S. No Name of Work Date of Start Date of Completion Cost
(In Lac)
Expenditure
(In Lac)
Progress Agency Status View
1 Providing Fire Fighting Arrangement in Various Govt. School Building in Delhi under Circle M-15 04/05/2010 28/02/2012 74986380.00 Royale Meridian (India ) Pvt. Ltd. Detail Report
Graph / Photo
2 SITC of passenger cum bed lift 17/01/2009 31/12/2011 23220000.00 Thyssenkrupp Elevator (India) Pvt. Ltd. completed Detail Report
Graph / Photo
3 SITC of Air conditioning system (Low Side) 04/06/2013 03/09/2013 16887050.00 Pneumatic Engineering Pvt Ltd completed Detail Report
Graph / Photo
4 Sound Reinforcement System 06/04/2013 05/07/2013 5351950.00 Elgin Electronics completed Detail Report
Graph / Photo
5 SITC of Addresable Fire Detection Alarm & PA System 26/04/2009 31/03/2012 3712930.00 New Fire Control completed Detail Report
Graph / Photo
6 Renovation of Cold Storage Room of Drug Store at MRD Block at GTB Hospital, Shahdara, Delhi 08/11/2017 29/08/2019 77700.00 M/s L&T Ltd. Not pertain to this office Detail Report
Graph / Photo
7 Repairing of fire alarm system installed at Lawyers chamber block 3 28/02/2020 27/03/2020 27388.89 Ekta Enterprises Detail Report
Graph / Photo
8 REWIRING/REPAIRING OF ELECTRICAL ACCESSORIES IN TOILETS AT VARIOUS DELHI GOVT. SCHOOL 09/08/2017 09/11/2019 23127.43 NKG Infrastructure Limited Detail Report
Graph / Photo
9 Expansion and Remodelling of Aruna Asaf Ali Govt. Hospital at Rajpur Road, New Delhi. 10/08/2019 03/08/2020 3730.52 78.49 (Mar'20) 0.00 (Mar'20) Labotek work in progress by M/s Labotk Detail Report
Graph / Photo
10 Remodelling of 94 nos. Delhi Govt. Dispensaries to Polyclinics. SH - Remodelling of 20 nos. DGD at various places in constituencies of District North of Delhi i/c Water supply, Sanitary, Elec installations, AC, Fire fighting system etc. (Package-I). 05/12/2018 31/07/2019 2935.52 0.00 (Aug'19) 55.00 % (Aug'19) Sh. Kamal Singh Work in Progress Detail Report
Graph / Photo
11 Providing furniture in various govt schools for additional classrooms under Education Zone 07 08 09 10 Distt North PWD Delhi Package 1 09/01/2020 08/05/2020 2416.02 159.67 (Sep'20) 0.00 (Sep'20) GEEKEN SEATING COLLECTION PVT LTD work in progress Detail Report
Graph / Photo
12 Comprehensive Maintenance in various Hospitals namely MAMC GNEC MAIDS under Lok Nayak Hospital New Delhi through outsourcing (SH Civil EM and Horticulture works relating to day to day maintenance ARMO and SR works) 14/10/2019 13/10/2021 2325.40 53.00 (Feb'20) 0.00 (Feb'20) Swastik Electrotech Pvt. Ltd.

work in progress

Detail Report
Graph / Photo
13 Providing furniture in various govt schools for additional classrooms under Education Zone 11 12 13 Distt North West PWD Delhi Package 7 09/01/2020 08/05/2020 2295.94 GEEKEN SEATING COLLECTION PVT LTD work in progress Detail Report
Graph / Photo
14 Providing furniture in various govt schools for additional classrooms under Education Zone 19 23 24 25 Distt South South East PWD Delhi Package 6 09/01/2020 08/05/2020 2157.86 GEEKEN SEATING COLLECTION PVT LTD work in progress Detail Report
Graph / Photo
15 Compreh Maint through outsourcing of various Hospital bldg underLNHSHCivil EM and Horticul. works relating to day to day maintA/R M/O Works Special Repair Works 26/10/2019 25/10/2021 2094.19 54.55 (May'20) 0.00 (May'20) Swastik Electrotech Pvt. Ltd. work in progress Detail Report
Graph / Photo
16 Providing furniture in various govt schools for additional classrooms under Education Zone 01 02 03 04 05 12 13 Distt North West East North East South West Pucca School North PWD Delhi Package8 09/01/2020 08/05/2020 2055.67 GEEKEN SEATING COLLECTION PVT LTD work in progress Detail Report
Graph / Photo
17 Providing furniture in various govt schools for additional classrooms under Education Zone 08 09 10 14 15 17 18 Distt. West, PWD Delhi Package 2 09/01/2020 08/05/2020 2049.56 108.81 (Sep'20) 0.00 (Sep'20) M/s Parin Furniture Limited work in progress Detail Report
Graph / Photo
18 Manufacturing and Providing lab furniture in various govt schools for additional classrooms under Education Zone 07 08 09 10 14 15 16 17 18 19 20 21 22 26,27 28 Distt North West South West Centr 09/01/2020 07/06/2020 1986.34 127.49 (Sep'20) 0.00 (Sep'20) M/s Godrej & Boyce Mfg. Co. Ltd. work in progress Detail Report
Graph / Photo
19 Providing furniture in various govt schools for additional classrooms under Education Zone 19 20 21 22 26 27 28 Distt South West and Central New Delhi PWD Delhi Package 4 11/01/2020 10/05/2020 1971.81 72.80 (Sep'20) 0.00 (Sep'20) M/s Methodex Systems Pvt. Ltd. work in progress Detail Report
Graph / Photo
20 Manufacturing and Providing lab furniture in various govt schools for additional classrooms under Education Zone 01 02 03 04 05 11 12 13 19 23 24 25 Distt South South East North West East North 09/01/2020 07/06/2020 1938.48 220.32 (Sep'20) 0.00 (Sep'20) M/s Godrej & Boyce Mfg. Co. Ltd. work in progress Detail Report
Graph / Photo
21 Compreh Maint of Govind Ballabh Pant HospNDthrough outsourcingSH EM Civil and Hortic works relating to day to day maint ARMO and SR works 19/10/2019 18/10/2021 1932.92 48.72 (May'20) 0.00 (May'20) Ador Engineers Private Limited work in progress by M/s Ador Engineers. Detail Report
Graph / Photo
22 Providing furniture in various govt schools for additional classrooms under Education Zone 24 25 Distt South South East PWD, Delhi Package 5 09/01/2020 08/05/2020 1854.77 125.43 (Sep'20) 0.00 (Sep'20) M/s Parin Furniture Limited work in progress Detail Report
Graph / Photo
23 Providing furniture in various govt schools for additional classrooms under Education Zone 14 15 16 17 18 Distt West PWD Delhi Package 3 13/01/2020 12/05/2020 1669.15 35.79 (Sep'20) 0.00 (Sep'20) M/s Methodex Systems Pvt. Ltd. work in progress Detail Report
Graph / Photo
24 Providing Manpower services of Clericals, Drivers, Multitasking and Staff (Un-skilled, Semi -skilled, Clerical and Non- Technical Supervisory Staff) in various offices under the jurisdiction of Health Maintenance Zone, PWD 03/04/2019 02/04/2021 1625.72 RAKSHAK SECURITAS PVT. LTD. Detail Report
Graph / Photo
25 Video projection system 19/09/2013 18/12/2013 908.00 Saga Infosolution Pvt. Ltd completed Detail Report
Graph / Photo
26 Comprehensive Consultancy Services for Designing and Development of Hospitals at Madipur, Sarita Vihar, Hastsal and Jwalapuri, Delhi. 17/11/2018 16/01/2022 720.00 0.00 (Sep'20) 27.00 % (Sep'20) ARCOP ASSOCIATES PVT. LTD. Work is under progress. Detail Report
Graph / Photo
27 Comprehensive Consultancy Services for Planning, Designing and Development of New Campus of Ambedkar University Delhi at Sector 3, Rohini, Delhi 110085 05/09/2019 04/09/2025 720.00 0.00 (Sep'20) 2.00 % (Sep'20) SIKKA ASSOCIATES REGD. PE submitted to Vice Chancellor, AUD. M/s Sikka is applying for local body clearances. Status is as under:- (i) Delhi Jal Board file submission done dt. 11/09/2020 to O/o EE Jhandewalan, New Delhi. Rain Water Harvesting pit design has been issued but copy not recieved. Other approvals still awaited. (ii) Fire Drawing after compliance of observations is not submitted till date by consultant. (iii) Environemental Clearance file submitted to MOEF by consultant. Detail Report
Graph / Photo
28 Comprehensive Consultancy Services for Planning, Designing and Development of New Campus of Ambedkar University Delhi (PHASE-I Works) at Dheerpur, Delhi-110009. 05/09/2019 04/09/2025 720.00 0.00 (Sep'20) 2.00 % (Sep'20) ARCOP ASSOCIATES PVT. LTD.

PE submitted to Vice Chancellor, M/s Arcop is applying for local body clearances. Status is as under:- (i) Delhi Jal Board file submission done dt. 31.08.2020 and Part 03/09/2020 to O/o EE (North-II) Burari, O/o (North-II). NOC still awaited. (ii) Fire Drawing after compliance of observations forwarded to Fire Department by Sr. Architect. Approval awaited. (iii) Forest Department file submitted on dt. 07.09.2020 to O/o Deputy Conservator of Forest. West Forest Division. Approval is awaited. (iv) Environemental Clearance file submitted to MOEF by consultant.Meeting has been conducted approval still awaited.

Detail Report
Graph / Photo
29 C/o East Delhi Campus of Guru Gobind Singh Indrasprastha University at Surajmal Vihar, Shahdara, Delhi. (SH: Supplying, Installation, Testing and Commissioning of Grid Interactive roof top solar photo voltaic power generation system). 28/08/2020 23/02/2021 680.89 0.00 (Sep'20) 20.00 % (Sep'20) Uneecops Technologies Ltd. Work in progress. Detail Report
Graph / Photo
30 Upgradation/Renovation of one staff room in each 951 schools, Civil and Electrical work (SH- Staff rooms 75 no. under south Building Maintenance Division). 14/03/2019 13/09/2019 610.61 18.00 (Jul'20) 0.00 (Jul'20) S.M. Builders work in progress Detail Report
Graph / Photo
31 Operation of lifts, L.N. HOspita, NEw Delhi 03/12/2019 02/12/2021 541.01 36.61 (May'20) 0.00 (May'20) Guruji Elevator work in progress by Guruji ElevATOR Detail Report
Graph / Photo
32 RMO Electrical and Mechanical services installed at Delhi Sachivalya, New Delhi. (SH Maintenance and Operation of E and M services at Delhi Sachivalaya, New Delhi) 13/07/2017 12/07/2020 540.00 Swastik Electrotech Pvt. Ltd. Detail Report
Graph / Photo
33 (SH: Providing Sub-station Equipments). 14/12/2012 13/10/2013 525.00 Reliance Elektrik works WORK COMPLETED FINAL PAYMENT TO BE MADE Detail Report
Graph / Photo
34 Running and Maintenance of lifts installed in residential and non-residential buildings at GTB Hospital complex, Shahdara, Delhi Sub Head Running operation of lifts 17/01/2019 16/01/2021 485.43 Guruji Elevator Work in progress 3RD RA 40220380 Detail Report
Graph / Photo
35 SITCof Central Sterile Supply Depart.includingCivil Work 5 Yrs ComprehensiveMaintenance 10/12/2019 07/05/2020 441.72 Med Freshe Pvt. Ltd. work in progress by Med Freshe Pvt. Ltd Detail Report
Graph / Photo
36 Providing Manpower services of Clericals Drivers Multitasking and Staff (Unskilled Semiskilled Clerical and NonTechnical Supervisory Staff in various offices under the jurisdiction of office of Pr Chief Engineer (Project) SE Health I SE Health II etc 21/08/2019 20/08/2021 419.47 72.34 (Jan'20) 0.00 (Jan'20) RAKSHAK SECURITAS PVT. LTD.

work in progress

Detail Report
Graph / Photo
37 Comprehensive Maintenance of Electrical Civil Operations relating Day to day Maintenance, Special Repair etc. of Ayurvedic Unani Tibbia College Dr. N.C. Joshi Memorial 25/12/2019 24/12/2021 409.69 34.95 (May'20) 0.00 (May'20) Royel Electricals

work in progress by agency

Detail Report
Graph / Photo
38 Providing Manpower services of Clericals, Drivers, Multitasking and Staff (Unskilled, Semi skilled, Clerical and Non- Technical Supervisory Staff in various offices under the jurisdiction of Chief Engineer Proj and Hr. Edu. Proj Units, PW 01/08/2019 31/07/2021 402.53 0.00 (Oct'20) 60.00 % (Oct'20) Soni Management & Allied Services Pvt. Ltd. Work in progress. Detail Report
Graph / Photo
39 EOR to Police Colony at sector A-5, Narela Delhi-110040. (SH:- Replacement of damaged steel Windows, damaged chajja, repair to roof and mumty with tanks and platforms). 28/11/2018 27/07/2019 387.81 293.40 (Mar'20) 0.00 (Mar'20) Aliyan Constaruction Company work in progress 90% Detail Report
Graph / Photo
40 Pdg A/C system 26/07/2009 25/12/2009 382.52 Voltas Ltd. completed Detail Report
Graph / Photo
41 Providing Air-conditioning System 26/07/2009 30/05/2012 382.00 Voltas Ltd. completed Detail Report
Graph / Photo
42 1. Running and maintenance of UPS at GTB Hospital, Complex, Shahdara, Delhi. 2. Running and Maintenance of Servo Voltage Stabilizer at GTB Hospital complex, Shahdara, Delhi. Sub Head Comprehensive maintenance and operation of UPS and CVCF systems 30/12/2018 29/12/2021 372.74 31.06 (May'19) 0.00 (May'19) ARECA TECHNOLOGIES work in progress(6th RA 3830905 ) Detail Report
Graph / Photo
43 Comprehensive Maintenance and Operation of Trauma Block, New Ward Block, OT, Gynae, Old Ward Block, Doctors and Nurses Hospital and Residential Complex Lifts at DDU Hospital, Hari Nagar, New Delhi (SH Operation of Lifts) 30/04/2019 29/04/2021 355.16 Guruji Elevator Detail Report
Graph / Photo
44 Up gradation of one staffroom in 86 Nos. Schools under South-East Building Maintenance Division, Hauz Khas, New Delhi during 2018-19. (Civil and Electrical work). 23/03/2019 22/09/2019 329.84 63.81 (Aug'20) 0.00 (Aug'20) S. P. CONSTRUCTION COMPANY Work in progress Detail Report
Graph / Photo
45 Running, Operation and Comprehensive Annual Maintenance of Online UPS and TVSS of different capacity installed at RGSS Hospital, Tahirpur, Delhi 30/12/2018 29/12/2021 316.38 0.00 (Mar'19) 80.00 % (Mar'19) ISSAR INDUSTRIES Work in Progress(6th RA 3411958 ) Detail Report
Graph / Photo
46 1. RMO of Central AC Plant at A BlockGIPMER2. RMOof Central AC Plant B BlockGIPMERSH Operation and Comprehensive maintenance of Blue Star Make Central AC Plant 11/09/2019 10/09/2021 306.35 40.88 (Apr'20) 0.00 (Apr'20) Blue Star Limited work in progress and 2nd R/A paid to M/s Blue Star Ltd. Detail Report
Graph / Photo
47 Providing services of Computer Operators, MTS and Drivers etc 02/03/2019 01/03/2020 277.10 332.76 (Sep'20) 0.00 (Sep'20) M/s Good Year Security Services (R) work in progress Detail Report
Graph / Photo
48 Consultancy Services for Comprehensive Architectural and Engineering Planning and Designing for Construction of New Hospital at Siraspur, New Delhi (Recall) 04/09/2019 03/09/2022 267.00 Design Associates Inc. work in progress Detail Report
Graph / Photo
49 SITC of 750 KVA DG Sets 03/02/2011 01/05/2011 258.50 S.L. Electromech Pvt. Ltd. completed Detail Report
Graph / Photo
50 SITC of passenger cum bed lift 17/01/2009 16/09/2009 232.20 Thyssenkrupp Elevator (India) Pvt. Ltd. completed Detail Report
Graph / Photo
51 Operation and compreh. Maint. of carrier make AC plant 28/09/2019 27/09/2021 218.92 22.25 (May'20) 0.00 (May'20) G D Enterprises work in progress by G D Enterprise Detail Report
Graph / Photo
52 Upgradation/Renovation of one staff room in each of 73 schools (Morning and Evening Shift) located at (NE) District of Delhi under the jurisdiction of PWD Building Maintenance Division M-222 25/01/2019 24/04/2019 209.29 99.15 (Sep'20) 0.00 (Sep'20) Shyam Sunder Tyagi

work completed

Detail Report
Graph / Photo
53 Providing for installation of fixing of false ceiling and VRF System in New College Building OPD and IPD in Nehru Homeopathic Medical College and Hospital, B-Block, Defence Colony, New Delhi-110024 15/03/2019 14/10/2019 208.35 HILLTOP REFRIGERATION Detail Report
Graph / Photo
54 Enhancement of capacity for existing seamless power supply to OT and MGPS at Rajiv Gandhi Super Specialty Hospital, Tahirpur, Delhi. 12/02/2019 11/04/2019 204.29 184.17 (Mar'19) 80.00 % (Mar'19) POWER HOUSE Work completed Detail Report
Graph / Photo
55 Operation and comprehensive maintenance of 4 x 400 TR AC Plant and Ductable Air conditioning unit at Delhi Sachivalaya, New Delhi 06/05/2019 05/05/2021 188.87 124.63 (Jul'20) 0.00 (Jul'20) Blue Star Limited Detail Report
Graph / Photo
56 Operation and comprehensive Maintenance of 3 X 300 TR Capacity York Make Chilling units with ancillaries of casualty block at Lok Nayak Hospital, New Delhi 28/09/2019 27/09/2021 188.75 G D Enterprises work in progress by GD Enterprise Detail Report
Graph / Photo
57 Renovation of D, E, F, G, J Block, Type-II and C Block Type-III Qtrs. at Pumbari Road, NPL Kingsway Camp, Delhi. 01/11/2018 01/11/2019 185.67 25.96 (Jan'20) 0.00 (Jan'20) RAJIV AGGARWAL

ok

Detail Report
Graph / Photo
58 C/o Extention of Maulana Azad Dental Institute of Dental Sciences, phase-II at Bahadur Shah Zafar Marg, New Delhi (SH: Providing Audio-Visual System & Stage Lighting System including 5 Years Comprehensive Maintenance) 27/07/2019 26/11/2020 184.85 HITECH AUDIO SYSTEMS PVT LTD

work in progress by agency

Detail Report
Graph / Photo
59 RMO UPS system installed at 2nd floor 4th floor and 6th floor Casualty Block Gynae Block Ward 14 Genetic Lab OT Block and New OPD Block at L.N. Hospital New Delhi. SH Comprehensive annual maintenance of Schneider Electric APC Make UPS system install 15/06/2019 14/06/2022 183.90 34.22 (Oct'19) 0.00 (Oct'19) Labotek work in progress by M/s LABOTEK ( Detail Report
Graph / Photo
60 EOR/Renovation of Toilet Blocks in Barrack No. 3, 4, 5, 6, 7, 8, 9, 11, 13, 14, 15, 16, 17 and 18 (Old Barracks Double storey) at NPL Kingsway Camp, Delhi. (SH Civil and Electrical Work). 21/10/2018 21/10/2019 183.06 133.10 (Jul'20) 0.00 (Jul'20) RAJIV AGGARWAL

ok

Detail Report
Graph / Photo
61 Setting up 12 Nos. Court Rooms with chambers and wash rooms for Judicial officers at Old Civil Supply Building and Military Pension Building, Tis Hazari Courts Building, Delhi, (SH Civil and Electrical Work). 05/05/2019 04/09/2019 176.52 174.57 (Mar'20) 0.00 (Mar'20) Jabir Hussain

ok

Detail Report
Graph / Photo
62 Design, Supply, Installation, Testing and Commissioning of High-Mast type Sport lighting system for Athletic cum football Ground at East Vinod Nagar Sports Complex, East Delhi as per IAAF/FIFA standards) 06/08/2018 05/12/2018 165.26 Lighting Technologies Pvt. Ltd. Detail Report
Graph / Photo
63 Comprehensive Consultancy Services (Balance Services) for Designing and Development of Buildings under Stage-1 of Phase-II of Delhi Technological Universityat Bawana Road, Delhi 05/05/2018 04/11/2022 159.42 0.00 (Sep'20) 73.00 % (Sep'20) Suresh Goel & Associates Work is in progress. Detail Report
Graph / Photo
64 A/R and M/O Delhi Vidhan Sabha Old Secretariat Delhi dg. 2018-20. (SH Mechanized Housekeeping Services for Internal and External Areas). 30/09/2018 29/09/2020 155.99 94.17 (Aug'20) 0.00 (Aug'20) Sainath Sales and Services Pvt. Ltd ok Detail Report
Graph / Photo
65 SITCofcentr.med.grade compr air sys semi dry suction sys with amalgam separ incl5yr Comp. maint 25/02/2020 24/05/2020 154.81 Villa India

work in progress by agency

Detail Report
Graph / Photo
66 Package B Electrical work 08/10/2007 07/05/2009 152.52 Budhiraja Electrical completed Detail Report
Graph / Photo
67 EOR to Residential Quarters at I.T.I., Vivek Vihar. Upgradation of Type - I, II, III & IV Quarters., Repair & Improvement of Road, Parking space, Path of Residential Park, Water proofing treatment of Roof and misc civil work 15/03/2013 14/02/2014 146.88 0.00 (Sep'15) 100.00 % (Sep'15) Naresh Kumar Bansal Detail Report
Graph / Photo
68 Supplying and replacement of existing passenger lifts at Tis Hazari Court Complex, Delhi. 22/04/2017 21/08/2017 146.38 Johnson Lifts Pvt. Ltd. Court Authority has directed to work for replacement of one lift at a time Detail Report
Graph / Photo
69 Renovation of Mud Houses, Open Dining Hall and Tin Sheds 15/07/2018 14/11/2018 143.58 133.49 (Oct'19) 0.00 (Oct'19) Aliyan Constaruction Company

work completed

Detail Report
Graph / Photo
70 RMO 2000/1600/1500 KVA capacity Andrew Yule make HT AVR installed at Sub-station No. 1 2 3 and 4 L.N. Hospital New Delhi. SH Comprehensive maintenance of 2000 KVA 1600 KVA and 1500 KVA HT AVR Andrew Yule make at sub station No. 1 2 3 and4 L.N. Hospit 28/01/2020 27/01/2023 142.09 Harsh India Enterprises Work in progress by Harsh India Enterprises Detail Report
Graph / Photo
71 27 Nos School under North Building Division and North Electrical Division NMC NB12 PackageII 08/11/2019 07/03/2020 138.79 33.08 (Mar'20) 0.00 (Mar'20) GARG AND CO work is in progress (70%) Detail Report
Graph / Photo
72 C/o Extention of Maulana Azad Dental Institute of Dental Sciences, Phase II at Bahadur Shah Zafar Marg New Delhi SH Providing Stacker and Puzzle Car Parking System 25/07/2019 22/10/2019 137.36 Ram Ratna Infrastructure Pvt. Work in progress by Ram Ratna Infrastructure Detail Report
Graph / Photo
73 Operation and Maintenance of CCTV System installed at Casualty Block, Gynae Block and Special Ward Block at L.N. Hospital, New Delhi. SH Operation and Comprehensive Maintenance of Bosch CCTV System at Casualty Block, Special Ward Block and Gynae Bloc 12/03/2017 11/03/2020 137.15 41.78 (Sep'19) 0.00 (Sep'19) HITECH AUDIO SYSTEMS PVT LTD Work in Progress Detail Report
Graph / Photo
74 24 Nos School under North Building Division and North Electrical Division NMC NB11 PackageI 15/11/2019 15/03/2020 135.69 Sharma Construction Company work is in progress (25%) Detail Report
Graph / Photo
75 Reconstruction of school boundary wall with grill, Replacement of roofing with Profile sheet in MP Hall, Entrance Hall and staff room, Installation of rainwater harvesting system at Sarvodaya Bal Sr. Sec. School, Qutub Mehrauli, New Delhi--- 11/07/2018 10/01/2019 133.28 Aliyan Constaruction Company work in progress Detail Report
Graph / Photo
76 Maintenance & Operation of various E & M Services 07/06/2018 06/06/2020 130.92 M/s Shaka Electrical (India) Work in progress Detail Report
Graph / Photo
77 22 Nos School under North Building Division and North Electrical Division NMC M3223 NB13 NB14 PackageIII 20/11/2019 19/03/2020 130.02 SWASTIK CONSTRUCTION COMPANY work is in progress (30%) Detail Report
Graph / Photo
78 Providing and installing additional furniture in Shaheed Sukhdev College of Business Studies during 2019-2020. 28/12/2019 26/02/2020 129.30 0.00 (Oct'20) 100.00 % (Oct'20) M/s Momentum Techsys Pvt. Ltd. Progress of work is 98%. Detail Report
Graph / Photo
79 Upgradation of sub-station no.3 at GTB Hospital, Shahdara, Delhi 15/08/2019 14/02/2020 128.98 Dubey Electric Works work completed Detail Report
Graph / Photo
80 Repair of bathing ghats, manhole and chambers/sewerline providing shed and toilet block renovation at CPMF site. 17/08/2018 16/12/2018 128.86 69.59 (Aug'20) 0.00 (Aug'20) Nafees Ahamed

work completed

Detail Report
Graph / Photo
81 (1) Operation & Maintenance of OTIS make lifts installed at MRD Block, L.N. Hospital, New Delhi. (2) Operation & Maintenance of OTIS make lifts installed at B.L. Taneja Block, L.N. Hospital, New Delhi. (3) Operation & Maintenance of ECE & Olympus make lifts installed at MAIDS, New Delhi (4) Operation & Maintenance of Johnson make lifts installed at New Orthopedic Block of L.N Hospital, New Delhi.(SH - Operation of lift installed at various locations in hospital complex). 14/11/2017 13/11/2019 128.68 146.66 (Oct'19) 32.18 % (Oct'19) Akash Enterprises work in progress. Detail Report
Graph / Photo
82 Special Repairs to vacated and unpopular quarters in PTS colony, Malviya Nagar, New Delhi. 11/07/2018 10/01/2019 125.28 78.33 (Sep'20) 0.00 (Sep'20) Puran Chand and Sons work in progress Detail Report
Graph / Photo
83 Providing and installation of air conditioning system with inverter type VRV/VRF System 02/02/2011 01/05/2011 123.32 LG Electronics completed Detail Report
Graph / Photo
84 C/o Extention of MADI of Dental Sciences,Ph-II at Bahadur Shah Zafar Marg,ND.SH SITCof Medical Gas Pipeline System including 3 Years Comprehensive Maintenance 12/08/2019 09/11/2019 115.37 Med Freshe Pvt. Ltd. work in progress by Med Freshe Pvt. Ltd Detail Report
Graph / Photo
85 ARMO Various Electrical and Mechanical Services at SGM Hospital Mangolpuri Delhi SH Operation and Maintenance of E and M Services 16/12/2017 15/12/2019 114.55 14.32 (May'19) 0.00 (May'19) PERFECT AIR CONDITIONING AND ELECTRICALS

work in progress

Detail Report
Graph / Photo
86 RMO various electrical and mechanical services (internal and external) at Deep Chand Bandhu Hospital Kokiwala Bagh Ashok Vihar New Delhi SH Annual Comprehensive maintenance of 4 x 200KVA UPS 21/10/2019 20/10/2022 111.48 power house Detail Report
Graph / Photo
87 1 RMO E and M Services at SGM Hospital Mangolpuri Delhi 2 RMO E and M Services at BJRM Hospital Jahangirpuri Delhi SH Running and Operation of lifts 25/04/2017 24/04/2019 111.36 SHUBHAM ENTERPRISES

work in progress

Detail Report
Graph / Photo
88 Renovation of entry to main court building between A and B block at Delhi High Court New Delhi SH Composite work 05/03/2020 03/05/2020 110.55 Jamshed Ali and Sons Work is in progress Detail Report
Graph / Photo
89 Replacement of 13 passenger lifts installed at MSO Building, New Delhi 26/09/2017 25/05/2018 107.28 Johnson Lifts Pvt. Ltd. work in progress Detail Report
Graph / Photo
90 Pdg Substation 06/01/2010 06/05/2010 103.64 Reliance Elektrik works completed Detail Report
Graph / Photo
91 Operation and Comprehensive Maintenance of 3 x 350 TR. Capacity Carrier Make water cooled Centrifugal Chilling Units with ancillaries of New O.P.D. Block at Lok Nayak Hospital, New Delhi, during 2017-18 and 2018-19. 06/01/2018 05/01/2020 103.20 50.40 (Mar'19) 49.00 % (Mar'19) MIA Construction Pvt. Ltd. Work in progress. Detail Report
Graph / Photo
92 Construction and setup the Nursery Pre-School in 10 No. Ten NOS. Sarvodaya Vidyalayas, Delhi Govt. School under Division West Building-I, PWD, New Delhi during 2018-19. SH Civil and Electrical Work. 15/02/2019 14/06/2019 97.35 38.44 (Dec'19) 0.00 (Dec'19) shri krishan constructions Detail Report
Graph / Photo
93 ARMO various Electrical and Mechanical Installation at 200 Bedded Bhagwan Mahavir Hospital Pitampura New Delhi under AE(E) PWD HMESD North I SH Running and operation of 11 Nos of Lift installed in Hospital 11/11/2017 10/11/2020 96.30 Ador Engineers Private Limited

work in progress

Detail Report
Graph / Photo
94 Running operation and annual maintenance of the sub-station, DG Sets, E and M service, Fire Fighting and Fire Alarm, RO Plant and Pumps House at RGSS Hospital, Tahirpur, Delhi 06/07/2019 05/07/2020 94.43 GLOBAL ENTERPRISES work in progress 6th RA 18182135 Detail Report
Graph / Photo
95 EOR to Old Residential Qtrs Central Jail Tihar, New Delhi. SH Necessary prevention measures and further improvement of damaged and sagged roof slab and other misc. civil work. 04/04/2019 03/10/2019 93.89 29.29 (Oct'19) 0.00 (Oct'19) IKRAMUDDIN Detail Report
Graph / Photo
96 Providing consultancy services for comprehensive planning and designing of construction of school building at various locations in Delhi. Dwarka Sector-12 (2) Dwarka Sector-1, Pocket-5 (3) Dwarka Sector-18 (4) Dwarka Sector-19 (Phase-I) (5) Dwarka Secot-16 (6) Dwarka Sector-11 (Package-A) 29/11/2017 28/03/2019 93.50 Design Forum International

work in progress

Detail Report
Graph / Photo
97 RMO CCTV system, ETP, Water level indicator and LAN connection at GIPMER, New Delhi SH CMO EXTREME Make LAN System Installed at GB Pant Hospital EDP Cell New Delhi. 19/08/2017 18/08/2020 93.42 87.38 (Aug'19) 74.93 % (Aug'19) Tracom Enterprises work in progress Detail Report
Graph / Photo
98 Repair and renovation of building in Delhi High Court for enhancing Universal accessibility for person with disabilities at Delhi High Court New Delhi 02/08/2019 29/11/2019 90.37 46.11 (Aug'20) 0.00 (Aug'20) M P BHATIA Work in progress Detail Report
Graph / Photo
99 SITC of CCTV camera at Dr. BSA Hospital, Rohini, Delhi. 25/06/2019 24/10/2019 89.67 SONAL ENTERPRISES PVT. LTD Work in progress Detail Report
Graph / Photo
100 Providing and Installation of Oil cum NG fired Steam Boilers at BSA Hospital Rohini Delhi 20/06/2019 19/12/2019 88.53 CRUPP BOILERS (INDIA) PVT. LTD. Work in progress Detail Report
Graph / Photo
101 Operation and Maintenance of various E&M Services 06/03/2018 05/03/2020 88.29 GLOBAL ENTERPRISES

work in progress

Detail Report
Graph / Photo
102 Comprehensive Maintenance and Operation of 3 x 150 TR Trane Make AC Plant. 04/08/2017 03/08/2020 87.66 Ingersoll-Rand Climate Solutions Pvt. Ltd. work in progress Detail Report
Graph / Photo
103 Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV RO Systems, Water Dispensers with Inbuilt RO Systems, RO Water Purifiers and Aquaguards 23/12/2019 22/12/2020 87.51 Aditi Enterprises

work in progress by Aditi Enterprises

Detail Report
Graph / Photo
104 Enhancement of capacity for existing seamless power supply to OT and MGPS of RGSS Hospital Tahirpur, Delhi 19/08/2018 18/10/2018 87.43 85.57 (Mar'19) 70.00 % (Mar'19) POWER HOUSE work in progress(IInd RA ) Detail Report
Graph / Photo
105 Replacement of old/ outlived lifts in MAC Block in GIPMERSH. SITC 26 passenger 1768 Kg lift 13/02/2020 12/06/2020 86.95 Omega Elevators work in progress by Omega Elevator Detail Report
Graph / Photo
106 RMO UPS system installed at 2nd floor, 4th floor 6th floor Casualty BlockGynae Block, Ward 14 Genetic Lab OT Block and New OPD Block at L.N. Hospital New Delhi.SH Comprehensive annual maintenance of Emerson Make UPS system installed at Casualty Bl 26/08/2019 25/08/2022 86.20 Labotek work in progress by Labotek Detail Report
Graph / Photo
107 Comprehensive maintenance of 3 X 110 TR AC Plant Blue Star Make 14/07/2017 13/07/2020 84.89 Blue Star Limited

work in progress

Detail Report
Graph / Photo
108 Construction of Extention of Maulana Azad Dental Institute of Dental Sciences, phaseII at Bahadur Shah Zafar Marg, New Delhi.SH Supplying, installation, testing and Commissioning of Modular Operation Theatre 12/08/2019 09/11/2019 83.93 MDD Medical System (INDIA) Pvt. Ltd work in progress by MDD Medical System (I) Pvt.Ltd. Detail Report
Graph / Photo
109 1 RMO Elect and Mech Services in Lawyers chambers Blk DEFG and H. 2 In KKD Court (Court Block) ACI B and JKL DEFG and H. 3 At UTCS Bldg. SH- Operation and Routine Maint. of EI DG Set Sub Station Fire Fighting Fire Alarm System and Vrs type pump sets. 18/05/2019 17/05/2020 83.16 103.48 (Sep'20) 0.00 (Sep'20) PARASAR Electrical & Refrigeration Detail Report
Graph / Photo
110 Mechanized Cleaning of underground and overhead RCC PVC water storage tanks at all locations in GB Pant Hospital MAMC AAAGH A U Tibbia College New Delhi 07/08/2019 06/08/2020 81.08 50.19 (Mar'20) 0.00 (Mar'20) BHARAT CONSTRUCTION & TANK CLEANER

work in progress

Detail Report
Graph / Photo
111 SH Operation and comprehensive maintenance of 3x330 TR Capacity Central Air Conditioning Plant. 06/02/2019 05/02/2021 79.95 Unique Engineers Pvt. Ltd. Work in progress Detail Report
Graph / Photo
112 Providing CCTV Surveillance System in Judges Residence complex O Block at District Court Karkardooma Shahdara Delhi. 07/10/2018 06/02/2019 79.60 21.54 (Dec'19) 0.00 (Dec'19) TECHNOSYS SECURITY SYSTEMS PVT. LTD Detail Report
Graph / Photo
113 Mechanized cleaning of Underground and Overhead RCCPVC water storage tanks at all locations in LN Hospital and Mirdard Lane campus New Nurses Hostel ABCON GNEC Hospital and 34 Nos Delhi Govt. etc 04/11/2019 03/11/2020 79.31 18.07 (Dec'19) 0.00 (Dec'19) Royal Construction

work in progress

Detail Report
Graph / Photo
114 RMO EandM Services at College Building at MAMC, New Delhi. SH Comprehensive Maintenance of RO Plant at MAMC New Delhi 17/03/2017 16/03/2020 79.12 78.48 (Jan'20) 65.97 % (Jan'20) Eureka Forbes Limited Work is in Progress Detail Report
Graph / Photo
115 1 RMO E and M Services in Lawyers chambers Block. 2 At KKD Court Court Block. 3 At UTCS Bldg. Vishwas Nagar Shahdara. SH-Routine Maintenance and Operation of various E and M services. 10/05/2018 09/05/2019 78.60 30.59 (Sep'19) 0.00 (Sep'19) M I Enterprises Detail Report
Graph / Photo
116 1 SITC of Ductable Split ACs in ward block 21 at Dr BSA Hosp 2 SITC of Ductable Split ACs in ward block Ward 2B at Dr BSA Hosp 3 SITC of Ductable Split ACs in ward block 42 at Dr BSA Hosp 4 SITC of Ductable Split ACs in ward block Ward 22 at BSA 27/12/2017 26/04/2018 77.16 53.46 (May'19) 0.00 (May'19) Nandi Electrical Works

work in progress

Detail Report
Graph / Photo
117 Operation and maintenance of lifts in court block & lawyers chamber blocks 04/02/2014 03/02/2015 76.96 A.G. Enterprises Detail Report
Graph / Photo
118 Renovation of MP Hall and Repairing/Replacement of Electrical Installations Flood Light Fitting Air Conditioning PA System etc. at SKV Vivek Vihar Delhi. School ID-1001022 27/09/2018 26/01/2019 76.31 51.34 (Sep'20) 0.00 (Sep'20) Mars Engineers Detail Report
Graph / Photo
119 RMO of Lifts at Dr BSA Hospital Sec 6 Rohini Delhi SH Operation of Lifts 04/12/2018 03/12/2020 75.44 Guruji Elevator Work in progress Detail Report
Graph / Photo
120 Third Party Inspection / Quality Assurance Service for the work of “Construction of New Building ‘S’ Block for Delhi High Court on 2.74 acre land at Bapa Nagar, Zakir Hussein Marg, New Delhi.(SH: - C/o RCC framed structure Building including water supply, sanitary, Electrical installation and E&M services.)”. 29/06/2017 01/09/2019 75.00 39.79 (Sep'20) 0.00 (Sep'20) CSIR Central Building Research Institute in progress Detail Report
Graph / Photo
121 Running and Maintenance of Sub-Station equipments and D.G. Sets at GTB Hospital complex, Shahdara, Delhi Sub Head Maintenance and operation of E and M services at non-residential area 06/09/2018 05/09/2019 74.43 27.91 (Mar'19) 36.00 % (Mar'19) R. D. Engineers Work completed Detail Report
Graph / Photo
122 SITC of Split and Window type Air Conditioners and Audio Speakers in various societies in Shakur Basti Constituency, Delhi. 18/11/2019 17/12/2019 74.32 M/s R. K. ELECTRICALS & REFRIGERATION WORK IN PROGRES Detail Report
Graph / Photo
123 EOR to PTS, Dwarka, New Delhi during 2018-19.(SH- Development of the outer area police station for police training purpose). 23/05/2018 21/07/2018 74.19 26.97 (Jul'18) 60.00 % (Jul'18) Aliyan Constaruction Company work in progress Detail Report
Graph / Photo
124 For Addl work of ducting, grills, celing, diffusers, duct installation & allied items for Air conditioning 21/10/2006 30/09/2007 74.17 Aahram Engrs Work completed Detail Report
Graph / Photo
125 1) ARMO various Electrical and Mechanical Services (Internal and External) at Shaheed Sukhdev College of Business Studies, Sector-16, Rohini, Delhi. 2)ARMO various Electrical and Mechanical Services (Internal and External) at Keshav Maha Vidyalaya at Pitampura, Delhi. 3) ARMO various Electrical and Mechanical Services (Internal and External) at LGW[/DTTE/BTE at Pitampura, Delhi (SH: Operation and routine maintenance of E and M services 09/07/2019 08/07/2020 74.11 5.54 (Apr'20) 0.00 (Apr'20) M/s R S Electricals 3RD RA BILL PAID RS.1690370/- Detail Report
Graph / Photo
126 Renovation for Urology and Renal Transplant Department at (Block 3, 2nd Floor) RGSS Hospital, Tahirpur, Delhi. Sub Head Providing Medical Instruments 17/08/2019 16/11/2019 73.86 MDD Medical System (INDIA) Pvt. Ltd No Payment Detail Report
Graph / Photo
127 Structural failure and threat of loss of property and life at Delhi Archives Building Special Institutional Area during 2017-18. 12/09/2018 11/03/2019 73.82 ASLAM BUILDERS work in progress Detail Report
Graph / Photo
128 4250 20/05/2013 19/08/2013 72.78 Varun Gupta & Co. Work foreclosed Detail Report
Graph / Photo
129 Main Work 20/05/2013 19/08/2013 72.78 Varun Gupta & Co. completed Detail Report
Graph / Photo
130 Compr Maint of 2000KVA/1500 KVA and 750 KVA HT AVR Andrew Yule Make at sub station No 1 2 17/12/2019 16/12/2021 72.51 Harsh India Enterprises

work in progress BY Harsh India Enterprises

Detail Report
Graph / Photo
131 Operation and Comprehensive Maintenance of SCADA based water pumping automation system 20/08/2020 19/08/2021 71.93 0.00 (Sep'20) 20.00 % (Sep'20) RECKTRONIC DEVICES AND SYSTEMS

WORK IN PROGRESS

Detail Report
Graph / Photo
132 Name of work 1 to 6 MOEI Fans and RMO Air- Conditioner, pump set, DG set installed at registrar co-operative societies, old court building, parliament street, New Delhi 07/10/2017 06/10/2018 71.64 17.52 (Aug'19) 0.00 (Aug'19) Parasar Electricals & Refrigeration Detail Report
Graph / Photo
133 1 Govt. Middle School, Sarita Vihar 2 Govt. Sr. Sec. School, Sultanpur 3 Sr. Sec. School, Tehkhand 4 Jonapur-1 5 Jonapur-2 6 RPVV at Sector A, Vasant Kunj Package-C. 20/11/2017 19/01/2018 71.50 0.00 (Sep'20) 35.00 % (Sep'20) SPACE DESIGN GROUP

in progress

Detail Report
Graph / Photo
134 Supply & replacement of old outlived transformers at Sub-Station No. 2 in GIPMER, New Delhi. (Sh:- SITC of Cast resin dry type transformer 1500 KVA). 12/01/2020 11/04/2020 70.42 Harsh India Enterprises

work in progress by agency

Detail Report
Graph / Photo
135 Comprehensive Maintenance of AC Plant Blue Star Make 18/01/2018 17/01/2021 70.39 9.73 (May'19) 0.00 (May'19) Blue Star Limited

work in progress

Detail Report
Graph / Photo
136 1 Maintenance and Operation of E and M Services for EI and fans in SRHC Hospital Narela Delhi during the year 2018 19 2 Maintenance and Operation of E and M Services in SRHC Hospital Narela Delhi during the year 2018 19 04/11/2018 03/05/2020 68.73 HST Enterprises Work in progress Detail Report
Graph / Photo
137 EOR to Fire Station, Moti Nagar, New Delhi during 2018-19. SH Repair and renovation of Staff Quarters at Moti Nagar Fire Station 10/10/2018 09/02/2019 68.36 25.62 (Oct'19) 0.00 (Oct'19) IKRAMUDDIN Detail Report
Graph / Photo
138 Sub Head Operation and routine maintenance of HVAC System 4x550TR capacity AC plant, Cold Storage Plant in Old and DEM Building 03/03/2019 02/03/2021 68.17 SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. Work completed Detail Report
Graph / Photo
139 Providing Services of Computer Operator, MTS etc. under various PWD Offices through, North Building Division 22/12/2019 21/12/2020 68.17 20.56 (May'20) 0.00 (May'20) ARMOUR SECURITY INDIA PVT LTD Work in progress Detail Report
Graph / Photo
140 1) RMO various Electrical & Mechanical services installed at Gomukh Tower Kaushambi Ghaziabad (Sub Head:- Operation of EI and fans i/c Compound light, Substation, DG Set, Pumps at Gomukh Tower) 2) MOEI & Fans i/c compound lighting for fire station at Mandawali and Kalyanwas Delhi & RMO pump sets for fire station at Mayur Vihar & Dallupura Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound light, Providing maintenance staff for Mayur Vihar & Dallupura) 3) MOEI & Fans i/c Compound lighting and RMO pump sets for police station at Mayur Vihar Ph-1 & Kalyanpuri Delhi. (Sub Head:- Provding maintenance staff for Mayur Vihar Ph-1 & Kalyanpuri) 4) MOEI & Fans i/c street light sewage & Drinking water pump sets for DA staff quarters at Kalyanvas Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound lightings) 5) MOEI & Fans i/c compound lighting for at VREC at Patpar Ganj Mandawali, Trilokpuri & Kondli Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound Lights). 6) MOEI & fans and RMO Pump sets i/c compound light High Mast lighting at East Vinod Nagar Sport Complex Delhi. During 2018-19(Sh:-Day to Day Maintenance of EI & Fans and compound lights Sports Complex East Vinod Nagar Delhi) 18/03/2019 17/03/2020 67.80 81.77 (May'20) 0.00 (May'20) Krishna Electreical Works Detail Report
Graph / Photo
141 RMO of Substation in A-Block and BBlock at GIPMER, New Delhi SH Comprehensive Maintenance of HT AVR 06/01/2018 05/01/2020 67.10 69.65 (Sep'19) 77.93 % (Sep'19) Harsh India Enterprises Work in progress. Detail Report
Graph / Photo
142 Mechanized Cleaning of over head tank and underground tank. 08/07/2020 07/07/2021 65.99 UNITECH WATER SLOUTIONS Detail Report
Graph / Photo
143 EOR to Tihar Jail Complex, New Delhi. SH Recarpeting of Bituminous Roads of Tihar Jail Complex under the jurisdiction of Sub Division WB 12 22/10/2019 22/10/2020 65.72 MAHAVIR PRASAD GUPTA AND SONS Detail Report
Graph / Photo
144 Augmentation of existing Sub Station and allied equipments at Delhi Archive Building, Qutub Institutional Area, New Delhi. 14/07/2018 13/01/2019 65.58 67.81 (Jun'19) 75.00 % (Jun'19) Dubey Electric Works Detail Report
Graph / Photo
145 1 Maintenance and Operation of E and M Services for EI and fans at BJRM Hospital 2 Maintenance and Operation of E and M Services for Wet Riser System and Water Supply Pumps, Fire Alarm System Sub station and DG Sets Air Conditioning and Central AC Pl 25/10/2018 24/04/2020 65.28 HST Enterprises Work in progress Detail Report
Graph / Photo
146 Construction / Increasing of Parade path at Parade ground, New Police Line, Kingsway Camp, Delhi. 11/08/2018 24/10/2018 65.16 0.00 (Aug'18) 0.10 % (Aug'18) Aslam Builders

ok

Detail Report
Graph / Photo
147 RMO UPS system installed at 2nd floor, 4th floor & 6th floor, Casualty Block, Gynae Block, Ward 14, Genetic Lab, OT Block and New OPD Block at L.N. Hospital, New Delhi. during 2015-16. (SH:- Comprehensive annual maintenance of APC Make UPS system installed at OT Block, Genetic Lab & Ward 14, L.N. Hospital). 04/09/2017 03/09/2020 64.19 77.76 (Feb'20) 70.00 % (Feb'20) POWER HOUSE work in progress Detail Report
Graph / Photo
148 1 RMO Vrs E and M services installed at O Blk Rsdl Court complex KKD. 2 At Juvenile Justice Board Delhi. SH- Operation of EI and fans and water supply pump sets Lifts Fire Fighting and Fire Alarm System PA System DG Set and CCTV Surveillance System 01/10/2018 24/09/2020 64.13 53.44 (Sep'20) 0.00 (Sep'20) A G ENTERPRISES Detail Report
Graph / Photo
149 Replacement of old outlived 250 KVA 230 KVA DG sets with 500 KVA DG set at Sub-Station No. 1 in GIPMER ND 07/10/2019 06/01/2020 63.76 M/s Shri Durga Electricals work in progress by Shree Durga Electricals Detail Report
Graph / Photo
150 Renovation of Ten (10) Nos. Court Rooms at Tis Hazari Courts Building, Delhi, SH Civil Work 17/03/2019 14/09/2019 63.19 35.37 (Aug'20) 0.00 (Aug'20) Jabir Hussain

ok

Detail Report
Graph / Photo
151 (Upgradation of existing building and other misc repair works) 2nd call 10/03/2019 09/06/2019 62.80 30.10 (Nov'19) 0.00 (Nov'19) SUSHIL KUMAR

work completed

Detail Report
Graph / Photo
152 Annual Comprehensive maintenance and operation of 3 Nos. x 120 TR AC Plant, 698 HP and 226 HP VRVs and 3 Nos. x 11 TR Air Cooled Package installed at Shaheed Sukhdev College of Business Studies at Sector 16, Rohini, Delhi. 30/09/2019 29/09/2020 62.12 20.01 (Mar'20) 0.00 (Mar'20) Daikin Airconditioning India Private Limited WORK IN PROGRESS Detail Report
Graph / Photo
153 Running and maintenance of E.I. services in non-residential area at GTB Hospital, Complex, Shahdara, Delhi Sub Head Maintenance and operation of E and M services at non-residential area 25/08/2018 24/08/2019 62.10 39.81 (Feb'19) 70.00 % (Feb'19) M/s Vivek Associates work completed Detail Report
Graph / Photo
154 3. Running and Maintenance of Fire Fighting and Wet Riser at GTB Hospital complex, Shahdara, Delhi. Sub Head Maintenance and operation of E and M services at residential and non-residential area 25/08/2018 24/08/2019 61.90 60.75 (Mar'19) 78.00 % (Mar'19) PARASAR Electrical & Refrigeration Work in Progress (4TH RA bill paid) Detail Report
Graph / Photo
155 Operation & Maintenance of Electrical & Mechanical Services 01/04/2014 31/03/2015 61.32 Shaka Electrical India Detail Report
Graph / Photo
156 Repair and renovation work of the property No. 7 55, Church Road, Jwala Nagar, Shahdara Health Department for opening of Polyclinic. (Composite work of Civil and Electrical) 03/08/2019 04/02/2020 60.92 RP Electrical and Maintenance Works Work in progress but work is affected due to Covid-19 Detail Report
Graph / Photo
157 Replacement of damaged doors of Kitchen, bath, toilet, repair of damaged windows and other misc. Work at A5 Police Colony Narela, Delhi 40.) Phase II. 09/03/2020 07/07/2020 60.53 M H Builders Work In progress (15%) Detail Report
Graph / Photo
158 Providing Computer Operators Services in Zonal Office, Senior Architect Office, Divisional Office and Sub-Division Office under NWB-2 01/10/2019 30/09/2020 60.27 49.05 (Sep'20) 0.00 (Sep'20) M/s Manomay Work in progress 60% Agmt. No. 38/EE/PWD/NWB-2/2019-20 Detail Report
Graph / Photo
159 Comprehensive maintenance of OTIS make Lift in OPD, administrative, Main OT, Emergency & ward block) 29/07/2017 28/07/2020 59.72 OTIS Elevator Company (India) Ltd.

work in progress

Detail Report
Graph / Photo
160 Providing for Augmentation of Sub Station in Nehru Homeopathic Medical Collage and Hospital, B-Block, Defence Colony, New Delhi - 110024 30/04/2019 29/07/2019 59.18 AVON ELECTRICALS Detail Report
Graph / Photo
161 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block F at District Court Karkardooma Courts Delhi. 24/07/2018 23/03/2019 58.95 9.50 (Feb'20) 0.00 (Feb'20) Johnson Lifts Pvt. Ltd. Work in progress Detail Report
Graph / Photo
162 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block G at District Court Karkardooma Courts Delhi. 24/07/2018 23/03/2019 58.95 9.50 (Feb'20) 0.00 (Feb'20) Johnson Lifts Pvt. Ltd. Work in progress Detail Report
Graph / Photo
163 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block E at District Court Karkardooma Courts Delhi. 24/07/2018 23/03/2019 58.95 9.50 (Feb'20) 0.00 (Feb'20) Johnson Lifts Pvt. Ltd. Work in progress Detail Report
Graph / Photo
164 Replacement of 4 Nos, 10 passengers lifts installed in 62 nos Type V, Multi storey Delhi Govt. Flats at Motia Khan, New Delhi. 29/08/2017 28/04/2018 58.64 Johnson Lifts Pvt. Ltd. Work in progress Detail Report
Graph / Photo
165 ARMO vrs. Elect. and Mechanical services in District Jail District Court and GND Co-Ed. Polytechnic at Sector 15, Rohini, Delhi.SH Running and Operation of E and M Services and Comprehensive maintenance of DG Set at vrs. locations under NWElect. SD1 16/07/2019 15/07/2020 58.47 51.86 (Jul'20) 0.00 (Jul'20) SHASHANK ELECTRICALS FIRST RA BILL RS. 3965691/- AND WORK IN PROGRESS Detail Report
Graph / Photo
166 RMO LAN System at various buildings under H.C.1 HMEDC at L.N. Hospital New Delhi. SH Comprehensive Maintenance of Extreme Entrays LAN System at various buildings at L.N. Hospital 30/12/2017 29/12/2020 58.09 42.37 (Apr'19) 0.00 (Apr'19) TRACOM ENTERPRISES Work in progress Detail Report
Graph / Photo
167 SH Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units 03/08/2018 02/08/2019 58.04 21.52 (Dec'19) 0.00 (Dec'19) LG Electronics Detail Report
Graph / Photo
168 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block D at District Court Karkardooma Courts Delhi. 21/07/2018 20/04/2019 56.86 2.41 (Sep'19) 0.00 (Sep'19) KONE ELEVATOR INDIA PRIVATE LIMITED Work in progress Detail Report
Graph / Photo
169 RCC Retaining Wall for Damaged, Deteriorated / Weak Boundary Wall with RCC Columns and Beams at G(Co-Ed) SV, Sector-22 Rohini, Delhi-86 (ID-1412290) (Modified) 15/08/2019 14/01/2020 55.92 Batra Constructions Work is Started but Labour etc. not sufficient due to Covid-19 Agmt. No. 23/EE/PWD/NWB-2/19-20 Detail Report
Graph / Photo
170 EOR to Aditi Mahavidyalaya, Bawana, Delhi. 08/11/2019 07/05/2020 55.81 0.00 (May'20) 48.00 % (May'20) M/s Ravi Construction Co. work is in progress (45%) Detail Report
Graph / Photo
171 Comprehensive maintenance and operation of HVAC system 17/05/2018 16/05/2020 55.43 19.35 (Feb'19) 60.00 % (Feb'19) COMFORT SYSTEM Work in progress 8th RA 6146479 Detail Report
Graph / Photo
172 A/R and M/O Various buildings under Sub Division M-III and M-IV under Division South Building (M), PWD, New Delhi during 2019-20. (SH Mechanized Cleaning of over head tank and underground tank). 30/05/2019 29/05/2020 55.29 11.64 (Sep'20) 0.00 (Sep'20) UNITECH WATER SLOUTIONS work in progress Detail Report
Graph / Photo
173 4. Renovation of HOS Room and DDO Room, 5. Provision of Planters all around the Building, 6. New Stage with Shed etc. 13/08/2019 12/02/2020 55.01 24.68 (Mar'20) 0.00 (Mar'20) Sharma Construction Co. Work in progress 80%, Work is held up due to COVID-19 Agmt. No. 22/EE/PWD/NWB-2/19-20 Detail Report
Graph / Photo
174 EOR to Govt. Girls Sr. Sec. School Harkesh Nagar (ID 1925341), New Delhi during 2019-20 01/07/2019 30/11/2019 54.63 38.20 (Sep'20) 0.00 (Sep'20) KAMAAL CONSTRUCTION CO. Work in progress Detail Report
Graph / Photo
175 SITC of wet riser system + sprinkle system 01/05/2010 31/07/2010 54.63 Mehta Enterprises completed Detail Report
Graph / Photo
176 RMO of UPS and Boiler at GIPMER, NDShComprehensive maintenance of Labotek make UPS 26/08/2019 25/08/2020 54.61 power house work in progress by Power House Detail Report
Graph / Photo
177 A/R and M/O in D-II Flats, Vasant Kunj, New Delhi during 2018-19 (SH Change of Wall and Floor tiles, Kitchen, W/C, Bath fittings and Cup board etc.) 03/03/2019 02/09/2019 54.45 KR construction interiors work in progress Detail Report
Graph / Photo
178 RMO Electrical & Mechanical services installed at various buildings (East) under PWD EMD M-253, New Delhi. 14/01/2019 13/01/2020 54.38 32.33 (Feb'20) 0.00 (Feb'20) Capital outsourcing management services pvt ltd Detail Report
Graph / Photo
179 Special repair and misc. work of Quarters of Police Colony, Ambedkar Nagar, New Delhi during 2018-19. 05/09/2018 04/01/2019 53.79 63.35 (Jul'20) 0.00 (Jul'20) Sanjeev Kumar Goel work in progress Detail Report
Graph / Photo
180 EOR to SKV Timarpur Delhi dg 2017 18 SH Construction of 10 Nos porta cabin 13/04/2019 12/06/2019 53.65 67.01 (Mar'20) 0.00 (Mar'20) SABUR ALAM Detail Report
Graph / Photo
181 EOR to ITI, Jail Road, New Delhi. SH Renovation of administration block, conference room, construction of SPS type reception hall, provision of work stations, conference table and misc. civil works 20/08/2019 19/11/2019 53.11 Himanshu Const. Co. Detail Report
Graph / Photo
182 1) RMO Electro Mech services at Delhi Vidhan Old Sectt. Delhi. 2) RMO E and M services at Delhi School Tribunal and Patrachar Building and Estate Branch Lucknow Road at Timarpur, Delhi.(SH- Day to Day Maint. of Elect. and Mech. Services) (Tender Re-Call) 16/08/2019 15/08/2021 52.80 20.31 (May'20) 0.00 (May'20) Sehra Electric Works

Work is 100 % Completed

Detail Report
Graph / Photo
183 Comprehensive maintenance operation of BOSCH make CCTV 28/10/2019 27/10/2021 52.52 Pan Intellecom Ltd work in progress by Pan Intellecom Detail Report
Graph / Photo
184 Leveling and Water Proofing work in roofs, G.I pipeline connection, Repair of roads with cement conc. and interlocking paver block, Repair of class rooms with kota stone flooring, wall tiles, repair of windows and fixing of glass panes, renovation-- 26/09/2018 25/12/2018 52.50 44.44 (Sep'20) 0.00 (Sep'20) New India Construction Co. work in progress Detail Report
Graph / Photo
185 Providing and fixing Central Air Conditioning in New Ward at DDU Hospital, Hari Nagar, New Delhi 24/05/2019 23/07/2019 52.16 Blue Star Limited Detail Report
Graph / Photo
186 Providing and installation of CCTV Surveillance System (Balance Work) in Lawyers Chambers Block at District Court Karkardooma Shahdara, Delhi 28/04/2018 27/07/2018 52.07 Sonal Enterprises Detail Report
Graph / Photo
187 Operation and Maintenance of EI, streets light, DG set ,Substation and Lift installed at Prison Complex Mandoli 01/10/2020 30/09/2021 52.04 Shivam Engineers

WORK IN PROGRESS

Detail Report
Graph / Photo
188 Supplying and Replacement of conventional light fittings with LED fittings in Delhi Secretariat for Energy conservation. 17/03/2018 16/07/2018 50.80 9.42 (Nov'19) 0.00 (Nov'19) Electric India Control Devices Detail Report
Graph / Photo
189 6 Nos. School under North Building Division, School Id.1208013, 1309031, 1310034, 1310031, 1310042, 1310036. Civil and Electrical Works. 16/11/2019 15/03/2020 50.74 Arif work is in progress (70%) Detail Report
Graph / Photo
190 RMO of various electrical and mechanical services (Internal and external) at Prison Complex, Mandoli, Delhi. 21/03/2020 20/09/2020 50.44 0.00 (Jul'20) 50.00 % (Jul'20) Vikas Electric Corporation

WORK IN PROGRESS

Detail Report
Graph / Photo
191 Pdg & installation of fire fighting + Sprinkler System 21/05/2009 29/10/2009 50.40 Royale Meridian (India ) Pvt. Ltd. completed Detail Report
Graph / Photo
192 Providing & installation of fire fighting and sprinkler system 21/05/2009 31/03/2012 50.40 Royale Meridian (India ) Pvt. Ltd. completed Detail Report
Graph / Photo
193 Routine Maintenance of EI , Fans, compound light and Routine maintenance and operation of Electrical Sub Station, DG Set , Pump Set, Fire Alarm,Fire fighting, PA system 17/06/2017 16/06/2018 49.72 Krishna Electrical Works Detail Report
Graph / Photo
194 Supplying and fixing of LED Lights in Saket Bar Association office and Toilets Rooms in Lawyers Chamber Block, Saket Court Complex ND- 17. (4) Supplying and Rep. of old lights in Basement 1 and 2 in Lawyers Chamber Block, at District Court Saket. 16/09/2018 14/11/2018 49.71 26.54 (Mar'19) 55.00 % (Mar'19) ACE Engineers Bureau Detail Report
Graph / Photo
195 EOR to Fire Station, Janak Puri, New Delhi. SH Repair and raising of boundary wall, repair of door and windows, toilets, water proofing treatment of roof, improvement of rain water harvesting, repair of toilet in quarters, repair of barracks, repair. 22/01/2019 21/05/2019 49.50 26.77 (Oct'19) 0.00 (Oct'19) A.R. Construction Co. Detail Report
Graph / Photo
196 1. RMO of Carrier make central AC plant at D Block, GIPMER, New Delhi. SH Operation of Low side 3x390 TR capacity carrier make central AC plant EDP Block 2. RMO of Central AC Plant at C Block, GIPMER, New Delhi. SH.Operation of Low side 2x120 TR capa 21/12/2017 20/12/2019 49.44 G.D. Enterprises Work in progress by M/s. G.D Enterprises. Detail Report
Graph / Photo
197 Construction of additional office rooms at first floor for Drawing Branch, Correspondence Branch, Storage Rooms with toilet and other civil works at SE Office at Circle West, Karampura, New Delhi SH Civil and Electrical Work. 19/06/2019 18/10/2019 49.00 10.27 (Mar'20) 0.00 (Mar'20) Zahid Hussain (B-26) Detail Report
Graph / Photo
198 SITC of Energy efficient water cooled Screw chiller against replacement of old reciprocating chillers at Dr. BSA Hospital, Rohini, Delhi. 24/01/2018 23/04/2018 48.94 Blue Star Limited

work in progress

Detail Report
Graph / Photo
199 RMO EPABX System installed at various locations at L.N. Hospital, New Delhi. (SH:- Comprehensive Maintenance of EPABX System of Coral Make). 04/08/2017 03/08/2020 48.59 34.10 (Sep'19) 56.31 % (Sep'19) Topaz services Corp. work in progress by M/s.Topaz Services corporation Detail Report
Graph / Photo
200 Provision for Split AC and Window type AC for various locations at GTB Hospital, Complex, Shahdara, Delhi 06/04/2019 05/06/2019 48.14 RCC Enterprises Work completed Detail Report
Graph / Photo
201 1)RMO various EI and mechanical equip.at KGIT/DTTE/BTE at Pitampura,Delhi2)ARMO EI in DA Staff Quarters,Nimri Colony,Ashok Vihar Phase-IV,Delhi(SH Running maint.and operation of EI,Fans,drinking water supply pumpset, DG sets, electrical S/Stn.etc) 06/02/2019 05/02/2021 48.12 20.13 (Apr'20) 0.00 (Apr'20) PARKASH ELECTRICALS 3RA BILL PAID RS.2260024/-/- Detail Report
Graph / Photo
202 Providing and Laying external granite stone flooring and Stainless Steel Railing in Front of Room No- 1 to 18 at Directorate of Education, Old Sectt. Delhi-54 11/01/2018 11/04/2018 48.05 0.00 (Mar'19) 30.00 % (Mar'19) Samsad * Detail Report
Graph / Photo
203 Construction of SPS Plumbing Workshop at I.T.I Jahangirpuri, Delhi. (Phase II). 20/10/2018 19/02/2019 47.51 28.21 (Mar'20) 0.00 (Mar'20) Zahid Hussain (B-26) Work is progress. Stopped due to lockdown. Restarted. Detail Report
Graph / Photo
204 Day to day Maintenance & Operation of E.I & Fan, , Fire Fighting, Fire Alarm System, water supply system, Lifts, DG sets and Sub Station etc. 17/03/2018 16/03/2019 47.40 R K Enterprises Detail Report
Graph / Photo
205 Running Comprehensive Maintenance of Eureka Forbes Water Treatment RO systems, Water Coolers with Inbuilt UVRO Systems, Water Dispensers with Inbuilt RO Systems 28/04/2020 27/07/2022 47.34 ADITI ENTERPRISES

work in progress by agency

Detail Report
Graph / Photo
206 Pdg Power Distribution system 16/10/2009 15/02/2010 47.04 Shiv Electric completed Detail Report
Graph / Photo
207 Providing Power Distribution System 16/10/2009 31/01/2012 47.04 Completed Detail Report
Graph / Photo
208 Augmentation of existing Juniper make LAN System at New Delhi District Court Complex at Rouse Avenue, DDU Marg, New Delhi. 30/03/2019 28/04/2019 46.96 0.00 (Sep'20) 98.00 % (Sep'20) TRACOM ENTERPRISES Work in progress Detail Report
Graph / Photo
209 Replacement of Defective/ Burnt-out fittings with new LED fittings Power/light plug etc. in Lawyers Chambers Blocks at District Court Karkardooma, Delhi. 19/01/2019 18/04/2019 46.93 21.98 (Jan'20) 0.00 (Jan'20) S K Engineers Detail Report
Graph / Photo
210 A/R and M/O to Saket Court Complex (Non Residential ) under Sub-Division-I, BMSD-1, PWD During 2019-20. Saket, New Delhi. (SH Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc.) 20/05/2019 29/05/2019 46.86 10.84 (Jul'20) 0.00 (Jul'20) M/s Trendy Security Services

work in progress

Detail Report
Graph / Photo
211 Comprehensive maintenance of 500/625/750 KVA DG Sets 30/04/2017 29/04/2020 46.82 M/s Cummins Svam Sales & Service Ltd.

work in progress

Detail Report
Graph / Photo
212 Pdg +Installation of Substation Equipments 02/04/2010 01/08/2010 46.50 Budhiraja Electrical completed Detail Report
Graph / Photo
213 EOR to Central Jail No. 1,2,3,6,8 and 9, Tihar, New Delhi SH Hiring of super sucker machine for day to day maintenance 28/06/2019 27/06/2020 46.37 8.64 (Mar'20) 0.00 (Mar'20) Aditya Construction Co. Detail Report
Graph / Photo
214 ARMO various Electrical Installation and Mechanical Equipments at Forensic Science Laboratory, Madhuban Chowk, Sector-14, Rohini, Delhi (SH Operation and Preventive maintenance of 3 x 200 TR York Make AC plant) 04/04/2019 03/04/2020 46.32 28.62 (Sep'19) 0.00 (Sep'19) M/s Cascade 3RD RA BILL PAID RS. 1098390/- Detail Report
Graph / Photo
215 Repair and renovation of toilet of admin blocks and conference room along with tele communication branch and other miscellaneous works at CTI Building, Raja Garden, New Delhi. 06/03/2019 05/08/2019 46.09 44.54 (Mar'20) 0.00 (Mar'20) Amritlal Detail Report
Graph / Photo
216 RMO of various electrical and mechanical services (internal and external) at District Court Rohini, Delhi. 18/05/2019 17/05/2020 45.82 14.93 (Mar'20) 0.00 (Mar'20) Vikas Electric Corporation WORK IN PROGRESS Detail Report
Graph / Photo
217 Replacement of existing 2 Nos 26 Passenger cum bed lift at Dr. Hedgewar Arogya Sansthan, Karkardooma, New Delhi 29/12/2017 28/03/2018 45.60 35.75 (Oct'18) 90.00 % (Oct'18) Johnson Lifts Pvt. Ltd. Work in progress 4TH RA 4281750 Detail Report
Graph / Photo
218 1.MOEI,fans at GynB,Sk,2. M.O.E.Ifansat Spe.WB,T.B. cent3. M.OE.I,F at Casu B,OPD4. MOEI.,fan at Sur B,NOT,MS off5. RMOF F. Sys inst vari buil 6. RMO Fire AlaSys instat var.bui7 RMO Sub StatNo.1234 ,8. RMO Pumset at SHMaint,Operof EM ser. 18/07/2019 17/09/2019 45.38 45.38 (Oct'19) 0.00 (Oct'19) M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 work in progress by M/s Vivek Associates and 3rd RA paids Detail Report
Graph / Photo
219 Comprehensive Maintenance of C Mos Make Servo Stabilizers installed in lifts and other location 09/01/2020 08/01/2023 45.10 S.S. Sales and Services

work in progress by agency

Detail Report
Graph / Photo
220 1). Upgradation of CCTV Cameras at Dada Dev Child and Maternity Hospital, Nasirpur, New Delhi, 2). Providing Additional CCTV Cameras for Surveillance at Sardar Vallabh Bhai Patel Hospital, Patel Nagar, New Delhi 08/12/2018 07/02/2019 44.82 Hitech Audio Systems Pvt. Ltd. Detail Report
Graph / Photo
221 Comprehensive Maintenance of DBSOLX developed Complaint Tracker System at GNEC 03/11/2019 02/11/2020 44.66 DBSOLX work in progress by DB SOLX Detail Report
Graph / Photo
222 Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System at GIPMER, New Delhi 28/04/2020 27/04/2023 44.66 DBSOLX

work in progress by agency

Detail Report
Graph / Photo
223 Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System at Meerdard Lane, New Delhi 09/04/2020 08/04/2023 44.65 SCS Technologies

work in progress by SCS Technologies

Detail Report
Graph / Photo
224 RMO Elect. and Mech. Services in Lawyers chambers Block D E F G and H at District Courts Karkardooma Delhi. SH-Operation of lifts in Lawyers chamber Blocks. 01/10/2018 11/09/2019 44.60 34.90 (Jan'20) 0.00 (Jan'20) Guruji Elevator Detail Report
Graph / Photo
225 SH Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units) 03/08/2018 02/08/2019 44.40 16.47 (Dec'19) 0.00 (Dec'19) LG Electronics Detail Report
Graph / Photo
226 RMO UPS system installed at 2nd floor, 4th floor and 6th floor Casualty Block, Gynae Block, Ward 14, Genetic Lab, OT Block and New OPD Block at L.NHSHComprehensive annual maintenance of Magna Flux Make UPS system installed at New OPD BlockL.N.H 31/08/2019 30/08/2022 44.30 power house Work in progress by M/s Power House. Detail Report
Graph / Photo
227 ComprMaint opera of DBSOLX devel Comp Tracker Sys at MAMC 01/01/2020 31/12/2022 44.22 SCS Technologies

work in progress by SCS Technologies

Detail Report
Graph / Photo
228 1ARMO of vrs.elect.and mech.Services in NCC Bhawan Sec-19 Rohini Delhi dg18-19.2)ARMO Elect.adMech.Services Home for Mentally Retarded and Old Age Person,AshaKiranComplex, Avantika,Rohini,SH Maint.of EI and Fans and Operation of S/Stn,DGSet and Pumps. 19/02/2019 18/02/2020 43.82 43.78 (Mar'20) 0.00 (Mar'20) PARASAR Electrical & Refrigeration WORK COMPLETED Detail Report
Graph / Photo
229 Day to day maintenance of Shaheed Sukhdev College of Business Studies Sector-16 Rohini, Delhi 04/09/2017 03/06/2018 43.35 0.00 (Sep'18) 100.00 % (Sep'18) Taksali Engineering Works

work done

Detail Report
Graph / Photo
230 Renovation of rooms of GPF cell and Animal Husbandary department, three nos rooms beside caretaking branch and installation of glass panels in visitor s gallary, officer s gallary, lieutenant governor s gallary in Delhi Vidhan Sabha, Old. 09/02/2019 10/07/2019 43.34 32.70 (Jan'20) 0.00 (Jan'20) Shri Bhagwan Mittal

ok

Detail Report
Graph / Photo
231 Renovation of toilets and shaft of New Medical Block at Lok Nayak Hospital New Delhi 11/01/2020 08/07/2020 43.29 Shabab Khan Work in progress..... Detail Report
Graph / Photo
232 Civil Work and Electrical Work (Composite Work). 05/09/2020 04/12/2020 43.21 SIDDHANSH ENGINEERING WORK Work just opened Detail Report
Graph / Photo
233 Providing Services of labour for day to day maintenance of colony 05/09/2019 04/08/2020 42.90 29.80 (Jun'20) 0.00 (Jun'20) Placement Security Services Work in progress Detail Report
Graph / Photo
234 Construction of Rain Water Harvesting Tank at DCP Office, Pushpanjali Enclave and PC and Police Line Pitampura, New Delhi. 21/12/2019 20/04/2020 42.41 7.44 (May'20) 0.00 (May'20) Sachin Prakash Work in progress 40%, Work is held up due to COVID-19 Detail Report
Graph / Photo
235 Supply and replacement of 2 x 80 KVA Seamless power supply system critical load of NIC Servers at Delhi Sachivalya New Delhi. 07/01/2019 06/02/2019 42.39 Issar Industries Detail Report
Graph / Photo
236 Renovation and Upgradation of conference hall in 5th floor District Court Complex, Rohini, Delhi. (SH SITC of EI work, Air Conditioning, Online UPS, Fire fighting and fire alarm system and Audio-Video Projection System) 30/03/2019 29/06/2019 42.22 10.53 (Feb'20) 0.00 (Feb'20) SIDDHANSH ENGINEERING WORK SECOND RA BILL PAID RS.1053274/- Detail Report
Graph / Photo
237 Reg. EOR to PTS colony Malviya Nagar, New Delhi. (SH- Development of parks). 25/03/2019 24/07/2019 42.09 20.45 (Jul'20) 0.00 (Jul'20) Naresh Kumar work in progress Detail Report
Graph / Photo
238 EOR to Central Jail No. 4,5,7 and various building under west building sub division-1, Tihar, New Delhi. SH Hiring of mini super sucker machine for day to day maintenance 09/03/2019 08/03/2020 42.06 27.86 (May'20) 0.00 (May'20) Aditya Construction Co. Detail Report
Graph / Photo
239 Construction of boundary wall and Installation of signage board for Geetanjali Fire Station, New Delhi. 30/01/2019 29/05/2019 41.85 17.00 (Sep'20) 0.00 (Sep'20) Vijay Bhardwaj work in progress Detail Report
Graph / Photo
240 Providing wiring/rewiring and miscellaneous electrical equipments in Type-I GBPH staff qtrs, New Delhi 18/09/2019 17/12/2019 41.74 11.43 (Oct'19) 0.00 (Oct'19) RCC Enterprises work in progress by RCC Enterprises. Detail Report
Graph / Photo
241 Operation and Comprehensive Maintenance of CCTV System and Allied equipments i c UPS at Mandoli Prison Complex 20/08/2020 19/02/2021 41.46 0.00 (Sep'20) 35.00 % (Sep'20) OPTIMUM SECURITY SOLUTIONS PVT. LTD.

WORK IN PROGRESS

Detail Report
Graph / Photo
242 SITC of LED strt lghts in Nav Sena Appt Vidya Vihar Vikas Co Oprtve Grp Husng Scity Triveni Appt Bannu Biradri Co oprtve Grp Husng Scity Ltd Jyot Appti Suraksha Eclve nd Subh Eclve Mausam Prijat Jiwan Anand Galib Kesturba Xavior Bank Vihar Rail Vihar 03/10/2019 02/12/2019 41.41 16.56 (Mar'20) 0.00 (Mar'20) Devin Electricals WORK IN PROGRESS Detail Report
Graph / Photo
243 RMO of Steam Boiler at LNJP HSHRoutine maint Oper of CNG/Oil Fired 2.5 TPH(03 Nos.)600 KG(Autoclave) Capacity Fire Tube IBR Boiler 01 No routine maint.and operat of water softening Plant 17/07/2019 16/07/2020 41.33 24.11 (May'20) 0.00 (May'20) Boilermart 3RD RA paid to the firm & WORK IN PROGRESS Detail Report
Graph / Photo
244 EOR to Central Jail No. 8 and 9, Tihar, New Delhi. SH Renovation of common toilets, barrack toilet and cell toilet with marble chips skirting and mosaic flooring of ward. 04/02/2019 03/08/2019 41.23 42.04 (Mar'20) 0.00 (Mar'20) sunil kumar Detail Report
Graph / Photo
245 A/R & Internal and External Finishing, Repair of Chajjas, Re-Casting of Terrace and Other Misc. Works. 07/09/2019 06/12/2019 41.02 17.64 (Mar'20) 0.00 (Mar'20) Love Joshi Work in progress 60%, Work is slow in Progress due to Covid-19 Agmt. No. 25/EE/PWD/NWB-2/19-20 Detail Report
Graph / Photo
246 Replacement of out lived fire alarm system at Tis Hazari Courts Building, Delhi. 30/09/2017 29/12/2017 40.96 17.54 (Mar'20) 0.00 (Mar'20) Royale Meridian (India ) Pvt. Ltd. Detail Report
Graph / Photo
247 A/R and M/O to Saket Court Complex (Residential) under Sub-Division-I, BMSD-1, PWD During 2019-20. Saket, New Delhi. (SH Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc.). 21/06/2019 20/06/2020 40.44 RAKSHAK SECURITAS PVT. LTD. work in progress Detail Report
Graph / Photo
248 Enhancing accessibility of built up environment of ITI Nand Nagri, Delhi-110093 -2nd call 23/09/2019 22/12/2019 40.22 25.50 (Feb'20) 0.00 (Feb'20) Jabir Hussain

work in progress

Detail Report
Graph / Photo
249 Re Construction of boundary wall with Washed stone grit plaster in BNN SKV Khera Kalan Delhi 31/08/2019 30/11/2019 40.18 21.70 (Jan'20) 0.00 (Jan'20) ALTECH GROUP Work in progress (95%) Detail Report
Graph / Photo
250 Construction of Maulana Azad Institute of Dental Sciences, Phase II at Bahadur Shah Zafar Marg New Delhi. SH: Consultancy Services) 16/04/2010 28/05/2016 40.00 Kothari Associates Pvt Ltd work in progress... Detail Report
Graph / Photo
251 Renovation upgradation and Misc Civil work at various un occupied flats under sub division M 3231N 16A Rajpur Road Delhi SH Renovation work at flat no 33 29 33 6 and 16 6 13/04/2019 12/09/2019 39.99 Munzareen Ahmd Detail Report
Graph / Photo
252 Providing Queue management system at Shri Dada Dev Child and Maternity Hospital, Nasirpur New Delhi 22/07/2018 21/10/2018 39.93 DAN Electronic System Pvt.Ltd Detail Report
Graph / Photo
253 Operation and Comprehensive Maintenance of Air washer Air scrubber installed at Mandoli Prison Complex. 05/06/2020 04/06/2021 39.85 0.00 (Sep'20) 35.00 % (Sep'20) SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD.

WORK IN PROGRESS

Detail Report
Graph / Photo
254 EOR/Renovation of O-block and P-block (Type-I) Pumbari road at New Police Line, Kingsway Camp, Delhi. (SH EOR/Renovation of P-Block Type -I Quarters). 18/01/2019 17/04/2019 39.79 33.71 (Jul'20) 0.00 (Jul'20) Saeed Builders

ok

Detail Report
Graph / Photo
255 EOR to CPMF Site PTS Wazirabad to facilitate camping personnel Delhi 25/09/2018 24/11/2018 39.50 14.01 (Feb'20) 0.00 (Feb'20) S K Engineers Work in progress Detail Report
Graph / Photo
256 SH Providing services for Computer Operator, Clerk, Peons and Messenger in PWD Circle M-13 18/02/2019 17/07/2019 39.47 8.79 (May'19) 0.00 (May'19) M/s AMY Enterprises Detail Report
Graph / Photo
257 1). Replacement of Old LT Panel of 2 x 1000 KVA Substation at Guru Gobind Singh Govt. Hospital, Raghubir Nagar, New Delhi, 2). Replacement of Old HT OCB Panel at Guru Gobind Singh Govt. Hospital, Raghubir Nagar, New Delhi 05/12/2018 04/04/2019 39.43 ELECTRO TECH SYSTEMS Detail Report
Graph / Photo
258 (A) Day to Day maintenance complaint, Internal External finishing, sweeping of roads, cleaning of sewerline, other misc. repair. (B) SO Material). 08/06/2020 05/04/2021 39.29 Irfan Ahmed Work in progress Detail Report
Graph / Photo
259 Replacement of common area corridor light by energy saving LED light of College Build G F 1st Floor 2nd Floor and 3rd Floor at MAMC CND2 Replacement of common area corridor light by energy saving LED light of NBH, OBH, PG Mens, Intern Hostel and Ward 06/07/2019 15/09/2019 39.04 23.48 (Oct'19) 0.00 (Oct'19) Sarnam Associates work in progress by Sarnam Asoociates Detail Report
Graph / Photo
260 Comprehensive maintenance and operation of 4 x 400 TR Central HVAC Plant. 20/05/2019 19/05/2020 39.01 Unique Engineers Pvt. Ltd. Detail Report
Graph / Photo
261 2 Nos. Lifts 22/10/2010 21/06/2011 39.00 Schindler India Pvt. Ltd. Detail Report
Graph / Photo
262 Renovation of toilet block and Strengthening of damaged RCC column,beam and slabs. 03/01/2020 02/09/2020 38.94 Mohd. WAZID Work in progress 10%. Work heldup due to lockdown Detail Report
Graph / Photo
263 SITC of balance work of air condition (GSS Ducting etc.) 16/07/2008 15/07/2009 38.90 AirTech Refrigration & Air-conditoning system. Work completed Detail Report
Graph / Photo
264 Running and maintenance of E.I. services in non-residential area at GTB Hospital, Complex, Shahdara, Delhi Sub Head Maintenance and operation of E and M services at UCMS, DEM Building and other ancillary buildings 25/08/2018 24/08/2019 38.90 28.88 (Mar'19) 77.00 % (Mar'19) PARASAR Electrical & Refrigeration Work in Progress (4TH RA Detail Report
Graph / Photo
265 Maint. Elect. Consumption Charges of Street Lighting on PWD NED Roads under North Zone M 3 SH Day to Day Maintenance Operation of Electrical Installation LT Panel Boards Sub Station DG Sets and Dewatering Pumps on Underpass RUB at Mukarba Cho 07/06/2017 06/06/2018 38.57 Sehra Electric Works

completed/in progress

Detail Report
Graph / Photo
266 Comprehensive maintenance of microprocessor based nurse call bell system 28/10/2019 27/10/2021 38.45 AKOUSTIK COMMUNICATIONS work in progress by Akoustik Communication Detail Report
Graph / Photo
267 Repair and Renovation of Workshop and Making Modification in room no. 9 of Women Wing 30/08/2019 29/12/2019 38.26 6.48 (Mar'20) 0.00 (Mar'20) Saeeduddin

work in progress

Detail Report
Graph / Photo
268 1 RMO of Specialized Electrical and Mechanical works at A and U Tibbia College and Hospitals, Karol Bagh, New Delhi .2 RMO of specialized Electrical and Mechanical works at DR. NC Joshi Memorial Hospital, Karol Bagh, New Delhi 09/01/2020 08/01/2022 37.87 SONAL ENTERPRISES PVT. LTD

work in progress by agency

Detail Report
Graph / Photo
269 RMO E and M Services in KKD Court Court Block ACI B JKL at District Court KKD Delhi. SH- Operation of lifts in Court Blocks 25/09/2018 24/09/2019 37.84 33.43 (Nov'19) 0.00 (Nov'19) Royal Electrical Co. Detail Report
Graph / Photo
270 EOR to Central Jail No. 5, Tihar Jail Complex, New Delhi. SH Renovation of toilets in ward no. 1, 2, 3 and 4. 02/01/2019 01/07/2019 37.76 29.36 (Mar'20) 0.00 (Mar'20) Himanshu Const. Co. Detail Report
Graph / Photo
271 Oper compr RDS make autom of water sup.SCADA sys inst at var loca 07/03/2020 06/03/2022 37.57 RECKTRONIC DEVICES AND SYSTEMS work in progress by Recktronics Services & System Detail Report
Graph / Photo
272 RMO Pump Set & Fountain, SCADA at College building, various hostel and Type VI, Type V, Type I, Residential Quarters at MAMC, New Delhi. (SH:- Operation and comprehensive RDS make automation of water supply and SCADA system installed at various location) 07/03/2020 06/03/2022 37.57 RECKTRONIC DEVICES AND SYSTEMS

work in progress by agency

Detail Report
Graph / Photo
273 Repair / Renovation of remaining Staff Quarters type I to V including street light at Police Colony Shalimar Bagh, Delhi - 110088. 24/06/2018 23/10/2018 37.53 RAS Enterprises WORK IN PROGRESS Detail Report
Graph / Photo
274 AR and MO Various works under Delhi High Court Civil Division PWD New Delhi dg 2019 20 SH Providing Data Entry Computer Operators Messengers Clerical Staff Security Guard etc for Delhi High Court Division PWD Govt. of Delhi 25/11/2019 23/11/2020 37.33 8.83 (May'20) 0.00 (May'20) UNIVERSAL SECURITY AND PLACEMENT SERVICES Work in progress Detail Report
Graph / Photo
275 SITC of addressable Fire detection Alarm & PA. System 26/04/2009 25/09/2009 37.12 New Fire Control completed Detail Report
Graph / Photo
276 Routine maintenance and operation of Lifts 16/05/2018 15/05/2019 37.05 33.96 (Apr'19) 94.00 % (Apr'19) Swastik Electrotech Pvt. Ltd. Work transferred and in progress Detail Report
Graph / Photo
277 SITC of addressable fire alarm and detection system 24/05/2013 23/09/2014 37.00 Royale Meridian (India ) Pvt. Ltd. completed Detail Report
Graph / Photo
278 EOR to EI and Fans and PA System at Govt. GSSS No.1 Ghonda Delhi-110053 (School ID- 1104025). 14/01/2019 13/03/2019 36.91 48.49 (Jan'20) 0.00 (Jan'20) V K Electrical Works Work in progress Detail Report
Graph / Photo
279 Comprehensive Maintenance and Operation of Lifts installed in Main Court Building, Lawyers Block and residential block at District Court, Saket, New Delhi. (SH- Comprehensive maintenance of Johnson make lift) 27/01/2019 26/01/2020 36.66 33.88 (Feb'20) 0.00 (Feb'20) Johnson Lifts Pvt. Ltd. Detail Report
Graph / Photo
280 Structural repair and Up gradation of Residential quarters at Police Quarters under Mehrauli police station (Type B-8 nos. and type C-4 nos.), under South Building (M), PTS colony, Malviya Nagar New Delhi. 27/06/2018 26/12/2018 36.43 33.72 (Jun'19) 0.00 (Jun'19) Datta Krupa Enterprises work in progress Detail Report
Graph / Photo
281 Repair and Renovation of various flats and civil misc. works 17/02/2020 16/08/2020 36.42 D.R. Enterprises Detail Report
Graph / Photo
282 Providing LAN System and All in One Desktop at Acharya Shree Bhikshu Govt. Hospital, Moti Nagar, New Delhi 30/11/2018 29/01/2019 36.40 DYNAMIC SYSTEMS Detail Report
Graph / Photo
283 Operation and Comprehensive Maintenance of 500 KLD ETP having BMW and OLMS system 01/05/2020 30/04/2022 36.30 Wellkome engineers

work in progress by agency

Detail Report
Graph / Photo
284 Providing and Installation of 500 KVA capacity Silent type DG Set for MSO Building, New Delhi. 12/09/2017 11/01/2018 36.23 Himalaya Generators Detail Report
Graph / Photo
285 Replacement of Defective/ Burnt-out fittings with new LED fittings ceiling fans fresh air fan power points etc. in Flats Type-II Type-III Type-IV Type-V Type-VI and Duplex in O block residential Complex at District Court Karkardooma Delhi 05/09/2018 04/12/2018 36.23 35.80 (Oct'19) 0.00 (Oct'19) Krishna Electreical Works Detail Report
Graph / Photo
286 Compr Maint of DBSOLX devel Compl Track Sys at L.N.H 12/10/2019 11/10/2022 36.21 DBSOLX work in progress by DB SOLX Detail Report
Graph / Photo
287 Renovation work at 7th floor in New surgical block at L.N H SH S I T C of modular type Var. Refr. Flow/Var. Refr. Volume air cooled outdoor units 26/06/2020 25/08/2020 36.12 Royel Electricals

work in progress by agency

Detail Report
Graph / Photo
288 (i) SITC of CCTV Cameras in Admin Block and Various offices of Saket Court Complex New Delhi-110017 (ii) SITC of CCTV Surveillance system in the Residential Complex at District Court saket New Delhi-110017. 24/01/2019 23/04/2019 35.83 38.98 (Aug'19) 65.00 % (Aug'19) San Infotech Services Detail Report
Graph / Photo
289 SITC of 2 Nos 16 passenger lifts 09/02/2010 08/06/2010 35.76 Thyssenkrupp Elevator (India) Pvt. Ltd. completed Detail Report
Graph / Photo
290 EOR to ITI Narela, Delhi-110040. (SH:-Renovation of damaged flooring of corridors staircase and other misc works at ITI Narela). 05/10/2019 04/02/2020 35.70 12.40 (Mar'20) 0.00 (Mar'20) Aayan Construction Co. work is in progress (90%) Detail Report
Graph / Photo
291 1). RMO of Central AC Plant/ Package Unit at DDUH, Hari Nagar, ND for the yr 18-19, 2). RMO of Central AC Plant Screw Type at Trauma Block at DDUH, Hari Nagar, New Delhi for the year 2018-2019 (SH Operation and Maintenance of Central AC Plant) 17/06/2018 16/06/2019 35.58 PMG ENGINEERS Detail Report
Graph / Photo
292 Compreh Maint and Operation of CCTV System 07/10/2019 06/10/2021 35.53 Pan Intellecom Ltd work in progress by Pan Intellecom Detail Report
Graph / Photo
293 A/R and M/O to Police Colony Model Town and New Police Line, Kingsway Camp, Delhi, during 2018-19. (SH Misc. Civil repair works.) 30/12/2018 27/06/2019 35.52 36.39 (Jul'20) 0.00 (Jul'20) Saeed Builders

ok

Detail Report
Graph / Photo
294 Supplying, Installation, Testing and Commissioning of 150 TR Chilling Machine with VFD in place of old existing worn out Chilling Unit No. 1 of 100 TR Capacity at Pt. Madan Mohan Malviya Hospital, Malviya Nagar, New Delhi 26/04/2018 25/08/2018 35.40 Blue Star Limited Detail Report
Graph / Photo
295 Comprehensive maintenance of AC Plant Blue Star Make 14/07/2017 14/07/2020 35.34 4.14 (May'19) 0.00 (May'19) Blue Star Limited

work in progress

Detail Report
Graph / Photo
296 Reconstruction and Repair of Drain and Development of Site. 21/12/2019 20/06/2020 34.86 5.53 (Jul'20) 0.00 (Jul'20) Love Joshi Work is slow in Progress due to Covid-19 Detail Report
Graph / Photo
297 Renovation of Bathroom cum toilet blocks of RAC and Sikkim Police Officers 12/03/2019 11/05/2019 34.66 32.69 (Jul'20) 0.00 (Jul'20) Saeed Builders

work completed

Detail Report
Graph / Photo
298 E.O.R. to S.K.V. No. 1 (Hindi Medium) at Jama Masjid, Delhi. Dg. 2018-19 (School ID-2127024). (SH: Renovation of toilet, kota stone flooring in court yard and class rooms under SRD Division-I, Sub-Division-III). 07/09/2018 06/01/2019 34.65 0.00 (Jan'19) 43.28 % (Jan'19) Kamal Construction Co. wORK COMPLETED FINAL BILL PAID Detail Report
Graph / Photo
299 M/o different Hort. works under HSD (Central and New Delhi), Hort. Division (East) M, PWD, Delhi during 2018-19 09/09/2018 08/05/2019 34.64 0.39 (Jun'19) 0.00 (Jun'19) PLANTS CARE Detail Report
Graph / Photo
300 Providing Cable Cover to Cover the haphazard wiring system at various places at DDU Hospital, Hari Nagar, New Delhi 18/04/2019 17/05/2019 34.37 M/s Kalsi Engineers Detail Report
Graph / Photo
301 Renovation of Sick room, counselling room, Reception and Staircase in Ground floor and C/o superintended room, class room and toilet on First floor etc. and Electrical works 16/12/2018 15/04/2019 34.29 17.78 (Aug'19) 28.00 % (Aug'19) Ikram Ali Work in progress Detail Report
Graph / Photo
302 Up gradation of existing sub-station at CNBC, Geeta Colony, Delhi 14/07/2017 13/11/2017 34.06 59.51 (Jan'19) 70.00 % (Jan'19) Sangeeta Electricals Work completed Detail Report
Graph / Photo
303 Providing Services of Data Entry / Computer Operator, Messenger, LMV Driver, MTS etc. for various offices under Horticulture Division East 08/12/2018 07/12/2019 33.98 24.29 (Jul'20) 0.00 (Jul'20) Good Luck Enterprises Detail Report
Graph / Photo
304 1 Providing Surveillance system at SRHC Hospital Narela New Delhi 2) SITC of AC Water Coolers Geysers and CCTV Cameras in Poly Clinic Sec 18 Rohini Delhi SH SITC of CCTV and allied equipments 13/11/2017 12/02/2018 33.91 SONAL ENTERPRISES PVT. LTD.

work in progress

Detail Report
Graph / Photo
305 Construction of double storey SPS rooms for Gym and activity centre in the campus with provision of stair case with false ceiling in library. 15/02/2019 14/06/2019 33.89 SANJEEV KUMAR GOEL Work in progress Detail Report
Graph / Photo
306 Running and maintenance of Air-conditioning System at GTB Hospital Complex, Shahdara, Delhi. Sub Head Operation, maintenance and charging of water softening plants for 4x550 and 4x300 TR capacity AC Plants 03/08/2019 02/08/2021 33.88 M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 work in progress Detail Report
Graph / Photo
307 Replacement of old out dated 380 KVA DG Set with silent type 500 KVA DG Set at DDUH Hari Nagar New Delhi 18/01/2019 17/04/2019 33.31 Himalaya Generators Detail Report
Graph / Photo
308 SITC of D.G. Sets 17/11/2010 16/01/2011 33.16 S.L. Electromech Pvt. Ltd. completed Detail Report
Graph / Photo
309 1.RMO Sub-Station and DG Set at College building at MAMC New Delhi.RMO Fire Alarm and Fire Fighting System Water purification System RO CCTV and Audio Visual System of College building and hostel building at MAMC New Delhi 11/04/2019 10/08/2019 33.09 20.68 (Sep'19) 0.00 (Sep'19) M/s Vivek Associates Work in progress by Vivek Associates Detail Report
Graph / Photo
310 (SH- Operation of EI and Fans including compound light substation DG set Water supply and Dewatering system Fire Fighting and Sprinkler System Lifts Fire Alarm and PA System.) 21/01/2019 20/01/2020 33.07 35.83 (Mar'20) 0.00 (Mar'20) M/s. A G ENTERPRISES Detail Report
Graph / Photo
311 Operation of EI and fans, lifts, fire fighting & fire alarm system, PA system, water supply pump set & D.G Set 21/04/2014 20/04/2015 32.99 A.G. Enterprises Detail Report
Graph / Photo
312 Renovation work at 4th floor New Medical Block at LNHSHS.I.T.Cof Central AirConditioning System 09/09/2019 08/12/2019 32.97 25.22 (Oct'19) 0.00 (Oct'19) Airtemp Engineers 2nd RA paid to Airtemp Engineers & Work in progress Detail Report
Graph / Photo
313 Replacement of Defective/Burnt-out Air-Conditioning Units installed in Hostel Block at UTCS Bldg. Vishwas Nagar, Shahdara Delhi. 25/02/2019 24/04/2019 32.84 8.33 (Sep'19) 0.00 (Sep'19) S K Engineers Detail Report
Graph / Photo
314 Repair/Renovation of main Hall ceiling and misc. work at Thyagraj Stadium, INA, New Delhi 27/07/2019 26/09/2019 32.83 Paras Nath Singh Detail Report
Graph / Photo
315 S/I/T/C of 1 No. X 120 TR AC Plant (Stand by unit) 21/08/2017 20/12/2017 32.80 Blue Star Limited

work in progress

Detail Report
Graph / Photo
316 (SH Netting of Base ball grills and stairs case, Raising of Boundary wall, Installation of main gates at every floor and rooftop, Construction of guard room, Extension of Stage, Grills over the ventilators in every rooms and labs, Sunshades over the 16/09/2019 15/01/2020 32.70 Raj Kumar Gautam Detail Report
Graph / Photo
317 RMO Eand M services at New Delhi District Court Complex at Rouse Avenue, DDU Marg, New Delhi (Comprehensive Annual Maintenance of HVAC Plant) 03/09/2020 02/09/2021 32.54 0.00 (Sep'20) 15.00 % (Sep'20) Voltas Ltd.

WORK IN PROGRESS

Detail Report
Graph / Photo
318 Comprehensive Maintenance of C-Mos Make Servo Voltage stabilizers installed at different locations 04/12/2019 03/12/2022 32.53 C Mos Sytems work in progress by C-mos system Detail Report
Graph / Photo
319 RMO E and M services at New Delhi District Court Complex at Rouse Avenue, DDU Marg, New Delhi. (SH Comprehensive Annual Maintenance of 3x120 KVA UPS system). 23/06/2019 22/06/2022 32.00 0.00 (Sep'20) 44.00 % (Sep'20) POWER HOUSE

WORK IN PROGRESS

Detail Report
Graph / Photo
320 AR and MO to Delhi High Court New Delhi dg 2020 21 SH Providing services of plumbing, carpentry jobs etc 07/06/2020 06/06/2021 31.93 TRENDY SECURITY SERVICES Work in progress Detail Report
Graph / Photo
321 Supplying, installation, testing and commissioning of laundry equipments at JPCH Shastri Park Delhi 08/04/2018 07/04/2022 31.84 26.53 (Jul'18) 30.00 % (Jul'18) Lucky Engineering Works Work in Progress 2ND RA 767530 Detail Report
Graph / Photo
322 1). Prosn of New Air Conditioners and Rep of Old ACs with Energy Efficient Air Conditioners GGSGH 2) EOR SVBPH (SH Rep of Old ACs with Energy Efficient Air Conditioners at SVBPH) 3) EOR SVBPH (SH SITC of Air Conditioners in IEC Room and DOT Centre) 17/05/2019 16/07/2019 31.78 MATHARU ELECTRIC WORKS Detail Report
Graph / Photo
323 SITC of Water Coolers at Various locations at Lok Nayak Hospital, New Delhi 02/09/2019 01/11/2019 31.67 M/s Vivek Associates work in progress by Vivek Associates Detail Report
Graph / Photo
324 Providing and Replacement of Cooling Tower and Defective Pipe Line at Janak Puri Super Specialty Hospital C-2B Janak Puri, New Delhi 26/06/2018 25/08/2018 31.54 Chopra Enterprises Detail Report
Graph / Photo
325 Maint. and Elect. Consumption Charges of Street Light under Central and New Delhi Division. (Sh- Operation of 13 Passenger Jhonson make lift at sindhora kalan FOB). 01/03/2019 28/02/2022 31.32 13.87 (May'20) 0.00 (May'20) Taksali Engineering Works

Work is 100 % Completed

Detail Report
Graph / Photo
326 RMO Electrical and Mechanical services at MV Hospital Pooth Khurd Delhi SH Operation Routine Maintenance and preventive maintenance of IBR approved Steam Boiler 25/06/2019 24/05/2020 31.31 Kamal Engineers Work in progress Detail Report
Graph / Photo
327 Repairing / replacement of EI and fans in Old Building at GTB Hospital, Shahdara, Delhi 20/07/2019 19/09/2019 31.30 AJAY CONSTRUCTIONS AND ENGINEERS 2ND RA 3016299 Detail Report
Graph / Photo
328 SH- Repair and Up-gradation of Electrical Installation of residential quarters and toilet block at police station 06/08/2018 05/10/2018 31.30 13.02 (Nov'19) 0.00 (Nov'19) Prem And KP Electric Co. Detail Report
Graph / Photo
329 SH- Maintenance and Operation of split AC, Pressurization and Ventilation at Delhi Sachivalaya, New Delhi 05/07/2018 04/07/2019 31.26 6.04 (Sep'19) 0.00 (Sep'19) KELVIN ASSOCIATES Detail Report
Graph / Photo
330 RMO Electrical and Maintenance services at JPC Hospital, Shastri Park, Delhi. Sub Head Operation and routine maintenance of electrical accessories, fire fighting, DG Set and fire alarm system installed at JPCH 02/07/2019 01/05/2020 31.23 M.I. Enterprises completed Detail Report
Graph / Photo
331 Renovation of TCPC (Rehabilitation Complex) Block No.-1, Lajpat Nagar-II, New Delhi during 2019-20. 25/07/2019 24/10/2019 30.89 SABUR ALAM Detail Report
Graph / Photo
332 Ventilation and Accoustic of DG Sets Room 09/12/2007 08/03/2008 30.89 Work completed Detail Report
Graph / Photo
333 RMO CCTV, sub-station, DG sets, UPS system, RO and compressed air system at MAIDS, New Delhi. SH CMC of 3x200KVA UPS at MAIDS 26/12/2017 25/12/2020 30.87 8.00 (Jan'19) 25.92 % (Jan'19) POWER HOUSE Work in progress by M/s Power House Detail Report
Graph / Photo
334 Replacement of old/outlived Power factor Panel at Sub-Station-1, 2 and 3 in GIPMER, New Delhi 26/12/2019 25/02/2020 30.84 Budhiraja Electrical work in progress by Budhiraja Electrical Detail Report
Graph / Photo
335 Wiring / Rewiring including providing fans, fittings, DB and other electrical repairing work at Lakshmi Bai College University of Delhi, Ashok Vihar - III, Delhi - 110052. (SH Electrical Work) 18/05/2019 17/08/2019 30.72 18.40 (Sep'19) 0.00 (Sep'19) R.S Electric Co. 2ND RA BILL PAID RS.2404857/- WORK IN PROGRESS Detail Report
Graph / Photo
336 (SH- Routine maintenance and Operation of EI and Fans, Fountains and Pump Sets, DG Sets, Fire Alarm System and Fire Fighting System ). 19/03/2019 18/03/2020 30.69 26.51 (Feb'20) 0.00 (Feb'20) Kamal Electrical Works Detail Report
Graph / Photo
337 Painting of shed with Polysiloxane paint around the Stadium and providing some missing drain cover 10/01/2020 10/03/2020 30.66 19.17 (Mar'20) 0.00 (Mar'20) A R CONSTRUCTION CO. Work In progress (90%) Detail Report
Graph / Photo
338 Renovation of Five ( 5) Nos. Court Rooms at Tis Hazari Courts Building, Delhi, SH Civil Work 23/06/2018 20/12/2018 30.46 16.10 (Dec'19) 5.00 % (Dec'19) D.S. Construction Co

ok

Detail Report
Graph / Photo
339 Maintenance of vrs E and M Services at BJRM Hospital Jahangirpuri Delhi SH Maintenance and operation of Central AC System 08/02/2018 07/02/2020 30.36 Altone Aircon

work in progress

Detail Report
Graph / Photo
340 A/R and M/O Sub Division M-I under Division South Building (M), PWD, New Delhi during 2019-20. (SH Mechanized Cleaning of over head tank and underground tank). 20/06/2019 19/06/2020 30.29 18.31 (Aug'20) 0.00 (Aug'20) UNITECH WATER SLOUTIONS work in progress Detail Report
Graph / Photo
341 M/o different Hort. works under HSD (Central and New Delhi), HD (East), PWD, Delhi dg 2018-19 04/12/2018 03/07/2019 30.17 17.15 (Aug'19) 0.00 (Aug'19) PLANTS CARE Detail Report
Graph / Photo
342 RMO of various Electrical and Mechanical services Mandoli Prison Complex Delhi. (SH Comprehensive maintenance of LAN and EPBAX System installed at Mandoli Prison Complex). 03/08/2019 02/08/2020 30.15 0.00 (Sep'20) 98.00 % (Sep'20) TRACOM ENTERPRISES Work in progress Detail Report
Graph / Photo
343 EOR to Govt. Girls Senior Secondary School, Baprola, New Delhi. SH Construction of boundary wall for bifurcation between school, construction 19/06/2019 18/10/2019 30.14 Zahid Hussain (B-26) Detail Report
Graph / Photo
344 M/o Hort. work at Delhi Vidhan Sabha under Hort. Sub Division (Central and New Delhi), HD (East), PWD, Delhi dg 2018-19 09/09/2018 08/09/2019 29.75 Suresh Chandra Infratach Pvt. Ltd Detail Report
Graph / Photo
345 Upgradation of EBR based ETP plant at Dada Dev Child and Maternity Hospital. Nasirpur, New Delhi. 15/06/2019 14/08/2019 29.55 Wellkome engineers Detail Report
Graph / Photo
346 ARMO of EI and fans including Electrical and Mechanical service at SGM Hospital Mangolpuri Delhi SH Running operation and maintenance of 350 KLD capacity Sewage Treatment Plant based on MBBR Technology 12/09/2017 11/09/2020 29.50 SOMBANSI ENVIRO ENGG. PVT. LTD work completed Detail Report
Graph / Photo
347 Providing barrier free environment for disable persons. 15/09/2020 14/03/2021 29.39 M H Builders Work in progress Detail Report
Graph / Photo
348 EOR to Sarvodaya Kanya Vidyalaya at Karala, Delhi. SH: 1. New water Line Connection from the Allotted Place (Delhi Jal Board) to all the Toilet Blocks and Drinking Water Places. 2. Ground Storage Water Tank for Emergency and Storing of Water. 3. Two Guard Rooms with Branda and Toilet near Both Gates. 4. Old Gate of School is required to Widen by 8’. 5. Both the Iron Gates to be changed to Steel Gates. 6. Existing Drinking Water Tanks of Students to be shifted to new place. 22/06/2019 21/08/2019 29.31 7.35 (Jan'20) 0.00 (Jan'20) Sanjay Kumar Chandhok Work in progress 60%, Work is Started but Labour etc. not sufficient due to Covid-19 Agreement No.09/EE/PWD/NWB-2/2019-20 Detail Report
Graph / Photo
349 Providing and displaying of foliage potted plants in the Non-Residential buildings. 26/01/2019 25/07/2019 29.24 14.92 (Nov'19) 0.00 (Nov'19) Chandra Farm and Nursery Detail Report
Graph / Photo
350 RMO of various electrical and mechanical services (internal and external) at Deep Chand Bandhu Hospital Kokiwala Bagh Ashok Vihar New Delhi SH SITC of Batteries 23/07/2019 22/08/2019 29.14 OM VAISHNO ENTERPRISES Work in progress Detail Report
Graph / Photo
351 RMO Fire Alarm and Fire Fighting system Water Purification System RO CCTV and Audio Visual system of College building and Hostel building at MAMC, New Delhi . SHComprehensive maintenance and Operation of CCTV Surveillance system installed at vario 15/06/2019 14/06/2022 29.09 Pan Intellecom Ltd work in progress by M/s Pan Intellecom Ltd. Detail Report
Graph / Photo
352 1.RMO EI Fans Pump Set, Wet Riser sub-station, Pumps, DG SetAC Equip Central AC Plant Sys.at AAA Govt. Hosp.2 RMO Electr Mech Service at STC-9 Metcafe Road, Delhi SHComprehensive Operation and Maint. of Complaint Tracker System 03/09/2019 02/09/2021 29.07 SCS Technologies Work in progress by SCS Technologies Detail Report
Graph / Photo
353 SITC of Water Cooler cum Purifier – Supply of Water cooler cum purifier 16/03/2011 15/04/2011 29.00 Aditi Enterprises completed Detail Report
Graph / Photo
354 EOR to Non-Residential Building like that Central Jail No. 4, 5 and 7 and other building i/c PHQ under the jurisdiction of West Building Sub Division WB-11. SH Mechanized Cleaning of Underground 19/06/2019 18/06/2020 28.78 8.82 (Jan'20) 0.00 (Jan'20) Bharat construction & tank cleaner Detail Report
Graph / Photo
355 Replacement of existing ACs and fitting at various zone offices at MSO Building, I.P Estate, New Delhi. 08/07/2017 07/10/2017 28.77 Cool Rays Detail Report
Graph / Photo
356 Supply and replacement of old outlived transformers at Sub-Station No. 1 in GIPMER New Delhi. Sh SITC of Cast resin dry type transformer 1000 KVA 09/09/2019 08/12/2019 28.71 AVON ELECTRICALS Work in progress by Avon Electrical Detail Report
Graph / Photo
357 Raising of boundary wall, re-fixing of old grill and fixing of new grill wherever required, grit wash plaster and construction of badminton court etc. 09/01/2020 08/04/2020 28.67 6.50 (Mar'20) 0.00 (Mar'20) Samsad Work In progress (70%) Detail Report
Graph / Photo
358 A/R and M/O to District Court, Rohini, Delhi during 2018-19. (SH- Miscellaneous Repair work in shaft) 02/08/2018 01/12/2018 28.64 16.17 (Mar'20) 0.00 (Mar'20) M P BHATIA Work in progress 75% Detail Report
Graph / Photo
359 Operation and Maintenance of Electrical Installation and Pumps 26/07/2020 25/07/2021 28.31 0.00 (Sep'20) 25.00 % (Sep'20) SEHRA ELECTRIC works

Work in Progress

Detail Report
Graph / Photo
360 Maintenance of various Electrical and Mechanical Services at BJRM Hospital Jahangirpuri SGM Hospital M V Hospital under HMED(N) New Delhi SH Comprehensive maintenance of Blue Star Make Cold Room for Mortuary 28/11/2017 27/11/2020 28.20 6.48 (May'19) 0.00 (May'19) Blue Star Limited

work in progress

Detail Report
Graph / Photo
361 Replacement of Two Passengers Lift having capacity to carry 8 persons installed in Lawyers Chamber Parking Block H at District Court Karkardooma Courts Delhi. 28/07/2018 27/03/2019 28.10 13.09 (Oct'19) 0.00 (Oct'19) Johnson Lifts Pvt. Ltd. Work in progress Detail Report
Graph / Photo
362 M/o different Hort. works under Hort. Sub Division (Project), Hort. Division (East), PWD, Delhi during 2018-19 04/05/2019 04/06/2019 28.02 29.61 (Jun'19) 0.00 (Jun'19) Om Sai Nursery Detail Report
Graph / Photo
363 Renovation of police communication center at National Emergency System (NERS) at Shalimar Bagh, Delhi. (SH Providing Automatic Boom Barrier, Flap Barrier and Access control system). 13/03/2019 12/05/2019 27.82 19.27 (Dec'19) 0.00 (Dec'19) OPTIMUM SECURITY SOLUTIONS PVT. LTD. FIRST RA BILL PAID RS.1904691/- WORK IN PROGRESS Detail Report
Graph / Photo
364 Providing and replacement of maintenance free battery with UPS for DEM Block and UCMS College Block for costly equipments and computer system only at GTB Hospital, Shahdara, Delhi 13/04/2019 12/06/2019 27.78 25.00 (May'19) 0.00 (May'19) M/s Vivek Associates Work completed Detail Report
Graph / Photo
365 Replacement of old fitting by energy saving LED fittings at DHAS, KKD, Delhi 29/07/2019 28/09/2019 27.78 Pratham Enterprises. 1st RA 1899839 Detail Report
Graph / Photo
366 EOR to Indira Gandhi Institute of Physical Education and Sports Science, B-Block, Vikas Puri, New Delhi. SH Renovation of boundary wall along with Shaheed Raj Guru Marg 02/09/2019 01/12/2019 27.68 SUNIL KUMAR MADHUKAR Detail Report
Graph / Photo
367 Providing barrier free environment for disable persons. 15/09/2020 15/03/2021 27.67 ARIF, Jahangirpuri, Delhi Work in progress Detail Report
Graph / Photo
368 Construction of 2 Nos. Rain Water Harvesting System with drainage in Non-residential building, PCR Campus and 1 No. at Thana, Adarsh Nagar, Delhi. 09/01/2020 08/04/2020 27.56 Arif Work in Progress Detail Report
Graph / Photo
369 Providing and fixing of sneezing shield clear acrylic barrier of A Block Extension Block and C Block in Courts Room at Delhi High Court New Delhi 13/10/2020 11/11/2020 27.48 R L WADHWA Tender call Detail Report
Graph / Photo
370 (A) P/L paver block, repair and renovation of room No.41 at SKV- Khera Kalan (BNN). (B) P/L APP treatment at roof of SBV, Auchandi, Delhi. 05/11/2019 02/02/2020 27.47 Irshad Ahmed work is in progress (50%) Detail Report
Graph / Photo
371 Repair of damaged chajjas, pillar, ceiling of classroom, corridor and other misc. work at GGSSS, Pocket 5 and 6, Narela, Delhi-40. School Id.1310164, Bldg. Id. 13101697, EOR Id.20171577 01/11/2019 28/02/2020 27.34 15.73 (Mar'20) 0.00 (Mar'20) Amit kumar work is in progress (95%) Detail Report
Graph / Photo
372 RMO various electrical mechanical services at RTRM Hospital, Jaffarpur, New Delhi (SH Annual routine maintenance of 10000 LPH RO Plant) 14/06/2019 13/06/2021 27.29 Graphite Works Detail Report
Graph / Photo
373 Upgradation of EBR based ETP Plant at RTRM Hospital, Jaffarpur, New Delhi 03/07/2019 02/09/2019 27.24 Wellkome engineers Detail Report
Graph / Photo
374 EOR to EI AND Fans Air Conditioners Security Lighting and PA System at Govt. Girls Sr. Sec. School Jhilmil Colony Delhi. School ID- 1001111 17/08/2018 16/10/2018 27.23 15.03 (Jan'20) 0.00 (Jan'20) CHETAN ENTERPRISES Detail Report
Graph / Photo
375 RMO E & M Services in Lawyers chambers Block D,E,F,G and H at District Court Karkardooma Delhi. (SH:- Providing, Data Entry/Computer Operators, Messengers cum Peon etc. for Division and Sub Division office) 18/10/2018 17/10/2019 27.11 30.54 (Feb'20) 0.00 (Feb'20) RAKSHAK SECURITAS PVT. LTD. Detail Report
Graph / Photo
376 Augmentation and Modification of Effluent Treatment Plant 50 KLD capacity for processing, controlling and online transfer and correction of transfer of data based on MBR technology at Pt. Madan Mohan Malviya Hospital, Malviya Nagar, New Delhi 03/07/2019 02/09/2019 26.95 Texol Engineers Detail Report
Graph / Photo
377 RMO of Fire Fighting equipment, wet riser automatic Fire Alarm system I c water pump sets and water softening plant in A, B and C Block in GIPMER, New Delhi. SH Operation repair and routine maintenance of 2000 LPH RO plant and water softening plant a 02/01/2018 01/01/2020 26.92 10.07 (Mar'18) 37.40 % (Mar'18) A TO Z Engineering Works Work in progress Detail Report
Graph / Photo
378 Sh Providing and replacing of M-PACT series unserviceable ACB of GE Make in Main LT panel in Delhi Sachivalaya, New Delhi 01/10/2018 30/11/2018 26.88 Master Engineering Services Detail Report
Graph / Photo
379 RMO of EI and Fans in Main Court Building at District Court Saket, New Delhi. (SH- Providing Services of Computing and official work) 27/09/2018 26/09/2019 26.88 7.84 (Mar'19) 26.00 % (Mar'19) Krishna Electreical Works Detail Report
Graph / Photo
380 RMO AC System at Delhi Sachivalya, New Delhi. (SH Maintenance and Operation of split AC, Pressurization and Ventilation at Delhi Sachivalaya, New Delhi) 25/06/2017 24/06/2018 26.64 19.28 (Sep'19) 0.00 (Sep'19) Cascade Detail Report
Graph / Photo
381 Electrical works. 11/08/2017 10/10/2017 26.47 Pratham Enterprises. Detail Report
Graph / Photo
382 Annual Comprehensive Maintenance Contract of Johnson Make lift installed at Police Housing Complex, Mandoli Delhi 15/09/2020 14/09/2021 26.10 0.00 (Sep'20) 15.00 % (Sep'20) Johnson Lifts Pvt. Ltd.

WORK IN PROGRESS

Detail Report
Graph / Photo
383 SH-Providing EI and AC Plant 30/08/2018 29/09/2018 26.10 27.41 (Mar'20) 0.00 (Mar'20) Krishna Electrical Works Detail Report
Graph / Photo
384 Pdg. , fixing of electrical accessories, Water Cooler, RO system, PA System, CCTV system , DG Set in proposed conference room, TIP room, Kharja room at JJB-II, OHB-I, department of women, child development, Delhi Gate, New Delhi. 14/09/2017 13/11/2017 26.03 Image Communication System Detail Report
Graph / Photo
385 SITC and Replacement of unserviceable/condemned Air Conditioning Units at JPCH Shastri Park, Delhi 13/04/2019 12/06/2019 25.97 Honey Collection, Address : B-3/105, Paschim Vihar, New Delhi-63 Work completed Detail Report
Graph / Photo
386 SITC of Ductable Split ACs in Ward No 52 at Dr BSA Hospital Rohini Sec 6 Delhi 03/08/2019 02/10/2019 25.89 M/s Pneumatic Engineering Services Detail Report
Graph / Photo
387 AR and MO to Various Delhi Govt. Buildings under Sub Division WB-13, Karampura, New Delhi. During 2018-19. SH Prov iding se rvices 18/02/2019 17/07/2019 25.85 22.16 (Dec'19) 0.00 (Dec'19) M/s AMY Enterprises Detail Report
Graph / Photo
388 2 . Wiring i/c providing fans, fitting, ACs, purifier and other electrical work in vocational wing at Govt. SKV B-3 Paschim Vihar Shakur Basti Delhi School ID 1617011 26/09/2019 25/11/2019 25.75 Jyoti Eelectricals WORK IN PROGRESS Detail Report
Graph / Photo
389 Renovation of Incubation Centre in old Administrative Block, IGDTUW, Kashmere Gate, Delhi. 20/08/2017 19/11/2017 25.74 Sehra Electric Works Detail Report
Graph / Photo
390 RMO E and M Services at Dr BSA Medical College and Hospital Sector 6 Rohini Delhi SH Comprehensive Maintenance and Operation of VRV Air Conditioner System of Daikin Make 18/04/2019 17/04/2020 25.71 RefAir India Pvt. Ltd. Work in progress Detail Report
Graph / Photo
391 Routine Maintenance of EI , Fans, compound light and Routine maintenance and operation of Drinking water supply pump set, electrical sub-station, DG Set , fire fighting system 07/09/2017 06/09/2018 25.68 Krishna Electrical Works Detail Report
Graph / Photo
392 Miscellanies civil work in the judges chambers and court premises (2nd call) 21/02/2020 20/02/2021 25.61 16.50 (Mar'20) 0.00 (Mar'20) Jeetender Kumar Verma Work in progress 10% Detail Report
Graph / Photo
393 Renovation of Electrical Installation of ward II including PICU Pediatrics emergency and provision of iron grill in Surgical Store in BJRM Hospital Jahangirpuri Delhi as per NIT 11/01/2018 10/05/2018 25.56 Carona Electricals

work in progress

Detail Report
Graph / Photo
394 M/o Hort. work under HD East, PWD, Delhi dg 2018-19. 20/01/2019 19/01/2020 25.48 21.89 (Oct'19) 0.00 (Oct'19) M/s Active Group Securitas Detail Report
Graph / Photo
395 Restoration of damaged boundary wall and concertina coil at BJRM Hospital Jahangir puri, Delhi. 08/07/2019 07/01/2020 25.47 M H Builders Work in Progress Detail Report
Graph / Photo
396 Renovation and Upgradation work of flat no 33 8, 33 3, and Other misc civil works at Rajpur Rod Delhi Govt Officers flats Delhi 13/04/2019 12/09/2019 25.35 26.72 (Sep'20) 0.00 (Sep'20) KRISHAN KUMAR Detail Report
Graph / Photo
397 AR MO to 810 type V flats Probyn Road Officers flat Timarpur Delhi 54 dg 2018 19 21/04/2019 20/06/2019 25.29 Shree Bhagwan Mittal Detail Report
Graph / Photo
398 (A) Misc. Repair of Annual maintenance. (B) Supply of Material. 08/06/2020 05/04/2021 25.19 Irfan Ahmed Work in progress Detail Report
Graph / Photo
399 RMO of Sub station DG Set and EI Work 26/06/2018 25/06/2019 25.03 23.51 (Apr'19) 90.00 % (Apr'19) Swastik Electrotech Pvt. Ltd. Tendering under process Detail Report
Graph / Photo
400 MOEI and fans, fire alarm system and lifts at B.L. Taneja Block, MAMC, New Delhi. SH Comprehensive Maintenance of OTIS make Lifts 06/03/2018 05/03/2021 25.01 5.88 (Apr'19) 0.00 (Apr'19) Otis Elevator Company (India) Ltd. Work in progress. Detail Report
Graph / Photo
401 Providing LED Display Board, Smart LED TV, Video Conferencing System and various Electronic accessories at Acharya Shree Bhikshu Govt. Hospital, Moti Nagar, New Delhi 23/03/2019 22/06/2019 24.90 PRAGATI ENGINEERS Detail Report
Graph / Photo
402 Providing One No. Goods/ Services Lift (Ground +7th Floor) in Residential Block O at District Court Karkardooma Delhi. 04/01/2019 03/07/2019 24.81 17.21 (Oct'19) 0.00 (Oct'19) Johnson Lifts Pvt. Ltd. Detail Report
Graph / Photo
403 1 Operation Maintenance and watch and ward of Pumps S/Stn DG Set EI and Fans and RUB Sub Way underneath of the flyover and Vrs locations under M-251. 2 MOEI Fans and RMO P/Set at Dr. B R Ambedkar College and Resi. complex. 3 RMO E and M Services at PTS Wazirabad. 4 EOR to Pdg. and repairing of Existing F/F System at SKV DDA Flats East of Loni Road (Sch ID- 1106024) (SH- Painting of Pumps DG Sets Panels and Transformer etc and Pdg. and Fixing of E.I. at Vrs Storm Water Pump House at Trans Yamuna area) 27/11/2018 26/03/2019 24.78 A K Electric Works Work in progress Detail Report
Graph / Photo
404 Rain Water Harvesting 17/08/2018 16/10/2018 24.70 23.10 (Nov'19) 0.00 (Nov'19) Shekhar

work completed

Detail Report
Graph / Photo
405 1)RMO EIandFans and P/sets in AshokVihar and MauryaEnclave PoliceStn.and PoliceColony(2)RMO EandM Ser.at Flatted Factory for Leather Goods at Wazirpur and O/o DC West Rampurai(3)Maint.of EandM Services O/o DDE(NW-B)and DIET FU Block(SH MOEI and Fans 03/04/2019 02/04/2020 24.69 26.78 (Jun'20) 0.00 (Jun'20) M/s R S Electricals 3RD RA BILL PAID RS.2009680/- Detail Report
Graph / Photo
406 Renovation of Administration Block ground and 1st floor at DDU Hospital, Hari Nagar, New Delhi 09/04/2019 08/07/2019 24.66 Electro Mech Engineers Detail Report
Graph / Photo
407 Providing and fixing Bus trunking power tracking system in room No. 213, 219 and 224 at UCMS of GTBH Shahdara, Delhi 15/09/2017 14/11/2017 24.58 18.43 (Mar'18) 50.00 % (Mar'18) Flair Tech Work in progress..3RD RA 2501802 Detail Report
Graph / Photo
408 Replacement of LOP, COP with Braille, controller in existing lifts installed at Bhagwan Mahavir Hospital, Pitampura, Delhi 19/07/2017 18/11/2017 24.57 Thyssenkrupp Elevator (India) Pvt. Ltd.

work in progress

Detail Report
Graph / Photo
409 Development of park, drains and Repair of road around A and G Block Type -V, Pumbari Road, New Police Line, Kingsway Camp, Delhi. 29/07/2019 12/09/2019 24.52 29.64 (Jul'20) 0.00 (Jul'20) Jabir Hussain

ok

Detail Report
Graph / Photo
410 AR MO to DA Flats Timarpur Delhi dg 2018 19 SH Renovation of B C and D type flats and Other Misc work ic change of tenancy 13/04/2019 12/01/2020 24.46 KAMAAL CONSTRUCTION CO. Detail Report
Graph / Photo
411 Annual Comprehensive Maintenance of Audio Video System and Stage Lighting System complete with associated accessories installed at Shaheed Sukhdev College of Business Studies, Sector-16, Rohini, Delhi. 30/10/2019 29/10/2020 24.44 8.15 (Mar'20) 0.00 (Mar'20) A G Acoustics India Pvt Ltd 2ND RA BILL PAID RS.407375/- Detail Report
Graph / Photo
412 RMO various Electrical and Mechanical Services installed at CNBC, Geeta Colony, Delhi Sub Head Operation and annual comprehensive maintenance of ETP plant of 100KLD 17/05/2018 16/05/2020 24.36 10.79 (May'19) 20.00 % (May'19) Green Way Technologies Work in Progress (IInd RA) Detail Report
Graph / Photo
413 1Reno work in resid qtrs and Hosp area at MV Hosp Pooth Khurd 2 Ren work at Poly Clinic Sec18 3 SITC of LED Boards at BJRM Hosp 4 Repl of Glow Sign Board on the Terrace and Pdg of One New Board on Entry Gate at BM Hosp 5 SITC of AC at ASJ Hosp at Law(ID : 27292) 05/07/2017 04/10/2017 24.34 Graphite Works

work in progress

Detail Report
Graph / Photo
414 Construction of new toilet for admin block and library at ground floor,covering of sides of courtyard with horizontal louvers and other misc work at Lakshmi Bai College Ashok Vihar Delhi (2nd Call) 21/02/2020 20/05/2020 24.34 3.93 (May'20) 0.00 (May'20) Mohd. Arif work in progress 25% Detail Report
Graph / Photo
415 A/R and M/O to DIPSAR Complex, Pushp Vihar, Sec-III, M. B. Road, New Delhi during 2019-20. (SH- Providing the services of Skilled, Semi-Skilled and Un-Skilled staff for day to day maintenance at DIPSAR Complex). 26/06/2019 25/12/2019 24.20 RAKSHAK SECURITAS PVT. LTD. work in progress Detail Report
Graph / Photo
416 Renovation of Room nos. 127, 127 A, 128 128A, 130, 131, 132, 133, New Reporter Branch and Question Branch in Delhi Vidhan Sabha, Old Secretariat, Delhi. 13/01/2019 12/03/2019 24.12 Samsad

ok

Detail Report
Graph / Photo
417 RMO of AC Plant and AHUs installed in the Main Court Building at District Court Complex, Saket, ND -17. (SH- Annual Comprehensive maintenance of High Side HVAC Plant of 5x400 TR Capacity Mequay i.e. Daikin Make Central Air Conditioning Plant). 09/05/2018 08/02/2019 24.10 30.08 (Aug'19) 70.00 % (Aug'19) Daikin Airconditioning India Private Limited Detail Report
Graph / Photo
418 RMO of UPS and Boiler at GIPMER, NDShComprehensive maintenance of APC make UPS 19/08/2019 18/08/2022 24.10 power house Work in progress by Power House Detail Report
Graph / Photo
419 RMO AC equipment installed at various locations at L.N. Hospital, New Delhi. (SH:- Comprehensive maintenance of Vinitec make AVR’s during 2016-17 to 2017-18). 30/03/2017 29/03/2020 24.06 21.83 (Aug'19) 59.61 % (Aug'19) Harsh India Enterprises Work in Progress Detail Report
Graph / Photo
420 Moder/Repl of collapsible gates by Auto Tel Multi gates of incl.car front panels contr wiri in lifts No.1 Locat at Burn plas War Lift no.3 at Pids War modif maint. by 17/11/2019 16/02/2020 24.04 Hi Tech Elevators Pvt. Ltd. work in progress by Hitech Elevator (Pvt.) Ltd. Detail Report
Graph / Photo
421 Providing Online biological parameter monitoring system for ETP plant at GNEC, New Delhi. Sh Augmentation and Modification of Effluent Treatment Plant 500 KLD capacity for processing, controlling and online transfer and correction of transfer of dat 19/08/2019 18/11/2019 23.98 Wellkome engineers Work in progress by Wellkome Engineers Detail Report
Graph / Photo
422 ARMO various Electrical and Mechanical services at SGM Hospital Mangolpuri Delhi SH Operation Routine Maintenance and preventive maintenance of IBR approved Steam Boiler 25/06/2019 24/05/2020 23.90 Kamal Engineers Work in progress Detail Report
Graph / Photo
423 Annual Maintenance of cummins make DG sets and Kirloskar make DG set at L.N. Hospital 30/10/2019 29/10/2021 23.89 OVN TRADING ENGINEERS PVT LTD work in progress by OVN Trading Engineers Pvt. Ltd Detail Report
Graph / Photo
424 (Providing and fixing of iron profile shed over mud houses) 3rd call 09/03/2019 08/04/2019 23.86 10.20 (Jul'19) 0.00 (Jul'19) Shekhar

work completed

Detail Report
Graph / Photo
425 RMO EI, Compound Lights, Lifts, Water supply pumps, Fire Fighting system, Fire Alarm System, Sub-Station and 500 KVA DG sets at Delhi Police Station & attached staff qtrs sector-17, Dwarka, New Delhi. 17/01/2019 16/01/2020 23.85 Azad Electricals Detail Report
Graph / Photo
426 Routine maintenance and operation of Fire Fighting, Water supply and Fire Alarm system 16/05/2018 15/05/2019 23.83 23.44 (Apr'19) 98.00 % (Apr'19) Swastik Electrotech Pvt. Ltd. Tendering under process Detail Report
Graph / Photo
427 Replacement of LOP, COP with Braille, controller in existing lifts installed at Sanjay Gandhi Memorial Hospital, Mangolpuri, Delhi 19/07/2017 18/11/2017 23.78 Thyssenkrupp Elevator (India) Pvt. Ltd.

work in progress

Detail Report
Graph / Photo
428 Renovation of toilets at Directorate of Education Old Sectt. Delhi-54. 14/12/2017 13/04/2018 23.61 9.95 (Aug'19) 75.00 % (Aug'19) Samsad * Detail Report
Graph / Photo
429 Pdg rising main floor panel and L.T. distribution 17/07/2010 16/09/2010 23.50 Budhiraja Electrical completed Detail Report
Graph / Photo
430 Comprehensive Maintenance of Integrated Audio Conference, Voting and Discreet Messaging System i/c CCTV at Delhi Vidhan Sabha 21/09/2020 20/09/2021 23.45 HITECH AUDIO SYSTEMS PVT LTD

Work in Progress

Detail Report
Graph / Photo
431 RMO RO Plants, Water Softening Plants and Comprehensive Maintenance of Water Coolers, Water Purifiers installed at GGSGH, Raghubir Nagar (SH Running Operation and Maintenance of 100000LPD Water Softening Plant, 4000 LPH and 3000 LPH RO Plants) 16/06/2019 15/06/2021 23.45 A TO Z Engineering Works Detail Report
Graph / Photo
432 Supply and replacement of existing old and unserviceable Air Circuit Breaker and MCCB by enhanced capacity at Sub station No. 3 and 4 at L.N. Hospital New Delhi. 22/12/2019 21/02/2020 23.45 AVON ELECTRICALS work in progress by Avon ELectrical Detail Report
Graph / Photo
433 Replacement of old conventional type worn out electrical panels at pathology block at MAMC, New Delhi 31/12/2019 30/03/2020 23.43 AVON ELECTRICALS

work in progress by agency

Detail Report
Graph / Photo
434 Compr maint contract of Johnson make lifts at Casualty Block,OPD Block 09/12/2019 08/12/2020 23.21 Johnson Lifts Pvt. Ltd.

work in progress by agency

Detail Report
Graph / Photo
435 1).RMO of central AC plant/ Package unit at DDU Hospital, Hari Nagar, New Delhi, 2). RMO A.C. Plant/ Screw type at Trauma Block at DDU Hospital, Hari Nagar, New Delhi (SH Maintenance of Servicing of Package Units and Central AC Equipment) 11/04/2019 10/06/2019 23.17 PMG ENGINEERS Detail Report
Graph / Photo
436 Fencing of 11 Nos. AAMC under construction under South District. 11/01/2020 10/05/2020 23.14 Sanjeev Kumar Goel

work in progress

Detail Report
Graph / Photo
437 Comprehensive maintenance of 10 Nos. Johnson make lifts at Rouse NDDC, Rouse Avenue, DDU, New Delhi 26/09/2020 25/09/2021 23.12 Johnson Lifts Pvt. Ltd.

WORK IN PROGRESS

Detail Report
Graph / Photo
438 Renovation of Ortho OT (6th Floor) at GTB Hospital, Shahdara, Delhi. 10/03/2019 09/05/2019 23.10 Chetan Enterprises Work In Progress ( 1st RA 431400 ).. Detail Report
Graph / Photo
439 Construction of boundary wall, Parking Shed and development of ground etc. 23/02/2019 22/04/2019 23.09 11.45 (Aug'20) 0.00 (Aug'20) Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094

work completed

Detail Report
Graph / Photo
440 RMO of Steam boiler No. 1 2 and 3 at L.N. Hospital, New Delhi.SH Maintenance of Steam Pipeline of Boilers L.N.H 24/06/2019 23/06/2021 22.99 A. K. Machinary Tools work in progress by A.K.Machinery Tools Detail Report
Graph / Photo
441 SITCof rectification devices at CCU Block AC Plant Voltas Make Chillers at LN H New Delhi 11/05/2020 10/07/2020 22.97 C Mos Sytems

work in progress by agency

Detail Report
Graph / Photo
442 Comprehensive Maintenance and Operation of BOSCH make CCTV 18/03/2020 17/03/2022 22.96 HITECH AUDIO SYSTEMS PVT LTD

work in progress by agency

Detail Report
Graph / Photo
443 (SH-Servicing/Maintenance of WTAC/STAC/Hot and Cold Split A.C and Water Coolers situated in different buildings under the different sub divisions) 25/02/2019 24/02/2020 22.91 27.25 (May'20) 0.00 (May'20) Krishna Electrical works Detail Report
Graph / Photo
444 Providing 80 KW air source centralized water heater at RTRM Hospital, Jaffarpur, New Delhi 18/08/2018 17/11/2018 22.81 ANAND ENTERPRISES Detail Report
Graph / Photo
445 SITC of Desktop Computers in various societies in Shakur Basti Constituency, Delhi. 13/11/2019 12/12/2019 22.78 4.10 (Mar'20) 0.00 (Mar'20) GCN INFOTECH PVT.LTD. WORK IN PROGRESS Detail Report
Graph / Photo
446 1 ARMO vrs E and M services at SGM Hosp Mangolpuri Delhi SH Annual Com Maint of UPS System 2 RMO E and M Services Boiler Laundry LED Displays CCTV Lift UPS and R O System at BJRM Hospital Jahangirpuri 3 RMO E and M Services WR WS Pumps FA System and 12/06/2019 11/06/2021 22.76 OM VAISHNO ENTERPRISES Work in progress Detail Report
Graph / Photo
447 Upgradation of 3 Nos staff rooms of GNCTD Schools under Jurisdiction of DHC Division PWD dg 2018 19 25/12/2018 22/02/2019 22.73 11.15 (Aug'19) 10.00 % (Aug'19) Sher Singh Work in progress Detail Report
Graph / Photo
448 Provision for RO plant for drinking water supply in various Hostels at MAMC New Delhi. 01/01/2020 29/02/2020 22.71 M/s Vivek Associates

work in progress by agency

Detail Report
Graph / Photo
449 M/o different Hort. works under Hort. Sub Division (Central and New Delhi), Hort. Division (East), PWD, Delhi during 2018-19 07/04/2019 06/05/2019 22.69 Shivam Enterprises Detail Report
Graph / Photo
450 RMO EI and Fans Lifts Pumps Water Supply Sub Station DG Set HVAC Fire Fighting and Fire Alarm at DDU College at Sec3 Dwarka New Delhi SH Comprehensive maintenance of Central AC System and RMO of Central AC and VRV System 26/07/2018 25/07/2019 22.61 21.32 (Jul'19) 65.00 % (Jul'19) M/s Snowmex Engineers Ltd. Work transferred and in progress Detail Report
Graph / Photo
451 RMO Works AC Installed at Delhi Sachivalaya, New Delhi. 13/12/2018 12/02/2019 22.58 AirTemp Engineers Detail Report
Graph / Photo
452 Replacement of old unserviceable package type Airconditi unit at central library at MAMC SH S.I.T.C. of Package Type AC Unit 03/10/2019 02/12/2019 22.55 15.81 (Oct'19) 0.00 (Oct'19) PANDIT POWER CONTROL work in progress Detail Report
Graph / Photo
453 RMO Electrical and Mechanical in Karkardooma Court Court Block ACI B and JKL at District Court Karkardooma Delhi. SH- Comprehensive Maintenance of Voltas make PTAC plant and equipments installed in A B and C Block 02/08/2018 01/08/2019 22.52 21.20 (Aug'19) 0.00 (Aug'19) Voltas Ltd. Detail Report
Graph / Photo
454 Provision for Rain Water Harvesting Systems in SBV Gokhle Marg, GGSSS Nicholson Road Mori Gate, GGSSS Diwan Hall Chandni Chowk and Govt. Co Education Sec. School Sushila Mohan Marg Naya Bazar under SRD Project Division-I, Sub-Division-III, New Delhi 09/08/2018 08/10/2019 22.52 14.43 (Sep'20) 0.00 (Sep'20) Munzareen Ahmed Work in progress Detail Report
Graph / Photo
455 RMO 2Nos. Boilers and Laundry equipments installed at GTB Hospital Complex, Shahdara, Delhi. Sub Head Annual comprehensive maintenance of 1.5 TPH capacity fire tube boilers (2 Nos.), operation of Boilers and water softening plant. 25/02/2019 24/08/2020 22.50 Boilermart Work completed Detail Report
Graph / Photo
456 Repairing of Fire Alarm System at District Courts Karkardooma Delhi. 12/02/2019 11/06/2019 22.48 5.87 (Sep'20) 0.00 (Sep'20) SK Engineers Detail Report
Graph / Photo
457 RMO of Internal E I and Fans in Hospital Building at Dr BSA Hospital SH Providing services for Clerical Staff Data Entry operator and messenger for HMEDN Division Office Sub Division office HN 1 and HN 2 10/05/2017 09/05/2018 22.44 Carona Electricals

work in progress

Detail Report
Graph / Photo
458 SITC of Air Conditioning System for Medicine and ENT OPD Section at JPCH, Shastri Park, Delhi 06/11/2017 05/01/2018 22.28 22.95 (Oct'18) 80.00 % (Oct'18) Jai Shri Bhairo Electricals work completed Detail Report
Graph / Photo
459 MOEI & Fans including Compound Lights, DG Set and Sub-Station in Chhattarsal Stadium, Model Town, Delhi 29/07/2017 28/07/2018 22.21 RAJAN D S BUILDTECH PVT LTD

completed/in progress

Detail Report
Graph / Photo
460 SH-Operation of Integrated Audio Visual System and Digital Conferencing System installed in different hall at Delhi Sachivalaya, New Delhi. 19/08/2018 18/08/2019 22.20 5.92 (Nov'19) 0.00 (Nov'19) R.C. Enterprises Detail Report
Graph / Photo
461 M/o Hort. work at Chief Minister House (6 Flag Staff Road), 4 No. Minister Bunglows at 8 No. Raj Niwas Marg and Vijay Ghat Nursery under Hort. Sub Division (Central and New Delhi), HD (East) (M-214), PWD, Delhi dg 2018-19 09/09/2018 08/09/2019 22.17 10.67 (Oct'19) 0.00 (Oct'19) S.K. Construction Detail Report
Graph / Photo
462 RMO all EandM services at Dispensaries under HSW-1 Malviya Nagar New Delhi dg. 2018-19 (SH Day to Day Maintenance of EI and Fans and Pump Set at 17 Nos. Dispensaries.) 02/11/2018 01/11/2020 22.14 ANAND ELECTRICALS Detail Report
Graph / Photo
463 Running maintenance and operation of electrical and mechanical services installed at type-III and type IV, Residential Staff Quarter, Shalimar Bagh, Delhi. (SH : Routine maintenance and operation of sub Station, Fire fighting system, pumps RO Plant, Compound lighting and attending day to day complaints and updeeping of various E and M Services at DA Residential Staff Quarters, Shalimar Bagh, Delhi.) 22/12/2018 21/12/2019 22.02 19.32 (Jun'20) 0.00 (Jun'20) Azad Electricals 3RA BILL PAID RS. 2202493/-WORK IN PROGRESS Detail Report
Graph / Photo
464 Tender Detail (Call of Tender) 1. SH Routine Maintenance of EI , Fans in flats 2. SH Replacement of faulty electrical installation and providing of down comers , PA system 24/06/2017 23/08/2017 22.01 10.60 (Jul'20) 0.00 (Jul'20) Shaka Electrical India Detail Report
Graph / Photo
465 Misc. Civil works 13/07/2019 12/01/2020 21.98 KAMAAL CONSTRUCTION CO. Detail Report
Graph / Photo
466 Addition and Alteration work in Main Court Building and Lawyers Block as per report received by the Delhi fire service at District Court Complex, Saket, New Delhi. 10/10/2018 23/11/2018 21.79 Sanjeev Kumar Goel work in progress Detail Report
Graph / Photo
467 Operation and Maintenance of 600 KLD ETP based on EBR Technology at Orthopedic Block, Lok Nayak Hospital, New Delhi. 17/09/2019 16/06/2020 21.72 Texol Engineers work in progress by Texol Engineers Detail Report
Graph / Photo
468 M/o different Hort. works under Hort. Sub Division (Central and New Delhi), Hort. Division (East), PWD, Delhi during 2018-19 15/04/2019 30/04/2019 21.67 Advance Nursery and landcaping Company Detail Report
Graph / Photo
469 Comprehensive Maintenance Kitchen Equipments at Surgical Block Kitchen at L.N. Hospital, New Delhi 19/07/2020 18/07/2021 21.62 G D Enterprises

work in progress by agency

Detail Report
Graph / Photo
470 EOR to Central Jail No. 1, Tihar, New Delhi. SH Laying of new water pipe line from newly built underground water tank to various wards of the jail for supply of raw water 01/11/2018 31/01/2019 21.62 5.48 (Jun'19) 0.00 (Jun'19) RAMJEE LAL Detail Report
Graph / Photo
471 Provision for EI, Fans and Air Conditioning for D.E.I.C. in Old Canteen Area at Guru Gobind Singh Govt. Hospital, Raghubir Nagar, New Delhi 18/08/2018 17/10/2018 21.61 M J ELECTRICALS & ELECTRONICS Detail Report
Graph / Photo
472 Replacement of Chilled Water Pipeline and Three Number of AHUs for HVAC Unit Installed at Bhagwan Mahavir Hospital Pitampura Delhi 28/12/2017 27/02/2018 21.45 Arora Electrical Works

work in progress

Detail Report
Graph / Photo
473 Operation and Maintenance of Fire Fighting and Fire Alarm System at Mandoli Jail Complex, Delhi 01/10/2020 30/09/2021 21.38 M/s Gejwal Construction Company

WORK IN PROGRESS

Detail Report
Graph / Photo
474 Running Comprehensive Maintenance and Semi comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV/ RO Systems, Water Dispensers with Inbuilt RO Systems, RO Water Purifiers and Aquaguards 08/01/2020 07/01/2022 21.35 ADITI ENTERPRISES work in progress by Aditi Enterprises Detail Report
Graph / Photo
475 Running maintenance of lifts in non-residential area at GTB Hospital Shahdara, Delhi (SH: Comprehensive maintenance of 9Nos. TKE make passenger cum bed elevator) 09/12/2018 08/12/2019 21.35 Thyssenkrupp Elevator (India) Pvt. Ltd. Work completed Detail Report
Graph / Photo
476 A/R & M/O to Rouse Avenue Court Complex at DDU Marg, New Delhi During 2020-21. (SH :- Preparation for Prevention from COVID-19.) 10/09/2020 09/10/2020 21.30 0.00 (Sep'20) 10.00 % (Sep'20) Upendra Singh Work is in progress Detail Report
Graph / Photo
477 Renovation work with Air-Conditioning System in Ward No.-18, 2nd Floor, Peads. block at L.N. Hospital, New Delhi. 08/03/2019 07/05/2019 21.28 8.20 (May'19) 0.00 (May'19) SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. Work in progress by Skyline Air Conditioning Engineer Pvt. Ltd Detail Report
Graph / Photo
478 Supplying, installation, testing and commissioning of online monitoring system (OLMS) at Outlet of wastewater treatment plant for monitoring of various parameter at GIPMER, New Delhi 18/02/2020 17/05/2020 21.26 Wellkome engineers

work in progress by agency

Detail Report
Graph / Photo
479 Augmentation and Modification of Effluent Treatment Plant 600 KLD capacity for processing controlling online transfer correction of transfer of data based on EBR technology 18/02/2020 17/05/2020 21.26 Texol Engineers

work in progress by agency

Detail Report
Graph / Photo
480 Com Main ofCMosM.SerVol stab instat diff loc 18/12/2019 17/12/2022 21.19 S.S. Sales and Services work in progress by S.S. Sales & Services Detail Report
Graph / Photo
481 Day to day maintenance work, attending day to day complaints and Misc. Repair work 22/12/2019 21/06/2020 21.08 6.40 (Mar'20) 0.00 (Mar'20) Mohd. Asif Work In progress (75%) Detail Report
Graph / Photo
482 AMC for comprehensive maintenance of various capacity UPS system 10/02/2018 09/02/2019 21.08 6.25 (Dec'19) 0.00 (Dec'19) Labotek Detail Report
Graph / Photo
483 1. SH- Annual Semi Comprehensive Maintenance of 50 LPH capacity RO System. 2. SH- Annual Comprehensive and semi comprehensive maintenance of 60,80 PSS RO and 80,120 PSS UV storage cooler cum purifier. 17/06/2017 16/06/2018 21.04 Aditi Enterprises Detail Report
Graph / Photo
484 Renovation of Prosecution Branch, Tis Hazari Courts, Delhi. SH. Providing and placing modular furnitures & compactors Room No. 160, 171, 172A & 223, Prosecution Branch, Tis Hazari Courts, Delhi. 24/11/2018 23/01/2019 21.04 21.65 (Jan'20) 0.00 (Jan'20) Ganpati Furniture System Pvt Ltd

ok

Detail Report
Graph / Photo
485 Replacement of old door & windows Resdl. building at Chankyapuri, New Delhi 08/08/2014 01/09/2014 21.03 0.00 (May'16) 100.00 % (May'16) work in progress. Detail Report
Graph / Photo
486 RMO E & M services at District Court, Dwarka, Sector-10, Dwarka, New Delhi. (SH : Comprehensive, operation and routine maintenance of CCTV and surveillance system in Administrative Block at Dwarka Court New Delhi-BOSCH make) 16/01/2019 16/01/2020 21.03 3.80 (Jul'19) 0.00 (Jul'19) Pan Intellecom Ltd Detail Report
Graph / Photo
487 1RMO vrs E and M Services at SRHCH Narela New Delhi SH Extension of FAS in the basement of hosp 2 Rep and repl of existing FF underground ring main system at SRHC Hosp SH Installation of test valve and replacement of defective valve 3 RMO vrs E and M services at BJRM Hospital, Jahangirpuri, New Delhi. SH Repairing of Fire Fighting System accessories 12/11/2017 11/01/2018 21.00 HST Enterprises

work in progress

Detail Report
Graph / Photo
488 Comprehensive maintenance of Talk Back System installed at Mulakat Hall 30/06/2020 29/06/2022 20.96 0.00 (Sep'20) 18.00 % (Sep'20) M/s TOPAZ SERVICES CORPORATION

WORK IN PROGRESS

Detail Report
Graph / Photo
489 EOR to Central Jail No. 7, Tihar, New Delhi. SH Renovation and improvement work in ward no. 5 and 7 and barracks and misc. civil work. 19/02/2019 18/06/2019 20.95 12.21 (Mar'20) 0.00 (Mar'20) RAMJEE LAL Detail Report
Graph / Photo
490 1 RMO Specialized EI and Mechanical services Lifts ETP Plant Solar System, CCTV at AAA Govt. Hospital Delhi. 2 RMO Electrical and Mechanical Service at S.T.C. 9 Metcafe Road, Delhi SH Comprehensive Maintenance of OTIS make Lifts 20/11/2017 19/11/2019 20.90 8.61 (Oct'19) 0.00 (Oct'19) Otis Elevator Company (India) Ltd. work in progress Detail Report
Graph / Photo
491 SITC of 1 x 75 KVA & 12 x 40 KVA servo voltage stabliser for lifts. 26/02/2005 30/04/2014 20.90 Labotech Work completed Detail Report
Graph / Photo
492 Renovation of Flat No 2 and 13 of Type VI at MAMC Campus and Renovation and Repair work of Flat No 3 and 7 of Type V at MAMC Campus (Composite Work Civil and Electrical) 08/09/2019 26/12/2019 20.79 15.35 (Mar'20) 0.00 (Mar'20) K.K. Construction Co.

work in progress

Detail Report
Graph / Photo
493 1)SITC of LED St.Lt in Sahyog Appart.,Rang Mahal Society, Gujrat Appartt,Kashmir Appart.and Krist Jyoti Appart. in Pitampura(2)SITC LED St.Lt.in MitraVihar,HaritNiketan, FerozParkSociety,Pundrik society,Shivalik Society and Nilambar Appart.Pitampura, 03/04/2019 02/07/2019 20.67 R.S. Electric Co. FIRST RA BILL PAID RS.2490024/- Detail Report
Graph / Photo
494 MOEI and Fans at DDU Hospital, Hari Nagar, New Delhi for the year 2019-20 and 2020-21 (SH Comprehensive Maintenance of Complaint Tracker System) 18/06/2019 17/06/2021 20.65 SCS Technologies Detail Report
Graph / Photo
495 (SH Operation of Integrated Audio Visual System and Digital Conferencing System installed in different hall at Delhi Sachivalaya, New Delhi). 11/08/2017 10/08/2018 20.65 R.C. Enterprises Detail Report
Graph / Photo
496 Augmentation and Modification Effluent Treatment Plant 500 KLD Capacity for processing, controlling online transfer correction of transfer of data based on MBR technology 17/01/2020 17/04/2020 20.63 Ionic Permutit System Pvt. Ltd.

work in progress by agency

Detail Report
Graph / Photo
497 Augmentation and Modification of Effluent Treatment Plant 100 KLD capacity for processing, controlling online transfer correction of transfer of data based on MBR technology 18/01/2020 17/04/2020 20.63 Ionic Permutit System Pvt. Ltd.

work in progress by agency

Detail Report
Graph / Photo
498 Maintenance Electrical Consumption charges of Street Lighting on PWD Roads under North Electrical Division PWD Delhi SH Pdg street lighting on existing street light poles etc 13/05/2017 12/07/2017 20.55 Shaka Electrical India

completed/in progress

Detail Report
Graph / Photo
499 Renovation of GF, FF and SF toilets and urgent repairing works. 28/02/2019 23/05/2019 20.53 SABUR ALAM Work in progress Detail Report
Graph / Photo
500 Repair/renovation work in 5 Delhi Battalion, NCC Department at Kashmere Gate, Delhi under SRD Project Sub-Division-III/Division-I, PWD, Delhi 11/08/2019 10/12/2019 20.52 KAMAAL CONSTRUCTION CO. Detail Report
Graph / Photo
501 Supply, Installation, Testing and Commissioning of Centralized RO Plant of Capacity 2x1000 LPH and Operation at Lal Bahadur Shastri Hospital, Delhi 29/07/2019 28/07/2021 20.42 Icon RO Systems 2ND RA 687492 Detail Report
Graph / Photo
502 Providing a permanent arrangement of electricity for the TSP and Womens Hostel at Prison Complex Mandoli, Delhi. 21/03/2020 18/07/2020 20.42 0.00 (Aug'20) 82.00 % (Aug'20) ASHISH GUPTA work in progress Detail Report
Graph / Photo
503 S.I.T and C of Complaint Tracker Communication System 02/04/2019 01/04/2020 20.37 SCS Technologies Work In Progress ( 3RD RA 366338 ). Detail Report
Graph / Photo
504 Day to Day and Annual Maintenance. 08/06/2020 05/04/2021 20.35 SABUR ALAM Work in progress Detail Report
Graph / Photo
505 RMO E and M services at DC NE Office Complex 2 DIET Bldg. 3 Fire Stn and New P/Stn Bldg. Seemapuri P/Stn GTB Enclave P/Stn Nand Nagari and P/Stn Chowki old seemapuri and Resdl. Qtr.SH- Maintenance of EI and fans Operation of P/Set E.I. and lift 05/06/2018 04/06/2019 20.28 18.56 (Oct'19) 0.00 (Oct'19) Krishna Electreical Works Detail Report
Graph / Photo
506 Compr maint of micror secur calling display sys at N.Medi-B,Children wardOT B,Surg B at LN.H 04/12/2019 03/12/2021 20.25 AKOUSTIK COMMUNICATIONS
work in progress by M/s Akoustik Communication
Detail Report
Graph / Photo
507 Repairing servicing Overhauling of 1600/2000 KVA HT AVR at Substation No. 134 04/12/2019 03/02/2020 20.11 Harsh India Enterprises work in progress by Harsh India Enterprises Detail Report
Graph / Photo
508 Routine maintenance and operation of EI & fans, Compound Lights, High Masts, Lifts, Pumps, Fire Fighting system, AFA & PA System , Sub-Station & DG Sets and 4 x 400 TR central HVAC plant at Delhi Judicial Academy and National Law University at Sector-14, Dwarka, New Delhi. (SH:- SITC of Online Electrostatic Scale Preventer in Condenser Pipeline of Central AC Plant). 04/06/2020 03/07/2020 20.11 Weldon Engineers India Detail Report
Graph / Photo
509 Laying of Cables for making double source at each feeder pillars Panels at various location at MAMC, New Delhi. 03/03/2020 02/05/2020 20.06 Sarnam Associates

work in progress by Sarnam Associates

Detail Report
Graph / Photo
510 SITC of 500 KVA capacity Unitized Package Electric Substation at Vikas Bhawan, IP Estate, New Delhi. 11/06/2017 10/08/2017 20.00 UK Enterprises Detail Report
Graph / Photo
511 EOR to SKV No 2 at Jama Masjid, Delhi, dg 2018-19 (School ID-2127017) (SH-Providing and fixing of wall tiles in Class Room, Concertina Coil in Boundary Wall, provision for gate, repair of drain in Courtyard, provision for additional Staff R 16/09/2018 15/12/2020 19.98 0.00 (Mar'19) 24.95 % (Mar'19) Arif Work completed and final bill paid Detail Report
Graph / Photo
512 SITC of PVC tanks inclu valves and piping work.BALANCE WORK 13/11/2019 12/02/2020 19.96 A. K. Machinary Tools work in progress by A..K. Machinery Tools Detail Report
Graph / Photo
513 M/o Hort. work at Seva Kutir department of Women and Child development at Mukherji Nagar, Delhi under Hort. Sub Division-C and ND, Division-East, PWD, Delhi dg 2018-19 20/07/2018 19/07/2019 19.95 11.24 (Nov'19) 0.00 (Nov'19) RAVINDRA SINGH Detail Report
Graph / Photo
514 Street / Compound lighting 27/04/2012 26/07/2012 19.94 Kumar Electricals& Refrigeration Works completed Detail Report
Graph / Photo
515 SITC of 150 TR Chilling Machine with VFD in place of existing construction of SPS type rooms in place of old existing worn out Chilling Unit No. 1 of 100 TR Capacity at Pt. MMMH, Malviya Nagar, New Delhi (SH S.I.T.C of 30 KVA UPS System at OT-4) 12/12/2018 11/01/2019 19.93 M/s Shraddha Electricals Detail Report
Graph / Photo
516 Replacement of Defective/ Burnt-out Air-Conditioning Units installed in Various Location in Court Block at Karkardooma Courts Delhi. 30/03/2019 29/05/2019 19.91 7.92 (Oct'19) 0.00 (Oct'19) Cool Rays Work in progress Detail Report
Graph / Photo
517 Routine maintenance and Operation of various capacity passenger Lifts 24/03/2017 23/07/2018 19.86 H.N. Traders & Engineers Detail Report
Graph / Photo
518 Re-installation and modification of old sewer line at DIPSAR Complex, Sec-III, Pushp Vihar, M. B. Road, New Delhi During 2018-19. 27/07/2018 26/10/2018 19.84 Sanjeev Kumar Goel work in progress Detail Report
Graph / Photo
519 Running and maintenance of servo voltage stabilizers at GTBH Complex, Shahdara, Delhi Sub Head Comprehensive maintenance of Selvon make servo voltage stabilizer. 07/01/2019 06/01/2021 19.80 Precision Control Instruments work in progress (1st RA 1154975 ) Detail Report
Graph / Photo
520 Renovation work with Air-Conditioning System in PNW-II and Cancer Ward at Gynae Block at Lok Nayak Hospital, New Delhi. 27/11/2019 26/02/2020 19.79 Multi Tech Engineers work in progress by Multi Tech Engineers Detail Report
Graph / Photo
521 Renovation of tap area and water proofing treatment on terrace of old building and other misc civil works) (Remaini 11/03/2020 10/06/2020 19.57 20.08 (Mar'20) 0.00 (Mar'20) Rohit Kumar Work heldup due to lockdown Detail Report
Graph / Photo
522 Rewiring & replacement of Panel Boards, MCB, RO System with Water Cooler & Flood Light Fitting work at Govt Sarvodaya Kanya Vidhalaya (Rani Chennamma) D-Block Jahangir Puri, Delhi 03/08/2017 03/10/2017 19.56 RAS Enterprises

completed/in progress

Detail Report
Graph / Photo
523 Essential urgent electrical work for preparation of Lok Sabha Elections 2019 at 15 Nos. North East School under sub-division-2 (M-2512), PWD, Delhi. 2) E.O.R to UPS System at SDM (Election) G-Block, D.C office Complex, Nand Nagri, Delhi -110093 15/05/2019 19/05/2019 19.47 24.33 (Oct'19) 0.00 (Oct'19) Shri Bankey Bihari Electricals Detail Report
Graph / Photo
524 Providing and replacement of electrical installation along with accessories in residential quarters at LBS Hospital, Khichripur, Delhi 24/07/2019 23/09/2019 19.47 PREM AND K P ELECTRIC CO. work completed Detail Report
Graph / Photo
525 RMO E and M Services in KKD Court (Court Block) ACI B and JKL at Distt. Court KKD, Delhi. (SH- Comprehensive maintenance of OITS Make Lifts.) 05/04/2019 04/04/2020 19.43 6.31 (Sep'19) 0.00 (Sep'19) Otis Elevator Company (India) Ltd. Detail Report
Graph / Photo
526 1) RMO of 3x80TR AC Plant WTACs Split ACs Ductable ACs ETACs W.Coolers at GGSGH 2) MOEI and Fans RMO P/Set in vrs Disp under AE(E)5 (SH Servicing Repairing Daytoday OpandMaint of D.Coolers WTACs/ Split ACs Ductable ACs ETACs Unit and W.Coolers) 09/04/2019 08/12/2019 19.40 Honey Collection, Address : B-3/105, Paschim Vihar, New Delhi-63 Detail Report
Graph / Photo
527 RMO Electrical and Mechanical Services at Dr BSA Hospital Rohini Delhi SH SITC of Complaint Tracker Communication System 02/07/2019 01/06/2020 19.32 DBSOLX Work in progress Detail Report
Graph / Photo
528 Supplying, Installation, Testing and Commissioning of water Dispenser with purifier at various locations at Lok Nayak Hospital, New Delhi 02/09/2019 01/11/2019 19.28 M/s Vivek Associates work in progress by Vivek Associates Detail Report
Graph / Photo
529 Construction of attached Fire Safety Staircase at Fire Station Nehru Place 13/08/2019 12/12/2019 19.26 Gyanchand Detail Report
Graph / Photo
530 Renovation of E.I and Fans at Wokshop No.- 1, I.T.I, Nand Nagri, Delhi-110093. E.O.R to New High Mast at I.T.I Nand Nagri Delhi. 28/03/2019 27/07/2019 19.22 10.97 (Dec'19) 0.00 (Dec'19) S K Engineers Work in progress Detail Report
Graph / Photo
531 A/R and M/O D-II Flats, Vasant Kunj, ND, under SD-II, Build. South (M), PWD, PTS Malviya Nagar, ND dg 19-20. (SH- Pdd. the services of Skilled, Semi-skilled, un-skilled staff etc for day to day maintenance at D-II flats). 20/06/2019 21/06/2019 19.05 RAKSHAK SECURITAS PVT. LTD. work in progress Detail Report
Graph / Photo
532 Comprehensive maintenance of OTIS make lifts 6 Nos. 1.5 MPS & 1 No. 2.5 MPS 25/05/2018 24/05/2019 19.05 Otis Elevator Company (India) Ltd. Detail Report
Graph / Photo
533 Compre Maint of 200 KVA Servo Voltage Stabilizer of PCI Make 08/10/2019 07/10/2022 19.03 M/s Shraddha Electricals

work in progress by agency

Detail Report
Graph / Photo
534 RMO E & M Services at Dr. BSA Medical College Rohini Sec-6 Delhi. 10/03/2018 09/03/2020 18.96 Rudraksh Associates

work in progress

Detail Report
Graph / Photo
535 EOR to Police colony at Civil Line Police Station dg 2018-19. ( SH Misc repair work of toilet at Ground Floor near Dossier Cell, Axis Bank ATM Barracks 1,2,3 Mess, dining hall, Internal and external finishing etc). 15/09/2018 12/12/2018 18.93 2.84 (Nov'19) 0.00 (Nov'19) Samsad ok Detail Report
Graph / Photo
536 ARMO various Electrical and Mechanical Services at SGM Hospital Mangolpuri Delhi SH SITC of Complaint Tracker Communication System 31/07/2019 30/07/2020 18.93 DBSOLX Work in progress Detail Report
Graph / Photo
537 3 Installation of EPABX System at GGSSS Mubarikpur Dabas Delhi School ID1412133 4 Providing and Installation of 100 LPH RO System at DIET Keshav Puram, Delhi. 5 Electrical Renovation of all class rooms, offices, corridors and toilets 15/09/2019 14/12/2019 18.84 19.52 (Jan'20) 0.00 (Jan'20) RAS Enterprises FIRST RA BILL PAID RS.1952284/-