|
|
Road taken by PWD (Year): | Road handed over to other Deptt: |
Length of Road (Km.): | 0.96 | No. of Lanes: | 6 | Lane Lentgh (Km.): | 5.76 |
Date of Last to Last Resurfacing(M/Y): | Right of Way: | 30.00 |
Main C.W. built thickness & specification of layer: |
Electrical |
No of Poles: | 25 | No of Fittings: | 51 | |