O Various Roads under Project Circle, PWD, New Delhi dg. 2017-18 (SH-Security Guards for various offices under Project Circle, PWD, Govt, of Delhi). 29/06/2017 28/06/2018 63.56 0.00 (Mar'19) 77.10 % (Mar'19) Good Year Security Services Work completed and final bill paid Detail Report
Graph / Photo
81 Resurfacing of Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Resurfacing of road and improvement of Footpath at Tank Road 18/08/2018 12/02/2019 63.43 73.44 (Sep'19) 0.00 (Sep'19) RAJ KUMAR SACHDEVA Work completed Detail Report
Graph / Photo
82 AR and MO to Various Roads under Sub Division NWR 12 PWD Division NWR 1 dg 2016 17 SH Comprehensive desilting of drains of various categories and sizes along PWD roads 22/04/2017 18/10/2017 60.15 Aditya Construction Co. Detail Report
Graph / Photo
83 A/R and M/O to various roads under SRD Project Division-I during 2018-19. (SH-Repairing of Drain andfootpath at back side of New Delhi court building at Kotla Road and repairing of footpath NMV Lane infront of Court building at DDU Marg under Sub Di 21/06/2018 20/10/2018 59.92 74.26 (Sep'19) 0.00 (Sep'19) Satyam Construction Co. work in progress Detail Report
Graph / Photo
84 Construction of RCC drain at Dallupura Road Near Timber Market 13/12/2018 12/03/2019 59.46 12.01 (Jan'21) 0.00 (Jan'21) Shiv Construction Co.

Work in progress

Detail Report
Graph / Photo
85 Restoration of roads cut by cut by DJB for laying of 700 mm dia water supply line from Shalimar Palace to Vijay Chowk at Swaroop Nagar Road 60ft. Road, New Delhi. Recall of Tender. 22/04/2019 21/07/2019 58.58 76.66 (Dec'19) 0.00 (Dec'19) Mls Rajat Construction Co. Detail Report
Graph / Photo
86 Restoration of various road under SRD Project Sub Divn. I SRD Project Divn. II PWD, New Delhi.SH Restoration of road cut by BSES at Panchkuiyan Road, Rani Jhansi Road and D.B. Gupta Road 24/04/2018 22/07/2018 58.00 AMCON Work completed Detail Report
Graph / Photo
87 A/R and M/O various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2016-17. SH Bituminous concrete patch repair. 03/12/2016 02/03/2017 56.05 Chaudhary Construction Co. Completed Detail Report
Graph / Photo
88 Widening of Bhagwan Pur Khera Culvert over 52 cusec drain on Loni Road. 09/08/2019 06/12/2019 55.71 60.94 (Jul'20) 0.00 (Jul'20) Ravinder Kumar award under process Detail Report
Graph / Photo
89 Construction of missing drain at Safiabad border and repair of safiabad road under Sub Division NR-13 (Revised) 31/05/2020 29/07/2020 55.71 Sethi Construction Work in progress and 26% work completed Detail Report
Graph / Photo
90 Desilting of drains by chassis mounted high pressure suction cum jetting machine under Sub Division 2. 05/08/2019 04/10/2019 55.58 49.88 (Nov'20) 0.00 (Nov'20) Maan Builders award in process Detail Report
Graph / Photo
91 Comprehensive Development of Corridor (Outer Ring Road) between Mukarba Chowk to Wazirabad. SH. Providing and laying stone pitching and chute drain on embankment slope and construction of cycle track. 10/04/2017 09/04/2017 55.56 AANISHA COMMUNICATION PVT.LTD. Detail Report
Graph / Photo
92 A/R and M/O to various roads under PWD (North East) Road Division dg. 2019-20. (SH- Providing M.S. Grill in central verge from Railway Line bridge to Road no. 66 T-Point at Road no. 68 under PWD Sub Division-4). 18/08/2019 16/11/2019 54.89 46.71 (Aug'20) 0.00 (Aug'20) MOHD. FIROZ Detail Report
Graph / Photo
93 AR Mo to various roads under PWD SWR II dg 2018 19 SH Improvement of Drain from Golak Dham to Bijwasan flyover RHS and providing footpath from IOC Morh to Bijwasan Flyover Sub Division 24 22/03/2019 19/07/2019 54.67 Bishwa Mohan Jha work in progress Detail Report
Graph / Photo
94 Micro surfacing of various Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Micro surfacing and Improvement of footpath at East Park Road 20/08/2018 12/02/2019 54.25 53.03 (Nov'20) 0.00 (Nov'20) SATYA PARKASH AND BROS PVT LTD Work Completed & first R/A bill paid for Rs. 1777119 Detail Report
Graph / Photo
95 A/R and M/O to various road under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2017-18 SH Comprehensive Maintenance of road 20/03/2018 14/11/2018 52.96 Satyam Construction Co. Work Completed Detail Report
Graph / Photo
96 AR and Mo to various roads under Sub Division 21 SWR-II PWD dg 2018 19. SH Repair of drain and footpath on Peer Baba Road ID 1218 Bindapur New Delhi. 11/02/2019 11/05/2019 52.63 BLG Innovations work in progress Detail Report
Graph / Photo
97 Improvement of Central Verge on Road No. 66 from 1st Metro Pillar (Seelampur side) to Moujpur Chowk Red light. 30/06/2019 29/07/2019 52.35 64.65 (Jan'20) 0.00 (Jan'20) Ravinder Kumar Work in progress. Detail Report
Graph / Photo
98 Restoration of road cut by TATA Power DDL at Main Burari Road from Hiranki Bandh to Outer Ring Road at various place 27/05/2017 26/06/2017 50.97 S S Chauhan & Sons Detail Report
Graph / Photo
99 Strengthening, of Azad Road, Sarai Rohilla Flyover, under RUB of Zakhira including Improvement of footpath & Drain, Providing and Fixing retro reflective signage and upgradation of street light of various roads under PWD Zone M-3.SH:- (Improvement of Road footpath & Drain of Nand Lal Marg, Azad Road, saria Rohila Flyover & under RUB of Zakhira) (Microsurfacing Work). 25/01/2018 24/05/2018 50.81 Pawan Kumar Detail Report
Graph / Photo
100 Resurfacing of Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Resurfacing of road and improvement of Footpath at Gurudwara Road 17/08/2018 14/12/2018 50.73 54.15 (Nov'19) 0.00 (Nov'19) ASLAM BUILDERS Work completed Detail Report
Graph / Photo
101 Cement concrete patch repair at East park road footpath, Panchkuyia NMV, Crimination Ground at Rani Jhansi Road, Military Road and Ajmal Khan Road repair 04/01/2017 03/04/2017 50.49 Shree Vishnu Steel Works Completed Detail Report
Graph / Photo
102 Road Restoration at Goyla Deenpur Road Road Cut by Delhi Jal Board under Sub Div24 SWR II New Delhi dg 2018 19 25/04/2019 23/06/2019 50.28 Dhanna Ram & Sons work completed Detail Report
Graph / Photo
103 Providing Computer operator, MTS, Clerk and MLD, in Sub Divisions office, Division office and CE South office. 21/07/2020 20/01/2021 50.23 33.89 (Jan'21) 0.00 (Jan'21) Trendy Security Services Work in Progress Detail Report
Graph / Photo
104 AR and MO to Various Roads under Sub Division NWR 11 PWD Division NW R 1 dg 2016 17 SH Comprehensive desilting of drains of various categories and sizes along PWD roads 28/04/2017 24/10/2017 49.61 Jitendra Singh Work Awarded Detail Report
Graph / Photo
105 Comprehensive maintenance of various roads under SRD Project Division-I, Sub Division-II PWD, New Delhi during 2019-20. (SH- Misc. Repair Work.) 18/03/2019 17/03/2020 48.71 42.68 (Mar'21) 0.00 (Mar'21) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
106 Renovation of A Block, B Block and C Block at Urdu Academy, CPO Building, Kashmere Gate under SRD Division-I, Sub-Division-III, PWD, New Delhi. 13/08/2018 12/01/2019 47.47 5.34 (Aug'20) 0.00 (Aug'20) Kamal Construction Co. Work completed final bill yet to be paid Detail Report
Graph / Photo
107 Resurfacing of Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Resurfacing of Road and improvement of Footpath at Abdul Rehman Road 18/08/2018 12/02/2019 46.36 41.09 (Sep'19) 0.00 (Sep'19) RAJ KUMAR SACHDEVA Work completed Detail Report
Graph / Photo
108 AR and MO to Various Roads under Sub Division NWR 13 PWD Division NWR 1 dg 2016 17 SH Comprehensive desilting of drains of various categories and sizes along PWD roads 22/04/2017 18/10/2017 44.80 Aditya Construction Co. Detail Report
Graph / Photo
109 Road Restoration for replacement/shifting of 900mm dia Zakhira Patel Road Rising main from RPF Camp Shastri Nagar to Patel Nagar BPS.(Under jurisdiction of PWD M-311 (N) from RPF Camp Shastri Nagar to Zakhira Under Bridge at Old Rohtak Road Bituminous Portion). 23/06/2016 21/08/2016 44.68 0.00 (Sep'16) 40.00 % (Sep'16) Shiv Shakti Enterprises Work in Progress Detail Report
Graph / Photo
110 Providing and Fixing M.S. Railings on loni Road from Durgapuri chowk to Loni Gole chakkar under (North East) Road Division. 30/06/2019 29/07/2019 43.93 52.77 (Nov'19) 0.00 (Nov'19) Sandeep Kumar Work in progress. Detail Report
Graph / Photo
111 Misc. Repair works. 29/08/2016 26/11/2016 43.53 0.00 (Apr'19) 0.10 % (Apr'19) Sudesh Kumar work in progress Detail Report
Graph / Photo
112 A/R and M/O various roads under SRD Division-I, Sub-Division-II, PWD, New Delhi dg. 2018-19. (SH-Repair/renovation of footpath/carriageway of Kotla road.) 05/10/2018 19/11/2018 43.03 A.R Infrastructure Work in progress Detail Report
Graph / Photo
113 Repair of Footpath and Central Verge at Road No.37 (Maharaja Nahar Singh Marg) from Keshav Puram to Inderlok Metro Station under Sub Division M-3113, Road No.41 from Wazirpur Flyover to Madhuvan Chowk Delhi under Sub Division M-3114 & Shri Shyam ji Krishan Verma Marg i.e. Road No. 44 under Tri Nagar Vidhan Sabha Sub Division). 27/08/2016 25/10/2016 42.80 0.00 (Sep'16) 0.01 % (Sep'16) Inderjit Singh work in progress Detail Report
Graph / Photo
114 AR MO to various roads under Sub Div 21 Division SWR II PWD dg 2018 19 SH Repair of Footpath Misc Works at Satguru Ram Singh Marg New Delhi. 12/03/2019 10/05/2019 42.74 P. R. S. Yash & Co. work completed Detail Report
Graph / Photo
115 A/R & M/O to various roads under Sub division CRMSD NW R-15 PWD Division NW R-1 during 2016-17. SH:- Misc. Repair Work under Tri Nagar Vidhan Sabha. 14/09/2016 12/12/2016 41.69 0.00 (Sep'16) 0.01 % (Sep'16) Mangat Ram Gupta work in progress Detail Report
Graph / Photo
116 Misc. Repair Work under Tri Nagar Vidhan Sabha. 14/09/2016 12/12/2016 41.69 0.00 (Sep'16) 0.01 % (Sep'16) Mangat Ram Gupta work in progress Detail Report
Graph / Photo
117 A/R and M/O to various roads under SRD Division-I, Sub-Division-II ,PWD, New Delhi during 18-19 (SH-Repairing of damaged portion of roads, under Matia Mahal Constituency) 20/09/2018 19/11/2018 39.91 Satyam Construction Company work completed final bill paid Detail Report
Graph / Photo
118 drain by increasing of existing section from Karala Chowk to Shiv Vihar on Guru Gowalkar Marg under Sub Division WR-22. 12/02/2020 11/05/2020 39.69 Mohd. Arif Detail Report
Graph / Photo
119 AR and Mo to various roads under PWD Division South West Road II New Delhi during 2019-20 SH Providing services of Clerk Computer Operators and MTS for Division Office 01/08/2019 30/07/2020 38.51 15.79 (Aug'20) 0.00 (Aug'20) M/s Trendy Security Services WORK IN PROGRESS Detail Report
Graph / Photo
120 Development of Khajuri Chowk for making left turn free of smooth flow of traffic under PWD Sub Division M-2134. 31/12/2019 29/03/2020 38.44 45.44 (Feb'21) 0.00 (Feb'21) Maan Builders Detail Report
Graph / Photo
121 AR and MO various roads under Project Circle PWD New Delhi during 2019 20 SH Security Guards for various offices under Project Circle SRD Project Division I and Sub Division I II and III 29/09/2019 28/09/2020 37.87 62.57 (Nov'20) 0.00 (Nov'20) Star security & Placement Services Detail Report
Graph / Photo
122 Provision for Rain Water Harvesting Systems in SKV Bulbuli Khana Matia Mahal, SBV No. 1 (UM) Jama Masjid and GGSSS Pataudi House Darya Ganj under SRD Project Division-I, Sub-Division-III, PWD, Delhi. 09/11/2018 08/01/2019 37.49 36.01 (Nov'20) 0.00 (Nov'20) Ved Pal work in progress Detail Report
Graph / Photo
123 Restoration of various road under SRD Project Sub Divn.III SRD Project Divn.II, PWD, New Delhi. SH Restoration of various road cut by BSES at D.B. Gupta Road, East Park Road, Sant Sujan Singh Road and Ajmal Khan Road. 26/04/2018 23/06/2018 36.92 AMOCON Work completed Detail Report
Graph / Photo
124 AR and MO various roads under Division SWR-II, PWD Delhi during 2019-20. SH Improvement of drain by laying 600 mm dia NP3 pipe Hospital and BSES side from Rawta Morh to Jafferpur Engineering College in Prithvi Singh Dagar Marg 03/09/2019 01/12/2019 36.30 Ashok Kumar Rathi work not started Detail Report
Graph / Photo
125 Development of Open Land as Public Park at Sheikh Sarai - 2 Press Enclave Road New Delhi dg.2018-19. 14/09/2018 12/12/2018 35.74 34.84 (Mar'20) 0.00 (Mar'20) Ravi Tanwar Work in progress Detail Report
Graph / Photo
126 AR Mo various roads under PWD Division SWR II during 2018 19 SH Miscellaneous Repair work of drain path of Section II under Sub Division II New Delhi. 12/03/2019 09/07/2019 35.27 H.P Builders Pvt Ltd WORK foreclosed Detail Report
Graph / Photo
127 Construction of RCC drain at Punjab khor under Sub Division NR-15 during 2019-20, North Roads, PWD, Delhi 22/12/2019 20/03/2020 35.24 ASEEM CONSTRUCTION CO. Work in progress and 45% Work Completed Detail Report
Graph / Photo
128 Resurfacing of Road under SRD Project Sub Division-III SRD Project Division-II PWD New Delhi Sh Resurfacing of road and improvement of footpath at Elahi Bux Road 17/08/2018 14/12/2018 34.08 28.82 (Nov'19) 0.00 (Nov'19) ASLAM BUILDERS Work completed Detail Report
Graph / Photo
129 AR and Mo various roads under Division South West Road II PWD dg 2018-19 SH Providing and Installation of Sewerage Pump at Different Vulnerable Location under Sub Division III. 07/02/2019 02/02/2020 33.55 24.99 (Aug'19) 0.00 (Aug'19) Tripurari Prasad Singh work complted Detail Report
Graph / Photo
130 Desilting 15/04/2017 11/10/2017 32.78 SAHIL GOYAL Detail Report
Graph / Photo
131 A/R & M/O to various roads under M-4423 during 2014-15 (SH: Repair to storm water drain at IGNOU Road from MB Road cut to Z-crossing under Sub-Division M-4423). 19/01/2015 18/03/2015 32.55 Surender Singh Chouhan work completed Detail Report
Graph / Photo
132 A/R and M/O to various roads under PWD Division NWR-2 dg. 2018-19. (SH- Repair of existing drains and roads at Avantika Market, Rohini under Sub Division NWR-21.) 18/10/2018 15/01/2019 31.72 WORK CEE Detail Report
Graph / Photo
133 Providing and fixing precast Jersey Barrier on Sadar Thana Road and Foota Road. 25/01/2017 23/02/2017 30.95 B.M. & Sons Completed Detail Report
Graph / Photo
134 AR and MO TO VARIOUS ROADS UNDER NW R 14 PWD NW R 1 DURING 2016 17 SH PATCH REPAIR WORK AT RING ROAD(ID : 27597) 16/07/2017 13/09/2017 30.72 Sethi Construction Detail Report
Graph / Photo
135 AR and MO TO VARIOUS ROAD UNDER PWD DIVISION NORTH WEST ROAD 1 DURING 2017 18 SH COMPREHENSIVE MAINTENANCE OF FOOTPATH OF VARIOUS ROADS UNDER SUB DIVISION NW R 13 08/11/2017 06/05/2018 28.69 Sanjay Kaura Detail Report
Graph / Photo
136 Providing services of outsourcing staff (Computer operators) 07/06/2017 26/06/2018 27.77 Harshidhi Security Service Detail Report
Graph / Photo
137 Restoration of Road No. 5 from D.B. Gupta Road to Tank Road in Karol Bagh, New Delhi cut by Delhi Jal Board for laying sewer line 01/01/2017 01/03/2017 27.68 Aslam Builders Completed Detail Report
Graph / Photo
138 Renovation work in Kothi No. 3, Behind DCP Office Complex, Central Distt. Darya Ganj, under SRD Division-I, Sub-Division-III, PWD, New Delhi-110002. 02/06/2018 01/11/2018 27.48 34.29 (Jun'19) 0.00 (Jun'19) Manohar Lal Sharma Work in porgress Detail Report
Graph / Photo
139 Remodeling of old damaged Brick Masonry drain of G-Block Road Mangolpuri (from Police Station Road to Senior Secondary School), Delhi. 04/08/2019 02/09/2019 27.28 Jitender Singh Detail Report
Graph / Photo
140 A/R & M/O to various roads under Sub division CRMSD NW R-14 PWD Division NW R-1 during 2016-17. (SH:- Misc. Repair Work under Shalimar Constituency) 12/09/2016 10/12/2016 27.04 0.00 (Sep'16) 0.01 % (Sep'16) Raj Associates work in progress Detail Report
Graph / Photo
141 IMPROVEMENT OF ROAD SURFACE OF PREMBADI UNDERPASS AT RING ROAD 25/10/2017 23/12/2017 26.97 Gaurav Construction Co. Detail Report
Graph / Photo
142 A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2016-17. SH Desilting of Road side storm water Drains. 03/05/2017 31/07/2017 26.32 Shakur Ahmed & Sons Completed Detail Report
Graph / Photo
143 A/R and M/O to various roads under Division NWR-2 during 2016-17 (SH- Desilting of Drains and Removal of Malba/ sludge etc. under the jurisdiction of Sub-Division NWR-25) (Re-call and Short Notice) 27/04/2017 26/04/2017 26.29 Vinay Shanker Detail Report
Graph / Photo
144 Removal of malba and disposal at approved MCD & dumping groun. 14/02/2016 13/02/2017 25.66 13.11 (Nov'19) 75.00 % (Nov'19) B.M. Gupta & Sons work in progress Detail Report
Graph / Photo
145 A/R and M/O various road under PWD SRD Project Division-I, PWD, New Delhi dg. 2018-19. (SH-Provision of two nos. yellow coloured maintenance van with required labour and T and P for day to day maintenance of roads). 26/11/2018 25/11/2019 25.46 12.62 (Oct'19) 0.00 (Oct'19) RANJIT CONSTRUCTION COMPANY work in progress Detail Report
Graph / Photo
146 A/R & M/O to various roads under Sub division CRMSD NW R-13 PWD Division NW R-1 during 2016-17 12/09/2016 10/12/2016 25.36 0.00 (Sep'16) 0.01 % (Sep'16) work in progress Detail Report
Graph / Photo
147 AR to MO to various Roads of PWD Division NW R 1 under Sub Division NW R 14 during 2017 18 SH Repair of existing footpath and other misc repair work at Road no 41(ID : 26747) 08/07/2017 05/10/2017 25.22 Globe Builders Detail Report
Graph / Photo
148 A/R & M/O various road under Sub -Division M-2111 during 2019-20.(SH: Widening of Service Road and Exit of Anand vihar Railway Station and DTC Bus terminal on Road No- 56.). Recall 28/05/2020 26/06/2020 25.18 19.07 (Oct'20) 0.00 (Oct'20) Nation Star Enterprises work in progress Detail Report
Graph / Photo
149 A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (Sh- Comprehensive repair of road footpath, drain, painting etc. under Section-I, Sub Division NWR-22.) 16/03/2019 13/06/2019 24.98 41.60 (Jul'19) 0.00 (Jul'19) Jitender Singh Detail Report
Graph / Photo
150 PROVIDING OFFICE STAFF, LDC AND COMPUTER OPERATOR FOR CHIEF OFFICE MZ-3 (NORTH) & CIRCLE NORTH WEST (CRMC M-31 11/05/2016 10/05/2017 24.83 0.00 (Sep'16) 60.00 % (Sep'16) Shaka Electrical India Work in Progress Detail Report
Graph / Photo
151 AR and MO TO VARIOUS ROAD UNDER SUB DIVISION NW R 14 PWD NW R 1 DURING 2017 18 SH IMPROVEMENT AND REPAIR OF EXISTING DRAINAGE SYSTEM AND FOOTPATH AT ABHINAV MODEL PUBLIC SCHOOL ROAD(ID : 27995) 08/07/2017 21/08/2017 24.72 Pawan Kumar Gupta Detail Report
Graph / Photo
152 A/R and M/O various Roads under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2017-18. 22/11/2017 05/01/2018 24.68 Shiv Shakti Enterprises DETERMINED Detail Report
Graph / Photo
153 AR and Mo various roads under Division South West Road II PWD dg 2018 19 SH Providing of Maintenance Van with required labours T and P for day to day upkeeping maintenance of roads under Sub Div III Jaffarpur Section. 13/02/2019 12/02/2020 24.14 23.38 (May'20) 0.00 (May'20) Bishwa Mohan Jha work in progress Detail Report
Graph / Photo
154 Improvement of various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2016-17. SH: Footpath repair in Panchkuiyan Road, Rani Jhansi Road and New Rohtak Road, Karol Bagh. 22/05/2017 20/07/2017 23.85 Ramesh Chand Completed Detail Report
Graph / Photo
155 AR TO MO TO VARIOUS ROADS OF PWD NW R 1 UNDER PWD SUB DIVISION NW R 14 DURING 2017 18 SH MISC REPAIR AND IMPROVEMENT WORK NEAR BRITANNIA FLYOVER(ID : 27325) 22/06/2017 20/08/2017 23.49 Globe Builders Detail Report
Graph / Photo
156 Removal of malba & dispaosal at approved MCD dumping ground. 30/11/2014 29/12/2015 22.89 0.00 (Aug'16) 85.00 % (Aug'16) Jitendra Singh Work in progress Detail Report
Graph / Photo
157 Desilting of drains and culverts on Sultanpuri area roads under 08/03/2016 05/07/2016 22.87 0.00 (Aug'16) 95.00 % (Aug'16) Nand Kishore Yadav work in progress 95 % Detail Report
Graph / Photo
158 A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (SH- Providing and installation of signages, Overhead cantilever and Gantry Sign Board in Rani Bagh area under sub Division NWR-24.) 21/07/2018 18/09/2018 22.86 26.83 (Sep'20) 0.00 (Sep'20) Sethi Construction Detail Report
Graph / Photo
159 Desilting of drains & culverts on mangolpuri areas roads 08/03/2016 05/07/2016 22.79 0.00 (Aug'16) 95.00 % (Aug'16) Nand Kishore Yadav work in progress 95 % Detail Report
Graph / Photo
160 A/R & M/O to various Roads under SRD Project Division-II, New Delhi dg. 2017-18. SH: Monsoon preparation works. 31/05/2017 27/09/2017 22.46 Kashi Nath Jha completed Detail Report
Graph / Photo
161 A/R and M/O various Road under Sub Division NWR-21, PWD, Division NWR-2 during 2017-18. SH- Hiring Inspection Vehicle for S.E. North West, PWD Sectt, Deputy Secretary to CM and E.E. NWR-2 for official purpose.). 27/03/2018 26/03/2019 22.43 7.01 (Aug'19) 0.00 (Aug'19) Gaurav Construction Co. Detail Report
Graph / Photo
162 Road Restoration. 16/01/2016 15/03/2016 22.38 Vinod Kumar Work in progress Detail Report
Graph / Photo
163 Speed beakers 06 bituminous concrete at various location PWD Roads. 20/02/2016 19/05/2016 22.07 0.00 (Aug'16) 90.00 % (Aug'16) Jitendra Singh work in progress 90 % Detail Report
Graph / Photo
164 Providing distribution line for water supply to plantation in central verge of Main Burari Road from Outer Ring Road to Hiranki Bandh. 30/05/2017 29/06/2017 21.80 Satyam Construction Company Detail Report
Graph / Photo
165 Deposit Work 16/01/2016 15/03/2016 21.75 Vinod Kumar Work in progress Detail Report
Graph / Photo
166 Restoration of road under SRD Project Sub Division III SRD Project DivisionII, PWD, New Delhi during 2017-18.SH Restoration of various road cut by BSES at DB Gupta Road Ajmal Khan Road Saraswati Marg, Vishnu Mandir Marg and Padam Singh Road. 24/04/2018 07/06/2018 21.61 Satyam Construction Co. Work completed Detail Report
Graph / Photo
167 Improvement of service road from Nigam Bodh Ghat to start of Ring Road Bypass. 27/05/2017 10/07/2017 21.10 Maa Vaishno Developers Detail Report
Graph / Photo
168 A/R and M/O various roads under SRD Division, PWD, New Delhi, During 2018-19. (SH-Desilting of road side water drain/ sewer line by manual and super sucker machine on Various roads, under Sub Division-II.) 10/03/2019 09/09/2019 20.87 33.58 (Aug'20) 0.00 (Aug'20) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
169 A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18 SH Repair of footpath and central verge on Azad Market Road 07/02/2018 07/04/2018 20.54 Kashi Nath Jha Work Completed Detail Report
Graph / Photo
170 AR and MO VARIOUS ROAD OF PWD DIVISION NW R 1 DG 2016 17 UNDER SUB DIVISION NW R 14 SH REPAIR AND REPLACEMENT OF OLD DAMAGED DRAIN SLABS AT GOPAL MANDIR MARG SIDE PITAMPURA SECOND CALL(ID : 27473) 01/07/2017 29/08/2017 20.52 Jitendra Singh Detail Report
Graph / Photo
171 Strengthening, Improvement of footpath and providing and fixing Retro-reflective road signages of Ahinsa Marg and Road passing through Laxmikunj Appt. to Razapur transformer in Rohini, Delhi. (SH- Microsurfacing of Bituminous road.) Re-call. 23/03/2019 20/06/2019 20.51 22.05 (Jan'20) 0.00 (Jan'20) Pawan Kumar Detail Report
Graph / Photo
172 Restoration of road cut by Indraprastha Gas Limited 12” dia steel pipeline along Ring Road from I.P. Estate 15/06/2017 14/08/2017 20.25 Ram Singh Detail Report
Graph / Photo
173 Repair of drain, footpath at Jagdamba Road, Sultanpuri, Delhi 04/07/2017 01/10/2017 20.00 Jitendra Singh Detail Report
Graph / Photo
174 A/R and M/O other PWD roads under SRD Division-I, Sub-Division-I, PWD, New Delhi dg. 2018-19 (SH-Repairing of footpath and other Misc. work at Gokhle Road) 18/03/2019 17/07/2019 19.92 24.81 (Nov'19) 0.00 (Nov'19) TKN Developers work in progress Detail Report
Graph / Photo
175 A/R and M/O to various roads under SRD Project Division-I during 2016-17 (SH-Laying of storm water pipe and reconstruction of footpath near Gurudwara side gate to Mata Sundri College on Mata Sundri Road Kotla Road around Gurudwara). 02/06/2017 01/09/2017 19.82 0.00 (Mar'18) 24.61 % (Mar'18) Satyam Construction Company Detail Report
Graph / Photo
176 Construction of Badminton Court including lighting arrangement and fixtures etc. in Green Park Extension near House No. V-20, AC-43 Malviya Nagar. 13/10/2019 12/12/2019 19.74 12.50 (Nov'20) 0.00 (Nov'20) Jai Bhawani Constructions Work in Progress Detail Report
Graph / Photo
177 A/R and M/O various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Development of Baba Lal Dayal Chowk. 29/12/2017 11/02/2018 19.68 Sirohi Construction Co. Work Completed Detail Report
Graph / Photo
178 A/R and M/O various roads under SRD Division-I, Sub-Division-II, PWD, New Delhi during 2018-19. (SH- Repairing of damaged Footpath, Central Verge and Main Carriageway at Asaf Ali Road.) 18/03/2019 17/06/2019 19.62 24.40 (Nov'19) 0.00 (Nov'19) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
179 Desilting of road side drains and culvert on Rohini Sector 1,2,3 & 4 area road drains, ORR-26 & Road No.43 area drains.) 02/06/2016 30/08/2016 19.58 0.00 (Aug'16) 95.00 % (Aug'16) Jitendra Singh work in progress 95 % Detail Report
Graph / Photo
180 A/R and M/O various Roads under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Repair of Footpath at Guru Dwara Road, Abdul Aziz Road, Ganga Mandir Marg and Desh Bandhu Gupta Road etc 29/12/2017 28/03/2018 19.45 Sirohi Construction Co. Work Completed Detail Report
Graph / Photo
181 A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (Sh- Improvement of berm portion at Pt. Deen Dayal Upadhyay Marg and Major Ashwani Kanwa Marg under Section-II, Sub Division NWR-24.) 29/11/2018 12/01/2019 19.36 24.12 (Sep'19) 0.00 (Sep'19) Jitender Singh Detail Report
Graph / Photo
182 Hiring Inspection Vehicle for SE M-31, PWD Sectt., Secretary Deputy CM & EE M-312 for official purpose 22/01/2016 21/01/2017 19.15 0.00 (Aug'16) 60.00 % (Aug'16) Jitendra Singh work in progress 60 % Detail Report
Graph / Photo
183 A/R and M/O to various roads under PWD division NWR-2 during 2018-19. (SH- P/L Stone Matrix Asphalt (SMA) on existing mastic surface at B-4 road and Conl. Sarna Marg, Rohini, under Section-I, Sub Division NWR-23.) 28/08/2018 26/10/2018 19.07 19.49 (May'19) 0.00 (May'19) Sanjay Kaura Detail Report
Graph / Photo
184 Providing Services of maintenance vehicle with labour and T&P in Sub Division M-3122 for Section-II) 22/01/2016 21/01/2017 18.65 0.00 (Aug'16) 73.00 % (Aug'16) SACHIN KUMAR work in progress Detail Report
Graph / Photo
185 A/R and M/O various roads under SRD Division, PWD, New Delhi, During 2018-19. (SH-Desilting of road side water drain/ sewer line by manual and super sucker machine on Various roads, under Sub Division-I.) 10/03/2019 09/09/2019 18.54 23.10 (Mar'20) 0.00 (Mar'20) Shiva Construction work in progress Detail Report
Graph / Photo
186 A/R & M/O various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2016-17. SH: Provision of Maintenance Van in Karol Bagh (Roads in between D.B Gupta Road & New Rohtak Road from Faiz Road crossing to Military Road and Arya Samaj Road). 19/12/2016 14/09/2017 18.25 AMCON Completed Detail Report
Graph / Photo
187 Civil Misc. woks and painting of ORR-6 from Mangolpuri to Madhuvan Chowk. 11/06/2017 25/07/2017 18.25 12.86 (Apr'19) 0.00 (Apr'19) Globe Builders Detail Report
Graph / Photo
188 Providing services of maintenance vehicle with labour and T & P in sub division M-3122 for section-I. 14/02/2016 13/02/2017 17.89 0.00 (Aug'16) 73.00 % (Aug'16) Jitendra Singh work in progress Detail Report
Graph / Photo
189 A/R and M/O various roads under SRD Division-I, Sub-Division-II, PWD, New Delhi during 2018-19. (SH- Repairing of damaged Footpath, NMV Lanes and Planters in front of LNJP Hospital at JLN Marg) 18/03/2019 17/06/2019 17.56 21.01 (Jan'20) 0.00 (Jan'20) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
190 A/R and M/O to other PWD roads under SRD Division-I, New Delhi dg. 2018-19 (SH- Repairing of footpath and other Misc. work at Zorawar Singh Marg under Sub Division-I) 26/02/2019 25/03/2019 17.56 21.83 (Sep'19) 0.00 (Sep'19) Sirohi Construction Co work in progress Detail Report
Graph / Photo
191 A/R and M/O to various roads under SRD Division-I, PWD, New Delhi dg. 2018-19. (SH-Repairing of Traffic Islands at Jawahar Lal Nehru Marg and Turkman Road.) 02/12/2018 01/02/2019 17.49 0.00 (Mar'19) 21.43 % (Mar'19) M/s. Satyam Construction Work completed final bill paid Detail Report
Graph / Photo
192 Providing services of maintenance vehicle with labour and T&P in Sub Divison M-3121 for Section-II. 24/01/2016 23/01/2017 17.45 0.00 (Aug'16) 69.00 % (Aug'16) Jitendra Singh work in progrss 69 % Detail Report
Graph / Photo
193 Renovation of office of Commission for Protection of Child Rights, GNCT Delhi in ISBT Building Kashmere Gate under SRD Division-I, Sub-Division-III, PWD, New Delhi. 26/02/2019 25/05/2019 17.37 12.48 (Feb'20) 0.00 (Feb'20) SUDHIR KUMAR SHARMA work in progress Detail Report
Graph / Photo
194 Strengthening, Improvement of footpath and providing and fixing retro-reflective road signages and upgradation of street lighting of Shiva Road, Connecting sector 7 and 8 in Rohini, Delhi. (SH- Microsurfacing of Bituminous road.) Re-call. 23/03/2019 20/06/2019 17.25 Pawan Kumar Detail Report
Graph / Photo
195 Repair of footpath, central verge on road from Shantivan to I.P. Flyover on Ring Road. 01/06/2017 30/07/2017 17.18 Aditya Construction Co. Detail Report
Graph / Photo
196 A/R and M/O PWD roads under Sub Division-3 of Division C and ND- Roads during 2016-17. SH_ Filling of construction joints with polysulphide sealant on Ring Road Bypass road from Geeta Colony to Hanuman Setu. 2nd Call of Tender 23/07/2017 06/07/2017 17.17 Kuldeep Kumar Detail Report
Graph / Photo
197 Providing services of maintenance vehicle with labour and T&P in Sub Divison M-3121 for Section-I 24/01/2016 23/01/2017 17.04 0.00 (Aug'16) 70.00 % (Aug'16) Jitendra Singh work in progress 70 % Detail Report
Graph / Photo
198 AR Mo various roads under Division South West Road II PWD dg 2018 19 SH Supply of Material for day to day Maintenance of Roads under Sub Division 21 New Delhi. 15/03/2019 12/07/2019 17.02 ASH NARAYAN SINGH work complete Detail Report
Graph / Photo
199 Miscellaneous repair works such as, brick work, coble stone, plaster, painting and footpath repair on Ring Road Bypass 05/05/2017 19/06/2017 16.76 Amaan Enterprises Detail Report
Graph / Photo
200 AR and MO various roads under NW R 14 PWD Division NW R 1 during 16 17 SH Providing Security arrangment at various locations in Subways Underpass etc 16/06/2017 15/11/2017 16.59 Devine Security Services Detail Report
Graph / Photo
201 A/R and M/O various roads under SRD Project Division-I, Sub-Division-II, PWD, New Delhi during 2018-19. (SH-Improvement of footpath, drainage and main carriageway at Mirdard Road.) 18/03/2019 17/06/2019 16.55 20.33 (Nov'19) 0.00 (Nov'19) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
202 ROAD NO. 40 OLD ROHTAK ROAD, HAJI ABDUL QUARESHI MARG, AZAD ROAD, LINK ROAD (EAST MOTI BAGH) & BHAGAT SINGH ROAD UNDER SUB DIVISION M-3113 DURING 2015-16. (SH:- DESILTING & MISC. REPAIR WORK OF DRAINS). 04/04/2016 30/09/2016 16.50 0.00 (Sep'16) 70.00 % (Sep'16) Pawan Kumar Work in Progress Detail Report
Graph / Photo
203 A/R and M/O to various roads under PWD Division NWR-2 during 2017-18. (SH- Comprehensive Repair of road footpath, drain, painting etc. under Sub division NWR-23.) 19/10/2017 15/02/2018 16.42 Arif Detail Report
Graph / Photo
204 VARIOUS ROADS SWAMI NARAYAN MARG, NAND LAL MARG, PRATAP NAGAR ROAD, NIMRI COLONY ROADS, BHARAT BAGAR ROAD,SUNDER LAL JAIN ROAD & TAWETIA MARG UNDER SUB DIVISION M-3113 DURING 2015-16.(SH:- DESILTING & MISC. REPAIR WORK OF DRAINS). 04/04/2016 30/09/2016 16.39 0.00 (Sep'16) 70.00 % (Sep'16) Pawan Kumar Work in Progress Detail Report
Graph / Photo
205 AR and MO TO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD I UNDER SUB DIVISION NW R 11 DURING 2016 17 SH REPAIRS OF FOOTPATHS ROAD BERM and OTHER MISC WORK AT BALBIR SINGH SIDHU MARG(ID : 27727) 29/06/2017 27/08/2017 16.13 Sanjay Kaura Detail Report
Graph / Photo
206 A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (Sh- Patch repair of H-block road Sultanpuri, Delhi under Sub Division NWR-21.) 04/12/2018 18/12/2018 16.11 Awasthi Construction Detail Report
Graph / Photo
207 PROVIDING AND FIXING MISSING RETRO REFLECTIVE SIGNAGE BOARDS AT VARIOUS ROADS OF PITAMPURA AREA UNDER PWD DIVISION NW R 1 OF SUB DIVISION NW R 14 DELHI DURING 2019 20 26/06/2019 25/07/2019 15.75 Fiberfill Engineer Detail Report
Graph / Photo
208 Desilting of open drains, covered drain, culverts, pipe etc. 26/05/2016 22/10/2016 15.71 0.00 (Aug'16) 90.00 % (Aug'16) Rajpal Sehgal work in progress Detail Report
Graph / Photo
209 AR and MO TO VARIOUS ROADS OF PWD NORTH WEST ROAD 1 DIVISION UNDER SUB DIVISION NW R 14 DG 2017 18 SH PROVIDING OFFICE STAFF LDC AND COMPUTER OPERATOR FOR CHIEF OFFICE MZ 3 NORTH and CIRCLE NORTH WEST CRMC M 31 16/06/2017 12/12/2017 15.63 Harshidhi Security Service Detail Report
Graph / Photo
210 PROVIDING SECURITY ARRANGEMENT AT VARIOUS LOCATIONS IN SUBWAYS, UNDERPASS ETC. UNDER SUB-DIVISION M-3114 FOR 5 MONTHS 11/05/2016 07/10/2016 15.39 0.00 (Sep'16) 90.00 % (Sep'16) Harshidhi Work in Progress Detail Report
Graph / Photo
211 A/R and M/O to various road under PWD SRD Project Division-I, dg. 2017-18 (SH-Provision of yellow coloured two maintenance van with required labour with T and P to attend day to day maintenance under Sub Division-II). 25/06/2017 24/12/2017 14.94 0.00 (Mar'18) 18.63 % (Mar'18) Satyam Construction Company Work completed and final bill paid Detail Report
Graph / Photo
212 DESILTING OF DRIANS AND REMOVAL OF MALBA/SLUDGE ETC. IN ROAD NO. 44 & OTHER ADJOINING ROAD IN PITAMPURA VILLAGE UNDER TRI NAGAR VIDHAN SABHA SUB DIVISION 05/06/2016 01/12/2016 14.90 0.00 (Sep'16) 75.00 % (Sep'16) Sanjay Malohtra work in progress Detail Report
Graph / Photo
213 A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Misc. Road Repair works under Sadar Constituency) 06/02/2018 07/05/2018 14.88 TKN Developers Work Completed Detail Report
Graph / Photo
214 Covering of drain by RCC slab of Road No. 316, Mangolpuri, Delhi.) 02/07/2016 30/08/2016 14.86 0.00 (Aug'16) 10.00 % (Aug'16) Dharam Vir Singh work in progress 10 % Detail Report
Graph / Photo
215 A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Laying of non pressure NP-2 class (light duty) R.C.C. pipes on Pahari Dhiraj road.) 05/03/2018 03/05/2018 14.77 Surender Singh Chahal Foreclosed on 18.12.2018 Detail Report
Graph / Photo
216 A/R and M/O various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2016-17. SH Painting of kerbs and central verge. 12/12/2016 10/04/2017 14.02 Aslam Builders Completed Detail Report
Graph / Photo
217 A/R and M/O to various roads under PWD Division NWR-2 during 2017-18. (SH- Repair of footpath, central verge and Painting under section-II, Sub-Division NWR-21.) Re-call. 10/01/2018 09/04/2018 14.01 Jai Builders Detail Report
Graph / Photo
218 A/R and M/O to various roads under SRD Division-I, PWD, New Delhi during 2017-18. (SH-Provision of semi permanent office for Sub-Division-II.) 25/06/2017 24/08/2017 13.87 0.00 (Jan'18) 17.31 % (Jan'18) Krishan Kumar Work completed and final bill paid Detail Report
Graph / Photo
219 A/R and M/O to various roads under SRD Division-I, PWD, New Delhi during 2018-19.(SH-Providing and fixing Bollards and other Misc. works at N.S. Marg) 30/11/2018 29/01/2019 13.82 17.01 (Nov'19) 0.00 (Nov'19) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
220 A/R and M/O to various road under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18 SH Misc. Road Repair works under Ballimaran Constituency 07/02/2018 07/05/2018 13.72 Kashi Nath Jha Work Completed Detail Report
Graph / Photo
221 Cleaning of underground pipe drain/RCC culvert etc by super sucker machine.) 29/05/2016 25/09/2016 13.70 0.00 (Aug'16) 54.00 % (Aug'16) RichCon Engineering Company work in progress Detail Report
Graph / Photo
222 Road restoration under PWD NWR-21. 31/07/2017 13/09/2017 13.50 Sanjay Kaura Detail Report
Graph / Photo
223 A/R and M/O to various road under PWD SRD Project Division-I, dg. 2018-19 (SH-Provision of yellow coloured maintenance van with required labour and T and P for Chandni Chowk Constituency to attend day to day complaints under Sub Division-I) 09/08/2018 08/08/2019 13.45 6.67 (Nov'19) 0.00 (Nov'19) Sirohi Construction Co. Work completed and final bill paid Detail Report
Graph / Photo
224 A/R & M/O to various road under PWD SRD Project Division-I, dg. 2016-17 (SH: Provision of yellow coloured maintenance van with required labour with T&P to attend day to day maintenance under Sub Division-I). 02/06/2017 01/06/2018 13.40 0.00 (Aug'18) 10.16 % (Aug'18) RANJIT CONSTRUCTION COMPANY Work completed and final bill paid Detail Report
Graph / Photo
225 A/R and M/O to various roads under SRD Project Division-I, New Delhi dg. 2018-19 (SH- Providing services of diesel pumps for removing water logging during rains, under Sub Division-II). 01/07/2018 11/10/2018 13.37 0.00 (Nov'18) 16.30 % (Nov'18) Satyam Construction Company Work Completed and final bill paid Detail Report
Graph / Photo
226 Providing and fixing RCC drain cover of different sizes for the various opening drains.) 03/07/2016 29/12/2016 13.36 0.00 (Aug'16) 10.00 % (Aug'16) Jitendra Singh work in progress 10 % Detail Report
Graph / Photo
227 Improvement of drainage system and footpath at T-junction of Ring Road and Shamnath Marg near Flag Staff Road. 05/06/2017 19/07/2017 13.31 Globe Builders Detail Report
Graph / Photo
228 A/R and M/O other PWD Roads under SRD Division-I, PWD, New Delhi during 2018-19. (SH-Painting of Kerb Stones and Other Misc. Work on various roads for Independence Day and Diwali festival under Sub Division-I.) 30/07/2018 29/11/2018 13.24 Arif Work completed and final bill paid Detail Report
Graph / Photo
229 Road Restoration of various roads cut by civic agencies for laying/cable/pipe etc. under section-1, sub division NWR-23, Division NWR-2 during 2017-18. 10/01/2018 23/02/2018 13.22 Jai Builders Detail Report
Graph / Photo
230 A/R and M/O to various roads under sub-division NWR-24, PWD, Division NWR-2 dg. 2016-17. (SH- Repair of footpath at Hans Raj Marg (near Shakti Vihar to Sant Nagar Chowk), Pitam pura, Delhi. 25/04/2017 23/07/2017 13.12 Vinay Babu Sharma Detail Report
Graph / Photo
231 A/R & M/O to various roads under sub division M-3121, PAD CRUD M-312 dg. 2014-15 31/03/2015 14/05/2015 12.93 0.00 (Aug'16) 15.00 % (Aug'16) Sanjay Kaura work in progress 15 % Detail Report
Graph / Photo
232 A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Repair of footpath and Improvement of Drainage system on Gali No. 10 08/02/2018 09/05/2018 12.78 TKN Developers Work Completed Detail Report
Graph / Photo
233 RAMLEELA GROUND ROAD, CANAL ROAD, AHINSA PATH ROAD, ABHINAV MODAL ROAD, HAIDERPUR MAIN ROAD, GOPAL MANDIR MARG, BD-FD ROAD, POWER HOUSE ROAD, T.V TOWER ROAD, SP-TP & NP-MP MARG, MUNI MAYA RAM MARG IN SOUTH & NORTH PITAMPURA AREA UNDER SUB DIVISIREA UNDER SUB DIVISION M-3114/ PWD CRMD M-311 DG.2016-17 (SH:- DESILTING & MISCLLENEOUS REPAIR OF DRAIN). 30/04/2016 26/09/2016 12.76 0.00 (Sep'16) 90.00 % (Sep'16) Sanjay Kaura Work in Progress Detail Report
Graph / Photo
234 NETAJI SUBHASH PLACE TO MADHUBAN CHOWK AT ROAD NO.41 AND SHALIMAR BAGH F.O.B TO PUNJABI BAGH FLY OVER ON RING ROAD AND DEEP DRAINS AT BRITANNIA CHOWK TO NEAR TEMPLE AREA UNDER SUB DIVISION M-3114/ PWD CRMD M-311 DG.2016-17 (SH:- DESILTING & MISCLLENEOUS REPAIR OF DRAIN). 30/04/2016 26/09/2010 12.63 0.00 (Sep'16) 90.00 % (Sep'16) Anil Malhotra Work in Progress Detail Report
Graph / Photo
235 Provision of Maintenance Van with required labour and T&P to attend day to day urgent repairs of roads on Sachivalya road, velodrome road, Kisan Ghat road & I.P. Marg area and Pahar Ganj Area. 22/04/2015 21/10/2015 12.48 Detail Report
Graph / Photo
236 DESILTING OF DRIANS AND REMOVAL OF MALBA/SLUDGE ETC. IN RAMPURA AREA, ROAD NO. 43 & BALBIR SINGH SIDHU MARG ETC. UNDER TRI NAGAR VIDHAN SABHA 05/06/2016 02/10/2016 12.46 0.00 (Sep'16) 85.00 % (Sep'16) Anil Malhotra work in progress Detail Report
Graph / Photo
237 A/R and M/O various Roads under SRD Project Division-II, PWD, New Delhi during 2016-17. SH Desilting of drains by Super Sucker Machine. 09/01/2017 07/07/2017 12.41 Sai Tubewell Completed Detail Report
Graph / Photo
238 Providing man power for VIP road like Ring Road Bypass and Sachivalaya Roads. 01/07/2017 30/06/2018 12.31 Kuldeep Kumar Detail Report
Graph / Photo
239 A/R and M/O to various roads under PWD division NWR-2 during 2017-18. (SH- Improvement of footpath and berm portion of Guru Virja Nand Marg from Road No.42 to Mahatma Hans Raj Marg Under Sub Division NWR-24.) 29/03/2018 27/05/2018 12.17 R. V. Constructions Detail Report
Graph / Photo
240 Improvement of Drain in I - Block under Tri Nagar Vidhan Sabha Sub-Division 13/08/2016 10/11/2016 12.13 0.00 (Sep'16) 0.01 % (Sep'16) Sanjay Kaura work in progress Detail Report
Graph / Photo
241 A/R and M/O to various roads under SRD Project Division-I, New Delhi during 2017-18. (SH-Providing and Laying of NP-2 Pipe lines at different locations on various roads for proper drainage during monsoon season under Sub Division-I) 16/06/2017 15/08/2017 12.10 0.00 (Apr'18) 22.62 % (Apr'18) RANJIT CONSTRUCTION COMPANY Work completed and final bill paid Detail Report
Graph / Photo
242 A/R and M/O to various roads under SRD Project Division-I, New Delhi dg. 2017-18 (SH-Providing services of diesel pumps for removing water logging during rains, under Sub Division-I and II). 02/06/2017 14/09/2017 11.93 0.00 (Feb'18) 11.66 % (Feb'18) Satyam Construction Company Work completed and final bill paid. Detail Report
Graph / Photo
243 SHAHEED UDHAM SINGH MARG, MAHARISHI DAYANAND MARG, BHAGWAN MAHAVIR MARG, SWAMI SARDANAND SARASWATI MARG, CLUB ROAD, K.L BAGGA MARG, GURUDWARA MARG, DIVIDING ROAD BJ BLOCK AND BG BLOCK, JHULE LAL MARG AND MAHARAJA AGGRASEN MARG IN SHALIMAR BAGH AREA UNDER SUB DIVISION M-3114/ PWD CRMD M-311 DG.2016-17 (SH: - DESILTING & MISCLLENEOUS REPAIR OF DRAIN). 30/04/2016 26/09/2016 11.87 0.00 (Sep'16) 90.00 % (Sep'16) Anil Malhotra Work in Progress Detail Report
Graph / Photo
244 A/R and M/O to various road under PWD SRD Project Division-I, dg. 2017-18 (SH-Provision of yellow coloured maintenance van with required labour with T and P for Chandni Chowk constituency to attend day to day Complaints under Sub Division-I) 20/07/2017 19/07/2018 11.77 K.P. Singh & Co. Work completed and final bill paid Detail Report
Graph / Photo
245 R/R of various road berms cut by DJB for laying water pipe line, NDPL for cable etc. under Section-1, sub division NWR-23, PWD division NWR-2 dg. 2016-17. (Re call and Short Notice) 07/05/2017 20/06/2017 11.71 Laxman Detail Report
Graph / Photo
246 IMPROVEMENT OF DRAIN IN H-BLOCK UNDER TRI NAGAR VIDHAN SABHA SUB DIVISION 13/08/2016 10/11/2016 11.67 0.00 (Sep'16) 0.01 % (Sep'16) Jitendra Singh work in progress Detail Report
Graph / Photo
247 Providing Parabolic Speed Calming Measures on Various Road under Tri Nagar Vidhan Sabha 15/07/2016 12/09/2016 11.67 0.00 (Sep'16) 0.01 % (Sep'16) Jitendra Singh Traffic Police not approving the location map. Hence work could not be started. Detail Report
Graph / Photo
248 A/R M/O Old Saint Stephon College building at K.Gate Building, C.P.O Building, Old Court Building, N.C.C offices buildings, N.C.C offices buildings Chabi Ganj, Novelty Fire Station, Fire Station Jama Masjid, Disability Commissioner office, Nayak Se 08/11/2018 07/11/2019 11.61 12.58 (Jan'20) 0.00 (Jan'20) ANSHUL SINGH WORK IN PROGRESS Detail Report
Graph / Photo
249 C/o kerb channel on B-5 road and refixing of missing steel railing on central verge of K.N.Katju Marg, B-8 and B-5 road etc.) 14/07/2017 11/09/2017 11.48 Laxman Detail Report
Graph / Photo
250 A/R & M/O various Roads under SRD Project Division-II, PWD, New Delhi during 2016-17. SH: Providing Water Tanker with Hydraulic Jet Facilities for day to day cleaning of Kerb Stone, Crash Barrier, Central Verge, Footpath, Railing, Plants and Planters etc. 13/01/2017 21/07/2017 11.44 Madhu Construction Co. Work Completed Detail Report
Graph / Photo
251 A/R and M/O to various roads under PWD division NWR-2 during 2018-19. (SH- Repair of footpath and Central Verge from Corner of Baba Wala Park to Rohini jail at B-8 road, Sector-19, Rohini under Sub Division NWR-23.) (Re-call) 18/10/2018 16/11/2018 11.41 11.42 (Jun'19) 0.00 (Jun'19) Rajdhani Constructions Detail Report
Graph / Photo
252 A/R and M/O to various roads under SRD Project Division-I during 2017-18. (SH-Providing and Laying of NP-2 Pipe lines at different locations on various roads for proper drainage during monsoon season under Sub Division-II) 04/06/2014 03/08/2017 11.39 0.00 (Mar'18) 14.12 % (Mar'18) RANJIT CONSTRUCTION COMPANY Work completed final bill paid Detail Report
Graph / Photo
253 A/R and M/O to various roads under Division NWR-2, PWD during 2017-18. (SH- C/O Speed Breaker under Sub division NWR-22.) 17/06/2018 31/07/2018 11.31 A B Associates Detail Report
Graph / Photo
254 REPAIR OF DRY PITCHING AREA OF ROAD NO. 37 13/08/2016 11/10/2016 11.28 0.00 (Sep'16) 0.01 % (Sep'16) Sanjay Kaura Work in progress Detail Report
Graph / Photo
255 SH:- Provision of Maintenance van with required labour material and T&P to attending day to day repair of roads for DDU Marg, Vishnu Digamber Marg, Mahawat Khan Road, Minto Road, Ranjeet Singh Marg and Thomson road under Sub Divn. M-4131, New Delhi 29/04/2015 28/10/2015 10.91 Detail Report
Graph / Photo
256 PROVIDING MAINTENANCE VAN WITH REQUIRED LABOUR AND T&P UNDER SUB DIVISION M-3114 27/12/2015 26/12/2016 10.52 0.00 (Sep'16) 80.00 % (Sep'16) Work in Progress Detail Report
Graph / Photo
257 DESSILTING & MISC. REPAIR WORK OF DRAINS 30/04/2016 26/09/2016 10.47 0.00 (Sep'16) 80.00 % (Sep'16) Anil Malhotra Work in progress Detail Report
Graph / Photo
258 AR and MO VARIOUS ROAD OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 15 DURING 2017 18 SH PATCH REPAIR WORK AT POWER HOUSE and MUNI MAYA RAM ROAD SECOND CALL(ID : 27468) 16/07/2017 14/08/2017 10.15 Sethi Construction Detail Report
Graph / Photo
259 A/R and M/O to various roads under PWD division NWR-2 during 2017-18. (SH- Repair of footpath, Kerb Stone and drain of S.N.Hardikar Marg, Mangolpuri, Delhi under Sub Division NWR-21.) 22/03/2018 19/06/2018 10.05 ATHAR PARVEZ Detail Report
Graph / Photo
260 Repair of Road in the campus of Delhi Govt. Officer Flats at Upper Bela Road, Delhi-110054. 01/08/2016 31/08/2016 9.99 0.00 (Aug'16) 20.00 % (Aug'16) Munzareen Ahmd work in progress Detail Report
Graph / Photo
261 P/F precast RCC Crash Barrier at RUB Shalimar Bagh approach 25/07/2016 22/09/2016 9.81 0.00 (Sep'16) 20.00 % (Sep'16) Raj Associates Work in Progress Detail Report
Graph / Photo
262 Providing supervisor and security guard for watch and ward for sub Division office and store etc. 10/07/2017 09/07/2018 9.72 UDIT VATS Detail Report
Graph / Photo
263 A/R and M/O to Various Roads under PWD SRD Project Division-I, during 2017-18. (SH-Disposal of unclaimed malba, building rubbish etc. from the various roads under Sub Division-I.) 26/05/2017 25/05/2018 9.60 0.00 (Apr'18) 10.59 % (Apr'18) TKN Developers Work Completed and final bill paid Detail Report
Graph / Photo
264 AR AND MO VARIOUS ROADS UNDER DIVISION NW R 1 DG 2016 17 SH IMPROVEMENT OF DRAINAGE SYSTEM AT MADHAV MARG UNDER SUB DIVISION NW R 12 01/06/2017 30/06/2017 9.48 Laxman Construction Co. Detail Report
Graph / Photo
265 Outsourcing Staff in the Office of Assistant Engineer Tri Nagar Vidhan Sabha Sub Division 29/02/2016 28/02/2017 9.43 0.00 (Sep'16) 75.00 % (Sep'16) work in progress Detail Report
Graph / Photo
266 A/R and M/O other PWD Roads under SRD Project Division-I, PWD, New Delhi during 2017-18. (SH- Painting of Kerb Stones on various roads before Independence Day under Sub-Division-II.) 11/08/2017 10/05/2018 9.40 0.00 (Apr'18) 5.92 % (Apr'18) Mohd. Asif Work completed and final bill paid Detail Report
Graph / Photo
267 Providing service of JCB, TIPPERS etc. for removal encroachment and malba within ROW of various roads Section-1) 01/05/2016 27/10/2016 9.37 0.00 (Aug'16) 80.00 % (Aug'16) Sanjay Kaura work in progress Detail Report
Graph / Photo
268 PROVIDING SERVICE OF MAINTENANCE VAN WITH REQUIRED LABOUR AND T&P UNDER SUB DIVISION M-3112 01/09/2016 31/08/2017 9.13 0.00 (Sep'16) 8.00 % (Sep'16) Pawan Kumar Work in Progress Detail Report
Graph / Photo
269 PROVIDING OF MAINTENANCE VAN WITH REQUIRED LABOUR AND T&P UNDER SUB DIVISION M-3114 UNDER SECTION-I 10/09/2016 09/09/2017 8.98 0.00 (Sep'16) 5.00 % (Sep'16) Sudesh Kumar Work in Progress Detail Report
Graph / Photo
270 A/R & M/O various road under division M-442 during 2014-15 (Disposal of malba from various roads) 31/05/2014 30/03/2015 8.94 B.M. & Sons                                                 Detail Report
Graph / Photo
271 A/R and M/O various PWD roads under SRD Division-I, PWD, New Delhi during 2019-20 (SH- Supply of Material for various roads under Sub Division-I) 11/08/2019 25/08/2019 8.88 5.06 (Sep'19) 0.00 (Sep'19) TKN Developers Detail Report
Graph / Photo
272 A/R and M/O various road under SRD Project Division-I, Sub-Division-I, PWD, New Delhi dg. 2019-20 (SH- Providing and installation of height guage on both side for restriction of heavy vehicles movement at Pul Mithai Bridge and Pul Duffr in Bridge at 02/07/2019 01/08/2019 8.77 10.92 (Mar'21) 0.00 (Mar'21) TKN Developers Detail Report
Graph / Photo
273 A/R and M/O to various Roads under PWD Division NWR-2, Delhi during 2017-18 (SH- Providing and operation of water tankers mounted on TATA-709 or equivalent of capacity 10000 Litres with required labour and T and P for washing of ...... (Re-call) 03/06/2018 27/02/2019 8.64 2.56 (Nov'19) 0.00 (Nov'19) Prashant Gupta Detail Report
Graph / Photo
274 Providing and operation of water tankers mounted on TATA-709 or equivalent of capacity 10000 Litres with required labour and T and P for washing of kerbstone, crash barrier, signages etc. 15/06/2017 11/03/2018 8.64 Jitendra Singh Detail Report
Graph / Photo
275 Patch repair work on road from B-8 to DJB booster pump, B-4 to Baba Wala Park corner of booster pump and PWD road B-4 to corner of E-II Astha Kunj. 14/07/2017 12/08/2017 8.54 ABHILEKH YADAV Detail Report
Graph / Photo
276 MISC. REPAIR WORK UNDER SUB DIVISION M-3114 14/05/2016 09/11/2016 8.52 0.00 (Sep'16) 75.00 % (Sep'16) Pawan Kumar Work in Progress Detail Report
Graph / Photo
277 PROVIDING SERVICES OF MAINTENANCE VEHICLE WITH LABOUR & T&P ETC. FOR TRI NAGAR VIDHAN SABHA SUB DIVISION 08/02/2016 06/02/2017 8.49 0.00 (Sep'16) 75.00 % (Sep'16) Rajesh Gupta work in progress Detail Report
Graph / Photo
278 AR and MO VARIOUS ROAD PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 13 DURING 17 18 SH REPAIR OF FOOTPATH AND PLANTER AT SARAI ROHILLA FLYOVER 02/09/2017 01/10/2017 8.33 Shivam Builders Detail Report
Graph / Photo
279 A/R and M/O to various Residential Building under SRD Division-I, SRD Sub-Division-III, PWD, Delhi during 2018-19. (SH-Misc., Repair Work in Minister Bungalow No. 217). 29/07/2018 11/09/2018 8.31 0.00 (Jan'19) 10.30 % (Jan'19) Intkahb Alam Work completed and final bill paid Detail Report
Graph / Photo
280 A/R and M/O other Roads under SRD Division-I, PWD, New Delhi during 2018-19.(SH-Painting of Kerb Stones on various roads, under Sub-Division-II.) 27/07/2018 26/03/2019 8.23 0.00 (Apr'19) 9.67 % (Apr'19) Mudassir Hussain Work Completed and final bill paid Detail Report
Graph / Photo
281 A/R and M/O to Various Roads under Sub Division NWR-25, PWD Division NWR-2 dg. 2016-17 ( SH- Comprehensive desilting of drains of various categories and sizes along PWD roads from Madhuvan Chowk to Mangolpuri.) 27/04/2017 26/05/2017 8.23 ABHILEKH YADAV Detail Report
Graph / Photo
282 A/R and M/O to various roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Painting of Kerb Stone and central Verge. 09/02/2018 08/08/2018 8.20 Mudassir Husain A letter has been written for proposal to rescind the work. Detail Report
Graph / Photo
283 PROVIDING MAINTENANCE VAN FOR ATTENDING DAY TO DAY COMPLAINTS UNDER SECION-I 09/04/2016 08/04/2017 8.10 0.00 (Sep'16) 40.00 % (Sep'16) Amit kumar Work in Progress Detail Report
Graph / Photo
284 AR and MO TO VARIOUS ROAD OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 15 DURING 2017 18 SH PROVIDING and LAYING PRECAST RCC CRASH BARRIER SECOND CALL(ID : 27551) 01/07/2017 30/07/2017 7.86 Sudesh Kumar Detail Report
Graph / Photo
285 AR and MO VARIOUS ROAD OF PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH PROVIDING SERVICES OF SECURITY GUARDS FOR WATCH AND WARD OF OFFICE PREMISES and SUBWAYS(ID : 27655) 01/07/2017 27/12/2017 7.47 City Commercial Services Detail Report
Graph / Photo
286 A/R and M/O to Various Roads under PWD Division NWR-2 during 2018-19. (SH- Comprehensive desilting of drains of various categories and sizes along PWD roads from Madhuvan Chowk to Mangolpuri under Sub Division NWR-25 27/05/2018 20/02/2019 7.30 1.35 (Apr'19) 0.00 (Apr'19) Jitender Singh Detail Report
Graph / Photo
287 A/R and M/O PWD Roads under SRD Division-I, Sub-Division-I, PWD, New Delhi during 2018-19. (SH-Providing water tanker with Hydraulic Jet Facilities for day to day cleaning of kerb stone, crash barrier, footpath, railling, plants and planter etc.) 02/06/2018 01/12/2018 7.20 17.90 (Oct'19) 0.00 (Oct'19) TKN Developers Work in progress Detail Report
Graph / Photo
288 A/R and M/O to various roads under PWD division NWR-2 during 2018-19. (Sh- Providing services of security guard for watch and ward for Division office and Sub Division office under Sub-division NWR-24) 27/09/2018 26/09/2019 7.20 5.03 (Aug'19) 0.00 (Aug'19) Friends Detective Security Services Detail Report
Graph / Photo
289 Provision of table top/speed breaker on PWD roads in GK-2. 18/02/2019 30/12/2019 7.15 8.94 (Sep'20) 0.00 (Sep'20) Awasthi Construcion Co., PAN: ACGPA1281M, Address: A-35, VEER SINGH COLONY, BUDH VIHAR, PHASE-II, NEW DELHI-110086 20% Detail Report
Graph / Photo
290 Providing service of sewerman for day to day maintenance of roads and drains. 25/07/2016 21/11/2016 7.13 0.00 (Aug'16) 35.00 % (Aug'16) Jitendra Singh work in progress Detail Report
Graph / Photo
291 DISPOSAL OF UNCLAIMED MALBA, BUILDING RUBBISH ETC. FROM FOOTPATH AND ROAD UNDER SUB DIVSIOIN CRMSD M-3113, PWD, DELHI UNDER SECTION-II 20/07/2016 15/01/2017 7.06 0.00 (Sep'16) 20.00 % (Sep'16) Rajesh Gupta Work in progress Detail Report
Graph / Photo
292 Construction of Boundary Wall with steel gate at Harijan Basti at Tilak Vihar (DUDA) 28/07/2019 10/09/2019 7.02 M. N. Construction Co. Work in Progress Detail Report
Graph / Photo
293 Providing and fixing solar studs and spring post on Ring Road Bypass. 05/07/2017 24/07/2017 6.97 Sethi Construction Detail Report
Graph / Photo
294 Misc. repair work at Section office-I, West Enclave, Pitampura, Delhi. 04/07/2017 02/08/2017 6.97 NAR SINGH PAL Detail Report
Graph / Photo
295 Providing Security guard for watch and ward for Sub-division office and store. 16/01/2016 15/01/2017 6.92 0.00 (Aug'16) 67.00 % (Aug'16) Good Luck Enterprises work in progress 67 % Detail Report
Graph / Photo
296 A/R and M/O to IGDTUW at Kashmere Gate, Delhi During 2018-19. (SH-Renovation of Pro Vice Chancellor Room and Room No. 218, 219 and 215 under SRD Division-I, Sub-Division-III, PWD, New Delhi.) 19/07/2018 01/09/2018 6.75 6.33 (Sep'19) 0.00 (Sep'19) Intkahb Alam Work completed final bill yet to be paid Detail Report
Graph / Photo
297 A/R and M/O Old Saint Stephon College building at K.Gate Building C.P.O Building, Old Court Building, N.C.C offices buildings N.C.C offices buildings Chabi Ganj Novelty Fire Station Fire Station Jama Masjid Disability Commissioner office Lok Naya 09/11/2018 08/11/2019 6.74 Kamal Construction Co. work in progress Detail Report
Graph / Photo
298 P/F of missing steel railings of existing pattern on central verge at B-2, B-4, B-6 and B-7, Roads 15/07/2017 12/09/2017 6.74 Globe Builders Detail Report
Graph / Photo
299 Outsourcing Staff 16/06/2017 13/09/2017 6.56 Praveen Gupta Detail Report
Graph / Photo
300 Disposal of unclaimed malba, building rubbish etc. from footpath and road under Sub Divsioin CRMSD M-3113, PWD, Delhi under Section-I 28/07/2016 23/01/2017 6.55 0.00 (Sep'16) 20.00 % (Sep'16) Rajesh Gupta Work in Progress Detail Report
Graph / Photo
301 AR and MO TO VARIOUS ROADS PWD OF DIVISION NORTH WEST ROAD I UNDER SUB DIVISION AE NW R 11 DURING 2017 18 SH PROVIDING SERVICES OF OUTSOURCING STAFF(ID : 28154). 08/07/2017 03/01/2018 6.49 Rajesh Gupta Detail Report
Graph / Photo
302 A/R and M/O to various roads under PWD division NWR-2 during 2017-18. (SH- Miscellaneous work of 70 foota road under Kirari Vidhan Sabha, Delhi under Sub Division NWR-21) 27/10/2017 25/11/2017 6.47 Jitendra Singh Detail Report
Graph / Photo
303 SUPPLY OF R.C.C. COVER, MANHOLE COVER AND BITUMINOUS READYMIX CONCRETE UNDER WAZIRPUR VIDHAN SABHA SUB-DIVISION M-3112 08/09/2016 22/09/2016 6.43 0.00 (Sep'16) 0.01 % (Sep'16) Sanjay Kaura Work in Progress Detail Report
Graph / Photo
304 Repair and Refixing of the duct slabs and providing Jersey Barrier. 24/08/2017 23/10/2017 6.35 0.00 (Dec'17) 7.23 % (Dec'17) B P Rai and Sons Work completed and final bill paid Detail Report
Graph / Photo
305 Providing and operating mobile maintenance vehicle under Sub Division M-2 under section - 1 and section-2. 29/07/2019 26/09/2019 6.35 7.76 (Dec'19) 0.00 (Dec'19) Ashok Kumar Rathi P.G. letter issued Detail Report
Graph / Photo
306 A/R & M/O various Road under Sub-Division M-2113 during 2019-20. (SH: Improvement of Road No. 57 near Swarn Cinema Culvert.). 28/05/2020 26/06/2020 6.27 Nation Star Enterprises work in progress Detail Report
Graph / Photo
307 Construction of slip road for jointing B-4 road to B-8 road near Baba Park corner Sector-19, Rohini Delhi. 15/06/2017 13/08/2017 6.22 Jitendra Singh Detail Report
Graph / Photo
308 AR and MO VARIOUS ROADS PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 13 DURING 16 17 SH REPAIR WORK IN PUMP HOUSE AT ZAKHIRA SECOND CALL(ID : 27467) 29/06/2017 28/07/2017 6.15 Jawala Prasad Koli Detail Report
Graph / Photo
309 Providing Security Guard for watch and ward for Sub-division office and store and MTS staff. 09/07/2017 08/07/2018 6.01 7.50 (Jun'19) 0.00 (Jun'19) Friends Detective Security Services Detail Report
Graph / Photo
310 Providing outsourcing staff like Security Guard, Sweeper and Supervisor for Section-I. 24/06/2017 23/06/2018 5.98 Planet Security Group Detail Report
Graph / Photo
311 Construction of speed breaker and repairing the road surface at Nandi Vithi Marg near N Block 06/09/2018 30/12/2019 5.93 7.37 (Sep'20) 0.00 (Sep'20) Awasthi Construcion Co., PAN: ACGPA1281M, Address: A-35, VEER SINGH COLONY, BUDH VIHAR, PHASE-II, NEW DELHI-110086 70% Detail Report
Graph / Photo
312 AR and MO VARIOUS ROADS PWD OF DIVISION NORTH WEST ROAD I UNDER SUB DIVISION NW R 12 DURING 2017 18 SH PROVIDING SERVICES OF OUTSOURCING STAFF(ID : 28150) 08/07/2017 03/01/2018 5.77 Pawan Kumar Gupta Detail Report
Graph / Photo
313 AR and MO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD I UNDER SUB DIVISION NW R 15 DURING 2017 18 SH REPAIR OF FOOTPATH OF OUTER RING ROAD(ID : 26613) 26/06/2017 25/07/2017 5.67 Jawala Prasad Koli Detail Report
Graph / Photo
314 AR and MO TO VARIOUS ROAD PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH PROVIDING and LAYING PIPE DRAINAGE SYSTEM NEAR GULABI BAGH BUS STAND AT SWAMI NARAYAN MARG(ID : 28207) 09/07/2017 07/08/2017 5.61 Shivam Builders Detail Report
Graph / Photo
315 Misc. Repair and White wash of sub division office, stores, Horticulture office and nursery at Sec-11, Rohini, Delhi. 15/07/2017 12/09/2017 5.39 Sageer Ahmad Detail Report
Graph / Photo
316 PROVIDING MAN POWER FOR CLEANING OF SUBWAYS & OFFICE PREMISES 08/04/2016 07/03/2017 5.37 0.00 (Sep'16) 100.00 % (Sep'16) Pawan Kumar Work in Progress Detail Report
Graph / Photo
317 AR and MO VARIOUS ROADS OF DIVISION NW R 1 UNDER SUB DIVISION NW R 15 DURING 2017 18 SH PROVIDING SECURTIY GUARD FOR WATCH AND WARD and CLEANING OF SUBWAY NEAR POWER HOUSE AT OUTER RING ROAD(ID : 27619) 01/07/2017 30/06/2018 5.35 City Commercial Services Detail Report
Graph / Photo
318 Desilting of Drains and Removal of Malba/ sludge etc. at misc roads under Tri Nagar Vidhan Sabha Sub-Division 26/09/2016 25/03/2017 5.23 0.00 (Sep'16) 0.01 % (Sep'16) Rajesh Gupta work in progress Detail Report
Graph / Photo
319 AR and MO VARIOUS ROAD OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 14 DURING 2017 18 SH IMPROVEMENT AND REPAIR OF EXISTING DRAINAGE SYSTEM AT SHALIMAR BAGH CROSSING(ID : 27726) 29/06/2017 12/08/2017 5.09 Jawala Prasad Koli Detail Report
Graph / Photo
320 Providing security guard for watch and ward for Sub Division office and Store. 04/07/2015 03/07/2016 5.03 0.00 (Aug'16) 100.00 % (Aug'16) Divine Security Services work in progress, Bill awaited by contractor. Detail Report
Graph / Photo
321 A/R and M/O other PWD roads under SRD Project Division-I, PWD, New Delhi during 2017-18 (SH- Essential miscellaneous ancillary work for various roads under Sub Division-I). 01/07/2017 30/07/2017 4.98 0.00 (Sep'17) 5.99 % (Sep'17) TKN Developers work completed and final bill paid Detail Report
Graph / Photo
322 Road Restoration of various roads under SRD Project Division-I, PWD, New Delhi during 2017-18. (SH-Repair of the road/ footpath cut by BSES Yamuna Power Limited for laying of Stringing on Chandni Chowk Road under Sub-Division-I) 01/07/2017 31/08/2017 4.96 0.00 (Feb'18) 5.73 % (Feb'18) RANJIT CONSTRUCTION COMPANY Work completed and final bill paid Detail Report
Graph / Photo
323 Hiring of inspection vehicle for EE, SER-2 19/07/2019 18/07/2020 4.89 1.92 (Sep'20) 0.00 (Sep'20) R. N. Construction Company Detail Report
Graph / Photo
324 AR and MO to various roads under NW R 1 PWD dg 2016 17 SH Providing services of Office Staff in Division Office and Sub Division NW R 14 Office 11/06/2017 07/12/2017 4.68 Praveen Gupta Detail Report
Graph / Photo
325 AR TO MO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISOIN NW R 12 PWD DELHI DURING 2016 17 SH MISC REPAIR WORK(ID : 27680) 01/07/2017 30/07/2017 4.66 Sethi Construction Detail Report
Graph / Photo
326 Misc. repair works at Sub-division office at Sector-21, Rohini, Delhi. 01/07/2017 30/07/2017 4.54 Jitendra Singh Detail Report
Graph / Photo
327 AR and MO VARIOUS ROAD OF PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH PROVIDING MAN POWER FOR CLEANING OF SUBWAYS FOB and OFFICE PREMISES(ID : 28231). 28/07/2017 27/07/2018 4.52 Sanjay Kaura Detail Report
Graph / Photo
328 A/R and M/O other PWD Roads under SRD Division -I, PWD, New Delhi during 2019-20. (SH- Painting of Kerb Stones on various roads before Independence Day under Sub Division-I.) 13/08/2019 27/08/2019 4.45 5.20 (Nov'19) 0.00 (Nov'19) Mohd Arshad Detail Report
Graph / Photo
329 A/R and M/O to various road under PWD SRD Project Division-I, PWD, New Delhi dg. 2017-18 (SH-Supplying, Commissioning, installing and testing of Desktop, UPS and Printer in Circle Office, Division Office and Sub Division-II and III). 03/07/2017 17/07/2017 4.40 0.00 (Jul'17) 5.12 % (Jul'17) Network Infotech Work completed and final bill paid Detail Report
Graph / Photo
330 A/R and M/o to various roads under PWD Division NWR-2 during 2018-19. (SH- Providing services of Security Guard, Sweeper and Supervisor under Section-I, sub Division NWR-25.) 26/08/2018 25/08/2019 4.36 5.16 (Dec'19) 0.00 (Dec'19) Planet Security Group Detail Report
Graph / Photo
331 Providing and fixing Retro Reflective Signage Board on various roads under SRD Project Sub Division I SRD Project Division II PWD New Delhi. 12/10/2018 10/11/2018 4.35 4.15 (Aug'20) 0.00 (Aug'20) Mohan KUMAR Work completed Detail Report
Graph / Photo
332 AR and MO VARIOUS ROADS UNDER DIVISION NW R 1 DURING 2017 18 SH PROVIDING SECURITY GUARD FOR WATCH AND WARD and CLEANING OF FOB and SUB DIVISION OFFICE UNDER NW R-12 07/05/2017 06/11/2017 4.32 Planet Security Group Detail Report
Graph / Photo
333 Supply and stacking of cutback based instant curing bituminous ready mix/cold mix concrete road maintenance compound 12/01/2016 09/07/2016 4.27 0.00 (Aug'16) 99.00 % (Aug'16) VCS Enterprises Ltd. work in progress,Provisional EOT granted upto 30.09.2016 Detail Report
Graph / Photo
334 Securing Govt. Land at Y-block, Sanjay Gandhi Hospital Road, Mangolpuri, Delhi. 21/07/2017 18/10/2017 4.23 Jitendra Singh Detail Report
Graph / Photo
335 Providing speed calming measures near Golcha Cinema Dariyaganj at N.S. Marg under SRD Division-I, PWD, New Delhi. 07/12/2018 06/01/2019 4.18 0.00 (Mar'19) 5.21 % (Mar'19) B P Rai and Sons Work completed final bill paid Detail Report
Graph / Photo
336 AR and MO TO VARIOUS ROADS OF PWD DIVSION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH PROVIDING SERVICES OF DIESEL ENGINE PUMP SET AND LABOUR DURING MONSOON SEASON IN ODD HOUR NIGHT(ID : 27560) 02/07/2017 29/09/2017 4.16 Pawan Kumar Gupta Detail Report
Graph / Photo
337 A/R and M/O to various roads under PWD Division NWR-2 during 2017-18. (SH- Supply of material for day to day maintenance work for section-II under Sub-Division NWR-23). 25/11/2017 24/12/2017 4.09 Kehar Singh Detail Report
Graph / Photo
338 A/R and M/O various Roads under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Supply of materials for day to day maintenance work. 07/02/2018 06/06/2018 4.03 Kashi Nath Jha Work Completed Detail Report
Graph / Photo
339 PROVIDING SECURITY GUARD FOR WATCH AND WARD & CLEANING OF FOB ROAD NO. 37 01/06/2016 30/05/2017 4.02 0.00 (Sep'16) 30.00 % (Sep'16) Devine Security Services Work in progress Detail Report
Graph / Photo
340 A/R and M/O to various roads under Division NWR-2 during 2017-18 (SH- Supply of material for day to day maintenance work under Section-II, Sub-Division NWR-24). 29/10/2017 27/11/2017 3.96 Jitendra Singh Detail Report
Graph / Photo
341 PROVIDING SERVICE OF MAINTENANCE VEHICLE WITH LABOUR AND T&P ETC. FOR TRI NAGAR VIDHAN SABHA SUB DIVISION 14/05/2016 09/11/2016 3.92 0.00 (Sep'16) 90.00 % (Sep'16) Amit kumar work in progress Detail Report
Graph / Photo
342 AR and MO various Roads under SRD Project Division II PWD New Delhi during 2017-18. SH Provision of inspection vehicle for use of Executive Engineer SRD Project Division II PWD. 07/04/2018 06/04/2019 3.90 4.49 (Sep'20) 0.00 (Sep'20) Ram Prasad Singh & Sons Work Completed Detail Report
Graph / Photo
343 A/R and M/O to various roads under PWD Division NWR-2 during 2017-18. (SH- Repair work on road B-5 to B-9, Sector-4, Rohini, Delhi under Sub Division NWR-21.) 05/11/2017 04/12/2017 3.86 Jitender Singh Detail Report
Graph / Photo
344 A/R and M/O to various roads under SRD Project Division-I, New Delhi dg. 2019-20 (SH-Providing services of diesel pumps for removing water logging during rains, under Sub Division-II) 02/07/2019 08/10/2019 3.86 Tripurari Prasad Singh Detail Report
Graph / Photo
345 A/R and M/O various Roads under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2016-17. SH Repair of central verge on New Rohtak Road and fixing of slab on drain. 20/03/2017 18/05/2017 3.84 Sarwar Completed Detail Report
Graph / Photo
346 Supply of Material 19/06/2017 03/07/2017 3.73 Sethi Construction Detail Report
Graph / Photo
347 DISPOSAL OF UNCLAIMED MALBA, BUILDING RUBBISH ETC. FROM THE ROADS UNDER SUB DIVISION CRMSD M-3114, PWD, DELH 25/04/2016 21/10/2016 3.70 0.00 (Sep'16) 98.00 % (Sep'16) Pawan Kumar Work in Progress Detail Report
Graph / Photo
348 Providing Maintenance vehicle with Pump Set with labour for odd hours for maintenance of roads and drains during Monsoon season. 16/07/2017 03/10/2017 3.65 A.B. Associates Detail Report
Graph / Photo
349 PROVIDING MAINTENANCE AND UPKEEPING AT VARIOUS LOCATIONS IN SUBWAYS, UNDERPASS ETC. UNDER SUB DIVISION M-3114 FOR 06 MONTHS 05/06/2016 01/12/2016 3.58 0.00 (Sep'16) 50.00 % (Sep'16) Pawan Kumar Work in Progress Detail Report
Graph / Photo
350 A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Supply of materials for day to day maintenance work. 16/07/2017 30/07/2017 3.57 TKN Developers Work completed Detail Report
Graph / Photo
351 A/R and M/O to various roads under PWD Division NWR-2 during 2017-18. (SH- Repair work of Road No. 42A nearby Deepali Chowk under sub division NWR-21.) 29/10/2017 27/11/2017 3.53 Jitendra Singh Detail Report
Graph / Photo
352 Providing and fixing sign board / name display board of Honourable MLA in Badli Assembly Constituency Delhi 14/11/2019 13/12/2019 3.52 Rajesh Construction co. Work in Progress and 90% work completed Detail Report
Graph / Photo
353 Supply of Material 19/06/2017 03/07/2017 3.42 Sethi Construction Detail Report
Graph / Photo
354 Providing Maintenance vehicle with Pump Set with labour for odd hours for maintenance of roads and drains during Monsoon season. 16/07/2017 03/10/2017 3.42 Mls Rajat Construction Co. Detail Report
Graph / Photo
355 AR and MO TO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH SUPPLY OF CUT BACK COLD MIX SPECIALIZED INSTANTEOUS ROAD MAINTENANCE BITUMEN CONCRETE COMPOUND SECOND CALL(ID : 27289) 19/06/2017 03/07/2017 3.36 Sethi Construction Detail Report
Graph / Photo
356 PROVIDING SERVICE OF MOBILE MAINTENANCE VAN FOR ATTENDING DAY TO DAY COMPLAINT UNDER WAZIRPUR CONSTITUENCY 27/07/2016 20/01/2017 3.36 0.00 (Sep'16) 40.00 % (Sep'16) Rajesh Gupta Work in progress Detail Report
Graph / Photo
357 AR and MO TO VARIOUS ROADS OF DIVISION NW R 1 UNDER SUB DIVISION NW R 11 DURING 2017 18 SH CONSTRUCTING THE ROAD GULLY CHAMBER AND LAYING OF RCC PIPE 250MM DIA IN SHAKURPUR AREA(ID : 27277) 22/06/2017 21/07/2017 3.35 Sanjay Kaura Detail Report
Graph / Photo
358 A/R and M/O to various roads under SRD Project Division-I, New Delhi dg. 2017-18. (SH-Providing services of Sewerman for cleaning bell mouth, kerb channel, drain etc. and removing water logging during rains under Sub Division-II). 22/06/2017 19/10/2017 3.32 0.00 (Nov'17) 4.12 % (Nov'17) RANJIT CONSTRUCTION COMPANY Work completed and final paid Detail Report
Graph / Photo
359 A/R and M/O to various roads under SRD Project Division-I, PWD, New Delhi during 2018-19. (SH- Providing photocopy machine with operator for the office of SE (Project) and EE, SRD-I). 18/03/2019 17/03/2020 3.21 4.01 (Dec'20) 0.00 (Dec'20) TKN Developers work in progress Detail Report
Graph / Photo
360 A/R and M/O to various roads under Sub-division NWR-23, PWD Division NWR-2 during 2016-17. (SH- Supplying and staking of cutback based instant curing bituminous ready mix/cold mix concrete road maintenance compound at sub division NWR-23, Delhi). 21/04/2017 05/05/2017 3.20 Manish Chandak Detail Report
Graph / Photo
361 A/R and M/O to various roads under sub-division NWR-25, PWD, division NWR-2 dg. 2016-17 (SH- Supplying and staking of cutback based instant curing bituminous ready mix/cold mix concrete road maintenance compound at sub division NWR-25.) 12/04/2017 26/04/2017 3.20 Manish Chandak Detail Report
Graph / Photo
362 A/R and M/o to various roads under sub division NWR-24, PWD, division NWR-2 dg. 2016-17 (SH- Supplying and staking of cutback based instead curing bituminous ready mix/cold mix concrete road maintenance compound at sub division NWR-24, Delhi.) 25/04/2017 09/05/2017 3.17 Rajpal Sehgal Detail Report
Graph / Photo
363 A/R & M/O VARIOUS ROAD UNDER SUB DIVISION M-3114/PWD CRMD M-311 DURING 2016-17. (SH:- DESILTING & MISCLLENEOUS REPAIR OR DRAIN AT WAZIRPUR INDUSTRIAL AREA). 25/04/2016 21/09/2016 3.15 0.00 (Sep'16) 70.00 % (Sep'16) Pawan Kumar work in progress Detail Report
Graph / Photo
364 A/R &M/O Various Roads under Shahdara Roads Civil Divn PWD during 2020-21. (SH Repair and maintenance of EPABX, KTS, Push button Phone, Plan & Inverter in sub division, Division & Circle office (M-21).) 06/08/2020 05/08/2021 3.07 Sagar Systems Work in Progress Detail Report
Graph / Photo
365 AR TO MO TO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 14 DURING 2017 18 SH SUPPLY OF MATERIAL(ID : 27285) 22/06/2017 21/07/2017 3.01 Sanjay Kaura Detail Report
Graph / Photo
366 Providing Maintenance vehicle with Pump Set with labour for odd hours for maintenance of roads and drains during Monsoon season. 16/07/2017 03/10/2017 2.98 Jitendra Singh Detail Report
Graph / Photo
367 Providing Pump Set with labour for day to day maintenance of roads and drains duing Monsoon Season. 11/07/2016 28/09/2016 2.98 0.00 (Aug'16) 80.00 % (Aug'16) Jitendra Singh work in progress Detail Report
Graph / Photo
368 PROVIDING SECURITY GUARD FOR WATCH AND WARD OF MUSICAL FOUNTAIN AT RAMPURA UNDER TRI NAGAR VIDHAN SABHA SUB-DIVISION 13/08/2016 12/08/2017 2.93 0.00 (Sep'16) 15.00 % (Sep'16) work in progress Detail Report
Graph / Photo
369 Providing Pump set with labour for day to day maintenance of roads and drains during Monsson Season. 11/07/2016 28/09/2016 2.91 0.00 (Aug'16) 75.00 % (Aug'16) SACHIN KUMAR work in progress Detail Report
Graph / Photo
370 A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (SH- Supplying and stacking of cutback based instant bituminous ready mix concrete road maintenance compound at sub division NWR-25, Sector-21, Rohini, Delhi). 18/05/2018 16/06/2018 2.83 Manish Chandak Detail Report
Graph / Photo
371 AR and MO TO VARIOUS ROADS UNDER NW R 1 PWD DG 2017 18 SH PROVIDING SERVICES OF OFFICE STAFF IN DIVISION AND SUB DIVISION NW R 15 01/03/2018 29/04/2018 2.82 Sanjay Kaura Detail Report
Graph / Photo
372 A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (SH- Supplying and stacking of cutback based instant bituminous ready mix concrete road maintenance compound at Section-I, sub division NWR-23, Delhi). 02/06/2018 29/09/2018 2.81 VCS Enterprises Ltd. Detail Report
Graph / Photo
373 A/R and M/O PWD roads under Sub Division-3 of Division C and ND Roads during 2016-17. SH Carry out subsoil investigations, architectural, structural design and drawings for construction of foot over bridge at Metcalfe House Ring Road, Delhi. 23/05/2017 07/07/2017 2.80 0.33 (Jul'19) 0.00 (Jul'19) TKN Developers Detail Report
Graph / Photo
374 AR and MO TO VARIOUS ROAD PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 12 DURING 2017 18 SH SUPPLY OF MATERIALS FOR ATTENDING DAY TO DAY COMPLAINTS 02/09/2017 16/09/2017 2.71 Jawala Prasad Koli Detail Report
Graph / Photo
375 Construction of Bell Mouth and Gully Chamber on K.N.Katju Marg from Transport Authority to Irrigation Nallah Sector-11, Rohini, Delhi. 08/09/2017 07/10/2017 2.71 Kehar Singh Detail Report
Graph / Photo
376 AR and MO TO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH DEMOLISHING PLANTER AND MAKING FOOTPATH AT ROAD NO 40 NEAR F BLOCK SHIV MANDIR DHARAMSHALA 08/06/2017 06/07/2017 2.71 Laxmi Narayan Detail Report
Graph / Photo
377 AR and MO TO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 14 DURING 2017 18 SH PROVIDING SERVICES FOR MAINTENANCE OF ELEVATED CORRIDOR AND CARRIAGE WAY FROM RING ROAD PREMBARI TO AZADPUR(ID : 27994) 13/07/2017 24/11/2017 2.59 Pawan Kumar Gupta Detail Report
Graph / Photo
378 Providing Maintenance vehicle with Pump Set with labour for odd hours for maintenance of roads and drains during Monsoon season. 16/07/2017 03/10/2017 2.59 Jitendra Singh Detail Report
Graph / Photo
379 Providing Pump set with labour for day to day maintenance of roads and drains during Monsson Season under Section-I, Pitampura, Rani Bagh area. 10/07/2016 27/09/2016 2.55 Vinay Babu Sharma Work in Progress Detail Report
Graph / Photo
380 A/R and M/O to various roads under Sub-Division NWR-23, PWD Division NWR-2 during 2016-17. (SH- Supply of material for day to day maintenance work for Section-II). 16/05/2017 14/06/2017 2.48 ABHILEKH YADAV Detail Report
Graph / Photo
381 AR and MO to various roads of Division North West Road 1 under Sub Division NW R 11 dg 2017 18 SH Disposal of unclaimed malba building rubbish etc from footpath and road(ID : 27327) 22/06/2017 19/10/2017 2.47 Rajesh Gupta Detail Report
Graph / Photo
382 AR and MO TO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NWR 13 DURING 2017 18 SH URGENT REPAIR WORK OF SWAMI NARAYAN UNDERPASS ROAD 06/05/2017 05/06/2017 2.41 Sanjay Kaura Detail Report
Graph / Photo
383 AR and MO TO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 14 DURING 2017 18 SH REMOVAL THE TEMPORARY ENCROACHMENT FROM PWD ROADS TIME TO TIME(ID : 27993) 08/07/2017 04/10/2017 2.40 Pawan Kumar Gupta Detail Report
Graph / Photo
384 Desilting of Drains and Removal of Malba/ sludge etc. at misc roads under Wazirpur Vidhan Sabha under Sub-Division M-3112 01/09/2016 29/11/2016 2.34 0.00 (Sep'16) 40.00 % (Sep'16) Pawan Kumar Work in Progress Detail Report
Graph / Photo
385 A/R and M/O to various roads under section-II, Sub-Division NWR-23, PWD Division NWR-2 during 2016-17. SH- Providing service of JCB, TIPPERS etc. for removal of encroachment and malba within ROW of various roads.) 24/04/2017 23/10/2017 2.30 ABHILEKH YADAV Detail Report
Graph / Photo
386 AR and MO TO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 12 DG 2017 18 SH REPAIR OF LIFT PORTION OF FOB 06/06/2017 20/06/2017 2.24 Sanjay Kaura Detail Report
Graph / Photo
387 Providing Maintenance vehicle with Pump Set with labour for odd hours for maintenance of roads and drains during Monsoon season. 16/07/2017 03/10/2017 2.22 Globe Builders Detail Report
Graph / Photo
388 AR AND MO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 15 DG 2017 18 SH MISC REPAIR WORK 06/05/2017 05/06/2017 2.21 Sanjay Kaura Detail Report
Graph / Photo
389 AR and MO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD1 UNDER SUB DIVISION NW R 15 DURING 2017 18 SH REPAIR OF DAMAGED DRAIN AT OUTER RING ROAD 06/05/2017 20/05/2017 1.98 Sanjay Kaura Detail Report
Graph / Photo
390 AR and MO Various Road under Sub Division M 2111 during 2018 19 SH Providing Height Restricting Barrier for Seelampur Flyover SECTION I 05/06/2018 04/07/2018 1.92 DASHRATH KUMAR WORK FORECLOSED Detail Report
Graph / Photo
391 Topographic Survey, OD Survey, Pedestrian Volume Count, etc. and detailed geometric design at junction of Parallel Road and Main Burari Road to provide solution to the congestion at junction by improving the geometry and suggesting feasible solutions 26/07/2018 27/10/2018 1.90 Integrated Techno Systems Private Limited

Revised proposed scheme submitted to UTTIPEC on 13.01.2020. UTTIPEC official visited site on 30.09.2020 and issued inspection report on 01.10.2020.

Detail Report
Graph / Photo
392 Providing Pump set with labour for day to day maintenance of roads and drains during Monsoon season. 12/07/2017 20/09/2017 1.87 Jitendra Singh Detail Report
Graph / Photo
393 REPAIR & IMPROVEMENT OF CARRIAGEWAY BELOW SARAI ROHILLA FLYOVER 05/06/2016 19/06/2016 1.85 0.00 (Sep'16) 0.01 % (Sep'16) Pawan Kumar To be started by the Agency Detail Report
Graph / Photo
394 AR and MO to various Road under Sub Division NW R 13 PWD of Division NW R 1 during 2016 17 SH Disposal of unclaimed malba Building rubbish etc from various roads 06/05/2017 03/08/2017 1.83 Sanjay Kaura Detail Report
Graph / Photo
395 AR and MO TO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD I DURING 2017 18 SH Removal of malba from various places under Wazirpur Vidhan Sabha Constituency 07/05/2017 20/06/2017 1.83 Sanjay Kaura Detail Report
Graph / Photo
396 Desilting 11/04/2017 09/07/2017 1.82 Happen Enterprises Detail Report
Graph / Photo
397 Providing Pump set with labour for day to day maintenance of roads and drains during Monsoon season. 09/07/2017 26/09/2017 1.70 Mls Rajat Construction Co. Detail Report
Graph / Photo
398 Providing Pump set with labour for day to day maintenance of roads and drains during Monsoon season. 09/07/2017 26/07/2017 1.70 Mls Rajat Construction Co. Detail Report
Graph / Photo
399 A/R and M/O to various roads under Sub-Division NWR-24, PWD Division NWR-2 during 2016-17. SH- Providing service of JCB, TIPPERS etc. for removal of encroachment and malba within ROW of various roads.) 20/04/2017 16/10/2017 1.58 Usha Construction Co Detail Report
Graph / Photo
400 Providing Pump set with labour for day to day maintenance of roads and drains during Monsoon season. 12/07/2017 29/10/2017 1.51 Vinay Shanker Detail Report
Graph / Photo
401 A/R and M/O to various roads under PWD Division NWR-2 dg. 2018-19. (SH- Providing Pump set with labour for day to day maintenance of roads and drains during Monsoon season under Sub-Division NWR-23.) (Re-call) 15/07/2018 12/10/2018 1.40 Globe Builders Detail Report
Graph / Photo
402 Annual Maintenance of office equipments and its allied items in Office of Superintending Engineer Project, Office of Executive Engineer, SRD Project Division I and Office of Assistant Engineer I, II, III and IV PWD, New Delhi Dg. 2019 20 28/09/2019 27/02/2020 1.01 A.N. TECHNOLOGIES Detail Report
Graph / Photo
403 PROVIDING MAN POWER FOR CLEANING OF MUSICAL FOUNTAIN KESHAV PURAM 07/04/2016 06/04/2017 0.88 0.00 (Sep'16) 60.00 % (Sep'16) Pawan Kumar work in progress Detail Report
Graph / Photo
404 Supply, Installation, Testing and Commissioning and Comprehensive maintenance and operation of 6 Nos. 13 Passenger Capacity Lifts (Machine Room less) 08/01/2012 -- Detail Report
Graph / Photo
405 Providing and laying Micro Surfacing on various PWD Roads under North-West Road Maintenance Division-I, PWD, Delhi during 2016-17. 06/08/2016 05/11/2016 0.00 (Sep'16) 0.01 % (Sep'16) Mahavir Parsad Gupta & Sons work in progress Detail Report
Graph / Photo
406 Providing crash barrier on Balmiki Road Abdul Hameed Marg and Block G and Block B Marg at Central Verge in Shakurpur area under Tri Nagar Vidhan Sabha Sub Division. 28/09/2016 26/12/2016 0.00 (Sep'16) 0.01 % (Sep'16) Mangat Ram Gupta work in progress Detail Report
Graph / Photo
407 Brick Masonary drain and footpath at Hans Raj Gupta Marg 29/05/2014 28/10/2014 0.00 (Mar'17) 85.00 % (Mar'17) Work is to be foreclosed after connecting with R Block drain. Detail Report
Graph / Photo
408 Construction of back to back u turn on road no. 13 A G.D. Birla Marg, Sarita Vihar, New Delhi 20/02/2016 19/04/2016 0.00 (Feb'17) 50.00 % (Feb'17) Plan showing modified location of U turn as per the demand of local RWA submitted to UTTIPEC for approval Detail Report
Graph / Photo
409 Laying of 1000 mm dia RCC pipe along road no. 13 for disconnection of storm water drain from sewer line to open drain on both side at Tughlakabad Extn, Kalkaji New Delhi 05/09/2016 04/10/2016 30.73 (Mar'17) 35.00 % (Mar'17) Work is held up due to non reciept of permission from Delhi Traffic Police Detail Report
Graph / Photo
410 Improvement of road surface of Hansraj Sethi Marg, Baba Fateh Singh Marg, Maharaja Agarsen Marg and Kashi Ram Takkar Marg 16/07/2016 15/09/2016 191.64 (Mar'17) 75.00 % (Mar'17) Bituminous work completed road marking is yet to be done Detail Report
Graph / Photo
411 Improvement of road surface of Hansraj Gupta Marg 16/07/2016 15/09/2016 111.72 (Mar'17) 85.00 % (Mar'17) bituminous work completed road marking is yet to be done Detail Report
Graph / Photo
412 Bituminous Work 26/07/2016 25/09/2016 0.00 (Mar'17) 5.00 % (Mar'17) work is in progress Detail Report
Graph / Photo
413 Improvement of riding surface of Maharaja Agarsen Marg, Madanpur Khadar Road & Jaiptur Road from Mathura Road to Agra Canal under Division SER-2 during 2016-17 25/07/2016 24/09/2016 69.07 (Mar'17) 15.00 % (Mar'17) paver block in berm on agarsen marg has been fixed resurfacing on Madanpur Khadar Road has also been completed Detail Report
Graph / Photo
414 Improvement of service road of Road No. 13 from Crown Plaza to Sarita Vihar Underpass at New Delhi 08/08/2016 07/10/2016 56.22 (Mar'17) 25.00 % (Mar'17) One side of service road completed in all respect and work is in progress on other side of road Detail Report
Graph / Photo
415 Improvement of Road surface of Saheed Surya Sen Marg and KPS Marg at Alaknanda Area 08/07/2016 07/09/2016 57.40 (Mar'17) 95.00 % (Mar'17) Bituminous work completed. Thermoplastic painting work is to be taken up Detail Report
Graph / Photo
416 Repair of damaged drain & Covering with precast RCC slab on School Road, Gurudwara Road & Jaitpur Road under PWD Division SER-2 during 2016-17 New Delhi. 25/10/2016 24/12/2016 0.00 (Feb'17) 65.00 % (Feb'17) Work is in progress Detail Report
Graph / Photo
417 Improvement of berm of Gurudwara Road from Don Bosco School to Savitri Cinema Road during 2016-17 15/11/2016 14/02/2017 0.00 (Mar'17) 5.00 % (Mar'17) Work is in progress Detail Report
Graph / Photo
418 Bridges & its approaches over river Yamuna down stream of the existing bridge at Wazirabad (DTTDC) 20/03/2010 30/11/2017 0.00 (Jun'17) 91.80 % (Jun'17) The work is executed by DTTDC Detail Report
Graph / Photo
419 AR and MO various roads under SWR-II PWD NCTD Delhi dg. 2016-17 SH Desilting of storm water drains at Janakpuri Area Lal Sai Road Vidya Marg Ram Mandir Marg Dabri Road etc. under Sub Divn. I New Delhi. 01/01/2017 30/06/2017 Work Completed Detail Report
Graph / Photo
420 AR and MO various roads under PWD Sub Divn I SWR II during 2016-17 SH Desilting of Drains under Section-I Pankha Road Area New Delhi 09/06/2017 05/12/2017 Work foreclosed on 18/10/2017 Detail Report
Graph / Photo
421 A/R and M/O various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Supply of materials for day to day maintenance work 23/04/2018 21/07/2018 WORK COMPLETED Detail Report
Graph / Photo
422 Detailed Feasibility Study and geometric design for construction of four lane road along bank of drain No. 8 (Najafgarh Drain) adjacent to existing single lane inspection road of Irrigation & Flood Control Department from Dhansa Regulator to Dwarka Mor for providing additional connectivity between Jhajjar (Haryana) and IGI Airport, New Delhi. 12/06/2014 09/12/2014

Feasibility to be approved by UTTIPEC after NOC from I&FC Department. NOC is awaited from I&FC department. On 11.05.2020, E-in-C PWD has written D.O. letter to secretary I&FC department (GNCTD) for issuing instruction for joint inspection.

On 08.10.2020, presentation was made to Hon'ble PWD Minister.

Detail Report
Graph / Photo
423 A/R and M/O various Roads under SRD Project Division-II, PWD, New Delhi during 2017-18. SH Provision of inspection vehicle for use of Executive Engineer, SRD Project Division 07/04/2018 06/04/2019 Completed (Final Bill yet to be submitted by the agency) Detail Report
Graph / Photo
424 Strengthening of road surface of Outer Ring Road from Modi Mill to Chirag Delhi (Masjid Moth). 27/05/2018 26/07/2018 436.54 (Apr'19) 73.00 % (Apr'19) - Detail Report
Graph / Photo
425 A/Rand M/O various Roads under SRD Project Sub Division III SRD Project Division II PWD, New Delhi,during 2017-18.SH Supply of materials for day to day maintenance work 24/03/2018 21/06/2018 Work Completed Detail Report
Graph / Photo
426 Detailed Feasibility Study and geometric design for construction of ROB/RUB on Cost-sharing basis on Railway crossing No. LC-12 (Delhi-Ambala line) on Khera Kalan to Khera Khurd Road. 07/08/2018 06/01/2019 Dhrupad Consultants Pvt. Ltd.

UTTIPEC Governing Body metting under chairmenship of Hon'ble L.G. was held on 25.12.2020. Scheme has been cleared / approved by UTTIPEC. Final drawings approved by UTTIPEC.

Detail Report
Graph / Photo
427 AR and MO various roads under SRD Project Sub Division II SRD Project Division II PWD New Delhi during 2018-19 SH Desilting through super sucker and manually of various roads drains under sub division II. 19/06/2018 15/12/2018 34.12 (Jan'19) 100.00 % (Jan'19) WORK COMPLETED Detail Report
Graph / Photo
428 Widening of road from Kalindi Kunj Park Red Light to FOB Saheen Bagh to prevention of traffic jam and pollution at Road No 13 A under PWD SER 2 New Delhi 02/06/2018 01/08/2018 43.19 (Jun'19) 49.00 % (Jun'19) 30% Detail Report
Graph / Photo
429 Shifting of drain from K Pocket Gate Sarita Vihar to Maharaja Agarsen Road for widening of road at Road No 13 A 02/06/2018 01/08/2018 7.02 (Mar'19) 100.00 % (Mar'19) 100% Detail Report
Graph / Photo
430 Micro Surfacing of various road under SRD Project Sub division-III SRD Project Division II, PWD , New Delhi during 2017-18. SH Micro Surfacing and improvement of footpath at Khajoor Road. 17/08/2018 14/12/2018 Work completed. Detail Report
Graph / Photo
431 Hiring of inspection vehicle for EE SER 2 17/06/2018 16/06/2019 4.53 (May'19) 77.00 % (May'19) 95% Detail Report
Graph / Photo
432 Providing and laying RMC in berm portion and repairing of footpath of Hansraj Sethi Marg and Kanshi Ram Takkar Marg 03/05/2018 02/06/2018 90% Detail Report
Graph / Photo
433 Re development of planter area for the prevention from the encroachment pollution unauthorised parking ease of movement of public and traffic jam etc at Guru Ravidass Marg under Division SER 2 17/05/2018 16/08/2018 61.76 (Apr'19) 96.00 % (Apr'19) - Detail Report
Graph / Photo
434 Making of missing drain for disposal of storm water near Paras ground side at Nehru Place on Outer Ring Road 17/05/2018 16/06/2018 The work has been completed ... Bill yet to be submit. Detail Report
Graph / Photo
435 AR and MO various roads under SRD Project Sub Division I SRD Project Division II PWD New Delhi during 2018-19 SH Desilting through super sucker and manually of various roads drains under sub division I 20/06/2018 16/12/2018 29.44 (Apr'19) 100.00 % (Apr'19) WORK COMPLETED Detail Report
Graph / Photo
436 AR and MO various roads under SRD Project Sub. Division III SRD Project Division-II PWD New Delhi during 2018-19 .SH Desilting through super sucker and manually of various roads drains under sub division III 19/06/2018 15/12/2018 WORK COMPLETED. Detail Report
Graph / Photo
437 Shifting of Footpath and drain and Providing RCC retaining wall to prevention of traffic jam Pollution and encroachment from FOB Saheen Bagh to Kalindi Kunj Park Red Light at Road No 13 A under PWD Division SER 2 New Delhi 29/05/2018 28/07/2018 27.26 (Mar'19) 44.00 % (Mar'19) 62% Detail Report
Graph / Photo
438 AR and MO Various Road under Sub Division M 2113 During 2018 19 SH Repairing of Drain at Babarpur Road SECTION II 07/08/2018 05/10/2018 Duplicate Work Detail Report
Graph / Photo
439 A R and M O to various roads under subdivision III SRD project division II Delhi dg 2018 19 SH Laying of NP 2 pipe repair of footpath at Hardhyan Singh road between road 3 to road no 4 pyare lal road between road no 3 to DB Gupta road and Guru Ravida 16/08/2019 13/11/2019 Work in progress Detail Report
Graph / Photo
440 Restoration of various roads under SRD Project Sub Division I of SRD Project Division II PWD dg 2019 20 SH Repair of roads and footpath cut by various utility services agencies 06/08/2019 04/10/2019 Work in progress Detail Report
Graph / Photo
441 Providing and fixing M. S. Grill at central verge from Chhawla Village to BDO office, at Najafgarh Bijwasan Road (ID 1173) under PWD division SWR-II, New Delhi. 14/09/2020 13/10/2020 WORK not started Detail Report
Graph / Photo
442 Rehabilitation and strengthening of Janak Setu Flyover in New Delhi (Balance Work) 29/03/2020 29/09/2020 Work in progress Detail Report
Graph / Photo
443 Repair and Rehabilitation of Vehicular Under Pass (VUP) and its approaches and Approaches of three RoBs at PulMithai on SPM Marg, Delhi 16/01/2020 15/10/2020 Work in progress Detail Report
Graph / Photo
444 Structural audit of flyovers of New Nizamuddin Flyover,Nehru Place Flyover,Sarita Vihar flyover,Andrews Ganj Flyover 05/03/2020 28/05/2021 Work in progress Detail Report
Graph / Photo
445 Structural audit of flyovers of Tilak Nagar flyover near metro station,Punjabi Bagh Club flyover,Raja Garden Flyover,Tilak Nagar flyover near District Centre,Peera Garhi flyover 05/03/2020 28/05/2021 Work in progress Detail Report
Graph / Photo
446 Construction of Two No Foot Over Bridge across (i)Sri Aurobindo Marg (ID-96) at Adhchini Village (ii) Hauz Khas Enclave (Near Padmini Enclave) with staircase and lift including Electrical Installation under Sub Division-II of Division South Road-II 21/03/2020 20/09/2020 Work in Progress. Detail Report
Graph / Photo
447 Construction of Elevated Road over Barapulla Nallah is starting from Sarai Kale Khan to Mayur Vihar, New Delhi (Phase III). (SH Supplying and Fixing LED Street Light Fixtures) 02/09/2018 01/03/2019 in progress Detail Report
Graph / Photo
448 Raising of manhole cover and making connection to the old drain with manhole chambers 17/07/2018 16/08/2018 Work is in progress. Detail Report
Graph / Photo
449 Disposal and Removal of dumped malba 30/03/2019 29/09/2019 4.73 (May'19) 0.00 (May'19) The 25% work has been completed and left work is in progress.. Detail Report
Graph / Photo
450 A/R and M/O various roads under SRD Project Sub. Division-III/SRD Project Division-II, PWD, New Delhi during 2018-19 .SH-Desilting through super sucker and manually of various roads drains under sub division- III. 19/06/2018 15/12/2018 15.42 (Jan'19) 0.00 (Jan'19) WORK COMPLETED Detail Report
Graph / Photo
451 AR and MO various roads under SRD Project Sub Division III SRD Project Division II PWD New Delhi during 2018-19 SH Desilting through super sucker and manually of various roads drains under sub division III 19/06/2018 15/12/2018 WORK COMPLETED Detail Report
Graph / Photo
452 Micro Surfacing of various road under SRD Project Sub division III SRD Project Division II PWD New Delhi during 2017-18. SH Micro Surfacing and improvement of footpath at Khajoor Road. 17/08/2018 14/12/2018 25.48 (Nov'20) 0.00 (Nov'20) WORK COMPLETED Detail Report
Graph / Photo
453 Watch and ward of Subways under Sub Division SER-23 and SER-25 24/06/2018 23/06/2019 90% Detail Report
Graph / Photo
454 Providing and running diesel pump set 01/07/2018 30/09/2018 2.27 (Jun'19) 0.00 (Jun'19) 100% Detail Report
Graph / Photo
455 Micro surfacing of various Road under SRD Project Sub Division I SRD Project Division II PWD New Delhi SH Micro surfacing and Improvement of footpath at Chitra Gupta Road 25/10/2018 21/02/2019 81.57 (Nov'20) 0.00 (Nov'20) WORK COMPLETED Detail Report
Graph / Photo
456 Providing services for special inspection, analysis of existing structure conducting tests and preparation of remedial measures report including BOQ for Repair and Rehabilitation of Seelampur Flyover Delhi 18/02/2019 18/05/2019

Work in Progress

Detail Report
Graph / Photo
457 Supply of sand stone aggregate and Bitumen emulsion for all Sub Divisions 17/12/2018 23/12/2018 - Detail Report
Graph / Photo
458 Repair of central verge and P/F of missing grill and other misc works at MB Road. 09/02/2019 10/03/2019 75% Detail Report
Graph / Photo
459 Repair and beautification of kabootar chowk T Point of SA Road near Kalkaji Mandir and Hansraj Sethi Marg near Nehru Place 31/12/2018 30/01/2019 - Detail Report
Graph / Photo
460 Construction of toe wall near Tehkhand Depot 31/12/2018 28/02/2019 16.03 (Jun'19) 0.00 (Jun'19) - Detail Report
Graph / Photo
461 Raising and repair of footpath on Road No. 13 from Guru Ravi Dass Marg T Point to Crowne Plaza 31/12/2018 30/01/2019 - Detail Report
Graph / Photo
462 Repair of damaged footpath from SA Road T Point to RUB Badarpur MB Road 31/12/2018 30/01/2019 - Detail Report
Graph / Photo
463 Improvement of kerb wall on Okhla Estate Marg (Road No 13) from Guru Ravi Dass Marg T Point to Aggarwal sweets 25/02/2019 24/03/2019 9.78 (May'19) 0.00 (May'19) The 60% work has been completed and the rest work is in progress. Detail Report
Graph / Photo
464 Provision of table top/speed breaker on PWD roads in GK-2. 18/02/2019 01/03/2019 - Detail Report
Graph / Photo
465 A R and M O various road under Sub Division M 2113 during 2018 19 SH Covering of drain of Babarpur Road after necessary misc repair work SECTION II Balance Work RECALL 28/10/2018 24/02/2019 Work in progress Detail Report
Graph / Photo
466 Providing JCB and Dumper with labours for removing temporary encroachment and collecting dumped malba 02/11/2018 01/05/2019 Work is completed ... Bill not submit yet.. Detail Report
Graph / Photo
467 Construction of missing drain and widening of road due to heavy traffic jam etc at Road No. 13 A 24/11/2018 23/02/2019 37.17 (May'19) 0.00 (May'19) 50% Detail Report
Graph / Photo
468 Providing services for special inspection, analysis of existing structure, conducting tests and preparation of remedial measures report including Bill of Quantities (BOQ) for Repair and Rehabilitation of Seelampur Flyover Delhi 18/02/2019 18/05/2019

Work in Progress

Detail Report
Graph / Photo
469 Providing and fixing M.S. Grill on footpath near FOB at Sarita Vihar Mathura Road 13/09/2018 28/10/2018 5% Detail Report
Graph / Photo
470 Development of open space at SA Road from DJB UGR to MCD SLF 16/04/2019 14/06/2019 60% Detail Report
Graph / Photo
471 Disposal of dumped malba 30/03/2019 29/09/2019 The 25% work has been completed and rest work is in progress... Detail Report
Graph / Photo
472 Repair of berm portion of Nehru Enclave Service road on Outer Ring Road 30/03/2019 29/04/2019 The 80% work has been completed and the rest work is in progress. Detail Report
Graph / Photo
473 Repair of damage footpath Hansraj Sethi Marg from EPDP Road to Nehru Place Flyover 30/03/2019 28/04/2019 - Detail Report
Graph / Photo
474 A/R and M/O various road under SER-2/25 during 2018-19 (SH- Removal of grass and malba from central verge and side berms) 30/03/2019 28/04/2019 The 70% work has been completed.. Detail Report
Graph / Photo
475 Raising of height of central verge SA Road from crowne plaza to MB Road T Point 30/03/2019 28/04/2019 - Detail Report
Graph / Photo
476 A/R and M/O various road under Sub -Division M-2111 during 2019-20.(SH Covering drain of Apsara Border underpass.).(Balance work). 02/09/2019 31/10/2019 Work in progress (Agmt. No. 41/EE/PWD/SHAHDARA ROAD/M-211/2019-20/05014) Detail Report
Graph / Photo
477 feasibility studies for the corridor network UG Tunnel and improvement of existing Dwarka Road from NH 8 to Dwarka 28/12/2019 24/06/2020 Work In progress. Detail Report
Graph / Photo
478 Restoration of various roads under SRD Project Sub. Division II SRD Project Division II PWD New Delhi. SH Restoration of various road cuts by IGL and Vodafone at New Rohtak Road under Sub Division II tion of various road 22/07/2019 19/10/2019 Work in progress Detail Report
Graph / Photo
479 Providing and fixing 6 feet high M.S. Railing on central verge of MB Road 23/03/2019 22/04/2019 - Detail Report
Graph / Photo
480 A R and M O to various roads under subdivision III SRD project division II Delhi dg 2018 19 SH Laying of NP 2 pipe repair of footpath at Hardhyan Singh road between road 3 to road no 4 pyare lal road between road no 3 to DB Gupta road and Guru Ravida 16/08/2019 13/11/2019 work in progress Detail Report
Graph / Photo
481 Raising of manhole height of storm water drain on Mathura road 26/04/2019 10/06/2019 0% Detail Report
Graph / Photo
482 Repair of footpath Outer Ring Road from Modi Mill to Kabootar Chowk and Providing and fixing carbonate sheet of FOB 18/04/2019 17/05/2019 The work is in progress... Detail Report
Graph / Photo
483 Supply and stacking of material 09/04/2019 18/04/2019 40% Detail Report
Graph / Photo
484 Repair of footpath Jaitpur Road. 21/02/2019 20/04/2019 95% Detail Report
Graph / Photo
485 Restoration of SA Road, Hansraj Sethi Marg, Baba Fateh Singh Marg. 01/03/2019 15/03/2019 - Detail Report
Graph / Photo
486 Repair of service road at Pul Pehladpur. 01/03/2019 31/05/2019 - Detail Report
Graph / Photo
487 Construction of boundary wall near Giri Nagar, Maharaja Agarsen Marg. 01/03/2019 30/04/2019 - Detail Report
Graph / Photo
488 Providing and placing jersey barrier on Madanpur Khadar Road. 02/03/2019 16/03/2019 11.11 (Jun'19) 0.00 (Jun'19) - Detail Report
Graph / Photo
489 Providing and placing jersey barrier on Meethapur chowk in Jaitpur area. 04/03/2019 18/03/2019 0% Detail Report
Graph / Photo
490 Improvement of kerb wall on Okhla Estate Marg (Road No 13) from Guru Ravi Dass Marg T Point to Aggarwal sweets. 25/02/2019 26/03/2019 The 60% work has been done.... Detail Report
Graph / Photo
491 Repair and Improvement of footpath from primary school lal Kuan to Suraj Kund crossing at MB Road. 09/02/2019 08/04/2019 - Detail Report
Graph / Photo
492 Beautification of surrounding area near Delhi Institute of Tool Engineering at SA Road 24/02/2019 25/03/2019 10.84 (May'19) 0.00 (May'19) - Detail Report
Graph / Photo
493 Providing and laying RCC kerb stone at roundabout at Hansraj Sethi marg 18/02/2019 19/03/2019 - Detail Report
Graph / Photo
494 Road Restoration of Bipin Chander Pal Marg 17/02/2019 18/03/2019 The 60% work has been done and the left work is in progress... Detail Report
Graph / Photo
495 Remodelling and construction of missing drain at R Block Road GK-I 10/03/2019 08/05/2019 - Detail Report
Graph / Photo
496 Repair and renovation of Sub Division office 15/03/2019 13/04/2019 The work is in progress.. Detail Report
Graph / Photo
497 Repair of footpath, Baba Fateh Singh Marg from SA Road to Guru Ravi Dass Marg 18/03/2019 16/04/2019 - Detail Report
Graph / Photo
498 Providing and laying RMC at berm portion of KPS Marg 15/03/2019 13/04/2019 - Detail Report
Graph / Photo
499 Providing and fixing of M.S. Railing at the footpath of Guru Ravi Dass Marg 23/03/2019 21/04/2019 75% Detail Report
Graph / Photo
500 Repair of damaged footpath and drain Guru Ravi Dass Marg from MB Road T Point to Road No. 13 Red Light 14/04/2019 13/06/2019 90% Detail Report
Graph / Photo
501 Repair of damage footpath Maharaja Agarsen Marg and Kanshi Ram Takkar Marg 25/03/2019 24/04/2019 - Detail Report
Graph / Photo
502 Repair of damage footpath KPS Marg 25/03/2019 23/04/2019 - Detail Report
Graph / Photo
503 Improvement of SA Road T Point Junction 30/03/2019 28/05/2019 - Detail Report
Graph / Photo
504 Repair and raising of central verge by RCC Road No. 13 from Pocket 8 to Sarita Vihar Underpass 30/03/2019 28/05/2019 The work yet to be start... Detail Report
Graph / Photo
505 Providing watch and ward for Sub Division office 15/03/2019 14/09/2019 - Detail Report
Graph / Photo
506 Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on MB Road and Suraj Kund Road and 5 Nos cross culvert 10/03/2019 05/10/2019 - Detail Report
Graph / Photo
507 Mechanical desilting of road side storm water drain and sewer mixed drains by Super Sucker Machine on Guru Ravi Dass Marg, KPS Marg and DDA Market Road 10/03/2019 05/10/2019 - Detail Report
Graph / Photo
508 Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Road No. 13 A 09/03/2019 04/10/2019 0% Detail Report
Graph / Photo
509 Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Sarita Vihar Road, Maharaja Agarsen Road and Madanpur Khadar Road 10/03/2019 05/10/2019 - Detail Report
Graph / Photo
510 Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Mathura Road. 09/03/2019 04/10/2019 8% Detail Report
Graph / Photo
511 Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Outer Ring Road, Hansraj Gupta Marg, R Block Road, Guru Nanak Market to Lala Lajpat Rai.. 09/03/2019 04/10/2019 - Detail Report
Graph / Photo
512 Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on SA Road 09/03/2019 04/10/2019 - Detail Report
Graph / Photo
513 Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Baba Fateh Singh Marg, Maharaja Agarsen Marg, Hansraj Sethi Marg and Kanshi Ram Takkar Ma 09/03/2019 04/10/2019 - Detail Report
Graph / Photo
514 Desilting of road side storm water drain on Savitri Cinema Road, Surya Sen Marg, Hansraj Gupta Marg, Lala Lajpat Rai Marg and other internal roads of GK-I and GK-II 10/03/2019 05/10/2019 - Detail Report
Graph / Photo