|
|
Road taken by PWD (Year): | Road handed over to other Deptt: |
Length of Road (Km.): | 18.79 | No. of Lanes: | 4 | Lane Lentgh (Km.): | 75.16 |
Date of Last to Last Resurfacing(M/Y): | 28/08/2024 | Right of Way: | 25.00 |
Main C.W. built thickness & specification of layer: |