|
|
Road taken by PWD (Year): | 2012 | Road handed over to other Deptt: |
Length of Road (Km.): | 0.50 | No. of Lanes: | 3 | Lane Lentgh (Km.): | 1.50 |
Date of Last to Last Resurfacing(M/Y): | 19/06/2017 | Right of Way: | 18.00 |
Main C.W. built thickness & specification of layer: | DBC - 40mm thickness |
Proposed Works |
General Remarks: | road is in good condition with footpaths and proper drainage system. |