Building - Maintenance Workभवन - रखरखाव का कार्य
Zoneअंचल
Divisionमंडल
Categoryश्रेणी
Work Typeकार्य का प्रकार
S. No.क्र. सं. Name of Workकार्य का नाम Date of Startकार्य आरम्भ करने की तिथि Date of Completionकार्य समाप्त करने की तिथि Cost
(In Lac)
Expenditure
(In Lac)
Progress Agency Status Viewदेखें
1 Providing Fire Fighting Arrangement in Various Govt. School Building in Delhi under Circle M-15 04/05/2010 28/02/2012 74986380.00 Royale Meridian (India ) Pvt. Ltd. Detail Report
Graph / Photo
2 Renovation of Cold Storage Room of Drug Store at MRD Block at GTB Hospital, Shahdara, Delhi 08/11/2017 29/08/2019 77700.00 M/s L&T Ltd. Not pertain to this office Detail Report
Graph / Photo
3 Construction of New Block For Medicine, Maternity And Advanced Pediatric Centre ( Composite Steel plus RCC framed 2B plus G plus 22 Storyed building At LN Hospital including internal water supply, Sanitary installation, External Development works, Dr 04/11/2020 03/05/2023 46552.58 5633.39 (Aug'22) 0.00 (Aug'22) Swadeshi Civil Infrastructure Pvt. Ltd., 302, DLF Tower B Jasola, New Delhi-110025 Steel coloum erection of 6th floor completed. Raft foundation work is in progress in LN 2 tower. Slab casting work in part area of LN2 is in progress. C.C. Block work is in progress at G.F. Detail Report
Graph / Photo
4 Repairing of fire alarm system installed at Lawyers chamber block 3 28/02/2020 27/03/2020 27388.89 Ekta Enterprises Detail Report
Graph / Photo
5 Construction of Hospital at Madipur, New Delhi 11/11/2020 10/11/2022 26970.58 2529.24 (Aug'22) 0.00 (Aug'22) Ramacivil India Construction Private Limited 95 % of 10th floor slab is completed. Masonary and finishing work is in progress at lower basement, upper basement, ground floor to 7th floor is in progress. Detail Report
Graph / Photo
6 Construction of Hospital at Jwalapuri, New Delhi 07/08/2020 06/08/2022 26950.37 2432.22 (Aug'22) 0.00 (Aug'22) Parnika Commercial and Estates Pvt. Ltd. RCC of terrace floor slab is in progress. Masonary work in 7th & 8th floor is in progress. Finishing work such as tile work, granite work etc. is in progress on 1st floor & 4th floor. Detail Report
Graph / Photo
7 REWIRING/REPAIRING OF ELECTRICAL ACCESSORIES IN TOILETS AT VARIOUS DELHI GOVT. SCHOOL 09/08/2017 09/11/2019 23127.43 NKG Infrastructure Limited Detail Report
Graph / Photo
8 Construction of Pucca School Buildings (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Govt. School Desu Colony (DTL) Janakpuri New Delhi (Package - 4). SH : Civil & Electrical work. 15/05/2021 14/05/2022 7689.40 1640.86 (Jul'22) 0.00 (Jul'22) B. L. INFRA PROJECTS PVT. LTD.

(i) DUAC approval :- Not required. (ii) Fire NOC :- Received. (iii) Local Body approval :- Case submitted for Local Body approval in SDMC. Final approval still awaited. (iv) Structure done.(v) Overhead tank done.(vi) MP Hall truss done.(vii) 4th floor plaster work & Brick work done & parapet wall done.(viii) 3rd kota stone & vitrified tile flooring work done & 4th floor class room kota flooring done, corridor tile flooring done.(ix) 5 Nos. Staircase granite work done.(x) Stilt, 1st & 2nd, 3rd floor toilet work done.(xi) Block-A & B Koba treatment done.(xii) Lift structure 2 nos. done.(xiii) GRC tile work done.(xiv) 1st, 2nd, 3rd & 4th floor corridor tile done.(xv) Heat resistant tile work done on terrace.(xvi) External development in progress.(xvii) Fixing of doors & windows in progress.(xviii) Painting & finishing work in progress.(xix) Lift installation in progress. (xx) Staircase S. S. railing work in progress. (xxi) MP Hall false ceiling & wall acoustic work in progress.

Detail Report
Graph / Photo
9 Construction of Pucca School Buildings (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at GGSSS No. 2 Uttam Nagar, New Delhi (Package - 4). SH : Civil & Electrical work. 15/05/2021 14/05/2022 7689.40 159.56 (Mar'22) 0.00 (Mar'22) M/S B L Infrastructure Projects Pvt.Ltd

(i) DUAC approval :- Not required.(ii) Fire NOC :- Received dated 11.02.2022. (iii) Tree transplantation permission :- received.(iv) Local Body approval :-Case submitted for Local Body approval in SDMC. Final approval still awaited. (v) Block-A - 4th floor slab done. Top floor slab in progress. (vi) Block-A - 3rd floor brick work done & 4th floor brick work in progress. (vii) Block-A - 2nd floor plaster done & 1st floor plaster in progress. (viii) Block-A - 1st floor kota stone work in progress. (ix) Block-B - 4th floor slab done. Top floor slab in progress. (x) Block-B - 2nd floor brick work done & 3rd floor brick work in progress. (xi) Block-B - 1st floor plaster done & 2nd floor plaster in progress. (xii) Block-C - 3rd floor slab done. 3rd to 4th floor column done & 4th floor slab in progress. (xiii) Block-C - 1st floor brick work done & 2nd floor brick work in progress. (xiv) Block-C - Stilt floor plaster done & 1st floor plaster in progress.

Detail Report
Graph / Photo
10 Construction of Pucca School Building (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Kohat Enclave, New Delhi (Package - 4). SH : Civil & Electrical work. 15/05/2021 14/05/2022 7689.40 7.22 (Aug'22) 0.00 (Aug'22) B. L. INFRA PROJECTS PRIVATE LIMITED

(i) DUAC approval :- Not required. (ii) Fire NOC :- Received. (iii) Local Body approval :- Received. (iv) On dated 26.06.2021, it was directed by Hon'ble Deputy Chief Minister of Delhi and Hon'ble Minister of PWD to hold the work and proposed Sports facility at Kohat Enclave. Now, Chief Engineer (Projects) vide letter No. 23(42)/22/CE(Projects) /PWD/West/292(E) dated 18.04.2022 directed to resume the construction work of school at Kohat Enclave on direction of Education Department.(v) Block-A 1st floor slab done. (vi) Block-A 1st floor to 2nd floor column reinforcement in progress. (vii) Block-B 1st floor slab casting done. (viii) Block-B 1st floor to 2nd floor column done. (ix) Block-B 2nd floor slab in progress. (x) Block-C 1st floor & 2nd floor slab done. (xi) Block-C 2nd to 3rd floor column in progress. (xii) Block-C ground floor brick work in progress.

Detail Report
Graph / Photo
11 Construction of Pucca School Building (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and comprising with complete site development, RWHS, STP, Tubewell, Gen Set, PA System etc. at Ladpur Village, New Delhi (Package - 7) 18/07/2021 17/07/2022 6988.57 91.22 (Aug'22) 0.00 (Aug'22) A. K. Mehta & Co.

Work is in progress.

Detail Report
Graph / Photo
12 Expansion and Remodelling of Aruna Asaf Ali Govt. Hospital at Rajpur Road, New Delhi. 10/08/2019 03/08/2020 3730.52 221.06 (Jul'22) 0.00 (Jul'22) Labotek work in progress by M/s Labotk Detail Report
Graph / Photo
13 E & M works relating to all day to day operation & maintenance, A/R & M/O Works & Special Repair Works etc 27/05/2022 26/05/2024 3516.35 Swastik Electrotech Pvt. Ltd. Detail Report
Graph / Photo
14 Providing Manpower services of Clericals, Drivers, Multitasking and Staff (Un-skilled, Semi – skilled, Clerical and Non- Technical Supervisory Staff) in various offices under the jurisdiction of office of Pr. Chief Engineer (Project), SE Health-I, SE Health-II, SE (Elect.) and all Divisions under Health Zone for the years of 2022-2023 & 2023-2024 04/05/2022 02/05/2024 3031.48 288.64 (Jul'22) 0.00 (Jul'22) RAKSHAK SECURITAS PVT. LTD.

work completed

Detail Report
Graph / Photo
15 Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Dariyapur Kalan, Delhi 30/05/2020 29/05/2021 2936.58 1617.06 (Jun'22) 61.00 % (Jun'22) Tewatia Construction Pvt. Ltd. Structure work completed. Partition work with bricks in progress. Tile, plaster and granite work is in progress. Truss work of MP Hall completed. Clading work with Dholpur sand stone in progress. Plumbing work is in progress. Coba work on terrace is in progress. Construction of UG tank is in progress. Detail Report
Graph / Photo
16 Remodelling of 94 nos. Delhi Govt. Dispensaries to Polyclinics. SH - Remodelling of 20 nos. DGD at various places in constituencies of District North of Delhi i/c Water supply, Sanitary, Elec installations, AC, Fire fighting system etc. (Package-I). 05/12/2018 31/07/2019 2935.52 0.00 (Aug'19) 55.00 % (Aug'19) Sh. Kamal Singh Work in progress Detail Report
Graph / Photo
17 Construction of DTC Bus Depot in resettlement colony at Sawada Ghevra, Delhi 05/04/2022 04/12/2022 2915.78 0.83 (Aug'22) 0.00 (Aug'22) SVK Infrastructures Tender for the work invited and work awarded on 04.03.2022. Letter of commencement issued on 05.04.2022. Site clearing, leveling work completed. Foundation work of retaining wall has started.. Detail Report
Graph / Photo
18 SITC and CAMC of CCTV System in Delhi Govt. Schools. SH- Providing and Maintenance of Internet lease line Connection. 17/08/2019 16/02/2020 2691.32 Reliance Jio Infocomm work for installation of CCTV camera in 574 nos. school building is provisionally completed and testing of lease line i/c replacement of Hardware work is in progress. Detail Report
Graph / Photo
19 Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Libaspur, Delhi 30/05/2020 29/05/2021 2653.59 2197.38 (Jun'22) 62.00 % (Jun'22) Tewatia Construction Pvt. Ltd. Structure work completed. Brick work and plastering work completed in Part-A, B, C, D and in Part -E is completed. Boundary wall work, granite work, tile works, CPVC & CI work in toilet is in progress. Clading work with Dholpur sand stone in progress. Detail Report
Graph / Photo
20 Co 136 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 1 20/01/2019 16/09/2019 2420.66 2902.11 (Aug'22) 0.00 (Aug'22) M C Constructions Company Work in Progress. Detail Report
Graph / Photo
21 Renovation / Development work in Building for Education Department at Boulverd Road, Delhi 07/04/2022 04/08/2022 1842.64 230.97 (Jun'22) 0.00 (Jun'22) DND Infra Private Limited Piling and pilecap work is completed. Casting of UG tank footing and wall completed. Construction of guard room and LT panel room completed in all respect. MS louvers and HPL work on main building is in progress. Framing for glazing and ACP work in Cafetaria in progress. UPVC window work is 70% completed. False ceiling and wall lining work in officers rooms in progress. Development work like road, placing of kerb stone and saucer drain in progress. Detail Report
Graph / Photo
22 Providing Manpower services of Clericals, Drivers, Multitasking and Staff (Un-skilled, Semi -skilled, Clerical and Non- Technical Supervisory Staff) in various offices under the jurisdiction of Health Maintenance Zone, PWD 03/04/2019 02/04/2021 1625.72 RAKSHAK SECURITAS PVT. LTD. Detail Report
Graph / Photo
23 Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at GSSS (Co ed) at Rana Pratap Bagh, Delhi 30/05/2020 29/05/2021 1335.04 1142.74 (Aug'22) 0.00 (Aug'22) The Krishna Construction Co. Structure work of building completed, Plaster work & brick completed. Water proofing work completed, Granite work and tile work completed. Toilet fittings, C.I. Work, CPVC work completed, painting work is in progress. False ceiling, SS work and Boundary wall work in progress. Aluminium work and Clading work with Dholpur sand stone in progress (65% completed). Detail Report
Graph / Photo
24 Civil works relating to day to day maintenance, A/R & M/O Works & Special Repair Works 10/05/2022 08/05/2024 1313.79 64.67 (Aug'22) 0.00 (Aug'22) Raghav Engineers

work completed

Detail Report
Graph / Photo
25 C/o 44 nos. (G Plus 3) SPS equivalent classroom including 2 nos staircase, 4 toilet blocks, 1 lift & 3 nos stilt at Govt. Girls Sr. Sec School, West Jyoti Nagar, Delhi & 36 nos. (G Plus 3) SPS equivalent classroom including 3 nos staircase, 4 toilet blocks & 2 nos stilt at Govt. Co-Ed. Middle School, East Rohtash Nagar School, Delhi including internal & external water supply, sanitary installations, electrical installations, development of site, boundary wall, UGR, RWH & Fire Fighting system etc 07/03/2022 30/01/2023 1246.96 K. L. ARORA & SON Work foreclosed due to not handing over the site vide date 28.06.2022 Detail Report
Graph / Photo
26 Running operation of lifts 06/05/2021 05/05/2024 909.76 Guruji Elevator Detail Report
Graph / Photo
27 Video projection system 19/09/2013 18/12/2013 908.00 Saga Infosolution Pvt. Ltd completed Detail Report
Graph / Photo
28 Construction of 144 Nos Temporary Courtroom in the existing court complexes of Saket Stilt plus G plus 3 Tis Hazari Stilt plus G plus 3 and Karkardooma G plus 4 Delhi Sub Head Providing and Placing Factory made Furniture 25/05/2020 23/07/2020 905.33 M/s Rajdhani Furnitures Pvt. Ltd. Work is in progress Detail Report
Graph / Photo
29 Comprehensive Consultancy Services for Planning, Designing and Development of New Campus of Ambedkar University Delhi (PHASE-I Works) at Dheerpur, Delhi-110009. 05/09/2019 04/09/2025 720.00 0.00 (Sep'20) 2.00 % (Sep'20) ARCOP ASSOCIATES PVT. LTD. EFC approved the proposal on 10.05.2022. Case to be put up in Cabinet. Detail Report
Graph / Photo
30 Comprehensive Consultancy Services for Designing and Development of Hospitals at Madipur, Sarita Vihar, Hastsal and Jwalapuri, Delhi. 17/11/2018 16/01/2022 720.00 22.36 (Aug'22) 0.00 (Aug'22) ARCOP ASSOCIATES PVT. LTD. Work is under progress. Detail Report
Graph / Photo
31 Comprehensive Consultancy Services for Planning, Designing and Development of New Campus of Ambedkar University Delhi at Sector 3, Rohini, Delhi 110085 05/09/2019 04/09/2025 720.00 0.00 (Sep'20) 2.00 % (Sep'20) SIKKA ASSOCIATES REGD. EFC approved the proposal on 10.05.2022. Case to be put up in Cabinet. Detail Report
Graph / Photo
32 C/o East Delhi Campus of Guru Gobind Singh Indrasprastha University at Surajmal Vihar, Shahdara, Delhi. (SH: Supplying, Installation, Testing and Commissioning of Grid Interactive roof top solar photo voltaic power generation system). 28/08/2020 23/02/2021 680.89 293.42 (Feb'21) 0.00 (Feb'21) Uneecops Technologies Ltd. Foundation work and frame work for the solar panel is in Girls Hostel and Teachers Hostel & Sports Hall is completed, Cable Laying work & Installation of String invertor is in progress. Installation of solar PV module A, B & Sports is in progress. Detail Report
Graph / Photo
33 Re laying of World Athletics approved 400 Mtr. synthetic athletic track at Chhatrasal Stadium, Delhi 26/03/2022 24/07/2022 679.06 ADVANCED SPORT TECHNOLOGIES LLP Work in progress Detail Report
Graph / Photo
34 E & M works relating to day to day operation & maintenance, A/R & M/O Works & Special Repair Works 26/05/2022 25/05/2024 619.38 H. N. TRADERS & ENGINEERS Detail Report
Graph / Photo
35 Upgradation/Renovation of one staff room in each 951 schools, Civil and Electrical work (SH- Staff rooms 75 no. under south Building Maintenance Division). 14/03/2019 13/09/2019 610.61 221.28 (Mar'21) 0.00 (Mar'21) S.M. Builders work in progress Detail Report
Graph / Photo
36 RMO Electrical and Mechanical services installed at Delhi Sachivalya, New Delhi. (SH Maintenance and Operation of E and M services at Delhi Sachivalaya, New Delhi) 13/07/2017 12/07/2020 540.00 Swastik Electrotech Pvt. Ltd. Detail Report
Graph / Photo
37 Renovation / construction works at Rajiv Gandhi Stadium, Bawana 07/07/2022 04/11/2022 535.01 M/s Vinod Kumar & Company Detail Report
Graph / Photo
38 (SH: Providing Sub-station Equipments). 14/12/2012 13/10/2013 525.00 Reliance Elektrik works WORK COMPLETED FINAL PAYMENT TO BE MADE Detail Report
Graph / Photo
39 Running and Maintenance of lifts installed in residential and non-residential buildings at GTB Hospital complex, Shahdara, Delhi Sub Head Running operation of lifts 17/01/2019 16/01/2021 485.43 Guruji Elevator Work in progress 3RD RA 40220380 Detail Report
Graph / Photo
40 Construction of Boundary Wall and other basic work for establishing of Driving training Institute in Village Malikpur Dist. South West, Delhi 25/01/2022 24/05/2022 435.79 123.58 (Jul'22) 0.00 (Jul'22) M/s Satish Builders Earth & foundation work is in progress.... Detail Report
Graph / Photo
41 Providing Manpower services of Clericals, Drivers, Multitasking and Housekeeping Staff (Unskilled, Semi skilled, Clerical and Non-Technical Supervisory Staff) in various offices under Higher Education Projects, PWD 21/11/2021 20/11/2023 433.86 Shri Krishna Constructions Physical progress of the work is 30%. Detail Report
Graph / Photo
42 Pdg A/C system 26/07/2009 25/12/2009 382.52 Voltas Ltd. completed Detail Report
Graph / Photo
43 Comprehensive Maintenance and Operation of Trauma Block, New Ward Block, OT, Gynae, Old Ward Block, Doctors and Nurses Hospital and Residential Complex Lifts at DDU Hospital, Hari Nagar, New Delhi (SH Operation of Lifts) 30/04/2019 29/04/2021 355.16 Guruji Elevator Detail Report
Graph / Photo
44 Comprehensive maintenance of Civil works at Guru Gobind Singh Govt. Hospital, Raghubir Nagar, Delhi and Rao Tula Ram Memorial Govt. Hospital, Jaffarpur Kalan, Delhi P.W.D. (GNCTD), New Delhi for 2 years 2021-22, 2022-23. 23/05/2022 21/05/2024 343.73 Aliyan Constaruction Company Work is under progress. Detail Report
Graph / Photo
45 comprehensive architetural consultancy services for construction of multistoried EWS Houses for Slum Dwellers at Bhalaswa, Jahangir Puri, Phase-I, New Delhi 04/04/2021 03/04/2024 335.09 Invalid Design Forum International Recently fund from DUSIB has been received. Presentation was made to the hon'ble Minister on 23.01.2021. Formal approval from ministry is awaited. DUSIB had intimated that Hon'ble Chief Minister of Delhi desire to hold on the work till further orders. Detail Report
Graph / Photo
46 Up gradation of one staffroom in 86 Nos. Schools under South-East Building Maintenance Division, Hauz Khas, New Delhi during 2018-19. (Civil and Electrical work). 23/03/2019 22/09/2019 329.84 63.81 (Aug'20) 0.00 (Aug'20) S. P. CONSTRUCTION COMPANY Work in progress Detail Report
Graph / Photo
47 1. RMO of Central AC Plant at A BlockGIPMER2. RMOof Central AC Plant B BlockGIPMERSH Operation and Comprehensive maintenance of Blue Star Make Central AC Plant 11/09/2019 10/09/2021 306.35 40.88 (Apr'20) 0.00 (Apr'20) Blue Star Limited work in progress and 2nd R/A paid to M/s Blue Star Ltd. Detail Report
Graph / Photo
48 Comprehensive maintenance and operation of UPS and CVCF systems 26/01/2022 25/01/2024 305.92 ARECA TECHNOLOGIES Detail Report
Graph / Photo
49 Running operation and comprehensive maintenance of online UPS, TVSS, APFF, PAC and Isolation transformer of different capacity installed at RGSS Hospital, Tahirpur, Delhi 26/01/2022 25/01/2024 296.84 24.74 (Jul'22) 0.00 (Jul'22) ISSAR INDUSTRIES Detail Report
Graph / Photo
50 RMO of various Electrical and Mechanical services at District Court Rohini, Delhi. dg. 2021-22 05/05/2022 04/05/2023 293.17 Swastik Construction Co. Detail Report
Graph / Photo
51 Consultancy Services for Comprehensive Architectural and Engineering Planning and Designing for Construction of New Hospital at Siraspur, New Delhi (Recall) 04/09/2019 03/09/2022 267.00 Design Associates Inc. work in progress Detail Report
Graph / Photo
52 Comprehensive architectural consultancy services for Construction of Pucca School of Specialized Excellence (SoSEs) Buildings (G Plus 3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Civil Lines, Global School INA & Library Building at Zeenat Mahal (Package-B) 29/07/2022 28/07/2023 224.75 Design Accord Consultant Tender under process Detail Report
Graph / Photo
53 Providing Data Entry Operator/Computer Operator, Multitasking and office Staff in various offices under Chief Engineer (OP), PWD, GNCTD, New Delhi 02/11/2021 01/11/2023 218.21 34.99 (Aug'22) 0.00 (Aug'22) M/s DA Construction Co. The work is in progress Detail Report
Graph / Photo
54 Renovation of school building and Multipurpose hall (Composite work Civil & Electrical) 22/05/2022 21/01/2023 217.86 44.06 (Aug'22) 0.00 (Aug'22) Nafees Ahmed Detail Report
Graph / Photo
55 Upgradation/Renovation of one staff room in each of 73 schools (Morning and Evening Shift) located at (NE) District of Delhi under the jurisdiction of PWD Building Maintenance Division M-222 25/01/2019 24/04/2019 209.29 192.52 (Jan'22) 0.00 (Jan'22) Shyam Sunder Tyagi

work completed

Detail Report
Graph / Photo
56 Providing for installation of fixing of false ceiling and VRF System in New College Building OPD and IPD in Nehru Homeopathic Medical College and Hospital, B-Block, Defence Colony, New Delhi-110024 15/03/2019 14/10/2019 208.35 HILLTOP REFRIGERATION Detail Report
Graph / Photo
57 Operation and comprehensive maintenance of 4 x 400 TR AC Plant and Ductable Air conditioning unit at Delhi Sachivalaya, New Delhi 06/05/2019 05/05/2021 188.87 244.87 (Jan'22) 0.00 (Jan'22) Blue Star Limited Detail Report
Graph / Photo
58 Operation and comprehensive Maintenance of 3 X 300 TR Capacity York Make Chilling units with ancillaries of casualty block at Lok Nayak Hospital, New Delhi 28/09/2019 27/09/2021 188.75 2.32 (Jul'22) 0.00 (Jul'22) G D Enterprises work in progress by GD Enterprise Detail Report
Graph / Photo
59 Comprehensive maintenance of Blue star make central AC Plant 14/06/2022 13/06/2024 187.29 Blue Star Limited Detail Report
Graph / Photo
60 C/o Extention of Maulana Azad Dental Institute of Dental Sciences, phase-II at Bahadur Shah Zafar Marg, New Delhi (SH: Providing Audio-Visual System & Stage Lighting System including 5 Years Comprehensive Maintenance) 27/07/2019 26/11/2020 184.85 HITECH AUDIO SYSTEMS PVT LTD

work in progress by agency

Detail Report
Graph / Photo
61 RMO UPS system installed at 2nd floor 4th floor and 6th floor Casualty Block Gynae Block Ward 14 Genetic Lab OT Block and New OPD Block at L.N. Hospital New Delhi. SH Comprehensive annual maintenance of Schneider Electric APC Make UPS system install 15/06/2019 14/06/2022 183.90 34.22 (Oct'19) 0.00 (Oct'19) Labotek work in progress by M/s LABOTEK ( Detail Report
Graph / Photo
62 Construction of Additional 13 nos Class rooms over existing G plus 1 SPS structure with Prefabricated fibre reinforced sandwich panel including electrical installations at BCP SKV, Babarpur, Delhi 27/05/2022 24/08/2022 183.58 68.58 (Aug'22) 0.00 (Aug'22) Ram Krishan Yudhister Prakash The renovation/ upgradation work has started at Joshi Colony. Boundary wall, flooring, grill, window/door in progress. Detail Report
Graph / Photo
63 Annual Comprehensive Maintenance of Online UPS and its accessories 23/10/2021 22/10/2024 177.62 power house Detail Report
Graph / Photo
64 Structural strengthening of RCC slab, Beam, Column and Fins of remaining portion of building (Phase-II part area) 25/09/2021 23/03/2022 165.91 21.87 (Jun'22) 0.00 (Jun'22) Cembond Construction Pvt. Ltd Work is under progress. Detail Report
Graph / Photo
65 Design, Supply, Installation, Testing and Commissioning of High-Mast type Sport lighting system for Athletic cum football Ground at East Vinod Nagar Sports Complex, East Delhi as per IAAF/FIFA standards) 06/08/2018 05/12/2018 165.26 Lighting Technologies Pvt. Ltd. Detail Report
Graph / Photo
66 Comprehensive Consultancy Services (Balance Services) for Designing and Development of Buildings under Stage-1 of Phase-II of Delhi Technological Universityat Bawana Road, Delhi 05/05/2018 04/11/2022 159.42 15.94 (Jul'22) 0.00 (Jul'22) Suresh Goel & Associates Work is in progress. Detail Report
Graph / Photo
67 Comprehensive maintenance and operation and augmentation of existing LAN Communication System (Active and Passive) and Voice Communication System installed at RGSS Hospital Tahirpur, Delhi 07/01/2022 06/02/2023 155.31 28.79 (Jun'22) 0.00 (Jun'22) Tracom Enterprises Detail Report
Graph / Photo
68 SITCofcentr.med.grade compr air sys semi dry suction sys with amalgam separ incl5yr Comp. maint 25/02/2020 24/05/2020 154.81 Villa India

work in progress by agency

Detail Report
Graph / Photo
69 Supplying and replacement of existing passenger lifts at Tis Hazari Court Complex, Delhi. 22/04/2017 21/08/2017 146.38 36.20 (Mar'22) 0.00 (Mar'22) Johnson Lifts Pvt. Ltd. Court Authority has directed to work for replacement of one lift at a time Detail Report
Graph / Photo
70 Renovation of Mud Houses, Open Dining Hall and Tin Sheds 15/07/2018 14/11/2018 143.58 162.50 (Mar'21) 0.00 (Mar'21) Aliyan Constaruction Company

work completed

Detail Report
Graph / Photo
71 Up-gradation / Modification of Zakhira Underpass Pump House, Inderlok, Delhi under PWD NWED Delhi 22/03/2022 21/07/2022 142.36 102.87 (Jun'22) 0.00 (Jun'22) HST Enterprises Detail Report
Graph / Photo
72 RMO 2000/1600/1500 KVA capacity Andrew Yule make HT AVR installed at Sub-station No. 1 2 3 and 4 L.N. Hospital New Delhi. SH Comprehensive maintenance of 2000 KVA 1600 KVA and 1500 KVA HT AVR Andrew Yule make at sub station No. 1 2 3 and4 L.N. Hospit 28/01/2020 27/01/2023 142.09 20.26 (Apr'22) 0.00 (Apr'22) Harsh India Enterprises Work in progress by Harsh India Enterprises Detail Report
Graph / Photo
73 Operation and Maintenance of CCTV System installed at Casualty Block, Gynae Block and Special Ward Block at L.N. Hospital, New Delhi. SH Operation and Comprehensive Maintenance of Bosch CCTV System at Casualty Block, Special Ward Block and Gynae Bloc 12/03/2017 11/03/2020 137.15 41.78 (Sep'19) 0.00 (Sep'19) HITECH AUDIO SYSTEMS PVT LTD Work in Progress Detail Report
Graph / Photo
74 Reconstruction of school boundary wall with grill, Replacement of roofing with Profile sheet in MP Hall, Entrance Hall and staff room, Installation of rainwater harvesting system at Sarvodaya Bal Sr. Sec. School, Qutub Mehrauli, New Delhi--- 11/07/2018 10/01/2019 133.28 41.85 (Dec'20) 0.00 (Dec'20) Aliyan Constaruction Company work in progress Detail Report
Graph / Photo
75 Repair of bathing ghats, manhole and chambers/sewerline providing shed and toilet block renovation at CPMF site. 17/08/2018 16/12/2018 128.86 69.59 (Aug'20) 0.00 (Aug'20) Nafees Ahamed

work completed

Detail Report
Graph / Photo
76 (1) Operation & Maintenance of OTIS make lifts installed at MRD Block, L.N. Hospital, New Delhi. (2) Operation & Maintenance of OTIS make lifts installed at B.L. Taneja Block, L.N. Hospital, New Delhi. (3) Operation & Maintenance of ECE & Olympus make lifts installed at MAIDS, New Delhi (4) Operation & Maintenance of Johnson make lifts installed at New Orthopedic Block of L.N Hospital, New Delhi.(SH - Operation of lift installed at various locations in hospital complex). 14/11/2017 13/11/2019 128.68 146.66 (Oct'19) 32.18 % (Oct'19) Akash Enterprises work in progress. Detail Report
Graph / Photo
77 Special Repairs to vacated and unpopular quarters in PTS colony, Malviya Nagar, New Delhi. 11/07/2018 10/01/2019 125.28 78.33 (Sep'20) 0.00 (Sep'20) Puran Chand and Sons work in progress Detail Report
Graph / Photo
78 Construction of 05 Nos. new classrooms, replacement of old damaged windows of classrooms, construction of new ramp for CWSN students & teachers, demolition of unserviceable stairs and shotcreting work in Sarvodaya Bal Vidyalaya No. 1 (Urdu Medium) at Jama Masjid, Delhi School ID-2127002 14/02/2022 13/08/2022 117.52 203.07 (Jul'22) 0.00 (Jul'22) KAMAAL CONSTRUCTION CO. Detail Report
Graph / Photo
79 C/o Extention of MADI of Dental Sciences,Ph-II at Bahadur Shah Zafar Marg,ND.SH SITCof Medical Gas Pipeline System including 3 Years Comprehensive Maintenance 12/08/2019 09/11/2019 115.37 Med Freshe Pvt. Ltd. work in progress by Med Freshe Pvt. Ltd Detail Report
Graph / Photo
80 Routine Maintenance of EI and Fans including RMO Pumpset & DG Set 01/06/2022 31/05/2023 113.64 GLOBAL ENTERPRISES Detail Report
Graph / Photo
81 RMO various electrical and mechanical services (internal and external) at Deep Chand Bandhu Hospital Kokiwala Bagh Ashok Vihar New Delhi SH Annual Comprehensive maintenance of 4 x 200KVA UPS 21/10/2019 20/10/2022 111.48 power house Detail Report
Graph / Photo
82 Replacement of 13 passenger lifts installed at MSO Building, New Delhi 26/09/2017 25/05/2018 107.28 Johnson Lifts Pvt. Ltd. work in progress Detail Report
Graph / Photo
83 Supply, Installation, Testing & Commissioning of UVSS (Under Vehicle Surveillance System) along with Automated License Plate reader, Driver Photo module at Rouse Avenue Court New Delhi. 21/05/2022 19/06/2022 106.22 80.05 (Jul'22) 0.00 (Jul'22) Vehant Technologies. Pvt. Ltd. Work in progress Detail Report
Graph / Photo
84 Up-gradation and enhancement of old Sub Station equipments at JPCH, Shastri Park, Delhi 28/03/2022 27/07/2022 100.63 SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. Detail Report
Graph / Photo
85 Comprehensive maintenance of carrier make central AC plant 28/11/2021 27/11/2023 97.83 62.96 (Jul'22) 0.00 (Jul'22) G D Enterprises Detail Report
Graph / Photo
86 Annual maintenance and servicing, repairing of 1000KVA DG Sets with Cummins make Engine 04/05/2022 03/05/2023 96.12 M/s Shri Durga Electricals Detail Report
Graph / Photo
87 RMO of HT AVR in A-Block, B-Block C-Block & D Block at GIPMER New Delhi (Comprehensive maintenance of 1500 KVA 2000 KVA and 750 KVA HT AVR Andrew yule make at Sub station No. 1, 3 & 5) 18/12/2021 17/12/2024 95.89 Harsh India Enterprises Detail Report
Graph / Photo
88 Civil Work and Electrical Work in Mangolpuri, Sultanpuri, Kirari, Shakurbasti, Rohini, Rithala, Tri Nagar, Shalimar Bagh, Keshav Puram and Wazirpur Total 17 Nos. Schools of NWB (Remaining Work) (Composite Work Civil and Electrical) 08/04/2022 07/07/2022 95.69 50.03 (Jul'22) 0.00 (Jul'22) Rohit Kumar Detail Report
Graph / Photo
89 Running operation and annual maintenance of the sub-station, DG Sets, E and M service, Fire Fighting and Fire Alarm, RO Plant and Pumps House at RGSS Hospital, Tahirpur, Delhi 06/07/2019 05/07/2020 94.43 GLOBAL ENTERPRISES work in progress 6th RA 18182135 Detail Report
Graph / Photo
90 Annual Comprehensive Maintenance of RO,Hot & Cold Water Dispensers of ATSIN make Under sub division-V HMED(C) 27/05/2022 26/05/2025 93.66 57.96 (Jul'22) 0.00 (Jul'22) AADITYA ENVIRO INDIA PVT.LTD Detail Report
Graph / Photo
91 Providing consultancy services for comprehensive planning and designing of construction of school building at various locations in Delhi. Dwarka Sector-12 (2) Dwarka Sector-1, Pocket-5 (3) Dwarka Sector-18 (4) Dwarka Sector-19 (Phase-I) (5) Dwarka Secot-16 (6) Dwarka Sector-11 (Package-A) 29/11/2017 28/03/2019 93.50 Design Forum International

work in progress

Detail Report
Graph / Photo
92 SITC of 2 Nos. 315 KVA Electrical Compact Substation at SCERT Building,Varun Marg Defence Colony, New Delhi) (Civil and Electrical Works) 02/05/2022 01/09/2022 92.47 KAUSHIK DIESEL GENERATOR Detail Report
Graph / Photo
93 A/R and M/O to Residential Buildings & Non Residential Buildings under PWD, North-West Building Delhi during 2021-22 SH: Mechanized cleaning of underground /overhead RCC/PVC Water Storage tanks. 09/08/2021 08/08/2022 91.40 25.38 (Feb'22) 0.00 (Feb'22) ROYAL CONSTRUCTION Detail Report
Graph / Photo
94 Enhancement of LT Supply to HT Supply with 630 KVA Substation at A&U Tibbia College and Hospital, Karol Bagh, New Delhi. 05/07/2022 04/10/2022 91.10 Jain Electric Works Detail Report
Graph / Photo
95 Providing Anti Smog Gun Mounted on mobile truck in the Assembly Constituency under Sub Division M-2134 North East Build & Road Division Delhi 05/08/2022 01/01/2023 89.40 Ramesh Chander Detail Report
Graph / Photo
96 Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV RO Systems, Water Dispensers with Inbuilt RO Systems, RO Water Purifiers and Aquaguards 23/12/2019 22/12/2020 87.51 Aditi Enterprises work in progress by Aditi Enterprises Detail Report
Graph / Photo
97 RMO UPS system installed at 2nd floor, 4th floor 6th floor Casualty BlockGynae Block, Ward 14 Genetic Lab OT Block and New OPD Block at L.N. Hospital New Delhi.SH Comprehensive annual maintenance of Emerson Make UPS system installed at Casualty Bl 26/08/2019 25/08/2022 86.20 Labotek work in progress by Labotek Detail Report
Graph / Photo
98 Construction of Extention of Maulana Azad Dental Institute of Dental Sciences, phaseII at Bahadur Shah Zafar Marg, New Delhi.SH Supplying, installation, testing and Commissioning of Modular Operation Theatre 12/08/2019 09/11/2019 83.93 21.56 (Feb'22) 0.00 (Feb'22) MDD Medical System (INDIA) Pvt. Ltd work in progress by MDD Medical System (I) Pvt.Ltd. Detail Report
Graph / Photo
99 Routine Maintenance, Operation of CNG Oil Fired 2.5 TPH B16 3Nos 600kg hr Autoclave Capacity Fire Tube IBR Boiler 01 Nos and Operation of Boilers and Water Softening plant 01/09/2020 31/08/2022 83.64 19.29 (May'22) 0.00 (May'22) Boilermart Work in progress by M/s Boilermart Detail Report
Graph / Photo
100 1 RMO Elect and Mech Services in Lawyers chambers Blk DEFG and H. 2 In KKD Court (Court Block) ACI B and JKL DEFG and H. 3 At UTCS Bldg. SH- Operation and Routine Maint. of EI DG Set Sub Station Fire Fighting Fire Alarm System and Vrs type pump sets. 18/05/2019 17/05/2020 83.16 103.48 (Sep'20) 0.00 (Sep'20) PARASAR Electrical & Refrigeration Detail Report
Graph / Photo
101 Construction of 5 nos Aam Aadmi Mohalla Clinic Primary Health Centres at various places in the jurisdiction of SRD1, PWD, Delhi 04/11/2021 05/02/2022 79.88 33.40 (Jul'22) 0.00 (Jul'22) Y I INFRASTRUCTURE Detail Report
Graph / Photo
102 Providing CCTV Surveillance System in Judges Residence complex O Block at District Court Karkardooma Shahdara Delhi. 07/10/2018 06/02/2019 79.60 21.54 (Dec'19) 0.00 (Dec'19) TECHNOSYS SECURITY SYSTEMS PVT. LTD Detail Report
Graph / Photo
103 RMO of HT AVR in A-Block, B-Block, C-Block D Block at GIPMER, ND Comprehensive maintenance of 1500 KVA HT AVR Andrew yule make at Sub station No. 2 18/02/2022 17/02/2025 78.70 24.11 (Jul'22) 0.00 (Jul'22) Harsh India Enterprises Detail Report
Graph / Photo
104 1 RMO E and M Services in Lawyers chambers Block. 2 At KKD Court Court Block. 3 At UTCS Bldg. Vishwas Nagar Shahdara. SH-Routine Maintenance and Operation of various E and M services. 10/05/2018 09/05/2019 78.60 30.59 (Sep'19) 0.00 (Sep'19) M I Enterprises Detail Report
Graph / Photo
105 Day to Day maintenance and Operation of E and M installations 03/03/2022 02/03/2023 77.90 M/s Krishna Electrical works Detail Report
Graph / Photo
106 Operation and maintenance of lifts in court block & lawyers chamber blocks 04/02/2014 03/02/2015 76.96 A.G. Enterprises Detail Report
Graph / Photo
107 Renovation of MP Hall and Repairing/Replacement of Electrical Installations Flood Light Fitting Air Conditioning PA System etc. at SKV Vivek Vihar Delhi. School ID-1001022 27/09/2018 26/01/2019 76.31 51.34 (Sep'20) 0.00 (Sep'20) Mars Engineers Detail Report
Graph / Photo
108 RMO of Lifts at Dr BSA Hospital Sec 6 Rohini Delhi SH Operation of Lifts 04/12/2018 03/12/2020 75.44 Guruji Elevator Work in progress Detail Report
Graph / Photo
109 Comprehensive consultancy for construction of Additional Academic and Administrative Block at Campus of DPSRU, Sector-3, M.B. Road, Pushp Vihar, New Delhi-110017 27/02/2022 26/10/2023 75.02 DESIGN ACCORD CONSULTANT Consultancy Work in progress. Detail Report
Graph / Photo
110 Comprehensive Maintenance of OTIS Lifts and Escalators 08/05/2022 07/05/2023 74.27 Otis Elevator Company (India) Ltd. Detail Report
Graph / Photo
111 EOR to PTS, Dwarka, New Delhi during 2018-19.(SH- Development of the outer area police station for police training purpose). 23/05/2018 21/07/2018 74.19 26.97 (Jul'18) 60.00 % (Jul'18) Aliyan Constaruction Company work in progress Detail Report
Graph / Photo
112 For Addl work of ducting, grills, celing, diffusers, duct installation & allied items for Air conditioning 21/10/2006 30/09/2007 74.17 Aahram Engrs Work completed Detail Report
Graph / Photo
113 RMO of various Electrical and Mechanical Services (Internal & external) at Prison Complex, Mandoli, Delhi. (SH: Operation & Comprehensive Maintenance of SCADA based water pumping automation system). 07/09/2021 06/09/2022 74.07 26.87 (Jul'22) 0.00 (Jul'22) CONCEPT AND SOLUTIONS work in progress Detail Report
Graph / Photo
114 Renovation for Urology and Renal Transplant Department at (Block 3, 2nd Floor) RGSS Hospital, Tahirpur, Delhi. Sub Head Providing Medical Instruments 17/08/2019 16/11/2019 73.86 MDD Medical System (INDIA) Pvt. Ltd No Payment Detail Report
Graph / Photo
115 Structural failure and threat of loss of property and life at Delhi Archives Building Special Institutional Area during 2017-18. 12/09/2018 11/03/2019 73.82 48.52 (Feb'21) 0.00 (Feb'21) ASLAM BUILDERS work in progress Detail Report
Graph / Photo
116 Providing Services of Computer Operator, MTS etc. under various PWD Offices of North Building Division and office of SA North 01/02/2022 26/01/2023 73.51 25.66 (Jul'22) 0.00 (Jul'22) placement security services Work in progress Detail Report
Graph / Photo
117 Construction of new rooms between old and new building (G+3) floor, C/o lift shaft and raising of boundary wall and fixing of MS grill with concertina coil 11/07/2022 09/10/2022 72.99 ARIF, Jahangirpuri, Delhi Detail Report
Graph / Photo
118 Mechanized Cleaning of over head tank and underground tank 07/08/2021 06/08/2022 72.88 16.19 (Jun'22) 0.00 (Jun'22) UNITECH WATER SLOUTIONS Detail Report
Graph / Photo
119 4250 20/05/2013 19/08/2013 72.78 Varun Gupta & Co. Work foreclosed Detail Report
Graph / Photo
120 Main Work 20/05/2013 19/08/2013 72.78 Varun Gupta & Co. completed Detail Report
Graph / Photo
121 Mechanized Cleaning of over head tank and underground tank 06/08/2021 05/08/2022 71.82 15.67 (Jun'22) 0.00 (Jun'22) UNITECH WATER SLOUTIONS Detail Report
Graph / Photo
122 Comprehensive maintenance of carrier make central AC plant 10/12/2021 09/12/2022 71.68 56.91 (Jul'22) 0.00 (Jul'22) G D Enterprises Detail Report
Graph / Photo
123 Name of work 1 to 6 MOEI Fans and RMO Air- Conditioner, pump set, DG set installed at registrar co-operative societies, old court building, parliament street, New Delhi 07/10/2017 06/10/2018 71.64 17.52 (Aug'19) 0.00 (Aug'19) Parasar Electricals & Refrigeration Detail Report
Graph / Photo
124 1 Govt. Middle School, Sarita Vihar 2 Govt. Sr. Sec. School, Sultanpur 3 Sr. Sec. School, Tehkhand 4 Jonapur-1 5 Jonapur-2 6 RPVV at Sector A, Vasant Kunj Package-C. 20/11/2017 19/01/2018 71.50 42.22 (Oct'21) 0.00 (Oct'21) SPACE DESIGN GROUP work is in progress Detail Report
Graph / Photo
125 Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV/ RO Sys. Water Dispensers with Inbuilt RO Sys RO Water Purifiers 06/10/2020 05/10/2022 71.14 39.10 (Apr'22) 0.00 (Apr'22) Aditi Enterprises Work in progress by M/s Aditi Enterprises Detail Report
Graph / Photo
126 A/R & M/O to various Mohalla Clinics under Sub Division-I, South Building Maintenance (M-422), during 2022-23. 22/06/2022 21/06/2023 70.37 Afjal Construction Detail Report
Graph / Photo
127 Providing various Services for the office of Senior Architect Office, Chief Engineer (North), Superintendent Engineer and O/o Executive Engineer (North West Building) 01/03/2022 28/02/2023 70.14 33.20 (Aug'22) 0.00 (Aug'22) DA Construction Co. Detail Report
Graph / Photo
128 Comprehensive maintenance of buildings including supply of materials and providing service of man power for day to day maint. work of UTCS Complex Employment exchange JJB Court. and others buildins under SD M2312 dg.2021 22 05/02/2022 04/02/2023 69.93 30.24 (Jun'22) 0.00 (Jun'22) RAman KUmar Detail Report
Graph / Photo
129 Renovation of MP Hall i/c Wooden Flooring, Wall Panelling, False Ceiling, up Liftmen of Stage Stepping in Flooring etc. and Electrical Renovation of MP Hall at SCERT Bhawan, New Delhi. (Civil and Electrical Works) 17/03/2022 16/05/2022 69.80 SHRI DATTA KRUPA ENTER PRISES Detail Report
Graph / Photo
130 Construction of Porta Cabin for security officers and outer force near Annexure -II building at Tis Hazari, Delhi (Civil Work) 30/07/2022 27/09/2022 69.57 Jabir Husain Detail Report
Graph / Photo
131 Comprehensive maintenance Supply of materials and providing services of manpower for day to day maintenance work of KKD Court Main Buildings A B C I J K and L Blocks under SD M 2312 dg 2021 22 28/01/2022 27/01/2023 69.22 31.92 (Apr'22) 0.00 (Apr'22) Uma Shankar In Progress. Detail Report
Graph / Photo
132 Comprehensive maintenance, Supply of materials and providing services of manpower for day to day maintenance work of Judge’s Flat Residential Complex at KKD Court under SD M-2311, Delhi during 2021-22 15/01/2022 14/01/2023 68.34 Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 Detail Report
Graph / Photo
133 Comprehensive Maintenance of RO/ Filtration Units 01/04/2022 30/09/2022 68.24 54.77 (Jul'22) 0.00 (Jul'22) M/s Vivek Associates Detail Report
Graph / Photo
134 Sub Head Operation and routine maintenance of HVAC System 4x550TR capacity AC plant, Cold Storage Plant in Old and DEM Building 03/03/2019 02/03/2021 68.17 SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. Work completed Detail Report
Graph / Photo
135 1) RMO various Electrical & Mechanical services installed at Gomukh Tower Kaushambi Ghaziabad (Sub Head:- Operation of EI and fans i/c Compound light, Substation, DG Set, Pumps at Gomukh Tower) 2) MOEI & Fans i/c compound lighting for fire station at Mandawali and Kalyanwas Delhi & RMO pump sets for fire station at Mayur Vihar & Dallupura Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound light, Providing maintenance staff for Mayur Vihar & Dallupura) 3) MOEI & Fans i/c Compound lighting and RMO pump sets for police station at Mayur Vihar Ph-1 & Kalyanpuri Delhi. (Sub Head:- Provding maintenance staff for Mayur Vihar Ph-1 & Kalyanpuri) 4) MOEI & Fans i/c street light sewage & Drinking water pump sets for DA staff quarters at Kalyanvas Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound lightings) 5) MOEI & Fans i/c compound lighting for at VREC at Patpar Ganj Mandawali, Trilokpuri & Kondli Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound Lights). 6) MOEI & fans and RMO Pump sets i/c compound light High Mast lighting at East Vinod Nagar Sport Complex Delhi. During 2018-19(Sh:-Day to Day Maintenance of EI & Fans and compound lights Sports Complex East Vinod Nagar Delhi) 18/03/2019 17/03/2020 67.80 86.50 (Jan'22) 0.00 (Jan'22) Krishna Electreical Works Detail Report
Graph / Photo
136 Structural Strengthening to slab beam and column 09/02/2022 09/05/2022 67.79 20.01 (Jun'22) 0.00 (Jun'22) Cembond Construction Pvt. Ltd Detail Report
Graph / Photo
137 RMO of Substation in A-Block and BBlock at GIPMER, New Delhi SH Comprehensive Maintenance of HT AVR 06/01/2018 05/01/2020 67.10 69.65 (Sep'19) 77.93 % (Sep'19) Harsh India Enterprises Work in progress. Detail Report
Graph / Photo
138 Repair and Maintenance of various AAMC and other buildings under North East B&R division dg. 2022-2023. 05/06/2022 04/06/2023 66.46 GEE Internationals Detail Report
Graph / Photo
139 Mechanized Cleaning of over head tank and underground tank. 08/07/2020 07/07/2021 65.99 45.24 (May'22) 0.00 (May'22) UNITECH WATER SLOUTIONS Detail Report
Graph / Photo
140 Renovation of Public Toilet of Rohini Court Complex, Sub Head- Renovation Work in 32 Nos. Public Toilet (16 Men and 16 Women) at all Four Ramp Side from Ground Floor to Third Floor. (Modified) 01/04/2022 30/09/2022 65.77 Jeetender Kumar Verma Detail Report
Graph / Photo
141 Augmentation of existing Sub Station and allied equipments at Delhi Archive Building, Qutub Institutional Area, New Delhi. 14/07/2018 13/01/2019 65.58 67.81 (Jun'19) 75.00 % (Jun'19) Dubey Electric Works Detail Report
Graph / Photo
142 Internal and External Finishing Repair of Chajjas Re-Casting of Terrace Reconstruction of Balcony of Police Quarters Type-2 Block No.17 and 19 Other Misc Works (Composite Work Civiland Elect) 06/01/2022 05/07/2022 65.41 10.51 (Jul'22) 0.00 (Jul'22) Jitender Singh Detail Report
Graph / Photo
143 1 RMO Vrs E and M services installed at O Blk Rsdl Court complex KKD. 2 At Juvenile Justice Board Delhi. SH- Operation of EI and fans and water supply pump sets Lifts Fire Fighting and Fire Alarm System PA System DG Set and CCTV Surveillance System 01/10/2018 24/09/2020 64.13 65.84 (Jun'21) 0.00 (Jun'21) A G ENTERPRISES Detail Report
Graph / Photo
144 Renovation of MP Hall i/c Wooden Flooring, Wall Panelling, False Ceiling, up Liftmen of Stage Stepping in Flooring etc. & Electrical Renovation of MP Hall at SCERT Bhawan, New Delhi). (Civil & Electrical Works) 16/06/2022 15/08/2022 63.93 M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 Detail Report
Graph / Photo
145 Construction of 4 nos. Aam Aadmi Mohalla Clinic (Primary Health Centres) at various places in the jurisdiction of SRD Project Division-2, PWD, Delhi. (Civil & Electrical Work) 01/06/2022 27/11/2022 63.68 R K Construction Co. Detail Report
Graph / Photo
146 A/R M/O various Mohalla Clinics under jurisdiction of North West Building-II during 2021-22 SH: Carrying out various civil works arises during day to day maintenance 26/07/2021 25/07/2022 63.23 SUSHIL KUMAR Detail Report
Graph / Photo
147 Operation and routine maintenance of E.I, D.G. Set, Sub Station, Fire Fighting, Fire Alarm System and Various type Pump Sets during 2021-22 22/10/2021 29/10/2022 62.92 43.13 (Jun'22) 0.00 (Jun'22) Ele Mec Engineering Co. Detail Report
Graph / Photo
148 (Upgradation of existing building and other misc repair works) 2nd call 10/03/2019 09/06/2019 62.80 77.96 (Nov'21) 0.00 (Nov'21) SUSHIL KUMAR

work completed

Detail Report
Graph / Photo
149 Up-gradation/Renovation of 25 Qtrs. Block No. 1109 to 1516, 1577 to 1642 & 1643 to 2143 under sub-division, M-3222 at Gulabi Bagh, Delhi 30/04/2022 29/12/2022 62.60 Irshad Ahmed Work in Progress Detail Report
Graph / Photo
150 Allied Work for Aam Aadmi Mohalla Clinic (Primary Health Centre)at various places under Sub Division North West Building 5 in Assembly Constituency Shalimar Bagh (AC14) Trinagar (AC16) Wazirpur (AC17) Rohini (AC13) Rithala (AC6) (Already Constructed) (Remaining Work) 18/10/2021 17/06/2022 62.26 34.71 (Mar'22) 0.00 (Mar'22) SUSHIL KUMAR Detail Report
Graph / Photo
151 Running and maintenance of E.I. services in non-residential area at GTB Hospital, Complex, Shahdara, Delhi Sub Head Maintenance and operation of E and M services at non-residential area 25/08/2018 24/08/2019 62.10 39.81 (Feb'19) 70.00 % (Feb'19) M/s Vivek Associates work completed Detail Report
Graph / Photo
152 3. Running and Maintenance of Fire Fighting and Wet Riser at GTB Hospital complex, Shahdara, Delhi. Sub Head Maintenance and operation of E and M services at residential and non-residential area 25/08/2018 24/08/2019 61.90 61.00 (May'22) 0.00 (May'22) PARASAR Electrical & Refrigeration Work in Progress (4TH RA bill paid) Detail Report
Graph / Photo
153 Operation & Maintenance of Electrical & Mechanical Services 01/04/2014 31/03/2015 61.32 Shaka Electrical India Detail Report
Graph / Photo
154 Construction of boundary wall on vacant land measuring 3093 Sq. Mtr. (approx 3700 Sq. Yard) bearing Khasra No.47 & 48/1 in Village- Ibrahimpur District North 16/06/2022 15/09/2022 61.04 P L Construction Work in progress Detail Report
Graph / Photo
155 Repair and renovation work of the property No. 7 55, Church Road, Jwala Nagar, Shahdara Health Department for opening of Polyclinic. (Composite work of Civil and Electrical) 03/08/2019 04/02/2020 60.92 RP Electrical and Maintenance Works Work in progress but work is affected due to Covid-19 Detail Report
Graph / Photo
156 Providing Services of Computer Operators, Clerk and MTS (Multi Tasking Staff) in PWD North West Electrical Maintenance Division, Sub Divisions and other offices, Delhi 14/07/2022 13/07/2023 60.63 7.57 (Jul'22) 0.00 (Jul'22) placement security services Detail Report
Graph / Photo
157 Regarding construction of MP hall, 02 Nos. of Labs and 01 Library at GGSSS, Bankner Delhi-40. Sch Id-1310049, EOR Id-20181894 Bldg. ID-13101408. 03/07/2022 30/12/2022 60.31 Sh. Devender Singh Work in progress Detail Report
Graph / Photo
158 Construction of 4 Nos. Aam Aadmi Mohalla Clinic at various places under North West Building Division in Assembly Constituency Rohini (AC– 13), Wazirpur (AC–17) & Bawana (AC–07) (Civil & Electrical Composite Work) 18/06/2022 17/10/2022 60.17 Laxman Detail Report
Graph / Photo
159 Laying of RMC, laying interlocking paver blocks with drainage, Kerb stone along with road, construction of 2 Nos. Security guard room & fixing of granite in tree guard 22/05/2022 21/08/2022 59.84 ARIF, Jahangirpuri, Delhi Work in Progress Detail Report
Graph / Photo
160 Construction of Collapse/Tilted boundary wall at Govt. SKV Prahaladpur, Delhi-110042 (Sch ID-1310032) (Bldg ID 13101331) 30/06/2022 28/09/2022 59.59 Rajeev Kumar Work in progress Detail Report
Graph / Photo
161 Providing for Augmentation of Sub Station in Nehru Homeopathic Medical Collage and Hospital, B-Block, Defence Colony, New Delhi - 110024 30/04/2019 29/07/2019 59.18 AVON ELECTRICALS Detail Report
Graph / Photo
162 Supplying, Installation, Testing and Commissioning of Biomedical treatment units near OT’s for pre treatment of yellow (f) category of Bio-Medical Waste at Lok Nayak Hospital, New Delhi 25/03/2022 24/04/2022 59.06 Texol Engineers Detail Report
Graph / Photo
163 Upgradation of reception area and other misc repair work 22/05/2022 21/08/2022 59.03 Jabir Husain Work in Progress Detail Report
Graph / Photo
164 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block F at District Court Karkardooma Courts Delhi. 24/07/2018 23/03/2019 58.95 9.50 (Feb'20) 0.00 (Feb'20) Johnson Lifts Pvt. Ltd. Work in progress Detail Report
Graph / Photo
165 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block G at District Court Karkardooma Courts Delhi. 24/07/2018 23/03/2019 58.95 9.50 (Feb'20) 0.00 (Feb'20) Johnson Lifts Pvt. Ltd. Work in progress Detail Report
Graph / Photo
166 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block E at District Court Karkardooma Courts Delhi. 24/07/2018 23/03/2019 58.95 9.50 (Feb'20) 0.00 (Feb'20) Johnson Lifts Pvt. Ltd. Work in progress Detail Report
Graph / Photo
167 Replacement of 4 Nos, 10 passengers lifts installed in 62 nos Type V, Multi storey Delhi Govt. Flats at Motia Khan, New Delhi. 29/08/2017 28/04/2018 58.64 9.00 (Mar'22) 0.00 (Mar'22) Johnson Lifts Pvt. Ltd. Work in progress Detail Report
Graph / Photo
168 SH Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units 03/08/2018 02/08/2019 58.04 21.52 (Dec'19) 0.00 (Dec'19) LG Electronics Detail Report
Graph / Photo
169 Regarding construction of MP hall 02 Nos. of Labs and 01 Library at GGSSS Bankner Delhi 40. Sch Id 1310049 EOR Id-20181894 Bldg. ID 13101408 07/02/2022 07/08/2022 57.37 SANU CONSTRUCTION CO. Work in progress Detail Report
Graph / Photo
170 Replacement of old outlived lifts in Academic and NRDH in GIPMER New Delhi 22/09/2020 21/01/2021 57.10 Thyssenkrupp Elevator (India) Pvt. Ltd. Work in progress by M/s THyssen Krupp Elevator Detail Report
Graph / Photo
171 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block D at District Court Karkardooma Courts Delhi. 21/07/2018 20/04/2019 56.86 5.72 (Mar'21) 0.00 (Mar'21) KONE ELEVATOR INDIA PRIVATE LIMITED Work in progress Detail Report
Graph / Photo
172 Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units 31/07/2021 30/07/2022 56.78 21.29 (Jun'22) 0.00 (Jun'22) LG ELECTRONICS INDIA PVT LTD. Detail Report
Graph / Photo
173 Providing for Services Day to Day Maintenance 01/09/2021 30/05/2022 56.56 47.79 (Jul'22) 0.00 (Jul'22) R.K. Jain& Sons Hospitality Servies (P) Ltd. Work in progress Detail Report
Graph / Photo
174 Construction of Two Guard Rooms with attached Toilets and Stainless Steel Railing for Ramps and Staircase, Fixing Acrylic Sheet in Window, I.R.C. Fabric Jali for Window, Fixing Wall Tiles in Class Room and Miscellaneous Work 07/02/2022 06/08/2022 56.11 34.27 (May'22) 0.00 (May'22) Laxman Detail Report
Graph / Photo
175 Renovation of Sports Complex Building and Improvement of Basket Ball Court and Hand Ball Court 08/04/2022 07/07/2022 55.83 Chittoria Constructio Co. Detail Report
Graph / Photo
176 Construction of 06 Nos additional class rooms in Govt Girls Sr Sec School at Panama Building Jama Masjid, Delhi School ID2127023 25/12/2021 22/06/2022 55.43 0.65 (May'22) 0.00 (May'22) Intkhab Alam Detail Report
Graph / Photo
177 Comprehensive maintenance and operation of HVAC system 17/05/2018 16/05/2020 55.43 19.35 (Feb'19) 60.00 % (Feb'19) COMFORT SYSTEM Work in progress 8th RA 6146479 Detail Report
Graph / Photo
178 Mechanized Cleaning of over head tank and underground tank. 30/05/2019 29/05/2020 55.29 11.64 (Sep'20) 0.00 (Sep'20) UNITECH WATER SLOUTIONS work in progress Detail Report
Graph / Photo
179 Replacement of all broken existing section windows in aluminium window with M.S. Grill, Providing and fixing FRP chajja, reconstruction of parapet wall and other miscellaneous work 04/03/2022 02/05/2022 55.05 27.66 (Jul'22) 0.00 (Jul'22) TKN Developers Detail Report
Graph / Photo
180 Change of tenancy of Type-V and Type-VI flats 15/07/2021 14/07/2022 54.73 RAM AVTAR SHARMA Detail Report
Graph / Photo
181 RMO of UPS and Boiler at GIPMER, NDShComprehensive maintenance of Labotek make UPS 26/08/2019 25/08/2020 54.61 power house work in progress by Power House Detail Report
Graph / Photo
182 A/R and M/O in D-II Flats, Vasant Kunj, New Delhi during 2018-19 (SH Change of Wall and Floor tiles, Kitchen, W/C, Bath fittings and Cup board etc.) 03/03/2019 02/09/2019 54.45 14.28 (Mar'21) 0.00 (Mar'21) KR construction interiors work in progress Detail Report
Graph / Photo
183 RMO Electrical & Mechanical services installed at various buildings (East) under PWD EMD M-253, New Delhi. 14/01/2019 13/01/2020 54.38 42.74 (Apr'21) 0.00 (Apr'21) Capital outsourcing management services pvt ltd Detail Report
Graph / Photo
184 Operation and Comprehensive Maintenance of 3 x 350 TR. Capacity Carrier Make water cooled Centrifugal Chilling Units with ancillaries of New O.P.D. Block at Lok Nayak Hospital, New Delhi 14/08/2020 13/08/2022 54.27 22.61 (Jul'22) 0.00 (Jul'22) Royel Electricals work in progress by M/s Royel Electrical Detail Report
Graph / Photo
185 Special repair and misc. work of Quarters of Police Colony, Ambedkar Nagar, New Delhi during 2018-19. 05/09/2018 04/01/2019 53.79 63.35 (Jul'20) 0.00 (Jul'20) Sanjeev Kumar Goel work in progress Detail Report
Graph / Photo
186 Providing services of Skilled, semi-skilled, un-skilled labour etc 14/05/2022 13/05/2023 53.77 R.K. Jain& Sons Hospitality Servies (P) Ltd. Detail Report
Graph / Photo
187 Renovation of Office Building of Sports Complex, Changing Room, Water Proofing Treatment and Providing and Installation of Office use Furniture and Other Misc. Civil Works 02/04/2022 01/07/2022 53.22 Irshad Ahmed Detail Report
Graph / Photo
188 Repair/Renovation work in office of Veterinary Hospital Tis Hazari in District Central.(Civil Work) 17/04/2022 15/07/2022 53.01 D.S. Construction Co Detail Report
Graph / Photo
189 Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc 13/05/2022 12/05/2023 52.95 6.71 (Aug'22) 0.00 (Aug'22) L.B. BONOFIED PRIVATE LIMITED Detail Report
Graph / Photo
190 Casting of RCC Slab and Repair of Rain Water Harvesting Pit, Laying of CC Payment on Damaged Road and Replacement of Damaged Sewer Line and Other Misc. Civil Works 02/05/2022 01/08/2022 52.93 Raju Kumar Singh Detail Report
Graph / Photo
191 Finishing works at Lift-Lobby area of Block A and C, Water proofing of roof top and repair works at various location in premises,at D-II Flats,Vasant Kunj, New Delhi 18/03/2022 17/07/2022 52.84 Vision Constructions Detail Report
Graph / Photo
192 Annual Comprehensive Maintenance of 1250 KVA Capacity HT Automatic Voltage Regulator Andrew Yule make 03/01/2022 02/01/2025 52.63 Harsh India Enterprises Detail Report
Graph / Photo
193 SITC of three (03) numbers 20 passenger cum bed lift at JPCH Shastri Park Delhi 17/03/2022 16/09/2022 52.54 EVAAN ELEVATORS PVT LTD Detail Report
Graph / Photo
194 Leveling and Water Proofing work in roofs, G.I pipeline connection, Repair of roads with cement conc. and interlocking paver block, Repair of class rooms with kota stone flooring, wall tiles, repair of windows and fixing of glass panes, renovation-- 26/09/2018 25/12/2018 52.50 49.53 (Mar'21) 0.00 (Mar'21) New India Construction Co. work in progress Detail Report
Graph / Photo
195 Providing and installation of CCTV Surveillance System (Balance Work) in Lawyers Chambers Block at District Court Karkardooma Shahdara, Delhi 28/04/2018 27/07/2018 52.07 2.63 (Aug'22) 0.00 (Aug'22) Sonal Enterprises Detail Report
Graph / Photo
196 RMO UPS system installed at 2nd floor, 4th floor & 6th floor, Casualty Block, Gynae Block, Ward 14, Genetic Lab, OT Block and New OPD Block at L.N. Hospital, New Delhi 03/04/2022 02/04/2024 51.85 Labotek Detail Report
Graph / Photo
197 Replacement of Addressable Type Fire Alarm System in place of Conventional type Fire Alarm System at Vikas Bhawan-II, Delhi-110054 26/05/2022 25/07/2022 51.83 37.69 (Aug'22) 0.00 (Aug'22) M/s Royale Meridian India Pvt Ltd Detail Report
Graph / Photo
198 SITC of Fire fighting system in Gynae ward Block at Lok Nayak Hospital, New Delhi 19/05/2022 18/07/2022 51.58 Swastik Electrotech Pvt. Ltd. Detail Report
Graph / Photo
199 Exterior work for repair of roof and replacement of exterior grit wash by plaster of Residential Complex and Girl's Hostel in the campus of DPSRU Complex, Pushp Vihar, Sector-III, M.B. Road, New Delhi 02/08/2022 01/12/2022 51.57 Subhash Enterprises Detail Report
Graph / Photo
200 Provision of Washed Stone Grit Plaster and Roof Water Proofing of A–Block, Provision of SS Main Gates and Shed at both Main Gates. Renovation of Classrooms (with Provision of Almirah), Labs, Library, Repairing of Toilet Blocks, Staircase and Corridor Plaster, Construction of Store Room, Replacement of Window and Damaged Water Tanks and Other Misc. Works 18/06/2022 17/12/2022 51.57 UR Construction Detail Report
Graph / Photo
201 Construction of 100 Bedded Portable Hospital reserved for Covid 19 at A and U Tibbia College and Hospital, Karol Bagh, New Delhi (Electrical Works) 28/12/2021 20/02/2022 51.44 52.14 (May'22) 0.00 (May'22) Jain Electric Works Detail Report
Graph / Photo
202 Day to Day Maintenance of Electrical Installation and Running Maintenance and Operation of Electrical Sub-Station, DG Set, Fire Fighting/Fire Alarm system, Water Supply pump sets and passenger Lift 11/12/2021 10/10/2022 51.12 59.99 (Jul'22) 0.00 (Jul'22) Rama Electrical Co Detail Report
Graph / Photo
203 Supplying and Replacement of conventional light fittings with LED fittings in Delhi Secretariat for Energy conservation. 17/03/2018 16/07/2018 50.80 9.42 (Nov'19) 0.00 (Nov'19) Electric India Control Devices Detail Report
Graph / Photo
204 Replacement of old existing 3 Nos. 60 TR Central AC Plant at GNEC, New Delhi 01/01/2022 28/02/2022 50.77 SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. Detail Report
Graph / Photo
205 Providing Electrical appliances in renovated 77 Nos. of staff rooms under NWED 14/06/2022 13/07/2022 50.37 25.73 (Jul'22) 0.00 (Jul'22) M/s R S Electric Co. Detail Report
Graph / Photo
206 Re construction and Raising of boundary wall with grill and concertina coil fencing BldgID 13101080 Sch Id 1309267 EORID 20191734 31/05/2022 31/08/2022 50.37 Saeed Builders Work in Progress Detail Report
Graph / Photo
207 Routine Maintenance of EI , Fans, compound light and Routine maintenance and operation of Electrical Sub Station, DG Set , Pump Set, Fire Alarm,Fire fighting, PA system 17/06/2017 16/06/2018 49.72 Krishna Electrical Works Detail Report
Graph / Photo
208 Supplying and fixing of LED Lights in Saket Bar Association office and Toilets Rooms in Lawyers Chamber Block, Saket Court Complex ND- 17. (4) Supplying and Rep. of old lights in Basement 1 and 2 in Lawyers Chamber Block, at District Court Saket. 16/09/2018 14/11/2018 49.71 54.34 (Feb'21) 0.00 (Feb'21) ACE Engineers Bureau Detail Report
Graph / Photo
209 1. RMO of Carrier make central AC plant at D Block, GIPMER, New Delhi. SH Operation of Low side 3x390 TR capacity carrier make central AC plant EDP Block 2. RMO of Central AC Plant at C Block, GIPMER, New Delhi. SH.Operation of Low side 2x120 TR capa 21/12/2017 20/12/2019 49.44 G.D. Enterprises Work in progress by M/s. G.D Enterprises. Detail Report
Graph / Photo
210 Desilting of Sewer System, Repair and Renovation Work at Old Garage and Annual Maintenance Works 04/02/2022 03/02/2023 49.33 Hak Construction Co Detail Report
Graph / Photo
211 Comprehensive maintenance, Supply of materials and providing services of manpower for day to day maintenance work of various buildings under SD M-2314 (I.T.I staff quarters Vivek Vihar, I.T.I old building Vivek Vihar, I.T.I Shahdara Vivek Vihar, Fire Station Tahirpur and Fire Station GT Shahdara) Delhi during 2021-22.(1st Recall) 09/02/2022 08/02/2023 49.33 Yatish Kumar Sharma Detail Report
Graph / Photo
212 Operation and Maintenance of EI, streets light, DG set , Substation , Lift , Fire Fighting , Fire Alarm System and Solar Water Heating System installed at Prison Complex Mandoli.. 22/10/2021 21/10/2022 48.76 Vee Aar Traders Work is in Progress Detail Report
Graph / Photo
213 Wiring of renovated office rooms i/c providing fan, fittings, street lights alongwith boundary wall, LED fittings on high masts & fabrication of main panels for high mast poles at Bharat Nagar Sports Complex, Ashok Vihar, Delhi 22/02/2022 21/06/2022 48.69 15.00 (Aug'22) 0.00 (Aug'22) M/s R S Electric Co. Detail Report
Graph / Photo
214 Provision for Split AC and Window type AC for various locations at GTB Hospital, Complex, Shahdara, Delhi 06/04/2019 05/06/2019 48.14 RCC Enterprises Work completed Detail Report
Graph / Photo
215 AR and MO Delhi High Court New Delhi during 2022 23 SH Renovation and modification of work stations overhead cabinets tables partition work and false ceiling at various places in Delhi High Court New Delhi 02/06/2022 01/06/2023 48.10 Shabbi Abbas Work in progress Detail Report
Graph / Photo
216 Running and Operation of E and M Services and Comprehensive maintenance of DG Set at various locations 20/09/2021 19/09/2022 48.09 DHARAM ENTERPRISES Detail Report
Graph / Photo
217 Providing Laying of Lumber processor system 1st Recall 12/02/2022 13/03/2022 47.96 51.18 (Jul'22) 0.00 (Jul'22) Laxman In Progress. Detail Report
Graph / Photo
218 AR and MO to Delhi High Court New Delhi dg 2022 23 SH Providing services of plumbing carpentry jobs etc 31/07/2022 30/06/2023 47.61 TRENDY SECURITY SERVICES Tender yet to be awarded Detail Report
Graph / Photo
219 AR and MO Various works under Delhi High Court Civil Division PWD New Delhi dg 2021 22 SH Providing Data Entry Computer Operators Messengers Clerical Staff Security Guard etc for Delhi High Court Division PWD Govt of Delhi 18/12/2021 17/12/2022 47.46 13.60 (May'22) 0.00 (May'22) PREM CONSTRUCTION Work in progress Detail Report
Graph / Photo
220 Day to day Maintenance & Operation of E.I & Fan, , Fire Fighting, Fire Alarm System, water supply system, Lifts, DG sets and Sub Station etc. 17/03/2018 16/03/2019 47.40 R K Enterprises Detail Report
Graph / Photo
221 Maintenance of EI and Fans and RMO drinking water supply pump sets of Fire stations situated at sector 5 and 15, Rohin 26/10/2021 25/10/2022 47.36 Adhiraj Constructions Detail Report
Graph / Photo
222 Replacement of Defective/ Burnt-out fittings with new LED fittings Power/light plug etc. in Lawyers Chambers Blocks at District Court Karkardooma, Delhi. 19/01/2019 18/04/2019 46.93 21.98 (Jan'20) 0.00 (Jan'20) S K Engineers Detail Report
Graph / Photo
223 Regarding Barrier Free Access Features, RCC Ramp with Stainless Steel Railing Tactile, Toilet for Disability Challenged and Grit Wash Plaster at Govt. Co–Ed Sr. Sec. School A–6, Paschim Vihar, Delhi–110063 (ID: 1617032). (Composite Work Civil & Electrical) 01/06/2022 30/09/2022 46.90 Laxman Detail Report
Graph / Photo
224 A/R and M/O to Saket Court Complex (Non Residential ) under Sub-Division-I, BMSD-1, PWD During 2019-20. Saket, New Delhi. (SH Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc.) 20/05/2019 29/05/2019 46.86 24.75 (Mar'21) 0.00 (Mar'21) M/s Trendy Security Services

work in progress

Detail Report
Graph / Photo
225 Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System 28/09/2020 27/09/2023 46.00 DB Solx Work in progress by M/s D.B. Solx Detail Report
Graph / Photo
226 Renovation of fetal medicine OT and upgradation of the department of Obsetetric HOD in Sher Singh Maternity Block at Lok Nayak Hospital New Delhi (Revised) 06/05/2022 03/08/2022 45.59 6.06 (Jun'22) 0.00 (Jun'22) Aar Kay Builders

work completed

Detail Report
Graph / Photo
227 (A) Construction of new septic tank (B) Providing and laying horticulture pipe line and sewer line for toilets in CH-I & II. 31/05/2022 30/08/2022 45.54 IZHAR AHMED Work in Progress Detail Report
Graph / Photo
228 1.MOEI,fans at GynB,Sk,2. M.O.E.Ifansat Spe.WB,T.B. cent3. M.OE.I,F at Casu B,OPD4. MOEI.,fan at Sur B,NOT,MS off5. RMOF F. Sys inst vari buil 6. RMO Fire AlaSys instat var.bui7 RMO Sub StatNo.1234 ,8. RMO Pumset at SHMaint,Operof EM ser. 18/07/2019 17/09/2019 45.38 45.38 (Oct'19) 0.00 (Oct'19) M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 work in progress by M/s Vivek Associates and 3rd RA paids Detail Report
Graph / Photo
229 Comprehensive Maintenance of C Mos Make Servo Stabilizers installed in lifts and other location 09/01/2020 08/01/2023 45.10 6.26 (Apr'22) 0.00 (Apr'22) S.S. Sales and Services

work in progress by agency

Detail Report
Graph / Photo
230 Repair and renovation work at bunglow no. 36 Ashoka Road and E-71 officers residence Minto Road, New Delhi 19/12/2021 18/03/2022 44.96 38.83 (Mar'22) 0.00 (Mar'22) BRIJ GOPAL MANN Detail Report
Graph / Photo
231 Regarding Provision of Grit Wash on Exterior of Old SPS Structure with Granite upto Door Level, Mosaic Tiles in Exterior Block, Removal of Old Toilet Block, Repair of Old Stage, Provision of Shed and Ramp on Stage and Other Misc. Work at SKV Sector–1, Avantika, Rohini, Delhi–110085 06/12/2021 05/08/2022 44.87 13.08 (Jun'22) 0.00 (Jun'22) SABUR ALAM Detail Report
Graph / Photo
232 Comprehensive Maintenance of DBSOLX developed Complaint Tracker System at GNEC 03/11/2019 02/11/2020 44.66 8.15 (Jul'22) 0.00 (Jul'22) DBSOLX work in progress by DB SOLX Detail Report
Graph / Photo
233 Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System at GIPMER, New Delhi 28/04/2020 27/04/2023 44.66 14.88 (Apr'22) 0.00 (Apr'22) DBSOLX work in progress by M/s D.B. Solx Detail Report
Graph / Photo
234 Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System at Meerdard Lane, New Delhi 09/04/2020 08/04/2023 44.65 7.11 (Jul'22) 0.00 (Jul'22) SCS Technologies work in progress by SCS Technologies Detail Report
Graph / Photo
235 RMO Elect. and Mech. Services in Lawyers chambers Block D E F G and H at District Courts Karkardooma Delhi. SH-Operation of lifts in Lawyers chamber Blocks. 01/10/2018 11/09/2019 44.60 37.15 (Mar'21) 0.00 (Mar'21) Guruji Elevator Detail Report
Graph / Photo
236 Day to day Running Maintenance & Operation of Electrical and Mechanical services of MAIDS Phase- II Building, New Delhi 01/07/2022 30/06/2023 44.55 GLOBAL ENTERPRISES Detail Report
Graph / Photo
237 SH Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units) 03/08/2018 02/08/2019 44.40 16.47 (Dec'19) 0.00 (Dec'19) LG Electronics Detail Report
Graph / Photo
238 Comprehensive Maintenance of RO Filtration Units 30/10/2021 29/04/2022 44.32 32.26 (Aug'22) 0.00 (Aug'22) M/s Vivek Associates Detail Report
Graph / Photo
239 RMO UPS system installed at 2nd floor, 4th floor and 6th floor Casualty Block, Gynae Block, Ward 14, Genetic Lab, OT Block and New OPD Block at L.NHSHComprehensive annual maintenance of Magna Flux Make UPS system installed at New OPD BlockL.N.H 31/08/2019 30/08/2022 44.30 power house Work in progress by M/s Power House. Detail Report
Graph / Photo
240 ComprMaint opera of DBSOLX devel Comp Tracker Sys at MAMC 01/01/2020 31/12/2022 44.22 SCS Technologies

work in progress by SCS Technologies

Detail Report
Graph / Photo
241 Providing services of office staff like Computer Operator, Messenger, Peon, Sweeper etc. at Division office & Sub-Division-II at PTS Malviya Nagar,New Delhi 12/02/2022 11/02/2023 43.99 14.27 (Aug'22) 0.00 (Aug'22) TRENDY SECURITY SERVICES Detail Report
Graph / Photo
242 Supplying, Installation, Testing and Commissioning of Centralized cooling and heating type AirConditioning System in ward 26 New Medical Block, CCU & RCU at L. N. Hospital, New Delhi. 15/05/2022 14/07/2022 43.91 Sai Aircon Engineers Detail Report
Graph / Photo
243 Providing and fixing Solar Hybrid street light system in existing light 21/05/2022 20/06/2022 43.85 23.24 (Jul'22) 0.00 (Jul'22) SAFTY Engineers, PAN: AARPW4473E, Address: 1836/3F, Shp No. 8, Bhagirath Place, New Delhi-72 Detail Report
Graph / Photo
244 Comprehensive maintenance, Supply of materials and providing services of manpower for day to day maintenance work of various buildings under SD M-2314 (I.T.I staff quarters VivekVihar, I.T.I old building VivekVihar, I.T.I ShahdaraVivekVihar, Fire Station Tahirpur and Fire Station GT Shahdara) Delhi during 2021-22 10/01/2022 09/01/2023 43.77 JABIR HUSSAIN Detail Report
Graph / Photo
245 Comprehensive Maintenance of Microprocessor based nurse call bell system 11/11/2021 10/11/2023 43.61 18.60 (Apr'22) 0.00 (Apr'22) AKOUSTIK COMMUNICATIONS Detail Report
Graph / Photo
246 Construction of Oxygen Generator plant Hall at GIPMER, New Delhi. (Electrical works) 06/12/2021 19/01/2022 43.31 0.11 (Jul'22) 0.00 (Jul'22) Jain Electric Works Detail Report
Graph / Photo
247 Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units 31/07/2021 30/07/2022 43.28 27.05 (Mar'22) 0.00 (Mar'22) LG ELECTRONICS INDIA PVT LTD. Detail Report
Graph / Photo
248 Civil Work and Electrical Work (Composite Work). 05/09/2020 04/12/2020 43.21 6.04 (Nov'20) 0.00 (Nov'20) SIDDHANSH ENGINEERING WORK Work in progress (Under Clause-5 of the Agreement, the date of completion for the work is provisionally extended upto 31.03.2021) Detail Report
Graph / Photo
249 Making School building barrier free and accessible to children with special needs at GSBV (VPT KR), Nangal Thakran, Delhi-39 (School ID-1310007), Govt. Boys Sr. Sec. School, Katewara, Delhi ID 1310010, Govt. Co-Ed SSS C-Block, Metro Vihar, Holambi Kalan, Delhi-110082 (Sch ID-1310407), SKV Bawana (Ravi Shankar) (ID 1310042) & Harewali G(Co-ed) SSS (Sch ID 1310026) 10/06/2022 09/09/2022 43.11 JABIR HUSSAIN Work in progress Detail Report
Graph / Photo
250 Regarding providing and fixing wall tiles, almirah, interlocking tiles and renovation of labs and MP hall at SKV A-Block, Plot No.5, Jahangir puri, Delhi - 110033 (Sch Id. 1309279) (Bldg. Id. 13091875) (EOR Id. 20211168) 18/04/2022 15/08/2022 42.66 Rang Lal Singh Work in Progress Detail Report
Graph / Photo
251 Repair of toilet block, Corridor, Varandah, Laundary area and other misc. works at Ashadeep, Narela, Delhi 110040 30/06/2022 27/10/2022 42.47 MAHIDEEP SHARMA Work in progress Detail Report
Graph / Photo
252 Supply and replacement of 2 x 80 KVA Seamless power supply system critical load of NIC Servers at Delhi Sachivalya New Delhi. 07/01/2019 06/02/2019 42.39 2.91 (Apr'21) 0.00 (Apr'21) Issar Industries Detail Report
Graph / Photo
253 Comprehensive maintenance of HVAC 752HP Daikin Make VRVAHU system installed at MAIDS Phase II NewDelhi 08/06/2022 07/06/2023 42.25 TF AIR SYSTEMS PRIVATE LIMITED Detail Report
Graph / Photo
254 Upgradation of 100 beds in existing ward to oxygen beds with installation of central pipe line for oxygen supply including construction of 10 nos new toilets for prepaidness of expected third wave of covid-19 18/12/2021 16/04/2022 42.25 10.56 (Jun'22) 0.00 (Jun'22) Ali Hasan Construction

work completed

Detail Report
Graph / Photo
255 A/R & M/O to Rouse Avenue Court Complex at DDU Marg, New Delhi During- 2021-22 & 2022-23. (SH : Providing Materials and Manpower for day to day maintenance including misc. repair and maintenance works in the Court Complex.) 30/12/2021 13/04/2023 42.19 R L WADHWA Work is in progress Detail Report
Graph / Photo
256 Reg. EOR to PTS colony Malviya Nagar, New Delhi. (SH- Development of parks). 25/03/2019 24/07/2019 42.09 20.45 (Jul'20) 0.00 (Jul'20) Naresh Kumar work in progress Detail Report
Graph / Photo
257 Construction of boundary wall and Installation of signage board for Geetanjali Fire Station, New Delhi. 30/01/2019 29/05/2019 41.85 17.00 (Sep'20) 0.00 (Sep'20) Vijay Bhardwaj work in progress Detail Report
Graph / Photo
258 Mechanized Cleaning of over head tank and underground tank 17/08/2021 16/08/2022 41.80 6.71 (May'22) 0.00 (May'22) UNITECH WATER SLOUTIONS Detail Report
Graph / Photo
259 Providing wiring/rewiring and miscellaneous electrical equipments in Type-I GBPH staff qtrs, New Delhi 18/09/2019 17/12/2019 41.74 11.43 (Oct'19) 0.00 (Oct'19) RCC Enterprises work in progress by RCC Enterprises. Detail Report
Graph / Photo
260 Renovation of Rooms at Ground Floor, 1st Floor and 2nd Floor at DTTE (HQ) 18/04/2022 17/06/2022 41.07 Sohan Lal Chhitoria and Sons Detail Report
Graph / Photo
261 Operation and Annual Comprehensive Maintenance of PA / Conference system at Committee Rooms, MLA Lounges and DIP & Ludlow castle wrestling venue 23/07/2022 22/07/2024 41.06 Ambica Electricals Detail Report
Graph / Photo
262 Replacement of out lived fire alarm system at Tis Hazari Courts Building, Delhi. 30/09/2017 29/12/2017 40.96 34.00 (Oct'21) 0.00 (Oct'21) Royale Meridian (India ) Pvt. Ltd. Detail Report
Graph / Photo
263 Renovation of Ist floor and 2nd floor of MRD Block at Lok Nayak Hospital New Delhi due to Covid 19 24/07/2021 21/09/2021 40.67 23.74 (Jun'22) 0.00 (Jun'22) M. T. Builders

work completed

Detail Report
Graph / Photo
264 Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc. 21/06/2019 20/06/2020 40.44 23.47 (Mar'21) 0.00 (Mar'21) RAKSHAK SECURITAS PVT. LTD. work in progress Detail Report
Graph / Photo
265 A/R & M/O Delhi Govt. Officers Flats at G.K.-1, New Delhi during 2021-22(SH:-Repair and Renovation of Various flats and misc. civil works.) 14/08/2021 13/02/2022 40.37 SHRI DATTA KRUPA ENTER PRISES Detail Report
Graph / Photo
266 A/R and M/O to Various Buildings under NWB-3, Delhi during 2021-22 SH: Day to Day Maintenance of various Services at DA Flats Sector-XI, GND and SSCBS, Rohini Delhi 10/10/2021 09/10/2022 40.31 20.52 (Jun'22) 0.00 (Jun'22) RAJIV RANJAN Detail Report
Graph / Photo
267 Enhancing accessibility of built up environment of ITI Nand Nagri, Delhi-110093 -2nd call 23/09/2019 22/12/2019 40.22 43.67 (Sep'21) 0.00 (Sep'21) Jabir Hussain

work in progress

Detail Report
Graph / Photo
268 Renovation of Toilet and Primary Wing with Repairing of all Leakage, Upgrade System and Other Misc. Work 27/02/2022 26/05/2022 40.20 Anshika Construction Co. Detail Report
Graph / Photo
269 Rewiring of EI and fans and Replacement of old defective fittings, cable fans & air conditioning as when as required 28/05/2022 27/11/2022 40.11 Shri Bankey Bihari Electricals Detail Report
Graph / Photo
270 Up gradation Renovation of 25 Qtrs. Block No. 1109 to 1516, 1577 to 1642 and 1643 to 2143 under SD, M-3222 at Gulabi Bagh, Delhi 17/12/2021 15/08/2022 39.98 Royal Construction Co. Work in progress Detail Report
Graph / Photo
271 (1) RMO of Specialized Electrical & Mechanical works at A&U Tibbia College and Hospitals, Karol Bagh, New Delhi (2) RMO of specialized Electrical & Mechanical works at DR. NC Joshi Memorial Hospital, Karol Bagh, New Delhi 28/01/2022 27/01/2024 39.86 12.19 (Jul'22) 0.00 (Jul'22) Sonal Enterpries Pvt. Ltd. Detail Report
Graph / Photo
272 Regarding Provision of Coba for Old Building, Guard Room with Wash Room, Overhead Tank, Counter Slab with Water Line in Chemistry, Physics and Biology Labs, Waiting Room with Covered Shed and all side Open for Parents, Shed on Assembly Stage, Replacement of Old Windows and Ventilators, P/F Grill for Protection of Green Plant of the School and Reconstruction of Broken Boundary Wall 18/06/2022 17/09/2022 39.53 LT INFRABUILD Detail Report
Graph / Photo
273 EOR to CPMF Site PTS Wazirabad to facilitate camping personnel Delhi 25/09/2018 24/11/2018 39.50 14.01 (Feb'20) 0.00 (Feb'20) S K Engineers Work in progress Detail Report
Graph / Photo
274 Comprehensive Maintenance of Extreme Entrays Make LAN System at various buildings at L.N. Hospital 28/02/2022 27/02/2025 39.40 TRACOM ENTERPRISES Detail Report
Graph / Photo
275 Operation and Routine Maintenance of E & M services 11/03/2022 10/09/2022 39.37 M/s R S Electricals Detail Report
Graph / Photo
276 Repairing / Replacement of EI and Fans 17/3, 17/9, 33/24, 33/25, 33/11, 16/11 Rajpur Road and D-II/2 Court lane, 33-A/4 Sham Nath Marg and 5 Bela Road 07/05/2022 06/08/2022 39.22 23.46 (Aug'22) 0.00 (Aug'22) Om Sai Electrical Co. Detail Report
Graph / Photo
277 Comprehensive maintenance and operation of 4 x 400 TR Central HVAC Plant. 20/05/2019 19/05/2020 39.01 Unique Engineers Pvt. Ltd. Detail Report
Graph / Photo
278 Routine, operation and maintenance of Stacker and Puzzle car Parking system 20/06/2022 19/06/2023 38.75 Ram Ratna Infrastructure Pvt. Detail Report
Graph / Photo
279 Structural Strengthening Works 11/08/2021 08/11/2021 38.75 41.82 (Jun'22) 0.00 (Jun'22) Cembond Construction Pvt. Ltd In Progress. Detail Report
Graph / Photo
280 Rewiring / Repairing of existing point/ power point/ fixtures and providing additional power points and wiring etc in various Resdl. Flats/ Bunglow, as when as required 28/07/2022 27/01/2023 38.73 Rama Electrical Co Detail Report
Graph / Photo
281 Misc. Repair work (Balance Work) 28/04/2022 27/07/2022 38.69 20.00 (Jul'22) 0.00 (Jul'22) Jabir Husain Work in Progress Detail Report
Graph / Photo
282 Comprehensive maintenance of microprocessor based nurse call bell system 28/10/2019 27/10/2021 38.45 AKOUSTIK COMMUNICATIONS work in progress by Akoustik Communication Detail Report
Graph / Photo
283 Repair and Renovation of Workshop and Making Modification in room no. 9 of Women Wing 30/08/2019 29/12/2019 38.26 15.93 (Oct'21) 0.00 (Oct'21) Saeeduddin

work in progress

Detail Report
Graph / Photo
284 RMO E and M Services in KKD Court Court Block ACI B JKL at District Court KKD Delhi. SH- Operation of lifts in Court Blocks 25/09/2018 24/09/2019 37.84 33.43 (Nov'19) 0.00 (Nov'19) Royal Electrical Co. Detail Report
Graph / Photo
285 Replacement of Interlocking Paver block of internal path of Judges Residential Complex at Saket, New Delhi 08/02/2022 07/04/2022 37.78 27.61 (Aug'22) 0.00 (Aug'22) Naveen Kumar Gupta Detail Report
Graph / Photo
286 Renovation of Principal office, providing SS railings in corridor, providing new main gate and other misc. works in GBSSS No.2 JJ Colony Bawana Delhi (School ID 1310460) 22/05/2022 21/07/2022 37.75 M/s Ravi Construction Co. Work in Progress Detail Report
Graph / Photo
287 Repairing and Rehabilitation of RCC Chajja in Kaveri Hostel and ECE Block at IGDTUW Campus, Kashmere Gate Delhi). Delhi During 2021-22 19/12/2021 18/02/2022 37.57 24.54 (May'22) 0.00 (May'22) MOHD AFTAB Detail Report
Graph / Photo
288 RMO Pump Set & Fountain, SCADA at College building, various hostel and Type VI, Type V, Type I, Residential Quarters at MAMC, New Delhi. (SH:- Operation and comprehensive RDS make automation of water supply and SCADA system installed at various location) 07/03/2020 06/03/2022 37.57 RECKTRONIC DEVICES AND SYSTEMS

work in progress by agency

Detail Report
Graph / Photo
289 Replacement Damaged C.I. Pipe. (MODIFIED) 15/04/2022 14/08/2022 37.42 15.55 (Jun'22) 0.00 (Jun'22) Shivam Kaushik Detail Report
Graph / Photo
290 Renovation of Zonal Office including Providing and Laying New Sewer Line and CC Pavement 20/05/2022 19/08/2022 37.38 Nurul Hak Detail Report
Graph / Photo
291 Annual comprehensive maintenance of 1.5 TPH capacity fire tube boilers (2 Nos.) operation of boilers and water softening plant 10/09/2020 09/09/2022 37.08 9.27 (Jun'22) 0.00 (Jun'22) Boilermart Detail Report
Graph / Photo
292 Routine maintenance and operation of Lifts 16/05/2018 15/05/2019 37.05 33.96 (Apr'19) 94.00 % (Apr'19) Swastik Electrotech Pvt. Ltd. Work transferred and in progress Detail Report
Graph / Photo
293 Providing Replacing and fixing MS gates and construction of Sentry Posts at various location in MAMC Campus and laying of CC paver block at Central Park (Rose Garden) (Re Call) 05/08/2021 02/11/2021 37.00 10.96 (Jul'22) 0.00 (Jul'22) Deep Const.

work completed

Detail Report
Graph / Photo
294 Construction of Cold Storage Room in Forensic Science Laboratory, Rohini, Delhi 06/04/2022 05/06/2022 36.96 18.24 (Jun'22) 0.00 (Jun'22) M/s Cascade Detail Report
Graph / Photo
295 Comprehensive maintenance of LAN and EPBAX System installed at Mandoli Prison Complex 29/03/2022 28/03/2023 36.92 TRACOM ENTERPRISES Work in progress Detail Report
Graph / Photo
296 RMO of various Electrical & Mechanical services Mandoli Prison Complex Delhi. (SH: Comprehensive maintenance of LAN & EPBAX System installed at Mandoli Prison Complex). 29/03/2022 28/03/2023 36.92 TRACOM ENTERPRISES Work in progress Detail Report
Graph / Photo
297 EOR to EI and Fans and PA System at Govt. GSSS No.1 Ghonda Delhi-110053 (School ID- 1104025). 14/01/2019 13/03/2019 36.91 48.49 (Jan'20) 0.00 (Jan'20) V K Electrical Works Work in progress Detail Report
Graph / Photo
298 Day to day Maintenance of Elect. and Mechanical Services 16/10/2021 15/10/2023 36.82 12.59 (Jun'22) 0.00 (Jun'22) SEHRA ELECTRIC works Detail Report
Graph / Photo
299 A/R & M/O to various building under Division M-222 Delhi dg 2021-22 (SH: Providing Services of Data Entry/ Computer Operator, Messenger cum MTS and Clerk.). 31/08/2021 30/08/2022 36.67 24.86 (Jul'22) 0.00 (Jul'22) TRENDY SECURITY SERVICES Detail Report
Graph / Photo
300 Comprehensive Maintenance and Operation of Lifts installed in Main Court Building, Lawyers Block and residential block at District Court, Saket, New Delhi. (SH- Comprehensive maintenance of Johnson make lift) 27/01/2019 26/01/2020 36.66 56.90 (Jul'22) 0.00 (Jul'22) Johnson Lifts Pvt. Ltd. Detail Report
Graph / Photo
301 Water Proofing Treatment in Planters for Preventing Seepage in Basement Floor, Replacing the Damaged C.I./CPVC Pipes and Other Miscellaneous Works 04/02/2022 03/02/2023 36.49 25.54 (Jul'22) 0.00 (Jul'22) BHUPESH KUMAR Detail Report
Graph / Photo
302 Structural repair and Up gradation of Residential quarters at Police Quarters under Mehrauli police station (Type B-8 nos. and type C-4 nos.), under South Building (M), PTS colony, Malviya Nagar New Delhi. 27/06/2018 26/12/2018 36.43 33.72 (Jun'19) 0.00 (Jun'19) Datta Krupa Enterprises work in progress Detail Report
Graph / Photo
303 Renovation of office area of Pay and Accounts Office -IV and Pay and Accounts Office-VI in Treasury Building, Tis Hazari Court Complex, Delhi. (Civil Work) 16/04/2022 14/06/2022 36.42 D.S. Construction Co Detail Report
Graph / Photo
304 Providing LAN System and All in One Desktop at Acharya Shree Bhikshu Govt. Hospital, Moti Nagar, New Delhi 30/11/2018 29/01/2019 36.40 DYNAMIC SYSTEMS Detail Report
Graph / Photo
305 Operation and Comprehensive Maintenance of 500 KLD ETP having BMW and OLMS system 01/05/2020 30/04/2022 36.30 Wellkome engineers Work in progress by M/s Wellkome Engineer Detail Report
Graph / Photo
306 Replacement of Defective/ Burnt-out fittings with new LED fittings ceiling fans fresh air fan power points etc. in Flats Type-II Type-III Type-IV Type-V Type-VI and Duplex in O block residential Complex at District Court Karkardooma Delhi 05/09/2018 04/12/2018 36.23 35.80 (Oct'19) 0.00 (Oct'19) Krishna Electreical Works Detail Report
Graph / Photo
307 Providing and Installation of 500 KVA capacity Silent type DG Set for MSO Building, New Delhi. 12/09/2017 11/01/2018 36.23 Himalaya Generators Detail Report
Graph / Photo
308 Compr Maint of DBSOLX devel Compl Track Sys at L.N.H 12/10/2019 11/10/2022 36.21 DBSOLX work in progress by DB SOLX Detail Report
Graph / Photo
309 Replacement of wooden damage Alimrah shutter, frames, sanitary fittings and others Misc. work in Judges flats 02/09/2021 01/06/2022 36.21 18.36 (May'22) 0.00 (May'22) Bhawani Constructions Detail Report
Graph / Photo
310 Renovation work at 7th floor in New surgical block at L.N H SH S I T C of modular type Var. Refr. Flow/Var. Refr. Volume air cooled outdoor units 26/06/2020 25/08/2020 36.12 Royel Electricals work in progress by M/s Royel Electrical. Detail Report
Graph / Photo
311 Providing and fixing MS window and aluminium cabins in workshop and Polycarbonate sheet and G.I gutter in north face truss workshop other misc. repair work 06/08/2022 05/11/2022 36.07 Samsad Detail Report
Graph / Photo
312 Maintenance and operation of Panasonic CCTV Cameras System 11/03/2022 10/02/2024 36.04 Media Tele Communication Detail Report
Graph / Photo
313 (i) SITC of CCTV Cameras in Admin Block and Various offices of Saket Court Complex New Delhi-110017 (ii) SITC of CCTV Surveillance system in the Residential Complex at District Court saket New Delhi-110017. 24/01/2019 23/04/2019 35.83 65.01 (May'21) 0.00 (May'21) San Infotech Services Detail Report
Graph / Photo
314 Strengthening of Beam, Slab and Repair of Tank (Remaining work- Renewing of Damaged Chajja and Windows) 20/03/2022 19/06/2022 35.66 BHUPESH KUMAR Detail Report
Graph / Photo
315 1). RMO of Central AC Plant/ Package Unit at DDUH, Hari Nagar, ND for the yr 18-19, 2). RMO of Central AC Plant Screw Type at Trauma Block at DDUH, Hari Nagar, New Delhi for the year 2018-2019 (SH Operation and Maintenance of Central AC Plant) 17/06/2018 16/06/2019 35.58 PMG ENGINEERS Detail Report
Graph / Photo
316 Providing and Installation Mono Block submerisble pump set 12/02/2022 11/02/2024 35.54 A.K. Machinery Tools WORK COMPLETED Detail Report
Graph / Photo
317 Cleaning, mopping of common area, like lift lobby, staircase, basement, community centre, footpath area, terrace, servant qtr. etc. by mopping machine at Residential Complex Saket Court, New Delhi 07/10/2021 06/10/2022 35.40 20.21 (Jul'22) 0.00 (Jul'22) R.K. Jain& Sons Hospitality Servies (P) Ltd. Detail Report
Graph / Photo
318 Routine Operation and Maintenance of Wellkome Make 1250 KLD ETP based on EBR Technology 22/05/2022 21/05/2023 35.16 Wellkome engineers Detail Report
Graph / Photo
319 Rewinding of wornout 2000/1600 KVA HT AVR Transformer of Andrew Yule Make and providing of protection accessories of HT AVR and HT Panel at Sub-Station No. 1, 3, and 4 L.N. Hospital 07/05/2022 06/08/2022 35.03 Harsh India Enterprises Detail Report
Graph / Photo
320 (A) Repair to damaged floor of classroom & corridor and fixing wall tiles & C-B in all rooms. (B) Providing/renovation/repair of ramps, railing, tactile tiles, signage etc. to make school building and environment barrier free & accessible. (Sch ID-1310031) (Bldg. ID-13101515) (EOR ID-20211054/20211032) 20/02/2022 26/06/2022 34.80 Aayan Construction Co. Work in progress Detail Report
Graph / Photo
321 Renovation of Bathroom cum toilet blocks of RAC and Sikkim Police Officers 12/03/2019 11/05/2019 34.66 32.69 (Jul'20) 0.00 (Jul'20) Saeed Builders

work completed

Detail Report
Graph / Photo
322 E.O.R. to S.K.V. No. 1 (Hindi Medium) at Jama Masjid, Delhi. Dg. 2018-19 (School ID-2127024). (SH: Renovation of toilet, kota stone flooring in court yard and class rooms under SRD Division-I, Sub-Division-III). 07/09/2018 06/01/2019 34.65 0.00 (Jan'19) 43.28 % (Jan'19) Kamal Construction Co. wORK COMPLETED FINAL BILL PAID Detail Report
Graph / Photo
323 Providing Services for Running the Computer, Messengers and Watch and Ward for Sub Division Office-1, 2, 3, 6 01/04/2022 31/03/2023 34.47 V R INDIA SECURITY SERVICES PVT. LTD. Detail Report
Graph / Photo
324 Providing Cable Cover to Cover the haphazard wiring system at various places at DDU Hospital, Hari Nagar, New Delhi 18/04/2019 17/05/2019 34.37 M/s Kalsi Engineers Detail Report
Graph / Photo
325 Renovation of Sick room, counselling room, Reception and Staircase in Ground floor and C/o superintended room, class room and toilet on First floor etc. and Electrical works 16/12/2018 15/04/2019 34.29 17.78 (Aug'19) 28.00 % (Aug'19) Ikram Ali Work in progress Detail Report
Graph / Photo
326 Renovation of Old Boys Hostel (Mathura Block) (MAMC) 05/11/2021 04/03/2022 34.05 3.20 (Jun'22) 0.00 (Jun'22) MOHD AFTAB

work completed

Detail Report
Graph / Photo
327 A/R and M/O to Various Buildings under NWB-3, Delhi during 2021-22 SH: Day to Day Maintenance of Rohini Court, Lawyers Chamber 07/10/2021 06/10/2022 33.90 17.44 (Jun'22) 0.00 (Jun'22) S. KUMAR & CO. Detail Report
Graph / Photo
328 Running and maintenance of Air-conditioning System at GTB Hospital Complex, Shahdara, Delhi. Sub Head Operation, maintenance and charging of water softening plants for 4x550 and 4x300 TR capacity AC Plants 03/08/2019 02/08/2021 33.88 M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 Cancelled Detail Report
Graph / Photo
329 Remodeling of drain on Nightingle apartment under Sub-Division WR-14, Division WR-1 during 2022-23 26/05/2022 22/09/2022 33.61 Dushyant Enterprises Detail Report
Graph / Photo
330 Upgradation & Augmentation of existing Cisco Make LAN System 12/06/2022 11/08/2022 33.46 28.76 (Aug'22) 0.00 (Aug'22) Star Enterprises Detail Report
Graph / Photo
331 Operation, routine maintenance of 4x420TR and 1x150TR capacity AC Plant installed at RGSS Hospital, Tahirpur, Delhi 17/03/2022 16/03/2024 33.39 Altone Aircon Detail Report
Graph / Photo
332 Renovation of electrical installation of 2 nos. Courtrooms no. 315 and 316, 3rd floor at District Court, Rohini, Delhi. 12/05/2022 11/06/2022 33.37 19.19 (Jul'22) 0.00 (Jul'22) R S ELECTRICALS Detail Report
Graph / Photo
333 Construction of 1st floor of Union Office at Lok Nayak Hospital, New Delhi due to Covid 19 27/08/2021 25/10/2021 33.35 15.57 (Jun'22) 0.00 (Jun'22) Aar Kay Builders

work completed

Detail Report
Graph / Photo
334 Replacement of old out dated 380 KVA DG Set with silent type 500 KVA DG Set at DDUH Hari Nagar New Delhi 18/01/2019 17/04/2019 33.31 Himalaya Generators Detail Report
Graph / Photo
335 Comprehensive Operation and Maintenance of Complaint Tracker System 09/10/2021 08/10/2023 33.19 DBSOLX Detail Report
Graph / Photo
336 (SH- Operation of EI and Fans including compound light substation DG set Water supply and Dewatering system Fire Fighting and Sprinkler System Lifts Fire Alarm and PA System.) 21/01/2019 20/01/2020 33.07 37.67 (Jun'21) 0.00 (Jun'21) M/s. A G ENTERPRISES Detail Report
Graph / Photo
337 Operation of EI and fans, lifts, fire fighting & fire alarm system, PA system, water supply pump set & D.G Set 21/04/2014 20/04/2015 32.99 A.G. Enterprises Detail Report
Graph / Photo
338 Repair and renovation work in Flat No. A-12 Type-VI, Flat No. C-04, Type V and other various flats at D-II Flats, Vasant Kunj, New Delhi 07/06/2022 06/09/2022 32.89 Vision Constructions Detail Report
Graph / Photo
339 Replacement of Defective/Burnt-out Air-Conditioning Units installed in Hostel Block at UTCS Bldg. Vishwas Nagar, Shahdara Delhi. 25/02/2019 24/04/2019 32.84 8.33 (Sep'19) 0.00 (Sep'19) S K Engineers Detail Report
Graph / Photo
340 Repair/Renovation of main Hall ceiling and misc. work at Thyagraj Stadium, INA, New Delhi 27/07/2019 26/09/2019 32.83 Paras Nath Singh Detail Report
Graph / Photo
341 Running maintenance and Operation of Medical and Gas Manifold plant installed at RGSS Hospital Tahirpur, Delhi-110093 during the remaining financial year of 2021-22 and complete financial year of 2022-23 16/04/2022 15/04/2023 32.73 MDD Medical System (INDIA) Pvt. Ltd Detail Report
Graph / Photo
342 Supplying and Placing of Furniture Items For E Library at Lawyer Chamber G block GF Karkardooma Court Delhi 17/12/2021 14/02/2022 32.43 Royal safe company (KB) In progress. Detail Report
Graph / Photo
343 Emergent addition/ Alteration Electrical works in Endoscopy and Colonoscopy area at Block-6, RGSS Hospital, Tahirpur, Delhi-110093 06/04/2022 05/06/2022 32.15 M/s Shri Durga Electricals Detail Report
Graph / Photo
344 RMO E and M services at New Delhi District Court Complex at Rouse Avenue, DDU Marg, New Delhi. (SH Comprehensive Annual Maintenance of 3x120 KVA UPS system). 23/06/2019 22/06/2022 32.00 0.00 (Jan'21) 55.00 % (Jan'21) POWER HOUSE Work in Progress Detail Report
Graph / Photo
345 Replacement of 2 number 15 passenger 1020 kg lifts at S.T.C.9 Metcalf Road Delhi 01/01/2021 31/05/2021 31.98 Thyssenkrupp Elevator (India) Pvt. Ltd. Work in progress by M/s Thyssenkrupp Elevator (P) Ltd. Detail Report
Graph / Photo
346 Supplying, installation, testing and commissioning of laundry equipments at JPCH Shastri Park Delhi 08/04/2018 07/04/2022 31.84 31.64 (Jun'22) 0.00 (Jun'22) Lucky Engineering Works Work in Progress 2ND RA 767530 Detail Report
Graph / Photo
347 1). Prosn of New Air Conditioners and Rep of Old ACs with Energy Efficient Air Conditioners GGSGH 2) EOR SVBPH (SH Rep of Old ACs with Energy Efficient Air Conditioners at SVBPH) 3) EOR SVBPH (SH SITC of Air Conditioners in IEC Room and DOT Centre) 17/05/2019 16/07/2019 31.78 MATHARU ELECTRIC WORKS Detail Report
Graph / Photo
348 Day to day maintenance of all E and M installations 02/08/2021 01/08/2023 31.77 A K Electric Works Detail Report
Graph / Photo
349 RMO E and M services at New Delhi District Court Complex at Rouse Avenue, DDU Marg, New Delhi (SH: Operation of EI and fans and Centralized air conditioning system and Johnson make 16 passenger lifts) 10/06/2021 09/06/2022 31.67 M/s Parasar Electricals & Refrigeration Work in Progress Detail Report
Graph / Photo
350 SITC of Water Coolers at Various locations at Lok Nayak Hospital, New Delhi 02/09/2019 01/11/2019 31.67 M/s Vivek Associates work in progress by Vivek Associates Detail Report
Graph / Photo
351 A/R and M/O Residential Building under Sub Division North-West B-6, PWD during 2021-22 SH: (A) Attending Day to Day Labour Complaints And Other Misc Work. at D.A. Flats, Nimri Colony, Ashok Vihar, Delhi. (B) Attending Day to Day Labour Complaints at Aryabhatt Enclave, Sawan Park Colony, Ashok Vihar, Delhi) 13/09/2021 12/09/2022 31.57 16.76 (Jun'22) 0.00 (Jun'22) RAJIV RANJAN Detail Report
Graph / Photo
352 RMO Electrical and Mechanical services at MV Hospital Pooth Khurd Delhi SH Operation Routine Maintenance and preventive maintenance of IBR approved Steam Boiler 25/06/2019 24/05/2020 31.31 Kamal Engineers Work in progress Detail Report
Graph / Photo
353 SH- Repair and Up-gradation of Electrical Installation of residential quarters and toilet block at police station 06/08/2018 05/10/2018 31.30 13.02 (Nov'19) 0.00 (Nov'19) Prem And KP Electric Co. Detail Report
Graph / Photo
354 SH- Maintenance and Operation of split AC, Pressurization and Ventilation at Delhi Sachivalaya, New Delhi 05/07/2018 04/07/2019 31.26 6.04 (Sep'19) 0.00 (Sep'19) KELVIN ASSOCIATES Detail Report
Graph / Photo
355 Urgent repair work for FRRO Building, Lampur, Delhi-110040 21/07/2022 19/10/2022 31.23 Ankur Bhardwaj Detail Report
Graph / Photo
356 Renovation of TCPC (Rehabilitation Complex) Block No.-1, Lajpat Nagar-II, New Delhi during 2019-20. 25/07/2019 24/10/2019 30.89 SABUR ALAM Detail Report
Graph / Photo
357 RMO CCTV, sub-station, DG sets, UPS system, RO and compressed air system at MAIDS, New Delhi. SH CMC of 3x200KVA UPS at MAIDS 26/12/2017 25/12/2020 30.87 8.00 (Jan'19) 25.92 % (Jan'19) POWER HOUSE Work in progress by M/s Power House Detail Report
Graph / Photo
358 Providing Services of Carpenter, Plumber, Enquiry Clerk, Sewerman , Mason and Beldar at PWD Service Centre M-3212, Tis Hazari Court, Delhi 01/01/2022 26/12/2022 30.82 D.S. Construction Co Detail Report
Graph / Photo
359 Reconstruction of Collapsed Boundary wall PL vitrified floor tiles and PF SS railing on staircase 30/09/2021 28/12/2021 30.71 28.28 (Mar'22) 0.00 (Mar'22) N.M. CONSTRUCTION CO. Detail Report
Graph / Photo
360 (SH- Routine maintenance and Operation of EI and Fans, Fountains and Pump Sets, DG Sets, Fire Alarm System and Fire Fighting System ). 19/03/2019 18/03/2020 30.69 26.51 (Feb'20) 0.00 (Feb'20) Kamal Electrical Works Detail Report
Graph / Photo
361 Operation and maintenance of Pelco Make CCTV surveillance system at Rouse Avenue Court Complex, DDU Marg, New Delhi 31/03/2022 30/03/2023 30.55 Sonal Enterpries Pvt. Ltd. Work in Progress Detail Report
Graph / Photo
362 Mechanized Cleaning of over head tank and underground tank. 20/06/2019 19/06/2020 30.29 18.31 (Aug'20) 0.00 (Aug'20) UNITECH WATER SLOUTIONS work in progress Detail Report
Graph / Photo
363 Pdg.fixing solar hybrid street light system for existing 90 to 120 watt street light Supported by solar Photo Voltaic Power generation System 20/02/2022 19/03/2022 30.24 10.32 (Apr'22) 0.00 (Apr'22) Electric India Control Devices Detail Report
Graph / Photo
364 Providing centralized air conditioning by VRV System in Mortuary complex at MAMC New Delhi. 15/05/2022 14/07/2022 30.19 Sai Aircon Engineers Detail Report
Graph / Photo
365 A/R & M/O to various Building under jurisdiction of Sub Divn. M-2221 D.C. office Nand Nagari, Delhi & Sub Divn.M-2222, Dilshad Garden, Delhi dg 2021-22 .( SH: Attending day to day complaints) 14/09/2021 13/09/2022 30.05 15.23 (May'22) 0.00 (May'22) R R Realtors Detail Report
Graph / Photo
366 Relocation of School Gates by Raising the Height with S.S. Gates. Construction of Planters, Renovation of School Libraries and Computer Lab alongwith HOS Toilet and White Wash in School Building with Minor Repair Work. Railing and Ramps for CWSN Students in Ist, IInd and IIIrd Floors. 02/05/2022 01/09/2022 29.90 17.19 (Jul'22) 0.00 (Jul'22) N Y Construction Detail Report
Graph / Photo
367 Provision of barrier free environment as per Accessible Audit Report for MAIDS 11/01/2020 08/07/2020 29.82 5.21 (Jun'22) 0.00 (Jun'22) Shabab Khan

work completed

Detail Report
Graph / Photo
368 Providing Services of Computer Operator, Office Assistant & MTS in the Office of Executive Engineer(E), PWD EMD South East (M-452) & Sub –Division-I, Thyagraj Stadium, New Delhi 26/07/2022 23/07/2023 29.64 R. DIAMOND ENTREPRISES Detail Report
Graph / Photo
369 Upgradation of EBR based ETP plant at Dada Dev Child and Maternity Hospital. Nasirpur, New Delhi. 15/06/2019 14/08/2019 29.55 Wellkome engineers Detail Report
Graph / Photo
370 Internal and external repair/maintenance like Grit wash plaster and renovation of Flat No. 661, 666 and 667, Delhi Govt. Officers Flats, Asian Games Village, New Delhi 04/12/2021 03/04/2022 29.47 S.B.Constructions Detail Report
Graph / Photo
371 Providing work station in Room No.104 first floor and Room No.201 second floor, Administration Block District Court Complex Saket, New Delhi 07/04/2021 06/06/2021 29.32 11.67 (Aug'22) 0.00 (Aug'22) Delite Hi- Tech Furniture India Pvt. Ltd. Detail Report
Graph / Photo
372 Rewinding of wornout 1500 KVA HT AVR Transformer Andrew Yule make and providing of protection accessories of HT AVR and HT panel at Sub-Station No.1,2 3 GIPMER 18/03/2022 17/06/2022 29.32 36.52 (Jun'22) 0.00 (Jun'22) Harsh India Enterprises Detail Report
Graph / Photo
373 Providing and fixing Solar Hybrid street light system supported by Solar photo voltaic power Generation System 23/05/2022 22/06/2022 29.31 36.54 (Jul'22) 0.00 (Jul'22) SAFTY Engineers, PAN: AARPW4473E, Address: 1836/3F, Shp No. 8, Bhagirath Place, New Delhi-72 Detail Report
Graph / Photo
374 Annual Comprehensive Maintenance Contract of Johnson Make lift installed at Police Housing Complex, Mandoli Delhi.. 07/11/2021 06/11/2022 29.23 22.51 (Jun'22) 0.00 (Jun'22) Johnson Lift Pvt Ltd Work is in progress Detail Report
Graph / Photo
375 Renovation of room & class room at 6th floor, surgical Block and replacement of old damaged flush door of surgical Block at Lok Nayak Hospital,New Delhi 09/05/2022 06/09/2022 29.22 15.11 (Jun'22) 0.00 (Jun'22) sabur alam

work completed

Detail Report
Graph / Photo
376 (A) Repairing of Toilet Block, Repairing & Leveling of corridor, Painting & Repairing of Classroom doors, Water proofing of sunken portion and tank platform (B) Interior and exterior painting work with minor repair (Sch. ID- 1310458), (Bldg. ID-13101923) & (EOR ID-20221344) 07/07/2022 05/10/2022 29.20 Suresh Kumar and Sons Detail Report
Graph / Photo
377 Replacement of old rusted/worn out Condenser lines and valves of Central A.C plants at L. N. Hospital, New Delhi 01/06/2022 31/07/2022 29.19 G D Enterprises Detail Report
Graph / Photo
378 RMO Fire Alarm and Fire Fighting system Water Purification System RO CCTV and Audio Visual system of College building and Hostel building at MAMC, New Delhi . SHComprehensive maintenance and Operation of CCTV Surveillance system installed at vario 15/06/2019 14/06/2022 29.09 Pan Intellecom Ltd work in progress by M/s Pan Intellecom Ltd. Detail Report
Graph / Photo
379 1.RMO EI Fans Pump Set, Wet Riser sub-station, Pumps, DG SetAC Equip Central AC Plant Sys.at AAA Govt. Hosp.2 RMO Electr Mech Service at STC-9 Metcafe Road, Delhi SHComprehensive Operation and Maint. of Complaint Tracker System 03/09/2019 02/09/2021 29.07 SCS Technologies Work in progress by SCS Technologies Detail Report
Graph / Photo
380 Additional office space and other facilities to Prosecution Branch and Renovations in Prosecution Branch at Saket Court Complex, New Delhi 28/03/2022 27/06/2022 29.04 Rajesh Sethi Detail Report
Graph / Photo
381 Operation and Maintenance of Electrical Installation and Pumps 14/09/2021 13/09/2022 28.83 SEHRA ELECTRIC works Detail Report
Graph / Photo
382 Replacement of existing ACs and fitting at various zone offices at MSO Building, I.P Estate, New Delhi. 08/07/2017 07/10/2017 28.77 Cool Rays Detail Report
Graph / Photo
383 Renovation of Mess and all toilets in New Wing Sanjeevani Hostel (OGH) MAMC 19/11/2021 17/01/2022 28.75 6.98 (Jun'22) 0.00 (Jun'22) MOHD AFTAB

work completed

Detail Report
Graph / Photo
384 Comprehensive Annual Maintenance of HVAC Plant at DDU Court Complex, Rouse Avenue, New Delhi. 10/11/2021 09/11/2022 28.71 9.57 (Aug'22) 0.00 (Aug'22) Voltas Ltd. Work in progress Detail Report
Graph / Photo
385 Supply and replacement of old outlived transformers at Sub-Station No. 1 in GIPMER New Delhi. Sh SITC of Cast resin dry type transformer 1000 KVA 09/09/2019 08/12/2019 28.71 AVON ELECTRICALS Work in progress by Avon Electrical Detail Report
Graph / Photo
386 Providing and fixing work station at A Block Basement, RKD Branch and Vth floor, Administrative Block i/c providing of chambers for Joint Registrars and Assistant Registrars, Delhi High Court, New Delhi 20/01/2022 20/03/2022 28.32 27.73 (Jun'22) 0.00 (Jun'22) R L WADHWA Work progress Detail Report
Graph / Photo
387 ARMO various Electrical and mechanical services at District Court Rohini, Delhi. dg 2021-22 28/02/2022 22/05/2022 28.28 LAXMI ELECTRICALS Detail Report
Graph / Photo
388 Non -Comprehensive Annual Maintenance of CARRIER CHILLER 26/03/2022 25/03/2023 28.23 5.95 (Jul'22) 0.00 (Jul'22) G D Enterprises Detail Report
Graph / Photo
389 Providing and fixing of M.S. Tubular window with acrylic plastic sheet and covering of staircase by IRC fabric, Balance Work (Recall of Tender) 23/07/2021 20/11/2021 28.22 26.97 (Mar'22) 0.00 (Mar'22) KAMAAL CONSTRUCTION CO. Detail Report
Graph / Photo
390 ARMO various Electrical and mechanical services at NCC Bhawan, Home for Mentally Retarted Asha Kiran Complex, Avantika Rohini Delhi. dg 2021 22 24/02/2022 23/02/2023 28.12 LAXMI ELECTRICALS Detail Report
Graph / Photo
391 Replacement of Two Passengers Lift having capacity to carry 8 persons installed in Lawyers Chamber Parking Block H at District Court Karkardooma Courts Delhi. 28/07/2018 27/03/2019 28.10 13.09 (Oct'19) 0.00 (Oct'19) Johnson Lifts Pvt. Ltd. Work in progress Detail Report
Graph / Photo
392 Replacement of damaged / rusted Fire Fighting pipeline and various other accessories of fire fighting System 10/06/2022 09/08/2022 28.00 M/s Royale Meridian India Pvt Ltd Detail Report
Graph / Photo
393 Repair and Maintenance of all shafts in A, C, B & Academic block G.B. Pant Hospital 20/05/2022 16/09/2022 27.99 Shashank Shekhar Singh

work completed

Detail Report
Graph / Photo
394 Repair of roof, renovation of toilet blocks and providing stair case for connecting with other misc. work 04/08/2022 02/11/2022 27.95 M H Builders Detail Report
Graph / Photo
395 Repairing and replacement of sagged ceiling at 6th floor of court rooms 12/05/2022 11/08/2022 27.94 Rajesh Sethi Detail Report
Graph / Photo
396 Replacement of Damaged Water Pipe Line in KIT Campus 16/05/2022 15/06/2022 27.80 UR Construction Detail Report
Graph / Photo
397 Providing and replacement of maintenance free battery with UPS for DEM Block and UCMS College Block for costly equipments and computer system only at GTB Hospital, Shahdara, Delhi 13/04/2019 12/06/2019 27.78 25.00 (May'19) 0.00 (May'19) M/s Vivek Associates Work completed Detail Report
Graph / Photo
398 Provision of additional RCC stair Case For Fire NOC in newly constructed building from ground floor to terrace level, minimum 1.5 meter wide and Related Works 25/12/2021 24/06/2022 27.77 2.67 (Mar'22) 0.00 (Mar'22) Friends Constructions Detail Report
Graph / Photo
399 (A) Pvdg./ren./rep. of ramps, railing, tactile tiles, signage etc. to make school bldg. and environment barrier free and accessible. (B) Affixing acrylic sheets in place of broken/missing window pans at SBV Narela, Delhi-110040. 15/08/2022 14/11/2022 27.62 ES TEE SOLUTIONS Detail Report
Graph / Photo
400 SITC of Fire alarm system in Gynae ward Block at Lok Nayak Hospital, New Delhi. 21/05/2022 20/07/2022 27.57 R.C.C. Enterprises Detail Report
Graph / Photo
401 A/R & M/O to Saket Court Complex (Non - Residential) under Sub-Division-I, BMSD-1, PWD During 2021-22. Saket, New Delhi.(SH:- Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc 08/10/2021 07/04/2022 27.50 RAKSHAK SECURITAS PVT. LTD. Detail Report
Graph / Photo
402 Repair of boundary wall waterproofing treatment on roof and replacement of damaged sewer 11/07/2021 09/11/2021 27.31 33.90 (Mar'22) 0.00 (Mar'22) M T Builders Detail Report
Graph / Photo
403 RMO various electrical mechanical services at RTRM Hospital, Jaffarpur, New Delhi (SH Annual routine maintenance of 10000 LPH RO Plant) 14/06/2019 13/06/2021 27.29 Graphite Works Detail Report
Graph / Photo
404 Upgradation of EBR based ETP Plant at RTRM Hospital, Jaffarpur, New Delhi 03/07/2019 02/09/2019 27.24 Wellkome engineers Detail Report
Graph / Photo
405 EOR to EI AND Fans Air Conditioners Security Lighting and PA System at Govt. Girls Sr. Sec. School Jhilmil Colony Delhi. School ID- 1001111 17/08/2018 16/10/2018 27.23 15.03 (Jan'20) 0.00 (Jan'20) CHETAN ENTERPRISES Detail Report
Graph / Photo
406 Civil Work and Electrical Work in Rohini, Rithala, Tri Nagar, Shalimar Bagh and Wazirpur Total 41 Nos. Schools of NWB-1 (Remaining Work). (Composite Work Civil and Electrical) 07/02/2022 06/06/2022 27.17 Laxman Detail Report
Graph / Photo
407 RMO E & M Services in Lawyers chambers Block D,E,F,G and H at District Court Karkardooma Delhi. (SH:- Providing, Data Entry/Computer Operators, Messengers cum Peon etc. for Division and Sub Division office) 18/10/2018 17/10/2019 27.11 30.54 (Feb'20) 0.00 (Feb'20) RAKSHAK SECURITAS PVT. LTD. Detail Report
Graph / Photo
408 Augmentation and Modification of Effluent Treatment Plant 50 KLD capacity for processing, controlling and online transfer and correction of transfer of data based on MBR technology at Pt. Madan Mohan Malviya Hospital, Malviya Nagar, New Delhi 03/07/2019 02/09/2019 26.95 Texol Engineers Detail Report
Graph / Photo
409 Sh Providing and replacing of M-PACT series unserviceable ACB of GE Make in Main LT panel in Delhi Sachivalaya, New Delhi 01/10/2018 30/11/2018 26.88 Master Engineering Services Detail Report
Graph / Photo
410 Providing Services of Computing and official work. 27/09/2018 26/09/2019 26.88 32.88 (Aug'21) 0.00 (Aug'21) Krishna Electreical Works Detail Report
Graph / Photo
411 Repair and Renovation of Toilets) (Balance work) 16/05/2022 15/01/2023 26.87 A R CONSTRUCTION CO. Detail Report
Graph / Photo
412 Replacement of 2 Nos old outlived lifts in New Medical block at L.N.H ND 27/01/2022 26/07/2022 26.43 NEUTECH ELEVATOR SYSTEM Detail Report
Graph / Photo
413 Providing & Laying of Cellulose system i/c operation & maintenance for 2 years after completion of work 10/07/2022 08/08/2022 26.20 26.26 (Jul'22) 0.00 (Jul'22) Ever Green Enterprises Detail Report
Graph / Photo
414 SH-Providing EI and AC Plant 30/08/2018 29/09/2018 26.10 32.60 (Jan'22) 0.00 (Jan'22) Krishna Electrical Works Detail Report
Graph / Photo
415 Providing Covered passage between A Block Master Amir Chand Block removing the dome at roof level and covering the passages for preventing entrance of pigeons in the wards OTs at all seven etc 15/10/2020 15/12/2020 26.09 Aar Kay Builders

work completed

Detail Report
Graph / Photo
416 Pdg. , fixing of electrical accessories, Water Cooler, RO system, PA System, CCTV system , DG Set in proposed conference room, TIP room, Kharja room at JJB-II, OHB-I, department of women, child development, Delhi Gate, New Delhi. 14/09/2017 13/11/2017 26.03 Image Communication System Detail Report
Graph / Photo
417 SITC and Replacement of unserviceable/condemned Air Conditioning Units at JPCH Shastri Park, Delhi 13/04/2019 12/06/2019 25.97 Honey Collection, Address : B-3/105, Paschim Vihar, New Delhi-63 Work completed Detail Report
Graph / Photo
418 Supply installation testing commissioning of CCTV surveillance system Boom barrier at Hospital Gate L.N.H ND (SITC of CCTV) 02/03/2022 01/05/2022 25.80 SANSQUARE AUTOMATION PVT. LTD. Detail Report
Graph / Photo
419 Renovation of Incubation Centre in old Administrative Block, IGDTUW, Kashmere Gate, Delhi. 20/08/2017 19/11/2017 25.74 Sehra Electric Works Detail Report
Graph / Photo
420 Routine Maintenance of EI , Fans, compound light and Routine maintenance and operation of Drinking water supply pump set, electrical sub-station, DG Set , fire fighting system 07/09/2017 06/09/2018 25.68 Krishna Electrical Works Detail Report
Graph / Photo
421 Constructing Sitting Area in Basket Ball Ground and Laying Interlocking Tiles in School 22/07/2022 21/09/2022 25.67 A R CONSTRUCTION CO. Detail Report
Graph / Photo
422 (A) Providing/renovation/repair of ramps, railing, tactile tiles, signage etc. to make school building and environment barrier free & accessible. (B) Affixing acrylic sheets in place of broken/ missing window pans at SBV Narela, Delhi - 110040. (Sch Id. 1310017) (Bldg. Id. 13101207) (EOR Id -20191761 / 20211053) 18/04/2022 16/07/2022 25.56 MOHD FIROZ KHAN Work in Progress Detail Report
Graph / Photo
423 Providing and fixing APP sheet, i/c repair of expansion gap all height with false ceiling & gypsum board, calcium silicate tiles, replacement of damaged flooring with marble stone and vitrified tiles i/c replacement of damaged G.I. main water supply line at terrace and other misc. works at Saket Court Complex 10/11/2021 09/05/2022 25.48 Afjal Construction Detail Report
Graph / Photo
424 1) Providing facilities for person with disability at CAW CELL Building, Sector-3, Rohini, New Delhi. 2) Providing facilities for person with disability at Police station South Rohini, Sector-3, New Delhi. (SITC of Lifts) 25/04/2022 24/06/2022 25.47 Escon Elevator Pvt. Ltd Detail Report
Graph / Photo
425 Comprehensive Maintenance Contract of Johnson Make Lifts at Casualty Block OPD Block 04/12/2021 03/12/2022 25.41 Johnson Lifts Pvt. Ltd. Detail Report
Graph / Photo
426 Comprehensive maintenance and RMO of AV system 07/02/2022 06/02/2023 25.35 RST Technologies Pvt. Ltd. Detail Report
Graph / Photo
427 Providing & Fixing M.S Wire Gauge Doors & Windows, Parking Shed & Other Misc. Work 12/06/2022 11/09/2022 25.16 Mohd. Mairaj Detail Report
Graph / Photo
428 RMO of Sub station DG Set and EI Work 26/06/2018 25/06/2019 25.03 23.51 (Apr'19) 90.00 % (Apr'19) Swastik Electrotech Pvt. Ltd. Work transferred and in progress Detail Report
Graph / Photo
429 MOEI and fans, fire alarm system and lifts at B.L. Taneja Block, MAMC, New Delhi. SH Comprehensive Maintenance of OTIS make Lifts 06/03/2018 05/03/2021 25.01 5.88 (Apr'19) 0.00 (Apr'19) Otis Elevator Company (India) Ltd. Work in progress Detail Report
Graph / Photo
430 Finishing work 21/07/2022 17/03/2023 24.91 SHRI BHAGWAN MITTAL Detail Report
Graph / Photo
431 Providing LED Display Board, Smart LED TV, Video Conferencing System and various Electronic accessories at Acharya Shree Bhikshu Govt. Hospital, Moti Nagar, New Delhi 23/03/2019 22/06/2019 24.90 PRAGATI ENGINEERS Detail Report
Graph / Photo
432 Comprehensive Maintenance/SITC of Network Booster System 08/07/2022 07/07/2023 24.88 R. DIAMOND ENTREPRISES Detail Report
Graph / Photo
433 Day to day running, maintenance and operation of all E&M installations 12/05/2022 11/05/2023 24.88 2.53 (Jun'22) 0.00 (Jun'22) M/s Parasar Electricals & Refrigeration Detail Report
Graph / Photo
434 Providing One No. Goods/ Services Lift (Ground +7th Floor) in Residential Block O at District Court Karkardooma Delhi. 04/01/2019 03/07/2019 24.81 17.21 (Oct'19) 0.00 (Oct'19) Johnson Lifts Pvt. Ltd. Detail Report
Graph / Photo
435 SITC of Network Booster System Left Wing Side & Other Remaining Locations 16/07/2022 15/08/2022 24.80 R. DIAMOND ENTREPRISES Detail Report
Graph / Photo
436 1 Operation Maintenance and watch and ward of Pumps S/Stn DG Set EI and Fans and RUB Sub Way underneath of the flyover and Vrs locations under M-251. 2 MOEI Fans and RMO P/Set at Dr. B R Ambedkar College and Resi. complex. 3 RMO E and M Services at PTS Wazirabad. 4 EOR to Pdg. and repairing of Existing F/F System at SKV DDA Flats East of Loni Road (Sch ID- 1106024) (SH- Painting of Pumps DG Sets Panels and Transformer etc and Pdg. and Fixing of E.I. at Vrs Storm Water Pump House at Trans Yamuna area) 27/11/2018 26/03/2019 24.78 A K Electric Works Work in progress Detail Report
Graph / Photo
437 Rain Water Harvesting 17/08/2018 16/10/2018 24.70 23.10 (Nov'19) 0.00 (Nov'19) Shekhar

work completed

Detail Report
Graph / Photo
438 Renovation of Administration Block ground and 1st floor at DDU Hospital, Hari Nagar, New Delhi 09/04/2019 08/07/2019 24.66 Electro Mech Engineers Detail Report
Graph / Photo
439 Providing and fixing Bus trunking power tracking system in room No. 213, 219 and 224 at UCMS of GTBH Shahdara, Delhi 15/09/2017 14/11/2017 24.58 18.43 (Mar'18) 50.00 % (Mar'18) Flair Tech Work in progress..3RD RA 2501802 Detail Report
Graph / Photo
440 Misc. Civil repair works in Court Rooms, Chambers and Branches . 29/06/2022 27/09/2022 24.58 Shyam Sundar Tyagi Detail Report
Graph / Photo
441 Comprehensive Maintenance of UPS System 20/05/2022 19/05/2023 24.53 Labotek Detail Report
Graph / Photo
442 Comprehensive maintenance of 10 Nos. Johnson make lifts at DDU Court complex, new delhi 05/11/2021 04/11/2022 24.50 Johnson Lifts Pvt. Ltd. WORK IN PROGRESS Detail Report
Graph / Photo
443 Construction of shed with Polycarbonate sheet around the building, construction of sps type pantry and convert the toilet into store Room at DIP Campus Delhi 27/06/2022 25/08/2022 24.42 SHRI BHAGWAN MITTAL Detail Report
Graph / Photo
444 RMO various Electrical and Mechanical Services installed at CNBC, Geeta Colony, Delhi Sub Head Operation and annual comprehensive maintenance of ETP plant of 100KLD 17/05/2018 16/05/2020 24.36 10.79 (May'19) 20.00 % (May'19) Green Way Technologies Work in Progress (IInd RA) Detail Report
Graph / Photo
445 RMO sub-Station including DG sets sub station at MAMC, New Delhi. (Comprehensive maintenance of 1500 KVA HT AVR Andrew Yule make) 01/06/2022 31/05/2025 24.30 Harsh India Enterprises Detail Report
Graph / Photo
446 EOR at GGSSS, Mandoli Extn. Delhi (School ID: 1106259). (SH: Raising of boundary wall, Renovation of Principal rooms of both shifts & C/o attached toilet with Principal room, P/f doors of classroom, replacement of window panes & misc. civil works) 02/04/2022 30/06/2022 24.27 Krishan Azad Detail Report
Graph / Photo
447 Comprehensive maintenance of buildings including supply of materials and engaging labours for day to day maintenance 15/07/2022 14/07/2023 24.21 N.M. CONSTRUCTION CO. Detail Report
Graph / Photo
448 Providing the services of Skilled, Semi-Skilled and Un-Skilled staff for day to day maintenance at DIPSAR Complex. 26/06/2019 25/12/2019 24.20 15.58 (Feb'21) 0.00 (Feb'21) RAKSHAK SECURITAS PVT. LTD. work in progress Detail Report
Graph / Photo
449 Routine Operation and Maintenance of Wellkome Make 600 KLD ETP based on EBR Technology at Orthopedic Block 09/04/2022 08/04/2023 24.15 Wellkome engineers Detail Report
Graph / Photo
450 RMO of UPS and Boiler at GIPMER, NDShComprehensive maintenance of APC make UPS 19/08/2019 18/08/2022 24.10 power house Work in progress by Power House Detail Report
Graph / Photo
451 RMO of AC Plant and AHUs installed in the Main Court Building at District Court Complex, Saket, ND -17. (SH- Annual Comprehensive maintenance of High Side HVAC Plant of 5x400 TR Capacity Mequay i.e. Daikin Make Central Air Conditioning Plant). 09/05/2018 08/02/2019 24.10 30.08 (Aug'19) 70.00 % (Aug'19) Daikin Airconditioning India Private Limited Detail Report
Graph / Photo
452 Rain Water Harvesting for Ortho Block OT MRD Block PG womens Hostel and B L Taneja Block at Lok Nayak Hospital New Delhi 24/07/2021 21/09/2021 24.04 16.32 (Jul'22) 0.00 (Jul'22) NATIONAL BUILDERS

work completed

Detail Report
Graph / Photo
453 1) Comprehensive Maintenance Contract of ECE make lifts at Surgical Ward and Special Ward, 2) Comprehensive Maintenance of ECE Make Lifts at MAIDS 27/10/2021 26/10/2023 23.94 ECE INDUSTRIES LIMITED Detail Report
Graph / Photo
454 Renovation of Electrical Installations, Wiring, Switch Board etc. at Forensic Science Lab., Madhuban Chowk, Sector - 14, Rohini, Delhi dg. 2021-22 17/03/2022 16/06/2022 23.94 6.69 (Jul'22) 0.00 (Jul'22) M/s R S Electric Co. Detail Report
Graph / Photo
455 Annual Maintenance of cummins make DG sets and Kirloskar make DG set at L.N. Hospital 30/10/2019 29/10/2021 23.89 OVN TRADING ENGINEERS PVT LTD work in progress by OVN Trading Engineers Pvt. Ltd Detail Report
Graph / Photo
456 (Providing and fixing of iron profile shed over mud houses) 3rd call 09/03/2019 08/04/2019 23.86 11.26 (Mar'21) 0.00 (Mar'21) Shekhar

work completed

Detail Report
Graph / Photo
457 RMO EI, Compound Lights, Lifts, Water supply pumps, Fire Fighting system, Fire Alarm System, Sub-Station and 500 KVA DG sets at Delhi Police Station & attached staff qtrs sector-17, Dwarka, New Delhi. 17/01/2019 16/01/2020 23.85 Azad Electricals Detail Report
Graph / Photo
458 Routine maintenance and operation of Fire Fighting, Water supply and Fire Alarm system 16/05/2018 15/05/2019 23.83 23.44 (Apr'19) 98.00 % (Apr'19) Swastik Electrotech Pvt. Ltd. Work transferred and in progress Detail Report
Graph / Photo
459 EOR for Upgradation of Casualty Block and Dental Department of RTRM Hospital, Jaffarpur, New Delhi 17/06/2021 14/10/2021 23.79 Rajesh Sethi Work is under progress. Detail Report
Graph / Photo
460 Development of 2 wheeler parking for judicial staff at back side courtyard of Annexe II building and renovation of waiting room near Lock Up at Tis Hazari Court,Delhi 17/04/2022 31/05/2022 23.71 D.S. Construction Co Detail Report
Graph / Photo
461 Comprehensive maintenance operation of BOSCH make IP based CCTV installed at D Block 03/04/2022 02/04/2023 23.63 Pan Intellecom Ltd Detail Report
Graph / Photo
462 Replacement of unserviceable and out dated cold storage body cabinets by New Walk in cold store with SS Rack in Mortuary at MAMC, ND 08/04/2022 07/07/2022 23.54 19.57 (May'22) 0.00 (May'22) G D Enterprises Detail Report
Graph / Photo
463 EI and Fan Works 22/02/2022 23/08/2022 23.53 R S ELECTRICALS Detail Report
Graph / Photo
464 Renovation of Main ICU at GTB Hospital complex, Shahdara, Delhi. 12/06/2020 11/06/2022 23.49 Labotek Detail Report
Graph / Photo
465 RMO RO Plants, Water Softening Plants and Comprehensive Maintenance of Water Coolers, Water Purifiers installed at GGSGH, Raghubir Nagar (SH Running Operation and Maintenance of 100000LPD Water Softening Plant, 4000 LPH and 3000 LPH RO Plants) 16/06/2019 15/06/2021 23.45 A TO Z Engineering Works Detail Report
Graph / Photo
466 Supply and replacement of existing old and unserviceable Air Circuit Breaker and MCCB by enhanced capacity at Sub station No. 3 and 4 at L.N. Hospital New Delhi. 22/12/2019 21/02/2020 23.45 AVON ELECTRICALS work in progress by Avon ELectrical Detail Report
Graph / Photo
467 Repair and Renovation of Toilets (Balance work) 23/01/2022 22/09/2022 23.41 Pankaj Gureja Detail Report
Graph / Photo
468 Repair and Renovation in Flat No. A-03, Type-VI and Other Misc. repair works in Flats at D-II Flats Vasant Kunj, New Delhi 13/03/2022 25/04/2022 23.39 12.09 (Jul'22) 0.00 (Jul'22) BABU LAL GUPTA Detail Report
Graph / Photo
469 Comprehensive Maintenance of vinitec make Automatic Voltage Stabilizer 04/10/2020 03/10/2022 23.24 17.30 (Jun'22) 0.00 (Jun'22) Harsh India Enterprises Work in progress by M/s Harsh India Enterprises Detail Report
Graph / Photo
470 1).RMO of central AC plant/ Package unit at DDU Hospital, Hari Nagar, New Delhi, 2). RMO A.C. Plant/ Screw type at Trauma Block at DDU Hospital, Hari Nagar, New Delhi (SH Maintenance of Servicing of Package Units and Central AC Equipment) 11/04/2019 10/06/2019 23.17 PMG ENGINEERS Detail Report
Graph / Photo
471 Comprehensive Maintenance of OTIS makes Lifts 18/02/2021 17/02/2023 23.16 Otis Elevator Company (India) Ltd. Work in progress by M/s Otis Elevator Company (India) Ltd. Detail Report
Graph / Photo
472 Fencing of 11 Nos. AAMC under construction under South District. 11/01/2020 10/05/2020 23.14 17.68 (Mar'21) 0.00 (Mar'21) Sanjeev Kumar Goel

work in progress

Detail Report
Graph / Photo
473 Construction of boundary wall, Parking Shed and development of ground etc. 23/02/2019 22/04/2019 23.09 11.45 (Aug'20) 0.00 (Aug'20) Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094

work completed

Detail Report
Graph / Photo
474 Comprehensive Maintenance of Johnson make Lifts 05/01/2022 04/01/2024 23.05 4.69 (Aug'22) 0.00 (Aug'22) Johnson Lifts Pvt Ltd Detail Report
Graph / Photo
475 Demolition of existing old/ dilapidated single storey class room/ building (55 year old) in the GBSSS, Katewara, Delhi (School ID 1310010) 15/07/2022 13/09/2022 23.01 M I BUILDERS Detail Report
Graph / Photo
476 Operation of PA System Committee Room No. 1,2 and MLA Lounge. Annual Comprehensive Maintenance of PA System Committee Room No. 1, MLA Lounge No. 2 and DIP 25/06/2020 24/06/2022 22.97 25.51 (Jun'22) 0.00 (Jun'22) Ambica Electricals

Work in Progress

Detail Report
Graph / Photo
477 (SH-Servicing/Maintenance of WTAC/STAC/Hot and Cold Split A.C and Water Coolers situated in different buildings under the different sub divisions) 25/02/2019 24/02/2020 22.91 27.25 (May'20) 0.00 (May'20) Krishna Electrical works Detail Report
Graph / Photo
478 Providing and placing compactor storage unit & furniture items at 1st floor of E Block, DC Office Complex, Nand Nagri, Shahdara, Delhi - 110093 27/05/2022 25/06/2022 22.90 Modern Office System Detail Report
Graph / Photo
479 Providing and fixing Bipolar Ionizer based Air Purification System in Surgical Block ground to 4th Floor 18/06/2022 17/09/2022 22.80 28.74 (Jul'22) 0.00 (Jul'22) V A Associates Detail Report
Graph / Photo
480 A/R and M/O to Saket Court Complex (Residential) under Sub-Division-I, BMSD-1, PWD During 2021-22. Saket, New Delhi(ID : 70268) 12/10/2021 11/04/2022 22.80 15.20 (May'22) 0.00 (May'22) RAHUL CONSTRUCTION Detail Report
Graph / Photo
481 Annual Service contract of 4 Nos. x 1010 KVA and 2 Nos. x 500 KVA DG Sets installed at Mandoli Prison Complex, including B Check. 11/11/2021 10/11/2022 22.78 0.89 (May'22) 0.00 (May'22) Lanvs Greek India Private Limited work is in progress Detail Report
Graph / Photo
482 Conversion of Barracks into Special Security Wards & Other Misc. Work 25/06/2022 24/10/2022 22.74 RAJIV RANJAN Detail Report
Graph / Photo
483 Upgradation of 3 Nos staff rooms of GNCTD Schools under Jurisdiction of DHC Division PWD dg 2018 19 25/12/2018 22/02/2019 22.73 17.72 (Nov'20) 0.00 (Nov'20) Sher Singh Work in progress Detail Report
Graph / Photo
484 Provision for RO plant for drinking water supply in various Hostels at MAMC New Delhi. 01/01/2020 29/02/2020 22.71 M/s Vivek Associates work in progress by agency Detail Report
Graph / Photo
485 Comprehensive maintenance of Microprocessor based security calling display system at New Medical Block Children ward,OT Bloc, Surgical Block at L.NH ND 21/02/2022 20/02/2024 22.68 AKOUSTIK COMMUNICATIONS Detail Report
Graph / Photo
486 Renovation of Main Entry Gate, Sign Board, Provision of Shed, Renovation of Gents/Boys Toilet, Replacement of Window/Door and Other Misc. Work 25/06/2022 24/10/2022 22.67 BHARAT SINGH Detail Report
Graph / Photo
487 Renovation of Dressing Room in Casualty, Waterproofing at OPD block terrace and providing and fixing wall mounted lockers / cupboards in Doctors duty room, Pediatrics OPD and Minor OT 14/04/2022 12/06/2022 22.62 8.03 (Jul'22) 0.00 (Jul'22) Waqaruddin Work is under progress. Detail Report
Graph / Photo
488 Comprehensive Maintenance of Topaz make Lift Voice Announcement system 13/09/2020 12/09/2022 22.62 M/s TOPAZ SERVICES CORPORATION Work in progress by M/s Topaz Services Corporation Detail Report
Graph / Photo
489 RMO EI and Fans Lifts Pumps Water Supply Sub Station DG Set HVAC Fire Fighting and Fire Alarm at DDU College at Sec3 Dwarka New Delhi SH Comprehensive maintenance of Central AC System and RMO of Central AC and VRV System 26/07/2018 25/07/2019 22.61 21.32 (Jul'19) 65.00 % (Jul'19) M/s Snowmex Engineers Ltd. Work transferred and in progress Detail Report
Graph / Photo
490 Extension of existing PA System of FBT make in Children ward,gynae ward burn ward at L.N. Hospital, New Delhi. 05/07/2022 04/09/2022 22.59 AKOUSTIK COMMUNICATIONS Detail Report
Graph / Photo
491 RMO Works AC Installed at Delhi Sachivalaya, New Delhi. 13/12/2018 12/02/2019 22.58 0.56 (May'22) 0.00 (May'22) AirTemp Engineers Detail Report
Graph / Photo
492 Provision for Rain Water Harvesting Systems in SBV Gokhle Marg, GGSSS Nicholson Road Mori Gate, GGSSS Diwan Hall Chandni Chowk and Govt. Co Education Sec. School Sushila Mohan Marg Naya Bazar under SRD Project Division-I, Sub-Division-III, New Delhi 09/08/2018 08/10/2019 22.52 14.43 (Sep'20) 0.00 (Sep'20) Munzareen Ahmed Work in progress Detail Report
Graph / Photo
493 RMO Electrical and Mechanical in Karkardooma Court Court Block ACI B and JKL at District Court Karkardooma Delhi. SH- Comprehensive Maintenance of Voltas make PTAC plant and equipments installed in A B and C Block 02/08/2018 01/08/2019 22.52 21.20 (Aug'19) 0.00 (Aug'19) Voltas Ltd. Detail Report
Graph / Photo
494 Repairing of Fire Alarm System at District Courts Karkardooma Delhi. 12/02/2019 11/06/2019 22.48 5.87 (Sep'20) 0.00 (Sep'20) SK Engineers Detail Report
Graph / Photo
495 Comprehensive annual maintenance of UPS system installed in GTB Hospital 21/02/2022 20/02/2024 22.46 Shraddha Electricals Detail Report
Graph / Photo
496 Repair/replacement of old brokened/damaged sunshade 30/04/2022 29/08/2022 22.44 S M Construction Work in Progress Detail Report
Graph / Photo
497 SITC of Air Conditioning System for Medicine and ENT OPD Section at JPCH, Shastri Park, Delhi 06/11/2017 05/01/2018 22.28 22.95 (Oct'18) 80.00 % (Oct'18) Jai Shri Bhairo Electricals work completed Detail Report
Graph / Photo
498 SH-Operation of Integrated Audio Visual System and Digital Conferencing System installed in different hall at Delhi Sachivalaya, New Delhi. 19/08/2018 18/08/2019 22.20 5.92 (Nov'19) 0.00 (Nov'19) R.C. Enterprises Detail Report
Graph / Photo
499 Provision of Tactile Tiles, Correction of Ramp Slopes and Provision of Reserved Parking, Toilet and Lift Structure for Person with Disability (PWD) and Other Related Misc. Works 07/02/2022 06/06/2022 22.20 Anshika Construction Co. Detail Report
Graph / Photo
500 Replacement of Door frame with other repairing work in Judges Flat Residential Complex 01/08/2022 30/10/2022 22.13 ARSHAD Detail Report
Graph / Photo
501 Comprehensive Maintenance of Kone Make Lifts 06/05/2022 05/05/2023 22.09 KONE ELEVATOR INDIA PRIVATE LIMITED Detail Report
Graph / Photo
502 Comprehensive maintenance and Operation of CCTV System Bosch, Hikvision, Sony, Panasonic, Pelco make and Honeywell make 26/08/2021 25/08/2022 22.08 0.10 (Jun'22) 0.00 (Jun'22) Media Tele Communication Detail Report
Graph / Photo
503 Tender Detail (Call of Tender) 1. SH Routine Maintenance of EI , Fans in flats 2. SH Replacement of faulty electrical installation and providing of down comers , PA system 24/06/2017 23/08/2017 22.01 10.60 (Jul'20) 0.00 (Jul'20) Shaka Electrical India Detail Report
Graph / Photo
504 Raising height of Boundary Wall of District Court Complex, Saket, New Delhi 08/02/2022 07/04/2022 21.88 SUDHIR KUMAR SHARMA Detail Report
Graph / Photo
505 Operation and comprehensive Maintenance of Panasonic make CCTV system at Gynae Surgical Casualty ward 13 andChildren Block 08/01/2022 07/01/2023 21.81 Deesan Systems Detail Report
Graph / Photo
506 Addition and Alteration work in Main Court Building and Lawyers Block as per report received by the Delhi fire service at District Court Complex, Saket, New Delhi. 10/10/2018 23/11/2018 21.79 Sanjeev Kumar Goel work in progress Detail Report
Graph / Photo
507 Operation and Maintenance of 600 KLD ETP based on EBR Technology at Orthopedic Block, Lok Nayak Hospital, New Delhi. 17/09/2019 16/06/2020 21.72 Texol Engineers work in progress by Texol Engineers Detail Report
Graph / Photo
508 Water Proofing Treatment of Roof and Replacement of Rusted G.I. Pipes at Terrace 16/05/2022 15/11/2022 21.71 Kavit Gulati Detail Report
Graph / Photo
509 Annual comprehensive maintenance of various capacity Online UPS systems 13/11/2021 12/11/2022 21.67 OM VAISHNO ENTERPRISES Detail Report
Graph / Photo
510 A/R & M/O to various Govt. AAMCs Under Division M-222 (NE) Delhi dg 2021-22 (SH:- Providing & fixing interior wall digital print graphics on self-adhesive vinyl)(Balance Work) 15/12/2021 14/01/2022 21.49 9.98 (Jan'22) 0.00 (Jan'22) Unique AD Agency Detail Report
Graph / Photo
511 Providing Services for Day to Day Maintenance 04/06/2022 03/06/2023 21.44 M/s Planet Security Group Work in Progress Detail Report
Graph / Photo
512 Running maintenance of lifts in non-residential area at GTB Hospital Shahdara, Delhi (SH: Comprehensive maintenance of 9Nos. TKE make passenger cum bed elevator) 09/12/2018 08/12/2019 21.35 Thyssenkrupp Elevator (India) Pvt. Ltd. Work completed Detail Report
Graph / Photo
513 Running Comprehensive Maintenance and Semi comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV/ RO Systems, Water Dispensers with Inbuilt RO Systems, RO Water Purifiers and Aquaguards 08/01/2020 07/01/2022 21.35 ADITI ENTERPRISES work in progress by Aditi Enterprises Detail Report
Graph / Photo
514 EOR to GGSSS Vijay park Maujpur, Delhi during 2022-23 (SH:-Upgradation of existing building and other misc. repair works) (Balance Work) 27/05/2022 25/07/2022 21.33 Manuvar Hussain Detail Report
Graph / Photo
515 EOR at GGSSS, Mandoli Extn. Delhi (School ID: 1106259). (SH: Raising of boundary wall, Renovation of Principal rooms of both shifts & C/o attached toilet with Principal room, P/f doors of classroom, replacement of window panes & misc. civil works) 24/02/2022 23/05/2022 21.26 M/S DEVDUTT SHARMA Detail Report
Graph / Photo
516 Water Proofing Treatment of Terrace 12/06/2022 11/08/2022 21.21 Shivam Enterprises Detail Report
Graph / Photo
517 Com Main ofCMosM.SerVol stab instat diff loc 18/12/2019 17/12/2022 21.19 S.S. Sales and Services work in progress by S.S. Sales & Services Detail Report
Graph / Photo
518 Providing of services of Computer Operator, Peon, Messenger Supervisor 07/07/2021 06/07/2022 21.16 DEVINE SECURITY SERVICES Detail Report
Graph / Photo
519 Renovation/Repair work in SDM (Election) office-District Shahdara at A-Block, D.C Office Complex, Nand Nagri, Delhi-110093. (Balance Work) 17/03/2022 15/05/2022 21.08 JABIR HUSSAIN Detail Report
Graph / Photo
520 AMC for comprehensive maintenance of various capacity UPS system 10/02/2018 09/02/2019 21.08 6.25 (Dec'19) 0.00 (Dec'19) Labotek Detail Report
Graph / Photo
521 1. SH- Annual Semi Comprehensive Maintenance of 50 LPH capacity RO System. 2. SH- Annual Comprehensive and semi comprehensive maintenance of 60,80 PSS RO and 80,120 PSS UV storage cooler cum purifier. 17/06/2017 16/06/2018 21.04 Aditi Enterprises Detail Report
Graph / Photo