|
|
Road taken by PWD (Year): | Road handed over to other Deptt: |
Length of Road (Km.): | 0.60 | No. of Lanes: | 4 | Lane Lentgh (Km.): | 2.40 |
Date of Last to Last Resurfacing(M/Y): | 01/01/2000 | Right of Way: | 18.30 |
Main C.W. built thickness & specification of layer: |
Proposed Works |
General Remarks: | Road required strengthning |