|
|
Road taken by PWD (Year): | Road handed over to other Deptt: |
Length of Road (Km.): | 0.36 | No. of Lanes: | 2 | Lane Lentgh (Km.): | 0.71 |
Date of Last to Last Resurfacing(M/Y): | 01/01/2000 | Right of Way: | 25.40 |
Main C.W. built thickness & specification of layer: |