S. No.क्र. सं. | Name of Workकार्य का नाम | Date of Startकार्य आरम्भ करने की तिथि | Date of Completionकार्य समाप्त करने की तिथि | Cost (In Lac) |
Expenditure (In Lac) |
Progress | Agency | Status | Viewदेखें |
---|---|---|---|---|---|---|---|---|---|
1 | Providing Fire Fighting Arrangement in Various Govt. School Building in Delhi under Circle M-15 | 04/05/2010 | 28/02/2012 | 74986380.00 | Royale Meridian (India ) Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
2 | Renovation of Cold Storage Room of Drug Store at MRD Block at GTB Hospital, Shahdara, Delhi | 08/11/2017 | 29/08/2019 | 77700.00 | M/s L&T Ltd. | Not pertain to this office |
Detail Report
Graph / Photo |
||
3 | Construction of New Block For Medicine, Maternity And Advanced Pediatric Centre ( Composite Steel plus RCC framed 2B plus G plus 22 Storyed building At LN Hospital including internal water supply, Sanitary installation, External Development works, Dr | 04/11/2020 | 03/05/2023 | 46552.58 | 5633.39 (Aug'22) | 0.00 (Aug'22) | Swadeshi Civil Infrastructure Pvt. Ltd., 302, DLF Tower B Jasola, New Delhi-110025 | Steel coloum erection of 6th floor completed. Raft foundation work is in progress in LN 2 tower. Slab casting work in part area of LN2 is in progress. C.C. Block work is in progress at G.F. |
Detail Report
Graph / Photo |
4 | Repairing of fire alarm system installed at Lawyers chamber block 3 | 28/02/2020 | 27/03/2020 | 27388.89 | Ekta Enterprises |
Detail Report
Graph / Photo |
|||
5 | Construction of Hospital at Madipur, New Delhi | 11/11/2020 | 10/11/2022 | 26970.58 | 2529.24 (Aug'22) | 0.00 (Aug'22) | Ramacivil India Construction Private Limited | 95 % of 10th floor slab is completed. Masonary and finishing work is in progress at lower basement, upper basement, ground floor to 7th floor is in progress. |
Detail Report
Graph / Photo |
6 | Construction of Hospital at Jwalapuri, New Delhi | 07/08/2020 | 06/08/2022 | 26950.37 | 2432.22 (Aug'22) | 0.00 (Aug'22) | Parnika Commercial and Estates Pvt. Ltd. | RCC of terrace floor slab is in progress. Masonary work in 7th & 8th floor is in progress. Finishing work such as tile work, granite work etc. is in progress on 1st floor & 4th floor. |
Detail Report
Graph / Photo |
7 | REWIRING/REPAIRING OF ELECTRICAL ACCESSORIES IN TOILETS AT VARIOUS DELHI GOVT. SCHOOL | 09/08/2017 | 09/11/2019 | 23127.43 | NKG Infrastructure Limited |
Detail Report
Graph / Photo |
|||
8 | Construction of Pucca School Buildings (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Govt. School Desu Colony (DTL) Janakpuri New Delhi (Package - 4). SH : Civil & Electrical work. | 15/05/2021 | 14/05/2022 | 7689.40 | 1640.86 (Jul'22) | 0.00 (Jul'22) | B. L. INFRA PROJECTS PVT. LTD. | (i) DUAC approval :- Not required. (ii) Fire NOC :- Received. (iii) Local Body approval :- Case submitted for Local Body approval in SDMC. Final approval still awaited. (iv) Structure done.(v) Overhead tank done.(vi) MP Hall truss done.(vii) 4th floor plaster work & Brick work done & parapet wall done.(viii) 3rd kota stone & vitrified tile flooring work done & 4th floor class room kota flooring done, corridor tile flooring done.(ix) 5 Nos. Staircase granite work done.(x) Stilt, 1st & 2nd, 3rd floor toilet work done.(xi) Block-A & B Koba treatment done.(xii) Lift structure 2 nos. done.(xiii) GRC tile work done.(xiv) 1st, 2nd, 3rd & 4th floor corridor tile done.(xv) Heat resistant tile work done on terrace.(xvi) External development in progress.(xvii) Fixing of doors & windows in progress.(xviii) Painting & finishing work in progress.(xix) Lift installation in progress. (xx) Staircase S. S. railing work in progress. (xxi) MP Hall false ceiling & wall acoustic work in progress. |
Detail Report
Graph / Photo |
9 | Construction of Pucca School Buildings (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at GGSSS No. 2 Uttam Nagar, New Delhi (Package - 4). SH : Civil & Electrical work. | 15/05/2021 | 14/05/2022 | 7689.40 | 159.56 (Mar'22) | 0.00 (Mar'22) | M/S B L Infrastructure Projects Pvt.Ltd | (i) DUAC approval :- Not required.(ii) Fire NOC :- Received dated 11.02.2022. (iii) Tree transplantation permission :- received.(iv) Local Body approval :-Case submitted for Local Body approval in SDMC. Final approval still awaited. (v) Block-A - 4th floor slab done. Top floor slab in progress. (vi) Block-A - 3rd floor brick work done & 4th floor brick work in progress. (vii) Block-A - 2nd floor plaster done & 1st floor plaster in progress. (viii) Block-A - 1st floor kota stone work in progress. (ix) Block-B - 4th floor slab done. Top floor slab in progress. (x) Block-B - 2nd floor brick work done & 3rd floor brick work in progress. (xi) Block-B - 1st floor plaster done & 2nd floor plaster in progress. (xii) Block-C - 3rd floor slab done. 3rd to 4th floor column done & 4th floor slab in progress. (xiii) Block-C - 1st floor brick work done & 2nd floor brick work in progress. (xiv) Block-C - Stilt floor plaster done & 1st floor plaster in progress. |
Detail Report
Graph / Photo |
10 | Construction of Pucca School Building (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Kohat Enclave, New Delhi (Package - 4). SH : Civil & Electrical work. | 15/05/2021 | 14/05/2022 | 7689.40 | 7.22 (Aug'22) | 0.00 (Aug'22) | B. L. INFRA PROJECTS PRIVATE LIMITED | (i) DUAC approval :- Not required. (ii) Fire NOC :- Received. (iii) Local Body approval :- Received. (iv) On dated 26.06.2021, it was directed by Hon'ble Deputy Chief Minister of Delhi and Hon'ble Minister of PWD to hold the work and proposed Sports facility at Kohat Enclave. Now, Chief Engineer (Projects) vide letter No. 23(42)/22/CE(Projects) /PWD/West/292(E) dated 18.04.2022 directed to resume the construction work of school at Kohat Enclave on direction of Education Department.(v) Block-A 1st floor slab done. (vi) Block-A 1st floor to 2nd floor column reinforcement in progress. (vii) Block-B 1st floor slab casting done. (viii) Block-B 1st floor to 2nd floor column done. (ix) Block-B 2nd floor slab in progress. (x) Block-C 1st floor & 2nd floor slab done. (xi) Block-C 2nd to 3rd floor column in progress. (xii) Block-C ground floor brick work in progress. |
Detail Report
Graph / Photo |
11 | Construction of Pucca School Building (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and comprising with complete site development, RWHS, STP, Tubewell, Gen Set, PA System etc. at Ladpur Village, New Delhi (Package - 7) | 18/07/2021 | 17/07/2022 | 6988.57 | 91.22 (Aug'22) | 0.00 (Aug'22) | A. K. Mehta & Co. | Work is in progress. |
Detail Report
Graph / Photo |
12 | Expansion and Remodelling of Aruna Asaf Ali Govt. Hospital at Rajpur Road, New Delhi. | 10/08/2019 | 03/08/2020 | 3730.52 | 221.06 (Jul'22) | 0.00 (Jul'22) | Labotek | work in progress by M/s Labotk |
Detail Report
Graph / Photo |
13 | E & M works relating to all day to day operation & maintenance, A/R & M/O Works & Special Repair Works etc | 27/05/2022 | 26/05/2024 | 3516.35 | Swastik Electrotech Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
14 | Providing Manpower services of Clericals, Drivers, Multitasking and Staff (Un-skilled, Semi – skilled, Clerical and Non- Technical Supervisory Staff) in various offices under the jurisdiction of office of Pr. Chief Engineer (Project), SE Health-I, SE Health-II, SE (Elect.) and all Divisions under Health Zone for the years of 2022-2023 & 2023-2024 | 04/05/2022 | 02/05/2024 | 3031.48 | 288.64 (Jul'22) | 0.00 (Jul'22) | RAKSHAK SECURITAS PVT. LTD. | work completed |
Detail Report
Graph / Photo |
15 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Dariyapur Kalan, Delhi | 30/05/2020 | 29/05/2021 | 2936.58 | 1617.06 (Jun'22) | 61.00 % (Jun'22) | Tewatia Construction Pvt. Ltd. | Structure work completed. Partition work with bricks in progress. Tile, plaster and granite work is in progress. Truss work of MP Hall completed. Clading work with Dholpur sand stone in progress. Plumbing work is in progress. Coba work on terrace is in progress. Construction of UG tank is in progress. |
Detail Report
Graph / Photo |
16 | Remodelling of 94 nos. Delhi Govt. Dispensaries to Polyclinics. SH - Remodelling of 20 nos. DGD at various places in constituencies of District North of Delhi i/c Water supply, Sanitary, Elec installations, AC, Fire fighting system etc. (Package-I). | 05/12/2018 | 31/07/2019 | 2935.52 | 0.00 (Aug'19) | 55.00 % (Aug'19) | Sh. Kamal Singh | Work in progress |
Detail Report
Graph / Photo |
17 | Construction of DTC Bus Depot in resettlement colony at Sawada Ghevra, Delhi | 05/04/2022 | 04/12/2022 | 2915.78 | 0.83 (Aug'22) | 0.00 (Aug'22) | SVK Infrastructures | Tender for the work invited and work awarded on 04.03.2022. Letter of commencement issued on 05.04.2022. Site clearing, leveling work completed. Foundation work of retaining wall has started.. |
Detail Report
Graph / Photo |
18 | SITC and CAMC of CCTV System in Delhi Govt. Schools. SH- Providing and Maintenance of Internet lease line Connection. | 17/08/2019 | 16/02/2020 | 2691.32 | Reliance Jio Infocomm | work for installation of CCTV camera in 574 nos. school building is provisionally completed and testing of lease line i/c replacement of Hardware work is in progress. |
Detail Report
Graph / Photo |
||
19 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Libaspur, Delhi | 30/05/2020 | 29/05/2021 | 2653.59 | 2197.38 (Jun'22) | 62.00 % (Jun'22) | Tewatia Construction Pvt. Ltd. | Structure work completed. Brick work and plastering work completed in Part-A, B, C, D and in Part -E is completed. Boundary wall work, granite work, tile works, CPVC & CI work in toilet is in progress. Clading work with Dholpur sand stone in progress. |
Detail Report
Graph / Photo |
20 | Co 136 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 1 | 20/01/2019 | 16/09/2019 | 2420.66 | 2902.11 (Aug'22) | 0.00 (Aug'22) | M C Constructions Company | Work in Progress. |
Detail Report
Graph / Photo |
21 | Renovation / Development work in Building for Education Department at Boulverd Road, Delhi | 07/04/2022 | 04/08/2022 | 1842.64 | 230.97 (Jun'22) | 0.00 (Jun'22) | DND Infra Private Limited | Piling and pilecap work is completed. Casting of UG tank footing and wall completed. Construction of guard room and LT panel room completed in all respect. MS louvers and HPL work on main building is in progress. Framing for glazing and ACP work in Cafetaria in progress. UPVC window work is 70% completed. False ceiling and wall lining work in officers rooms in progress. Development work like road, placing of kerb stone and saucer drain in progress. |
Detail Report
Graph / Photo |
22 | Providing Manpower services of Clericals, Drivers, Multitasking and Staff (Un-skilled, Semi -skilled, Clerical and Non- Technical Supervisory Staff) in various offices under the jurisdiction of Health Maintenance Zone, PWD | 03/04/2019 | 02/04/2021 | 1625.72 | RAKSHAK SECURITAS PVT. LTD. |
Detail Report
Graph / Photo |
|||
23 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at GSSS (Co ed) at Rana Pratap Bagh, Delhi | 30/05/2020 | 29/05/2021 | 1335.04 | 1142.74 (Aug'22) | 0.00 (Aug'22) | The Krishna Construction Co. | Structure work of building completed, Plaster work & brick completed. Water proofing work completed, Granite work and tile work completed. Toilet fittings, C.I. Work, CPVC work completed, painting work is in progress. False ceiling, SS work and Boundary wall work in progress. Aluminium work and Clading work with Dholpur sand stone in progress (65% completed). |
Detail Report
Graph / Photo |
24 | Civil works relating to day to day maintenance, A/R & M/O Works & Special Repair Works | 10/05/2022 | 08/05/2024 | 1313.79 | 64.67 (Aug'22) | 0.00 (Aug'22) | Raghav Engineers | work completed |
Detail Report
Graph / Photo |
25 | C/o 44 nos. (G Plus 3) SPS equivalent classroom including 2 nos staircase, 4 toilet blocks, 1 lift & 3 nos stilt at Govt. Girls Sr. Sec School, West Jyoti Nagar, Delhi & 36 nos. (G Plus 3) SPS equivalent classroom including 3 nos staircase, 4 toilet blocks & 2 nos stilt at Govt. Co-Ed. Middle School, East Rohtash Nagar School, Delhi including internal & external water supply, sanitary installations, electrical installations, development of site, boundary wall, UGR, RWH & Fire Fighting system etc | 07/03/2022 | 30/01/2023 | 1246.96 | K. L. ARORA & SON | Work foreclosed due to not handing over the site vide date 28.06.2022 |
Detail Report
Graph / Photo |
||
26 | Running operation of lifts | 06/05/2021 | 05/05/2024 | 909.76 | Guruji Elevator |
Detail Report
Graph / Photo |
|||
27 | Video projection system | 19/09/2013 | 18/12/2013 | 908.00 | Saga Infosolution Pvt. Ltd | completed |
Detail Report
Graph / Photo |
||
28 | Construction of 144 Nos Temporary Courtroom in the existing court complexes of Saket Stilt plus G plus 3 Tis Hazari Stilt plus G plus 3 and Karkardooma G plus 4 Delhi Sub Head Providing and Placing Factory made Furniture | 25/05/2020 | 23/07/2020 | 905.33 | M/s Rajdhani Furnitures Pvt. Ltd. | Work is in progress |
Detail Report
Graph / Photo |
||
29 | Comprehensive Consultancy Services for Planning, Designing and Development of New Campus of Ambedkar University Delhi (PHASE-I Works) at Dheerpur, Delhi-110009. | 05/09/2019 | 04/09/2025 | 720.00 | 0.00 (Sep'20) | 2.00 % (Sep'20) | ARCOP ASSOCIATES PVT. LTD. | EFC approved the proposal on 10.05.2022. Case to be put up in Cabinet. |
Detail Report
Graph / Photo |
30 | Comprehensive Consultancy Services for Designing and Development of Hospitals at Madipur, Sarita Vihar, Hastsal and Jwalapuri, Delhi. | 17/11/2018 | 16/01/2022 | 720.00 | 22.36 (Aug'22) | 0.00 (Aug'22) | ARCOP ASSOCIATES PVT. LTD. | Work is under progress. |
Detail Report
Graph / Photo |
31 | Comprehensive Consultancy Services for Planning, Designing and Development of New Campus of Ambedkar University Delhi at Sector 3, Rohini, Delhi 110085 | 05/09/2019 | 04/09/2025 | 720.00 | 0.00 (Sep'20) | 2.00 % (Sep'20) | SIKKA ASSOCIATES REGD. | EFC approved the proposal on 10.05.2022. Case to be put up in Cabinet. |
Detail Report
Graph / Photo |
32 | C/o East Delhi Campus of Guru Gobind Singh Indrasprastha University at Surajmal Vihar, Shahdara, Delhi. (SH: Supplying, Installation, Testing and Commissioning of Grid Interactive roof top solar photo voltaic power generation system). | 28/08/2020 | 23/02/2021 | 680.89 | 293.42 (Feb'21) | 0.00 (Feb'21) | Uneecops Technologies Ltd. | Foundation work and frame work for the solar panel is in Girls Hostel and Teachers Hostel & Sports Hall is completed, Cable Laying work & Installation of String invertor is in progress. Installation of solar PV module A, B & Sports is in progress. |
Detail Report
Graph / Photo |
33 | Re laying of World Athletics approved 400 Mtr. synthetic athletic track at Chhatrasal Stadium, Delhi | 26/03/2022 | 24/07/2022 | 679.06 | ADVANCED SPORT TECHNOLOGIES LLP | Work in progress |
Detail Report
Graph / Photo |
||
34 | E & M works relating to day to day operation & maintenance, A/R & M/O Works & Special Repair Works | 26/05/2022 | 25/05/2024 | 619.38 | H. N. TRADERS & ENGINEERS |
Detail Report
Graph / Photo |
|||
35 | Upgradation/Renovation of one staff room in each 951 schools, Civil and Electrical work (SH- Staff rooms 75 no. under south Building Maintenance Division). | 14/03/2019 | 13/09/2019 | 610.61 | 221.28 (Mar'21) | 0.00 (Mar'21) | S.M. Builders | work in progress |
Detail Report
Graph / Photo |
36 | RMO Electrical and Mechanical services installed at Delhi Sachivalya, New Delhi. (SH Maintenance and Operation of E and M services at Delhi Sachivalaya, New Delhi) | 13/07/2017 | 12/07/2020 | 540.00 | Swastik Electrotech Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
37 | Renovation / construction works at Rajiv Gandhi Stadium, Bawana | 07/07/2022 | 04/11/2022 | 535.01 | M/s Vinod Kumar & Company |
Detail Report
Graph / Photo |
|||
38 | (SH: Providing Sub-station Equipments). | 14/12/2012 | 13/10/2013 | 525.00 | Reliance Elektrik works | WORK COMPLETED FINAL PAYMENT TO BE MADE |
Detail Report
Graph / Photo |
||
39 | Running and Maintenance of lifts installed in residential and non-residential buildings at GTB Hospital complex, Shahdara, Delhi Sub Head Running operation of lifts | 17/01/2019 | 16/01/2021 | 485.43 | Guruji Elevator | Work in progress 3RD RA 40220380 |
Detail Report
Graph / Photo |
||
40 | Construction of Boundary Wall and other basic work for establishing of Driving training Institute in Village Malikpur Dist. South West, Delhi | 25/01/2022 | 24/05/2022 | 435.79 | 123.58 (Jul'22) | 0.00 (Jul'22) | M/s Satish Builders | Earth & foundation work is in progress.... |
Detail Report
Graph / Photo |
41 | Providing Manpower services of Clericals, Drivers, Multitasking and Housekeeping Staff (Unskilled, Semi skilled, Clerical and Non-Technical Supervisory Staff) in various offices under Higher Education Projects, PWD | 21/11/2021 | 20/11/2023 | 433.86 | Shri Krishna Constructions | Physical progress of the work is 30%. |
Detail Report
Graph / Photo |
||
42 | Pdg A/C system | 26/07/2009 | 25/12/2009 | 382.52 | Voltas Ltd. | completed |
Detail Report
Graph / Photo |
||
43 | Comprehensive Maintenance and Operation of Trauma Block, New Ward Block, OT, Gynae, Old Ward Block, Doctors and Nurses Hospital and Residential Complex Lifts at DDU Hospital, Hari Nagar, New Delhi (SH Operation of Lifts) | 30/04/2019 | 29/04/2021 | 355.16 | Guruji Elevator |
Detail Report
Graph / Photo |
|||
44 | Comprehensive maintenance of Civil works at Guru Gobind Singh Govt. Hospital, Raghubir Nagar, Delhi and Rao Tula Ram Memorial Govt. Hospital, Jaffarpur Kalan, Delhi P.W.D. (GNCTD), New Delhi for 2 years 2021-22, 2022-23. | 23/05/2022 | 21/05/2024 | 343.73 | Aliyan Constaruction Company | Work is under progress. |
Detail Report
Graph / Photo |
||
45 | comprehensive architetural consultancy services for construction of multistoried EWS Houses for Slum Dwellers at Bhalaswa, Jahangir Puri, Phase-I, New Delhi | 04/04/2021 | 03/04/2024 | 335.09 | Invalid Design Forum International | Recently fund from DUSIB has been received. Presentation was made to the hon'ble Minister on 23.01.2021. Formal approval from ministry is awaited. DUSIB had intimated that Hon'ble Chief Minister of Delhi desire to hold on the work till further orders. |
Detail Report
Graph / Photo |
||
46 | Up gradation of one staffroom in 86 Nos. Schools under South-East Building Maintenance Division, Hauz Khas, New Delhi during 2018-19. (Civil and Electrical work). | 23/03/2019 | 22/09/2019 | 329.84 | 63.81 (Aug'20) | 0.00 (Aug'20) | S. P. CONSTRUCTION COMPANY | Work in progress |
Detail Report
Graph / Photo |
47 | 1. RMO of Central AC Plant at A BlockGIPMER2. RMOof Central AC Plant B BlockGIPMERSH Operation and Comprehensive maintenance of Blue Star Make Central AC Plant | 11/09/2019 | 10/09/2021 | 306.35 | 40.88 (Apr'20) | 0.00 (Apr'20) | Blue Star Limited | work in progress and 2nd R/A paid to M/s Blue Star Ltd. |
Detail Report
Graph / Photo |
48 | Comprehensive maintenance and operation of UPS and CVCF systems | 26/01/2022 | 25/01/2024 | 305.92 | ARECA TECHNOLOGIES |
Detail Report
Graph / Photo |
|||
49 | Running operation and comprehensive maintenance of online UPS, TVSS, APFF, PAC and Isolation transformer of different capacity installed at RGSS Hospital, Tahirpur, Delhi | 26/01/2022 | 25/01/2024 | 296.84 | 24.74 (Jul'22) | 0.00 (Jul'22) | ISSAR INDUSTRIES |
Detail Report
Graph / Photo |
|
50 | RMO of various Electrical and Mechanical services at District Court Rohini, Delhi. dg. 2021-22 | 05/05/2022 | 04/05/2023 | 293.17 | Swastik Construction Co. |
Detail Report
Graph / Photo |
|||
51 | Consultancy Services for Comprehensive Architectural and Engineering Planning and Designing for Construction of New Hospital at Siraspur, New Delhi (Recall) | 04/09/2019 | 03/09/2022 | 267.00 | Design Associates Inc. | work in progress |
Detail Report
Graph / Photo |
||
52 | Comprehensive architectural consultancy services for Construction of Pucca School of Specialized Excellence (SoSEs) Buildings (G Plus 3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Civil Lines, Global School INA & Library Building at Zeenat Mahal (Package-B) | 29/07/2022 | 28/07/2023 | 224.75 | Design Accord Consultant | Tender under process |
Detail Report
Graph / Photo |
||
53 | Providing Data Entry Operator/Computer Operator, Multitasking and office Staff in various offices under Chief Engineer (OP), PWD, GNCTD, New Delhi | 02/11/2021 | 01/11/2023 | 218.21 | 34.99 (Aug'22) | 0.00 (Aug'22) | M/s DA Construction Co. | The work is in progress |
Detail Report
Graph / Photo |
54 | Renovation of school building and Multipurpose hall (Composite work Civil & Electrical) | 22/05/2022 | 21/01/2023 | 217.86 | 44.06 (Aug'22) | 0.00 (Aug'22) | Nafees Ahmed |
Detail Report
Graph / Photo |
|
55 | Upgradation/Renovation of one staff room in each of 73 schools (Morning and Evening Shift) located at (NE) District of Delhi under the jurisdiction of PWD Building Maintenance Division M-222 | 25/01/2019 | 24/04/2019 | 209.29 | 192.52 (Jan'22) | 0.00 (Jan'22) | Shyam Sunder Tyagi | work completed |
Detail Report
Graph / Photo |
56 | Providing for installation of fixing of false ceiling and VRF System in New College Building OPD and IPD in Nehru Homeopathic Medical College and Hospital, B-Block, Defence Colony, New Delhi-110024 | 15/03/2019 | 14/10/2019 | 208.35 | HILLTOP REFRIGERATION |
Detail Report
Graph / Photo |
|||
57 | Operation and comprehensive maintenance of 4 x 400 TR AC Plant and Ductable Air conditioning unit at Delhi Sachivalaya, New Delhi | 06/05/2019 | 05/05/2021 | 188.87 | 244.87 (Jan'22) | 0.00 (Jan'22) | Blue Star Limited |
Detail Report
Graph / Photo |
|
58 | Operation and comprehensive Maintenance of 3 X 300 TR Capacity York Make Chilling units with ancillaries of casualty block at Lok Nayak Hospital, New Delhi | 28/09/2019 | 27/09/2021 | 188.75 | 2.32 (Jul'22) | 0.00 (Jul'22) | G D Enterprises | work in progress by GD Enterprise |
Detail Report
Graph / Photo |
59 | Comprehensive maintenance of Blue star make central AC Plant | 14/06/2022 | 13/06/2024 | 187.29 | Blue Star Limited |
Detail Report
Graph / Photo |
|||
60 | C/o Extention of Maulana Azad Dental Institute of Dental Sciences, phase-II at Bahadur Shah Zafar Marg, New Delhi (SH: Providing Audio-Visual System & Stage Lighting System including 5 Years Comprehensive Maintenance) | 27/07/2019 | 26/11/2020 | 184.85 | HITECH AUDIO SYSTEMS PVT LTD | work in progress by agency |
Detail Report
Graph / Photo |
||
61 | RMO UPS system installed at 2nd floor 4th floor and 6th floor Casualty Block Gynae Block Ward 14 Genetic Lab OT Block and New OPD Block at L.N. Hospital New Delhi. SH Comprehensive annual maintenance of Schneider Electric APC Make UPS system install | 15/06/2019 | 14/06/2022 | 183.90 | 34.22 (Oct'19) | 0.00 (Oct'19) | Labotek | work in progress by M/s LABOTEK ( |
Detail Report
Graph / Photo |
62 | Construction of Additional 13 nos Class rooms over existing G plus 1 SPS structure with Prefabricated fibre reinforced sandwich panel including electrical installations at BCP SKV, Babarpur, Delhi | 27/05/2022 | 24/08/2022 | 183.58 | 68.58 (Aug'22) | 0.00 (Aug'22) | Ram Krishan Yudhister Prakash | The renovation/ upgradation work has started at Joshi Colony. Boundary wall, flooring, grill, window/door in progress. |
Detail Report
Graph / Photo |
63 | Annual Comprehensive Maintenance of Online UPS and its accessories | 23/10/2021 | 22/10/2024 | 177.62 | power house |
Detail Report
Graph / Photo |
|||
64 | Structural strengthening of RCC slab, Beam, Column and Fins of remaining portion of building (Phase-II part area) | 25/09/2021 | 23/03/2022 | 165.91 | 21.87 (Jun'22) | 0.00 (Jun'22) | Cembond Construction Pvt. Ltd | Work is under progress. |
Detail Report
Graph / Photo |
65 | Design, Supply, Installation, Testing and Commissioning of High-Mast type Sport lighting system for Athletic cum football Ground at East Vinod Nagar Sports Complex, East Delhi as per IAAF/FIFA standards) | 06/08/2018 | 05/12/2018 | 165.26 | Lighting Technologies Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
66 | Comprehensive Consultancy Services (Balance Services) for Designing and Development of Buildings under Stage-1 of Phase-II of Delhi Technological Universityat Bawana Road, Delhi | 05/05/2018 | 04/11/2022 | 159.42 | 15.94 (Jul'22) | 0.00 (Jul'22) | Suresh Goel & Associates | Work is in progress. |
Detail Report
Graph / Photo |
67 | Comprehensive maintenance and operation and augmentation of existing LAN Communication System (Active and Passive) and Voice Communication System installed at RGSS Hospital Tahirpur, Delhi | 07/01/2022 | 06/02/2023 | 155.31 | 28.79 (Jun'22) | 0.00 (Jun'22) | Tracom Enterprises |
Detail Report
Graph / Photo |
|
68 | SITCofcentr.med.grade compr air sys semi dry suction sys with amalgam separ incl5yr Comp. maint | 25/02/2020 | 24/05/2020 | 154.81 | Villa India | work in progress by agency |
Detail Report
Graph / Photo |
||
69 | Supplying and replacement of existing passenger lifts at Tis Hazari Court Complex, Delhi. | 22/04/2017 | 21/08/2017 | 146.38 | 36.20 (Mar'22) | 0.00 (Mar'22) | Johnson Lifts Pvt. Ltd. | Court Authority has directed to work for replacement of one lift at a time |
Detail Report
Graph / Photo |
70 | Renovation of Mud Houses, Open Dining Hall and Tin Sheds | 15/07/2018 | 14/11/2018 | 143.58 | 162.50 (Mar'21) | 0.00 (Mar'21) | Aliyan Constaruction Company | work completed |
Detail Report
Graph / Photo |
71 | Up-gradation / Modification of Zakhira Underpass Pump House, Inderlok, Delhi under PWD NWED Delhi | 22/03/2022 | 21/07/2022 | 142.36 | 102.87 (Jun'22) | 0.00 (Jun'22) | HST Enterprises |
Detail Report
Graph / Photo |
|
72 | RMO 2000/1600/1500 KVA capacity Andrew Yule make HT AVR installed at Sub-station No. 1 2 3 and 4 L.N. Hospital New Delhi. SH Comprehensive maintenance of 2000 KVA 1600 KVA and 1500 KVA HT AVR Andrew Yule make at sub station No. 1 2 3 and4 L.N. Hospit | 28/01/2020 | 27/01/2023 | 142.09 | 20.26 (Apr'22) | 0.00 (Apr'22) | Harsh India Enterprises | Work in progress by Harsh India Enterprises |
Detail Report
Graph / Photo |
73 | Operation and Maintenance of CCTV System installed at Casualty Block, Gynae Block and Special Ward Block at L.N. Hospital, New Delhi. SH Operation and Comprehensive Maintenance of Bosch CCTV System at Casualty Block, Special Ward Block and Gynae Bloc | 12/03/2017 | 11/03/2020 | 137.15 | 41.78 (Sep'19) | 0.00 (Sep'19) | HITECH AUDIO SYSTEMS PVT LTD | Work in Progress |
Detail Report
Graph / Photo |
74 | Reconstruction of school boundary wall with grill, Replacement of roofing with Profile sheet in MP Hall, Entrance Hall and staff room, Installation of rainwater harvesting system at Sarvodaya Bal Sr. Sec. School, Qutub Mehrauli, New Delhi--- | 11/07/2018 | 10/01/2019 | 133.28 | 41.85 (Dec'20) | 0.00 (Dec'20) | Aliyan Constaruction Company | work in progress |
Detail Report
Graph / Photo |
75 | Repair of bathing ghats, manhole and chambers/sewerline providing shed and toilet block renovation at CPMF site. | 17/08/2018 | 16/12/2018 | 128.86 | 69.59 (Aug'20) | 0.00 (Aug'20) | Nafees Ahamed | work completed |
Detail Report
Graph / Photo |
76 | (1) Operation & Maintenance of OTIS make lifts installed at MRD Block, L.N. Hospital, New Delhi. (2) Operation & Maintenance of OTIS make lifts installed at B.L. Taneja Block, L.N. Hospital, New Delhi. (3) Operation & Maintenance of ECE & Olympus make lifts installed at MAIDS, New Delhi (4) Operation & Maintenance of Johnson make lifts installed at New Orthopedic Block of L.N Hospital, New Delhi.(SH - Operation of lift installed at various locations in hospital complex). | 14/11/2017 | 13/11/2019 | 128.68 | 146.66 (Oct'19) | 32.18 % (Oct'19) | Akash Enterprises | work in progress. |
Detail Report
Graph / Photo |
77 | Special Repairs to vacated and unpopular quarters in PTS colony, Malviya Nagar, New Delhi. | 11/07/2018 | 10/01/2019 | 125.28 | 78.33 (Sep'20) | 0.00 (Sep'20) | Puran Chand and Sons | work in progress |
Detail Report
Graph / Photo |
78 | Construction of 05 Nos. new classrooms, replacement of old damaged windows of classrooms, construction of new ramp for CWSN students & teachers, demolition of unserviceable stairs and shotcreting work in Sarvodaya Bal Vidyalaya No. 1 (Urdu Medium) at Jama Masjid, Delhi School ID-2127002 | 14/02/2022 | 13/08/2022 | 117.52 | 203.07 (Jul'22) | 0.00 (Jul'22) | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
79 | C/o Extention of MADI of Dental Sciences,Ph-II at Bahadur Shah Zafar Marg,ND.SH SITCof Medical Gas Pipeline System including 3 Years Comprehensive Maintenance | 12/08/2019 | 09/11/2019 | 115.37 | Med Freshe Pvt. Ltd. | work in progress by Med Freshe Pvt. Ltd |
Detail Report
Graph / Photo |
||
80 | Routine Maintenance of EI and Fans including RMO Pumpset & DG Set | 01/06/2022 | 31/05/2023 | 113.64 | GLOBAL ENTERPRISES |
Detail Report
Graph / Photo |
|||
81 | RMO various electrical and mechanical services (internal and external) at Deep Chand Bandhu Hospital Kokiwala Bagh Ashok Vihar New Delhi SH Annual Comprehensive maintenance of 4 x 200KVA UPS | 21/10/2019 | 20/10/2022 | 111.48 | power house |
Detail Report
Graph / Photo |
|||
82 | Replacement of 13 passenger lifts installed at MSO Building, New Delhi | 26/09/2017 | 25/05/2018 | 107.28 | Johnson Lifts Pvt. Ltd. | work in progress |
Detail Report
Graph / Photo |
||
83 | Supply, Installation, Testing & Commissioning of UVSS (Under Vehicle Surveillance System) along with Automated License Plate reader, Driver Photo module at Rouse Avenue Court New Delhi. | 21/05/2022 | 19/06/2022 | 106.22 | 80.05 (Jul'22) | 0.00 (Jul'22) | Vehant Technologies. Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
84 | Up-gradation and enhancement of old Sub Station equipments at JPCH, Shastri Park, Delhi | 28/03/2022 | 27/07/2022 | 100.63 | SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. |
Detail Report
Graph / Photo |
|||
85 | Comprehensive maintenance of carrier make central AC plant | 28/11/2021 | 27/11/2023 | 97.83 | 62.96 (Jul'22) | 0.00 (Jul'22) | G D Enterprises |
Detail Report
Graph / Photo |
|
86 | Annual maintenance and servicing, repairing of 1000KVA DG Sets with Cummins make Engine | 04/05/2022 | 03/05/2023 | 96.12 | M/s Shri Durga Electricals |
Detail Report
Graph / Photo |
|||
87 | RMO of HT AVR in A-Block, B-Block C-Block & D Block at GIPMER New Delhi (Comprehensive maintenance of 1500 KVA 2000 KVA and 750 KVA HT AVR Andrew yule make at Sub station No. 1, 3 & 5) | 18/12/2021 | 17/12/2024 | 95.89 | Harsh India Enterprises |
Detail Report
Graph / Photo |
|||
88 | Civil Work and Electrical Work in Mangolpuri, Sultanpuri, Kirari, Shakurbasti, Rohini, Rithala, Tri Nagar, Shalimar Bagh, Keshav Puram and Wazirpur Total 17 Nos. Schools of NWB (Remaining Work) (Composite Work Civil and Electrical) | 08/04/2022 | 07/07/2022 | 95.69 | 50.03 (Jul'22) | 0.00 (Jul'22) | Rohit Kumar |
Detail Report
Graph / Photo |
|
89 | Running operation and annual maintenance of the sub-station, DG Sets, E and M service, Fire Fighting and Fire Alarm, RO Plant and Pumps House at RGSS Hospital, Tahirpur, Delhi | 06/07/2019 | 05/07/2020 | 94.43 | GLOBAL ENTERPRISES | work in progress 6th RA 18182135 |
Detail Report
Graph / Photo |
||
90 | Annual Comprehensive Maintenance of RO,Hot & Cold Water Dispensers of ATSIN make Under sub division-V HMED(C) | 27/05/2022 | 26/05/2025 | 93.66 | 57.96 (Jul'22) | 0.00 (Jul'22) | AADITYA ENVIRO INDIA PVT.LTD |
Detail Report
Graph / Photo |
|
91 | Providing consultancy services for comprehensive planning and designing of construction of school building at various locations in Delhi. Dwarka Sector-12 (2) Dwarka Sector-1, Pocket-5 (3) Dwarka Sector-18 (4) Dwarka Sector-19 (Phase-I) (5) Dwarka Secot-16 (6) Dwarka Sector-11 (Package-A) | 29/11/2017 | 28/03/2019 | 93.50 | Design Forum International | work in progress |
Detail Report
Graph / Photo |
||
92 | SITC of 2 Nos. 315 KVA Electrical Compact Substation at SCERT Building,Varun Marg Defence Colony, New Delhi) (Civil and Electrical Works) | 02/05/2022 | 01/09/2022 | 92.47 | KAUSHIK DIESEL GENERATOR |
Detail Report
Graph / Photo |
|||
93 | A/R and M/O to Residential Buildings & Non Residential Buildings under PWD, North-West Building Delhi during 2021-22 SH: Mechanized cleaning of underground /overhead RCC/PVC Water Storage tanks. | 09/08/2021 | 08/08/2022 | 91.40 | 25.38 (Feb'22) | 0.00 (Feb'22) | ROYAL CONSTRUCTION |
Detail Report
Graph / Photo |
|
94 | Enhancement of LT Supply to HT Supply with 630 KVA Substation at A&U Tibbia College and Hospital, Karol Bagh, New Delhi. | 05/07/2022 | 04/10/2022 | 91.10 | Jain Electric Works |
Detail Report
Graph / Photo |
|||
95 | Providing Anti Smog Gun Mounted on mobile truck in the Assembly Constituency under Sub Division M-2134 North East Build & Road Division Delhi | 05/08/2022 | 01/01/2023 | 89.40 | Ramesh Chander |
Detail Report
Graph / Photo |
|||
96 | Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV RO Systems, Water Dispensers with Inbuilt RO Systems, RO Water Purifiers and Aquaguards | 23/12/2019 | 22/12/2020 | 87.51 | Aditi Enterprises | work in progress by Aditi Enterprises |
Detail Report
Graph / Photo |
||
97 | RMO UPS system installed at 2nd floor, 4th floor 6th floor Casualty BlockGynae Block, Ward 14 Genetic Lab OT Block and New OPD Block at L.N. Hospital New Delhi.SH Comprehensive annual maintenance of Emerson Make UPS system installed at Casualty Bl | 26/08/2019 | 25/08/2022 | 86.20 | Labotek | work in progress by Labotek |
Detail Report
Graph / Photo |
||
98 | Construction of Extention of Maulana Azad Dental Institute of Dental Sciences, phaseII at Bahadur Shah Zafar Marg, New Delhi.SH Supplying, installation, testing and Commissioning of Modular Operation Theatre | 12/08/2019 | 09/11/2019 | 83.93 | 21.56 (Feb'22) | 0.00 (Feb'22) | MDD Medical System (INDIA) Pvt. Ltd | work in progress by MDD Medical System (I) Pvt.Ltd. |
Detail Report
Graph / Photo |
99 | Routine Maintenance, Operation of CNG Oil Fired 2.5 TPH B16 3Nos 600kg hr Autoclave Capacity Fire Tube IBR Boiler 01 Nos and Operation of Boilers and Water Softening plant | 01/09/2020 | 31/08/2022 | 83.64 | 19.29 (May'22) | 0.00 (May'22) | Boilermart | Work in progress by M/s Boilermart |
Detail Report
Graph / Photo |
100 | 1 RMO Elect and Mech Services in Lawyers chambers Blk DEFG and H. 2 In KKD Court (Court Block) ACI B and JKL DEFG and H. 3 At UTCS Bldg. SH- Operation and Routine Maint. of EI DG Set Sub Station Fire Fighting Fire Alarm System and Vrs type pump sets. | 18/05/2019 | 17/05/2020 | 83.16 | 103.48 (Sep'20) | 0.00 (Sep'20) | PARASAR Electrical & Refrigeration |
Detail Report
Graph / Photo |
|
101 | Construction of 5 nos Aam Aadmi Mohalla Clinic Primary Health Centres at various places in the jurisdiction of SRD1, PWD, Delhi | 04/11/2021 | 05/02/2022 | 79.88 | 33.40 (Jul'22) | 0.00 (Jul'22) | Y I INFRASTRUCTURE |
Detail Report
Graph / Photo |
|
102 | Providing CCTV Surveillance System in Judges Residence complex O Block at District Court Karkardooma Shahdara Delhi. | 07/10/2018 | 06/02/2019 | 79.60 | 21.54 (Dec'19) | 0.00 (Dec'19) | TECHNOSYS SECURITY SYSTEMS PVT. LTD |
Detail Report
Graph / Photo |
|
103 | RMO of HT AVR in A-Block, B-Block, C-Block D Block at GIPMER, ND Comprehensive maintenance of 1500 KVA HT AVR Andrew yule make at Sub station No. 2 | 18/02/2022 | 17/02/2025 | 78.70 | 24.11 (Jul'22) | 0.00 (Jul'22) | Harsh India Enterprises |
Detail Report
Graph / Photo |
|
104 | 1 RMO E and M Services in Lawyers chambers Block. 2 At KKD Court Court Block. 3 At UTCS Bldg. Vishwas Nagar Shahdara. SH-Routine Maintenance and Operation of various E and M services. | 10/05/2018 | 09/05/2019 | 78.60 | 30.59 (Sep'19) | 0.00 (Sep'19) | M I Enterprises |
Detail Report
Graph / Photo |
|
105 | Day to Day maintenance and Operation of E and M installations | 03/03/2022 | 02/03/2023 | 77.90 | M/s Krishna Electrical works |
Detail Report
Graph / Photo |
|||
106 | Operation and maintenance of lifts in court block & lawyers chamber blocks | 04/02/2014 | 03/02/2015 | 76.96 | A.G. Enterprises |
Detail Report
Graph / Photo |
|||
107 | Renovation of MP Hall and Repairing/Replacement of Electrical Installations Flood Light Fitting Air Conditioning PA System etc. at SKV Vivek Vihar Delhi. School ID-1001022 | 27/09/2018 | 26/01/2019 | 76.31 | 51.34 (Sep'20) | 0.00 (Sep'20) | Mars Engineers |
Detail Report
Graph / Photo |
|
108 | RMO of Lifts at Dr BSA Hospital Sec 6 Rohini Delhi SH Operation of Lifts | 04/12/2018 | 03/12/2020 | 75.44 | Guruji Elevator | Work in progress |
Detail Report
Graph / Photo |
||
109 | Comprehensive consultancy for construction of Additional Academic and Administrative Block at Campus of DPSRU, Sector-3, M.B. Road, Pushp Vihar, New Delhi-110017 | 27/02/2022 | 26/10/2023 | 75.02 | DESIGN ACCORD CONSULTANT | Consultancy Work in progress. |
Detail Report
Graph / Photo |
||
110 | Comprehensive Maintenance of OTIS Lifts and Escalators | 08/05/2022 | 07/05/2023 | 74.27 | Otis Elevator Company (India) Ltd. |
Detail Report
Graph / Photo |
|||
111 | EOR to PTS, Dwarka, New Delhi during 2018-19.(SH- Development of the outer area police station for police training purpose). | 23/05/2018 | 21/07/2018 | 74.19 | 26.97 (Jul'18) | 60.00 % (Jul'18) | Aliyan Constaruction Company | work in progress |
Detail Report
Graph / Photo |
112 | For Addl work of ducting, grills, celing, diffusers, duct installation & allied items for Air conditioning | 21/10/2006 | 30/09/2007 | 74.17 | Aahram Engrs | Work completed |
Detail Report
Graph / Photo |
||
113 | RMO of various Electrical and Mechanical Services (Internal & external) at Prison Complex, Mandoli, Delhi. (SH: Operation & Comprehensive Maintenance of SCADA based water pumping automation system). | 07/09/2021 | 06/09/2022 | 74.07 | 26.87 (Jul'22) | 0.00 (Jul'22) | CONCEPT AND SOLUTIONS | work in progress |
Detail Report
Graph / Photo |
114 | Renovation for Urology and Renal Transplant Department at (Block 3, 2nd Floor) RGSS Hospital, Tahirpur, Delhi. Sub Head Providing Medical Instruments | 17/08/2019 | 16/11/2019 | 73.86 | MDD Medical System (INDIA) Pvt. Ltd | No Payment |
Detail Report
Graph / Photo |
||
115 | Structural failure and threat of loss of property and life at Delhi Archives Building Special Institutional Area during 2017-18. | 12/09/2018 | 11/03/2019 | 73.82 | 48.52 (Feb'21) | 0.00 (Feb'21) | ASLAM BUILDERS | work in progress |
Detail Report
Graph / Photo |
116 | Providing Services of Computer Operator, MTS etc. under various PWD Offices of North Building Division and office of SA North | 01/02/2022 | 26/01/2023 | 73.51 | 25.66 (Jul'22) | 0.00 (Jul'22) | placement security services | Work in progress |
Detail Report
Graph / Photo |
117 | Construction of new rooms between old and new building (G+3) floor, C/o lift shaft and raising of boundary wall and fixing of MS grill with concertina coil | 11/07/2022 | 09/10/2022 | 72.99 | ARIF, Jahangirpuri, Delhi |
Detail Report
Graph / Photo |
|||
118 | Mechanized Cleaning of over head tank and underground tank | 07/08/2021 | 06/08/2022 | 72.88 | 16.19 (Jun'22) | 0.00 (Jun'22) | UNITECH WATER SLOUTIONS |
Detail Report
Graph / Photo |
|
119 | 4250 | 20/05/2013 | 19/08/2013 | 72.78 | Varun Gupta & Co. | Work foreclosed |
Detail Report
Graph / Photo |
||
120 | Main Work | 20/05/2013 | 19/08/2013 | 72.78 | Varun Gupta & Co. | completed |
Detail Report
Graph / Photo |
||
121 | Mechanized Cleaning of over head tank and underground tank | 06/08/2021 | 05/08/2022 | 71.82 | 15.67 (Jun'22) | 0.00 (Jun'22) | UNITECH WATER SLOUTIONS |
Detail Report
Graph / Photo |
|
122 | Comprehensive maintenance of carrier make central AC plant | 10/12/2021 | 09/12/2022 | 71.68 | 56.91 (Jul'22) | 0.00 (Jul'22) | G D Enterprises |
Detail Report
Graph / Photo |
|
123 | Name of work 1 to 6 MOEI Fans and RMO Air- Conditioner, pump set, DG set installed at registrar co-operative societies, old court building, parliament street, New Delhi | 07/10/2017 | 06/10/2018 | 71.64 | 17.52 (Aug'19) | 0.00 (Aug'19) | Parasar Electricals & Refrigeration |
Detail Report
Graph / Photo |
|
124 | 1 Govt. Middle School, Sarita Vihar 2 Govt. Sr. Sec. School, Sultanpur 3 Sr. Sec. School, Tehkhand 4 Jonapur-1 5 Jonapur-2 6 RPVV at Sector A, Vasant Kunj Package-C. | 20/11/2017 | 19/01/2018 | 71.50 | 42.22 (Oct'21) | 0.00 (Oct'21) | SPACE DESIGN GROUP | work is in progress |
Detail Report
Graph / Photo |
125 | Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV/ RO Sys. Water Dispensers with Inbuilt RO Sys RO Water Purifiers | 06/10/2020 | 05/10/2022 | 71.14 | 39.10 (Apr'22) | 0.00 (Apr'22) | Aditi Enterprises | Work in progress by M/s Aditi Enterprises |
Detail Report
Graph / Photo |
126 | A/R & M/O to various Mohalla Clinics under Sub Division-I, South Building Maintenance (M-422), during 2022-23. | 22/06/2022 | 21/06/2023 | 70.37 | Afjal Construction |
Detail Report
Graph / Photo |
|||
127 | Providing various Services for the office of Senior Architect Office, Chief Engineer (North), Superintendent Engineer and O/o Executive Engineer (North West Building) | 01/03/2022 | 28/02/2023 | 70.14 | 33.20 (Aug'22) | 0.00 (Aug'22) | DA Construction Co. |
Detail Report
Graph / Photo |
|
128 | Comprehensive maintenance of buildings including supply of materials and providing service of man power for day to day maint. work of UTCS Complex Employment exchange JJB Court. and others buildins under SD M2312 dg.2021 22 | 05/02/2022 | 04/02/2023 | 69.93 | 30.24 (Jun'22) | 0.00 (Jun'22) | RAman KUmar |
Detail Report
Graph / Photo |
|
129 | Renovation of MP Hall i/c Wooden Flooring, Wall Panelling, False Ceiling, up Liftmen of Stage Stepping in Flooring etc. and Electrical Renovation of MP Hall at SCERT Bhawan, New Delhi. (Civil and Electrical Works) | 17/03/2022 | 16/05/2022 | 69.80 | SHRI DATTA KRUPA ENTER PRISES |
Detail Report
Graph / Photo |
|||
130 | Construction of Porta Cabin for security officers and outer force near Annexure -II building at Tis Hazari, Delhi (Civil Work) | 30/07/2022 | 27/09/2022 | 69.57 | Jabir Husain |
Detail Report
Graph / Photo |
|||
131 | Comprehensive maintenance Supply of materials and providing services of manpower for day to day maintenance work of KKD Court Main Buildings A B C I J K and L Blocks under SD M 2312 dg 2021 22 | 28/01/2022 | 27/01/2023 | 69.22 | 31.92 (Apr'22) | 0.00 (Apr'22) | Uma Shankar | In Progress. |
Detail Report
Graph / Photo |
132 | Comprehensive maintenance, Supply of materials and providing services of manpower for day to day maintenance work of Judge’s Flat Residential Complex at KKD Court under SD M-2311, Delhi during 2021-22 | 15/01/2022 | 14/01/2023 | 68.34 | Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 |
Detail Report
Graph / Photo |
|||
133 | Comprehensive Maintenance of RO/ Filtration Units | 01/04/2022 | 30/09/2022 | 68.24 | 54.77 (Jul'22) | 0.00 (Jul'22) | M/s Vivek Associates |
Detail Report
Graph / Photo |
|
134 | Sub Head Operation and routine maintenance of HVAC System 4x550TR capacity AC plant, Cold Storage Plant in Old and DEM Building | 03/03/2019 | 02/03/2021 | 68.17 | SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. | Work completed |
Detail Report
Graph / Photo |
||
135 | 1) RMO various Electrical & Mechanical services installed at Gomukh Tower Kaushambi Ghaziabad (Sub Head:- Operation of EI and fans i/c Compound light, Substation, DG Set, Pumps at Gomukh Tower) 2) MOEI & Fans i/c compound lighting for fire station at Mandawali and Kalyanwas Delhi & RMO pump sets for fire station at Mayur Vihar & Dallupura Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound light, Providing maintenance staff for Mayur Vihar & Dallupura) 3) MOEI & Fans i/c Compound lighting and RMO pump sets for police station at Mayur Vihar Ph-1 & Kalyanpuri Delhi. (Sub Head:- Provding maintenance staff for Mayur Vihar Ph-1 & Kalyanpuri) 4) MOEI & Fans i/c street light sewage & Drinking water pump sets for DA staff quarters at Kalyanvas Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound lightings) 5) MOEI & Fans i/c compound lighting for at VREC at Patpar Ganj Mandawali, Trilokpuri & Kondli Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound Lights). 6) MOEI & fans and RMO Pump sets i/c compound light High Mast lighting at East Vinod Nagar Sport Complex Delhi. During 2018-19(Sh:-Day to Day Maintenance of EI & Fans and compound lights Sports Complex East Vinod Nagar Delhi) | 18/03/2019 | 17/03/2020 | 67.80 | 86.50 (Jan'22) | 0.00 (Jan'22) | Krishna Electreical Works |
Detail Report
Graph / Photo |
|
136 | Structural Strengthening to slab beam and column | 09/02/2022 | 09/05/2022 | 67.79 | 20.01 (Jun'22) | 0.00 (Jun'22) | Cembond Construction Pvt. Ltd |
Detail Report
Graph / Photo |
|
137 | RMO of Substation in A-Block and BBlock at GIPMER, New Delhi SH Comprehensive Maintenance of HT AVR | 06/01/2018 | 05/01/2020 | 67.10 | 69.65 (Sep'19) | 77.93 % (Sep'19) | Harsh India Enterprises | Work in progress. |
Detail Report
Graph / Photo |
138 | Repair and Maintenance of various AAMC and other buildings under North East B&R division dg. 2022-2023. | 05/06/2022 | 04/06/2023 | 66.46 | GEE Internationals |
Detail Report
Graph / Photo |
|||
139 | Mechanized Cleaning of over head tank and underground tank. | 08/07/2020 | 07/07/2021 | 65.99 | 45.24 (May'22) | 0.00 (May'22) | UNITECH WATER SLOUTIONS |
Detail Report
Graph / Photo |
|
140 | Renovation of Public Toilet of Rohini Court Complex, Sub Head- Renovation Work in 32 Nos. Public Toilet (16 Men and 16 Women) at all Four Ramp Side from Ground Floor to Third Floor. (Modified) | 01/04/2022 | 30/09/2022 | 65.77 | Jeetender Kumar Verma |
Detail Report
Graph / Photo |
|||
141 | Augmentation of existing Sub Station and allied equipments at Delhi Archive Building, Qutub Institutional Area, New Delhi. | 14/07/2018 | 13/01/2019 | 65.58 | 67.81 (Jun'19) | 75.00 % (Jun'19) | Dubey Electric Works |
Detail Report
Graph / Photo |
|
142 | Internal and External Finishing Repair of Chajjas Re-Casting of Terrace Reconstruction of Balcony of Police Quarters Type-2 Block No.17 and 19 Other Misc Works (Composite Work Civiland Elect) | 06/01/2022 | 05/07/2022 | 65.41 | 10.51 (Jul'22) | 0.00 (Jul'22) | Jitender Singh |
Detail Report
Graph / Photo |
|
143 | 1 RMO Vrs E and M services installed at O Blk Rsdl Court complex KKD. 2 At Juvenile Justice Board Delhi. SH- Operation of EI and fans and water supply pump sets Lifts Fire Fighting and Fire Alarm System PA System DG Set and CCTV Surveillance System | 01/10/2018 | 24/09/2020 | 64.13 | 65.84 (Jun'21) | 0.00 (Jun'21) | A G ENTERPRISES |
Detail Report
Graph / Photo |
|
144 | Renovation of MP Hall i/c Wooden Flooring, Wall Panelling, False Ceiling, up Liftmen of Stage Stepping in Flooring etc. & Electrical Renovation of MP Hall at SCERT Bhawan, New Delhi). (Civil & Electrical Works) | 16/06/2022 | 15/08/2022 | 63.93 | M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 |
Detail Report
Graph / Photo |
|||
145 | Construction of 4 nos. Aam Aadmi Mohalla Clinic (Primary Health Centres) at various places in the jurisdiction of SRD Project Division-2, PWD, Delhi. (Civil & Electrical Work) | 01/06/2022 | 27/11/2022 | 63.68 | R K Construction Co. |
Detail Report
Graph / Photo |
|||
146 | A/R M/O various Mohalla Clinics under jurisdiction of North West Building-II during 2021-22 SH: Carrying out various civil works arises during day to day maintenance | 26/07/2021 | 25/07/2022 | 63.23 | SUSHIL KUMAR |
Detail Report
Graph / Photo |
|||
147 | Operation and routine maintenance of E.I, D.G. Set, Sub Station, Fire Fighting, Fire Alarm System and Various type Pump Sets during 2021-22 | 22/10/2021 | 29/10/2022 | 62.92 | 43.13 (Jun'22) | 0.00 (Jun'22) | Ele Mec Engineering Co. |
Detail Report
Graph / Photo |
|
148 | (Upgradation of existing building and other misc repair works) 2nd call | 10/03/2019 | 09/06/2019 | 62.80 | 77.96 (Nov'21) | 0.00 (Nov'21) | SUSHIL KUMAR | work completed |
Detail Report
Graph / Photo |
149 | Up-gradation/Renovation of 25 Qtrs. Block No. 1109 to 1516, 1577 to 1642 & 1643 to 2143 under sub-division, M-3222 at Gulabi Bagh, Delhi | 30/04/2022 | 29/12/2022 | 62.60 | Irshad Ahmed | Work in Progress |
Detail Report
Graph / Photo |
||
150 | Allied Work for Aam Aadmi Mohalla Clinic (Primary Health Centre)at various places under Sub Division North West Building 5 in Assembly Constituency Shalimar Bagh (AC14) Trinagar (AC16) Wazirpur (AC17) Rohini (AC13) Rithala (AC6) (Already Constructed) (Remaining Work) | 18/10/2021 | 17/06/2022 | 62.26 | 34.71 (Mar'22) | 0.00 (Mar'22) | SUSHIL KUMAR |
Detail Report
Graph / Photo |
|
151 | Running and maintenance of E.I. services in non-residential area at GTB Hospital, Complex, Shahdara, Delhi Sub Head Maintenance and operation of E and M services at non-residential area | 25/08/2018 | 24/08/2019 | 62.10 | 39.81 (Feb'19) | 70.00 % (Feb'19) | M/s Vivek Associates | work completed |
Detail Report
Graph / Photo |
152 | 3. Running and Maintenance of Fire Fighting and Wet Riser at GTB Hospital complex, Shahdara, Delhi. Sub Head Maintenance and operation of E and M services at residential and non-residential area | 25/08/2018 | 24/08/2019 | 61.90 | 61.00 (May'22) | 0.00 (May'22) | PARASAR Electrical & Refrigeration | Work in Progress (4TH RA bill paid) |
Detail Report
Graph / Photo |
153 | Operation & Maintenance of Electrical & Mechanical Services | 01/04/2014 | 31/03/2015 | 61.32 | Shaka Electrical India |
Detail Report
Graph / Photo |
|||
154 | Construction of boundary wall on vacant land measuring 3093 Sq. Mtr. (approx 3700 Sq. Yard) bearing Khasra No.47 & 48/1 in Village- Ibrahimpur District North | 16/06/2022 | 15/09/2022 | 61.04 | P L Construction | Work in progress |
Detail Report
Graph / Photo |
||
155 | Repair and renovation work of the property No. 7 55, Church Road, Jwala Nagar, Shahdara Health Department for opening of Polyclinic. (Composite work of Civil and Electrical) | 03/08/2019 | 04/02/2020 | 60.92 | RP Electrical and Maintenance Works | Work in progress but work is affected due to Covid-19 |
Detail Report
Graph / Photo |
||
156 | Providing Services of Computer Operators, Clerk and MTS (Multi Tasking Staff) in PWD North West Electrical Maintenance Division, Sub Divisions and other offices, Delhi | 14/07/2022 | 13/07/2023 | 60.63 | 7.57 (Jul'22) | 0.00 (Jul'22) | placement security services |
Detail Report
Graph / Photo |
|
157 | Regarding construction of MP hall, 02 Nos. of Labs and 01 Library at GGSSS, Bankner Delhi-40. Sch Id-1310049, EOR Id-20181894 Bldg. ID-13101408. | 03/07/2022 | 30/12/2022 | 60.31 | Sh. Devender Singh | Work in progress |
Detail Report
Graph / Photo |
||
158 | Construction of 4 Nos. Aam Aadmi Mohalla Clinic at various places under North West Building Division in Assembly Constituency Rohini (AC– 13), Wazirpur (AC–17) & Bawana (AC–07) (Civil & Electrical Composite Work) | 18/06/2022 | 17/10/2022 | 60.17 | Laxman |
Detail Report
Graph / Photo |
|||
159 | Laying of RMC, laying interlocking paver blocks with drainage, Kerb stone along with road, construction of 2 Nos. Security guard room & fixing of granite in tree guard | 22/05/2022 | 21/08/2022 | 59.84 | ARIF, Jahangirpuri, Delhi | Work in Progress |
Detail Report
Graph / Photo |
||
160 | Construction of Collapse/Tilted boundary wall at Govt. SKV Prahaladpur, Delhi-110042 (Sch ID-1310032) (Bldg ID 13101331) | 30/06/2022 | 28/09/2022 | 59.59 | Rajeev Kumar | Work in progress |
Detail Report
Graph / Photo |
||
161 | Providing for Augmentation of Sub Station in Nehru Homeopathic Medical Collage and Hospital, B-Block, Defence Colony, New Delhi - 110024 | 30/04/2019 | 29/07/2019 | 59.18 | AVON ELECTRICALS |
Detail Report
Graph / Photo |
|||
162 | Supplying, Installation, Testing and Commissioning of Biomedical treatment units near OT’s for pre treatment of yellow (f) category of Bio-Medical Waste at Lok Nayak Hospital, New Delhi | 25/03/2022 | 24/04/2022 | 59.06 | Texol Engineers |
Detail Report
Graph / Photo |
|||
163 | Upgradation of reception area and other misc repair work | 22/05/2022 | 21/08/2022 | 59.03 | Jabir Husain | Work in Progress |
Detail Report
Graph / Photo |
||
164 | Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block F at District Court Karkardooma Courts Delhi. | 24/07/2018 | 23/03/2019 | 58.95 | 9.50 (Feb'20) | 0.00 (Feb'20) | Johnson Lifts Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
165 | Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block G at District Court Karkardooma Courts Delhi. | 24/07/2018 | 23/03/2019 | 58.95 | 9.50 (Feb'20) | 0.00 (Feb'20) | Johnson Lifts Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
166 | Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block E at District Court Karkardooma Courts Delhi. | 24/07/2018 | 23/03/2019 | 58.95 | 9.50 (Feb'20) | 0.00 (Feb'20) | Johnson Lifts Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
167 | Replacement of 4 Nos, 10 passengers lifts installed in 62 nos Type V, Multi storey Delhi Govt. Flats at Motia Khan, New Delhi. | 29/08/2017 | 28/04/2018 | 58.64 | 9.00 (Mar'22) | 0.00 (Mar'22) | Johnson Lifts Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
168 | SH Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units | 03/08/2018 | 02/08/2019 | 58.04 | 21.52 (Dec'19) | 0.00 (Dec'19) | LG Electronics |
Detail Report
Graph / Photo |
|
169 | Regarding construction of MP hall 02 Nos. of Labs and 01 Library at GGSSS Bankner Delhi 40. Sch Id 1310049 EOR Id-20181894 Bldg. ID 13101408 | 07/02/2022 | 07/08/2022 | 57.37 | SANU CONSTRUCTION CO. | Work in progress |
Detail Report
Graph / Photo |
||
170 | Replacement of old outlived lifts in Academic and NRDH in GIPMER New Delhi | 22/09/2020 | 21/01/2021 | 57.10 | Thyssenkrupp Elevator (India) Pvt. Ltd. | Work in progress by M/s THyssen Krupp Elevator |
Detail Report
Graph / Photo |
||
171 | Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block D at District Court Karkardooma Courts Delhi. | 21/07/2018 | 20/04/2019 | 56.86 | 5.72 (Mar'21) | 0.00 (Mar'21) | KONE ELEVATOR INDIA PRIVATE LIMITED | Work in progress |
Detail Report
Graph / Photo |
172 | Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units | 31/07/2021 | 30/07/2022 | 56.78 | 21.29 (Jun'22) | 0.00 (Jun'22) | LG ELECTRONICS INDIA PVT LTD. |
Detail Report
Graph / Photo |
|
173 | Providing for Services Day to Day Maintenance | 01/09/2021 | 30/05/2022 | 56.56 | 47.79 (Jul'22) | 0.00 (Jul'22) | R.K. Jain& Sons Hospitality Servies (P) Ltd. | Work in progress |
Detail Report
Graph / Photo |
174 | Construction of Two Guard Rooms with attached Toilets and Stainless Steel Railing for Ramps and Staircase, Fixing Acrylic Sheet in Window, I.R.C. Fabric Jali for Window, Fixing Wall Tiles in Class Room and Miscellaneous Work | 07/02/2022 | 06/08/2022 | 56.11 | 34.27 (May'22) | 0.00 (May'22) | Laxman |
Detail Report
Graph / Photo |
|
175 | Renovation of Sports Complex Building and Improvement of Basket Ball Court and Hand Ball Court | 08/04/2022 | 07/07/2022 | 55.83 | Chittoria Constructio Co. |
Detail Report
Graph / Photo |
|||
176 | Construction of 06 Nos additional class rooms in Govt Girls Sr Sec School at Panama Building Jama Masjid, Delhi School ID2127023 | 25/12/2021 | 22/06/2022 | 55.43 | 0.65 (May'22) | 0.00 (May'22) | Intkhab Alam |
Detail Report
Graph / Photo |
|
177 | Comprehensive maintenance and operation of HVAC system | 17/05/2018 | 16/05/2020 | 55.43 | 19.35 (Feb'19) | 60.00 % (Feb'19) | COMFORT SYSTEM | Work in progress 8th RA 6146479 |
Detail Report
Graph / Photo |
178 | Mechanized Cleaning of over head tank and underground tank. | 30/05/2019 | 29/05/2020 | 55.29 | 11.64 (Sep'20) | 0.00 (Sep'20) | UNITECH WATER SLOUTIONS | work in progress |
Detail Report
Graph / Photo |
179 | Replacement of all broken existing section windows in aluminium window with M.S. Grill, Providing and fixing FRP chajja, reconstruction of parapet wall and other miscellaneous work | 04/03/2022 | 02/05/2022 | 55.05 | 27.66 (Jul'22) | 0.00 (Jul'22) | TKN Developers |
Detail Report
Graph / Photo |
|
180 | Change of tenancy of Type-V and Type-VI flats | 15/07/2021 | 14/07/2022 | 54.73 | RAM AVTAR SHARMA |
Detail Report
Graph / Photo |
|||
181 | RMO of UPS and Boiler at GIPMER, NDShComprehensive maintenance of Labotek make UPS | 26/08/2019 | 25/08/2020 | 54.61 | power house | work in progress by Power House |
Detail Report
Graph / Photo |
||
182 | A/R and M/O in D-II Flats, Vasant Kunj, New Delhi during 2018-19 (SH Change of Wall and Floor tiles, Kitchen, W/C, Bath fittings and Cup board etc.) | 03/03/2019 | 02/09/2019 | 54.45 | 14.28 (Mar'21) | 0.00 (Mar'21) | KR construction interiors | work in progress |
Detail Report
Graph / Photo |
183 | RMO Electrical & Mechanical services installed at various buildings (East) under PWD EMD M-253, New Delhi. | 14/01/2019 | 13/01/2020 | 54.38 | 42.74 (Apr'21) | 0.00 (Apr'21) | Capital outsourcing management services pvt ltd |
Detail Report
Graph / Photo |
|
184 | Operation and Comprehensive Maintenance of 3 x 350 TR. Capacity Carrier Make water cooled Centrifugal Chilling Units with ancillaries of New O.P.D. Block at Lok Nayak Hospital, New Delhi | 14/08/2020 | 13/08/2022 | 54.27 | 22.61 (Jul'22) | 0.00 (Jul'22) | Royel Electricals | work in progress by M/s Royel Electrical |
Detail Report
Graph / Photo |
185 | Special repair and misc. work of Quarters of Police Colony, Ambedkar Nagar, New Delhi during 2018-19. | 05/09/2018 | 04/01/2019 | 53.79 | 63.35 (Jul'20) | 0.00 (Jul'20) | Sanjeev Kumar Goel | work in progress |
Detail Report
Graph / Photo |
186 | Providing services of Skilled, semi-skilled, un-skilled labour etc | 14/05/2022 | 13/05/2023 | 53.77 | R.K. Jain& Sons Hospitality Servies (P) Ltd. |
Detail Report
Graph / Photo |
|||
187 | Renovation of Office Building of Sports Complex, Changing Room, Water Proofing Treatment and Providing and Installation of Office use Furniture and Other Misc. Civil Works | 02/04/2022 | 01/07/2022 | 53.22 | Irshad Ahmed |
Detail Report
Graph / Photo |
|||
188 | Repair/Renovation work in office of Veterinary Hospital Tis Hazari in District Central.(Civil Work) | 17/04/2022 | 15/07/2022 | 53.01 | D.S. Construction Co |
Detail Report
Graph / Photo |
|||
189 | Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc | 13/05/2022 | 12/05/2023 | 52.95 | 6.71 (Aug'22) | 0.00 (Aug'22) | L.B. BONOFIED PRIVATE LIMITED |
Detail Report
Graph / Photo |
|
190 | Casting of RCC Slab and Repair of Rain Water Harvesting Pit, Laying of CC Payment on Damaged Road and Replacement of Damaged Sewer Line and Other Misc. Civil Works | 02/05/2022 | 01/08/2022 | 52.93 | Raju Kumar Singh |
Detail Report
Graph / Photo |
|||
191 | Finishing works at Lift-Lobby area of Block A and C, Water proofing of roof top and repair works at various location in premises,at D-II Flats,Vasant Kunj, New Delhi | 18/03/2022 | 17/07/2022 | 52.84 | Vision Constructions |
Detail Report
Graph / Photo |
|||
192 | Annual Comprehensive Maintenance of 1250 KVA Capacity HT Automatic Voltage Regulator Andrew Yule make | 03/01/2022 | 02/01/2025 | 52.63 | Harsh India Enterprises |
Detail Report
Graph / Photo |
|||
193 | SITC of three (03) numbers 20 passenger cum bed lift at JPCH Shastri Park Delhi | 17/03/2022 | 16/09/2022 | 52.54 | EVAAN ELEVATORS PVT LTD |
Detail Report
Graph / Photo |
|||
194 | Leveling and Water Proofing work in roofs, G.I pipeline connection, Repair of roads with cement conc. and interlocking paver block, Repair of class rooms with kota stone flooring, wall tiles, repair of windows and fixing of glass panes, renovation-- | 26/09/2018 | 25/12/2018 | 52.50 | 49.53 (Mar'21) | 0.00 (Mar'21) | New India Construction Co. | work in progress |
Detail Report
Graph / Photo |
195 | Providing and installation of CCTV Surveillance System (Balance Work) in Lawyers Chambers Block at District Court Karkardooma Shahdara, Delhi | 28/04/2018 | 27/07/2018 | 52.07 | 2.63 (Aug'22) | 0.00 (Aug'22) | Sonal Enterprises |
Detail Report
Graph / Photo |
|
196 | RMO UPS system installed at 2nd floor, 4th floor & 6th floor, Casualty Block, Gynae Block, Ward 14, Genetic Lab, OT Block and New OPD Block at L.N. Hospital, New Delhi | 03/04/2022 | 02/04/2024 | 51.85 | Labotek |
Detail Report
Graph / Photo |
|||
197 | Replacement of Addressable Type Fire Alarm System in place of Conventional type Fire Alarm System at Vikas Bhawan-II, Delhi-110054 | 26/05/2022 | 25/07/2022 | 51.83 | 37.69 (Aug'22) | 0.00 (Aug'22) | M/s Royale Meridian India Pvt Ltd |
Detail Report
Graph / Photo |
|
198 | SITC of Fire fighting system in Gynae ward Block at Lok Nayak Hospital, New Delhi | 19/05/2022 | 18/07/2022 | 51.58 | Swastik Electrotech Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
199 | Exterior work for repair of roof and replacement of exterior grit wash by plaster of Residential Complex and Girl's Hostel in the campus of DPSRU Complex, Pushp Vihar, Sector-III, M.B. Road, New Delhi | 02/08/2022 | 01/12/2022 | 51.57 | Subhash Enterprises |
Detail Report
Graph / Photo |
|||
200 | Provision of Washed Stone Grit Plaster and Roof Water Proofing of A–Block, Provision of SS Main Gates and Shed at both Main Gates. Renovation of Classrooms (with Provision of Almirah), Labs, Library, Repairing of Toilet Blocks, Staircase and Corridor Plaster, Construction of Store Room, Replacement of Window and Damaged Water Tanks and Other Misc. Works | 18/06/2022 | 17/12/2022 | 51.57 | UR Construction |
Detail Report
Graph / Photo |
|||
201 | Construction of 100 Bedded Portable Hospital reserved for Covid 19 at A and U Tibbia College and Hospital, Karol Bagh, New Delhi (Electrical Works) | 28/12/2021 | 20/02/2022 | 51.44 | 52.14 (May'22) | 0.00 (May'22) | Jain Electric Works |
Detail Report
Graph / Photo |
|
202 | Day to Day Maintenance of Electrical Installation and Running Maintenance and Operation of Electrical Sub-Station, DG Set, Fire Fighting/Fire Alarm system, Water Supply pump sets and passenger Lift | 11/12/2021 | 10/10/2022 | 51.12 | 59.99 (Jul'22) | 0.00 (Jul'22) | Rama Electrical Co |
Detail Report
Graph / Photo |
|
203 | Supplying and Replacement of conventional light fittings with LED fittings in Delhi Secretariat for Energy conservation. | 17/03/2018 | 16/07/2018 | 50.80 | 9.42 (Nov'19) | 0.00 (Nov'19) | Electric India Control Devices |
Detail Report
Graph / Photo |
|
204 | Replacement of old existing 3 Nos. 60 TR Central AC Plant at GNEC, New Delhi | 01/01/2022 | 28/02/2022 | 50.77 | SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. |
Detail Report
Graph / Photo |
|||
205 | Providing Electrical appliances in renovated 77 Nos. of staff rooms under NWED | 14/06/2022 | 13/07/2022 | 50.37 | 25.73 (Jul'22) | 0.00 (Jul'22) | M/s R S Electric Co. |
Detail Report
Graph / Photo |
|
206 | Re construction and Raising of boundary wall with grill and concertina coil fencing BldgID 13101080 Sch Id 1309267 EORID 20191734 | 31/05/2022 | 31/08/2022 | 50.37 | Saeed Builders | Work in Progress |
Detail Report
Graph / Photo |
||
207 | Routine Maintenance of EI , Fans, compound light and Routine maintenance and operation of Electrical Sub Station, DG Set , Pump Set, Fire Alarm,Fire fighting, PA system | 17/06/2017 | 16/06/2018 | 49.72 | Krishna Electrical Works |
Detail Report
Graph / Photo |
|||
208 | Supplying and fixing of LED Lights in Saket Bar Association office and Toilets Rooms in Lawyers Chamber Block, Saket Court Complex ND- 17. (4) Supplying and Rep. of old lights in Basement 1 and 2 in Lawyers Chamber Block, at District Court Saket. | 16/09/2018 | 14/11/2018 | 49.71 | 54.34 (Feb'21) | 0.00 (Feb'21) | ACE Engineers Bureau |
Detail Report
Graph / Photo |
|
209 | 1. RMO of Carrier make central AC plant at D Block, GIPMER, New Delhi. SH Operation of Low side 3x390 TR capacity carrier make central AC plant EDP Block 2. RMO of Central AC Plant at C Block, GIPMER, New Delhi. SH.Operation of Low side 2x120 TR capa | 21/12/2017 | 20/12/2019 | 49.44 | G.D. Enterprises | Work in progress by M/s. G.D Enterprises. |
Detail Report
Graph / Photo |
||
210 | Desilting of Sewer System, Repair and Renovation Work at Old Garage and Annual Maintenance Works | 04/02/2022 | 03/02/2023 | 49.33 | Hak Construction Co |
Detail Report
Graph / Photo |
|||
211 | Comprehensive maintenance, Supply of materials and providing services of manpower for day to day maintenance work of various buildings under SD M-2314 (I.T.I staff quarters Vivek Vihar, I.T.I old building Vivek Vihar, I.T.I Shahdara Vivek Vihar, Fire Station Tahirpur and Fire Station GT Shahdara) Delhi during 2021-22.(1st Recall) | 09/02/2022 | 08/02/2023 | 49.33 | Yatish Kumar Sharma |
Detail Report
Graph / Photo |
|||
212 | Operation and Maintenance of EI, streets light, DG set , Substation , Lift , Fire Fighting , Fire Alarm System and Solar Water Heating System installed at Prison Complex Mandoli.. | 22/10/2021 | 21/10/2022 | 48.76 | Vee Aar Traders | Work is in Progress |
Detail Report
Graph / Photo |
||
213 | Wiring of renovated office rooms i/c providing fan, fittings, street lights alongwith boundary wall, LED fittings on high masts & fabrication of main panels for high mast poles at Bharat Nagar Sports Complex, Ashok Vihar, Delhi | 22/02/2022 | 21/06/2022 | 48.69 | 15.00 (Aug'22) | 0.00 (Aug'22) | M/s R S Electric Co. |
Detail Report
Graph / Photo |
|
214 | Provision for Split AC and Window type AC for various locations at GTB Hospital, Complex, Shahdara, Delhi | 06/04/2019 | 05/06/2019 | 48.14 | RCC Enterprises | Work completed |
Detail Report
Graph / Photo |
||
215 | AR and MO Delhi High Court New Delhi during 2022 23 SH Renovation and modification of work stations overhead cabinets tables partition work and false ceiling at various places in Delhi High Court New Delhi | 02/06/2022 | 01/06/2023 | 48.10 | Shabbi Abbas | Work in progress |
Detail Report
Graph / Photo |
||
216 | Running and Operation of E and M Services and Comprehensive maintenance of DG Set at various locations | 20/09/2021 | 19/09/2022 | 48.09 | DHARAM ENTERPRISES |
Detail Report
Graph / Photo |
|||
217 | Providing Laying of Lumber processor system 1st Recall | 12/02/2022 | 13/03/2022 | 47.96 | 51.18 (Jul'22) | 0.00 (Jul'22) | Laxman | In Progress. |
Detail Report
Graph / Photo |
218 | AR and MO to Delhi High Court New Delhi dg 2022 23 SH Providing services of plumbing carpentry jobs etc | 31/07/2022 | 30/06/2023 | 47.61 | TRENDY SECURITY SERVICES | Tender yet to be awarded |
Detail Report
Graph / Photo |
||
219 | AR and MO Various works under Delhi High Court Civil Division PWD New Delhi dg 2021 22 SH Providing Data Entry Computer Operators Messengers Clerical Staff Security Guard etc for Delhi High Court Division PWD Govt of Delhi | 18/12/2021 | 17/12/2022 | 47.46 | 13.60 (May'22) | 0.00 (May'22) | PREM CONSTRUCTION | Work in progress |
Detail Report
Graph / Photo |
220 | Day to day Maintenance & Operation of E.I & Fan, , Fire Fighting, Fire Alarm System, water supply system, Lifts, DG sets and Sub Station etc. | 17/03/2018 | 16/03/2019 | 47.40 | R K Enterprises |
Detail Report
Graph / Photo |
|||
221 | Maintenance of EI and Fans and RMO drinking water supply pump sets of Fire stations situated at sector 5 and 15, Rohin | 26/10/2021 | 25/10/2022 | 47.36 | Adhiraj Constructions |
Detail Report
Graph / Photo |
|||
222 | Replacement of Defective/ Burnt-out fittings with new LED fittings Power/light plug etc. in Lawyers Chambers Blocks at District Court Karkardooma, Delhi. | 19/01/2019 | 18/04/2019 | 46.93 | 21.98 (Jan'20) | 0.00 (Jan'20) | S K Engineers |
Detail Report
Graph / Photo |
|
223 | Regarding Barrier Free Access Features, RCC Ramp with Stainless Steel Railing Tactile, Toilet for Disability Challenged and Grit Wash Plaster at Govt. Co–Ed Sr. Sec. School A–6, Paschim Vihar, Delhi–110063 (ID: 1617032). (Composite Work Civil & Electrical) | 01/06/2022 | 30/09/2022 | 46.90 | Laxman |
Detail Report
Graph / Photo |
|||
224 | A/R and M/O to Saket Court Complex (Non Residential ) under Sub-Division-I, BMSD-1, PWD During 2019-20. Saket, New Delhi. (SH Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc.) | 20/05/2019 | 29/05/2019 | 46.86 | 24.75 (Mar'21) | 0.00 (Mar'21) | M/s Trendy Security Services | work in progress |
Detail Report
Graph / Photo |
225 | Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System | 28/09/2020 | 27/09/2023 | 46.00 | DB Solx | Work in progress by M/s D.B. Solx |
Detail Report
Graph / Photo |
||
226 | Renovation of fetal medicine OT and upgradation of the department of Obsetetric HOD in Sher Singh Maternity Block at Lok Nayak Hospital New Delhi (Revised) | 06/05/2022 | 03/08/2022 | 45.59 | 6.06 (Jun'22) | 0.00 (Jun'22) | Aar Kay Builders | work completed |
Detail Report
Graph / Photo |
227 | (A) Construction of new septic tank (B) Providing and laying horticulture pipe line and sewer line for toilets in CH-I & II. | 31/05/2022 | 30/08/2022 | 45.54 | IZHAR AHMED | Work in Progress |
Detail Report
Graph / Photo |
||
228 | 1.MOEI,fans at GynB,Sk,2. M.O.E.Ifansat Spe.WB,T.B. cent3. M.OE.I,F at Casu B,OPD4. MOEI.,fan at Sur B,NOT,MS off5. RMOF F. Sys inst vari buil 6. RMO Fire AlaSys instat var.bui7 RMO Sub StatNo.1234 ,8. RMO Pumset at SHMaint,Operof EM ser. | 18/07/2019 | 17/09/2019 | 45.38 | 45.38 (Oct'19) | 0.00 (Oct'19) | M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 | work in progress by M/s Vivek Associates and 3rd RA paids |
Detail Report
Graph / Photo |
229 | Comprehensive Maintenance of C Mos Make Servo Stabilizers installed in lifts and other location | 09/01/2020 | 08/01/2023 | 45.10 | 6.26 (Apr'22) | 0.00 (Apr'22) | S.S. Sales and Services | work in progress by agency |
Detail Report
Graph / Photo |
230 | Repair and renovation work at bunglow no. 36 Ashoka Road and E-71 officers residence Minto Road, New Delhi | 19/12/2021 | 18/03/2022 | 44.96 | 38.83 (Mar'22) | 0.00 (Mar'22) | BRIJ GOPAL MANN |
Detail Report
Graph / Photo |
|
231 | Regarding Provision of Grit Wash on Exterior of Old SPS Structure with Granite upto Door Level, Mosaic Tiles in Exterior Block, Removal of Old Toilet Block, Repair of Old Stage, Provision of Shed and Ramp on Stage and Other Misc. Work at SKV Sector–1, Avantika, Rohini, Delhi–110085 | 06/12/2021 | 05/08/2022 | 44.87 | 13.08 (Jun'22) | 0.00 (Jun'22) | SABUR ALAM |
Detail Report
Graph / Photo |
|
232 | Comprehensive Maintenance of DBSOLX developed Complaint Tracker System at GNEC | 03/11/2019 | 02/11/2020 | 44.66 | 8.15 (Jul'22) | 0.00 (Jul'22) | DBSOLX | work in progress by DB SOLX |
Detail Report
Graph / Photo |
233 | Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System at GIPMER, New Delhi | 28/04/2020 | 27/04/2023 | 44.66 | 14.88 (Apr'22) | 0.00 (Apr'22) | DBSOLX | work in progress by M/s D.B. Solx |
Detail Report
Graph / Photo |
234 | Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System at Meerdard Lane, New Delhi | 09/04/2020 | 08/04/2023 | 44.65 | 7.11 (Jul'22) | 0.00 (Jul'22) | SCS Technologies | work in progress by SCS Technologies |
Detail Report
Graph / Photo |
235 | RMO Elect. and Mech. Services in Lawyers chambers Block D E F G and H at District Courts Karkardooma Delhi. SH-Operation of lifts in Lawyers chamber Blocks. | 01/10/2018 | 11/09/2019 | 44.60 | 37.15 (Mar'21) | 0.00 (Mar'21) | Guruji Elevator |
Detail Report
Graph / Photo |
|
236 | Day to day Running Maintenance & Operation of Electrical and Mechanical services of MAIDS Phase- II Building, New Delhi | 01/07/2022 | 30/06/2023 | 44.55 | GLOBAL ENTERPRISES |
Detail Report
Graph / Photo |
|||
237 | SH Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units) | 03/08/2018 | 02/08/2019 | 44.40 | 16.47 (Dec'19) | 0.00 (Dec'19) | LG Electronics |
Detail Report
Graph / Photo |
|
238 | Comprehensive Maintenance of RO Filtration Units | 30/10/2021 | 29/04/2022 | 44.32 | 32.26 (Aug'22) | 0.00 (Aug'22) | M/s Vivek Associates |
Detail Report
Graph / Photo |
|
239 | RMO UPS system installed at 2nd floor, 4th floor and 6th floor Casualty Block, Gynae Block, Ward 14, Genetic Lab, OT Block and New OPD Block at L.NHSHComprehensive annual maintenance of Magna Flux Make UPS system installed at New OPD BlockL.N.H | 31/08/2019 | 30/08/2022 | 44.30 | power house | Work in progress by M/s Power House. |
Detail Report
Graph / Photo |
||
240 | ComprMaint opera of DBSOLX devel Comp Tracker Sys at MAMC | 01/01/2020 | 31/12/2022 | 44.22 | SCS Technologies | work in progress by SCS Technologies |
Detail Report
Graph / Photo |
||
241 | Providing services of office staff like Computer Operator, Messenger, Peon, Sweeper etc. at Division office & Sub-Division-II at PTS Malviya Nagar,New Delhi | 12/02/2022 | 11/02/2023 | 43.99 | 14.27 (Aug'22) | 0.00 (Aug'22) | TRENDY SECURITY SERVICES |
Detail Report
Graph / Photo |
|
242 | Supplying, Installation, Testing and Commissioning of Centralized cooling and heating type AirConditioning System in ward 26 New Medical Block, CCU & RCU at L. N. Hospital, New Delhi. | 15/05/2022 | 14/07/2022 | 43.91 | Sai Aircon Engineers |
Detail Report
Graph / Photo |
|||
243 | Providing and fixing Solar Hybrid street light system in existing light | 21/05/2022 | 20/06/2022 | 43.85 | 23.24 (Jul'22) | 0.00 (Jul'22) | SAFTY Engineers, PAN: AARPW4473E, Address: 1836/3F, Shp No. 8, Bhagirath Place, New Delhi-72 |
Detail Report
Graph / Photo |
|
244 | Comprehensive maintenance, Supply of materials and providing services of manpower for day to day maintenance work of various buildings under SD M-2314 (I.T.I staff quarters VivekVihar, I.T.I old building VivekVihar, I.T.I ShahdaraVivekVihar, Fire Station Tahirpur and Fire Station GT Shahdara) Delhi during 2021-22 | 10/01/2022 | 09/01/2023 | 43.77 | JABIR HUSSAIN |
Detail Report
Graph / Photo |
|||
245 | Comprehensive Maintenance of Microprocessor based nurse call bell system | 11/11/2021 | 10/11/2023 | 43.61 | 18.60 (Apr'22) | 0.00 (Apr'22) | AKOUSTIK COMMUNICATIONS |
Detail Report
Graph / Photo |
|
246 | Construction of Oxygen Generator plant Hall at GIPMER, New Delhi. (Electrical works) | 06/12/2021 | 19/01/2022 | 43.31 | 0.11 (Jul'22) | 0.00 (Jul'22) | Jain Electric Works |
Detail Report
Graph / Photo |
|
247 | Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units | 31/07/2021 | 30/07/2022 | 43.28 | 27.05 (Mar'22) | 0.00 (Mar'22) | LG ELECTRONICS INDIA PVT LTD. |
Detail Report
Graph / Photo |
|
248 | Civil Work and Electrical Work (Composite Work). | 05/09/2020 | 04/12/2020 | 43.21 | 6.04 (Nov'20) | 0.00 (Nov'20) | SIDDHANSH ENGINEERING WORK | Work in progress (Under Clause-5 of the Agreement, the date of completion for the work is provisionally extended upto 31.03.2021) |
Detail Report
Graph / Photo |
249 | Making School building barrier free and accessible to children with special needs at GSBV (VPT KR), Nangal Thakran, Delhi-39 (School ID-1310007), Govt. Boys Sr. Sec. School, Katewara, Delhi ID 1310010, Govt. Co-Ed SSS C-Block, Metro Vihar, Holambi Kalan, Delhi-110082 (Sch ID-1310407), SKV Bawana (Ravi Shankar) (ID 1310042) & Harewali G(Co-ed) SSS (Sch ID 1310026) | 10/06/2022 | 09/09/2022 | 43.11 | JABIR HUSSAIN | Work in progress |
Detail Report
Graph / Photo |
||
250 | Regarding providing and fixing wall tiles, almirah, interlocking tiles and renovation of labs and MP hall at SKV A-Block, Plot No.5, Jahangir puri, Delhi - 110033 (Sch Id. 1309279) (Bldg. Id. 13091875) (EOR Id. 20211168) | 18/04/2022 | 15/08/2022 | 42.66 | Rang Lal Singh | Work in Progress |
Detail Report
Graph / Photo |
||
251 | Repair of toilet block, Corridor, Varandah, Laundary area and other misc. works at Ashadeep, Narela, Delhi 110040 | 30/06/2022 | 27/10/2022 | 42.47 | MAHIDEEP SHARMA | Work in progress |
Detail Report
Graph / Photo |
||
252 | Supply and replacement of 2 x 80 KVA Seamless power supply system critical load of NIC Servers at Delhi Sachivalya New Delhi. | 07/01/2019 | 06/02/2019 | 42.39 | 2.91 (Apr'21) | 0.00 (Apr'21) | Issar Industries |
Detail Report
Graph / Photo |
|
253 | Comprehensive maintenance of HVAC 752HP Daikin Make VRVAHU system installed at MAIDS Phase II NewDelhi | 08/06/2022 | 07/06/2023 | 42.25 | TF AIR SYSTEMS PRIVATE LIMITED |
Detail Report
Graph / Photo |
|||
254 | Upgradation of 100 beds in existing ward to oxygen beds with installation of central pipe line for oxygen supply including construction of 10 nos new toilets for prepaidness of expected third wave of covid-19 | 18/12/2021 | 16/04/2022 | 42.25 | 10.56 (Jun'22) | 0.00 (Jun'22) | Ali Hasan Construction | work completed |
Detail Report
Graph / Photo |
255 | A/R & M/O to Rouse Avenue Court Complex at DDU Marg, New Delhi During- 2021-22 & 2022-23. (SH : Providing Materials and Manpower for day to day maintenance including misc. repair and maintenance works in the Court Complex.) | 30/12/2021 | 13/04/2023 | 42.19 | R L WADHWA | Work is in progress |
Detail Report
Graph / Photo |
||
256 | Reg. EOR to PTS colony Malviya Nagar, New Delhi. (SH- Development of parks). | 25/03/2019 | 24/07/2019 | 42.09 | 20.45 (Jul'20) | 0.00 (Jul'20) | Naresh Kumar | work in progress |
Detail Report
Graph / Photo |
257 | Construction of boundary wall and Installation of signage board for Geetanjali Fire Station, New Delhi. | 30/01/2019 | 29/05/2019 | 41.85 | 17.00 (Sep'20) | 0.00 (Sep'20) | Vijay Bhardwaj | work in progress |
Detail Report
Graph / Photo |
258 | Mechanized Cleaning of over head tank and underground tank | 17/08/2021 | 16/08/2022 | 41.80 | 6.71 (May'22) | 0.00 (May'22) | UNITECH WATER SLOUTIONS |
Detail Report
Graph / Photo |
|
259 | Providing wiring/rewiring and miscellaneous electrical equipments in Type-I GBPH staff qtrs, New Delhi | 18/09/2019 | 17/12/2019 | 41.74 | 11.43 (Oct'19) | 0.00 (Oct'19) | RCC Enterprises | work in progress by RCC Enterprises. |
Detail Report
Graph / Photo |
260 | Renovation of Rooms at Ground Floor, 1st Floor and 2nd Floor at DTTE (HQ) | 18/04/2022 | 17/06/2022 | 41.07 | Sohan Lal Chhitoria and Sons |
Detail Report
Graph / Photo |
|||
261 | Operation and Annual Comprehensive Maintenance of PA / Conference system at Committee Rooms, MLA Lounges and DIP & Ludlow castle wrestling venue | 23/07/2022 | 22/07/2024 | 41.06 | Ambica Electricals |
Detail Report
Graph / Photo |
|||
262 | Replacement of out lived fire alarm system at Tis Hazari Courts Building, Delhi. | 30/09/2017 | 29/12/2017 | 40.96 | 34.00 (Oct'21) | 0.00 (Oct'21) | Royale Meridian (India ) Pvt. Ltd. |
Detail Report
Graph / Photo |
|
263 | Renovation of Ist floor and 2nd floor of MRD Block at Lok Nayak Hospital New Delhi due to Covid 19 | 24/07/2021 | 21/09/2021 | 40.67 | 23.74 (Jun'22) | 0.00 (Jun'22) | M. T. Builders | work completed |
Detail Report
Graph / Photo |
264 | Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc. | 21/06/2019 | 20/06/2020 | 40.44 | 23.47 (Mar'21) | 0.00 (Mar'21) | RAKSHAK SECURITAS PVT. LTD. | work in progress |
Detail Report
Graph / Photo |
265 | A/R & M/O Delhi Govt. Officers Flats at G.K.-1, New Delhi during 2021-22(SH:-Repair and Renovation of Various flats and misc. civil works.) | 14/08/2021 | 13/02/2022 | 40.37 | SHRI DATTA KRUPA ENTER PRISES |
Detail Report
Graph / Photo |
|||
266 | A/R and M/O to Various Buildings under NWB-3, Delhi during 2021-22 SH: Day to Day Maintenance of various Services at DA Flats Sector-XI, GND and SSCBS, Rohini Delhi | 10/10/2021 | 09/10/2022 | 40.31 | 20.52 (Jun'22) | 0.00 (Jun'22) | RAJIV RANJAN |
Detail Report
Graph / Photo |
|
267 | Enhancing accessibility of built up environment of ITI Nand Nagri, Delhi-110093 -2nd call | 23/09/2019 | 22/12/2019 | 40.22 | 43.67 (Sep'21) | 0.00 (Sep'21) | Jabir Hussain | work in progress |
Detail Report
Graph / Photo |
268 | Renovation of Toilet and Primary Wing with Repairing of all Leakage, Upgrade System and Other Misc. Work | 27/02/2022 | 26/05/2022 | 40.20 | Anshika Construction Co. |
Detail Report
Graph / Photo |
|||
269 | Rewiring of EI and fans and Replacement of old defective fittings, cable fans & air conditioning as when as required | 28/05/2022 | 27/11/2022 | 40.11 | Shri Bankey Bihari Electricals |
Detail Report
Graph / Photo |
|||
270 | Up gradation Renovation of 25 Qtrs. Block No. 1109 to 1516, 1577 to 1642 and 1643 to 2143 under SD, M-3222 at Gulabi Bagh, Delhi | 17/12/2021 | 15/08/2022 | 39.98 | Royal Construction Co. | Work in progress |
Detail Report
Graph / Photo |
||
271 | (1) RMO of Specialized Electrical & Mechanical works at A&U Tibbia College and Hospitals, Karol Bagh, New Delhi (2) RMO of specialized Electrical & Mechanical works at DR. NC Joshi Memorial Hospital, Karol Bagh, New Delhi | 28/01/2022 | 27/01/2024 | 39.86 | 12.19 (Jul'22) | 0.00 (Jul'22) | Sonal Enterpries Pvt. Ltd. |
Detail Report
Graph / Photo |
|
272 | Regarding Provision of Coba for Old Building, Guard Room with Wash Room, Overhead Tank, Counter Slab with Water Line in Chemistry, Physics and Biology Labs, Waiting Room with Covered Shed and all side Open for Parents, Shed on Assembly Stage, Replacement of Old Windows and Ventilators, P/F Grill for Protection of Green Plant of the School and Reconstruction of Broken Boundary Wall | 18/06/2022 | 17/09/2022 | 39.53 | LT INFRABUILD |
Detail Report
Graph / Photo |
|||
273 | EOR to CPMF Site PTS Wazirabad to facilitate camping personnel Delhi | 25/09/2018 | 24/11/2018 | 39.50 | 14.01 (Feb'20) | 0.00 (Feb'20) | S K Engineers | Work in progress |
Detail Report
Graph / Photo |
274 | Comprehensive Maintenance of Extreme Entrays Make LAN System at various buildings at L.N. Hospital | 28/02/2022 | 27/02/2025 | 39.40 | TRACOM ENTERPRISES |
Detail Report
Graph / Photo |
|||
275 | Operation and Routine Maintenance of E & M services | 11/03/2022 | 10/09/2022 | 39.37 | M/s R S Electricals |
Detail Report
Graph / Photo |
|||
276 | Repairing / Replacement of EI and Fans 17/3, 17/9, 33/24, 33/25, 33/11, 16/11 Rajpur Road and D-II/2 Court lane, 33-A/4 Sham Nath Marg and 5 Bela Road | 07/05/2022 | 06/08/2022 | 39.22 | 23.46 (Aug'22) | 0.00 (Aug'22) | Om Sai Electrical Co. |
Detail Report
Graph / Photo |
|
277 | Comprehensive maintenance and operation of 4 x 400 TR Central HVAC Plant. | 20/05/2019 | 19/05/2020 | 39.01 | Unique Engineers Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
278 | Routine, operation and maintenance of Stacker and Puzzle car Parking system | 20/06/2022 | 19/06/2023 | 38.75 | Ram Ratna Infrastructure Pvt. |
Detail Report
Graph / Photo |
|||
279 | Structural Strengthening Works | 11/08/2021 | 08/11/2021 | 38.75 | 41.82 (Jun'22) | 0.00 (Jun'22) | Cembond Construction Pvt. Ltd | In Progress. |
Detail Report
Graph / Photo |
280 | Rewiring / Repairing of existing point/ power point/ fixtures and providing additional power points and wiring etc in various Resdl. Flats/ Bunglow, as when as required | 28/07/2022 | 27/01/2023 | 38.73 | Rama Electrical Co |
Detail Report
Graph / Photo |
|||
281 | Misc. Repair work (Balance Work) | 28/04/2022 | 27/07/2022 | 38.69 | 20.00 (Jul'22) | 0.00 (Jul'22) | Jabir Husain | Work in Progress |
Detail Report
Graph / Photo |
282 | Comprehensive maintenance of microprocessor based nurse call bell system | 28/10/2019 | 27/10/2021 | 38.45 | AKOUSTIK COMMUNICATIONS | work in progress by Akoustik Communication |
Detail Report
Graph / Photo |
||
283 | Repair and Renovation of Workshop and Making Modification in room no. 9 of Women Wing | 30/08/2019 | 29/12/2019 | 38.26 | 15.93 (Oct'21) | 0.00 (Oct'21) | Saeeduddin | work in progress |
Detail Report
Graph / Photo |
284 | RMO E and M Services in KKD Court Court Block ACI B JKL at District Court KKD Delhi. SH- Operation of lifts in Court Blocks | 25/09/2018 | 24/09/2019 | 37.84 | 33.43 (Nov'19) | 0.00 (Nov'19) | Royal Electrical Co. |
Detail Report
Graph / Photo |
|
285 | Replacement of Interlocking Paver block of internal path of Judges Residential Complex at Saket, New Delhi | 08/02/2022 | 07/04/2022 | 37.78 | 27.61 (Aug'22) | 0.00 (Aug'22) | Naveen Kumar Gupta |
Detail Report
Graph / Photo |
|
286 | Renovation of Principal office, providing SS railings in corridor, providing new main gate and other misc. works in GBSSS No.2 JJ Colony Bawana Delhi (School ID 1310460) | 22/05/2022 | 21/07/2022 | 37.75 | M/s Ravi Construction Co. | Work in Progress |
Detail Report
Graph / Photo |
||
287 | Repairing and Rehabilitation of RCC Chajja in Kaveri Hostel and ECE Block at IGDTUW Campus, Kashmere Gate Delhi). Delhi During 2021-22 | 19/12/2021 | 18/02/2022 | 37.57 | 24.54 (May'22) | 0.00 (May'22) | MOHD AFTAB |
Detail Report
Graph / Photo |
|
288 | RMO Pump Set & Fountain, SCADA at College building, various hostel and Type VI, Type V, Type I, Residential Quarters at MAMC, New Delhi. (SH:- Operation and comprehensive RDS make automation of water supply and SCADA system installed at various location) | 07/03/2020 | 06/03/2022 | 37.57 | RECKTRONIC DEVICES AND SYSTEMS | work in progress by agency |
Detail Report
Graph / Photo |
||
289 | Replacement Damaged C.I. Pipe. (MODIFIED) | 15/04/2022 | 14/08/2022 | 37.42 | 15.55 (Jun'22) | 0.00 (Jun'22) | Shivam Kaushik |
Detail Report
Graph / Photo |
|
290 | Renovation of Zonal Office including Providing and Laying New Sewer Line and CC Pavement | 20/05/2022 | 19/08/2022 | 37.38 | Nurul Hak |
Detail Report
Graph / Photo |
|||
291 | Annual comprehensive maintenance of 1.5 TPH capacity fire tube boilers (2 Nos.) operation of boilers and water softening plant | 10/09/2020 | 09/09/2022 | 37.08 | 9.27 (Jun'22) | 0.00 (Jun'22) | Boilermart |
Detail Report
Graph / Photo |
|
292 | Routine maintenance and operation of Lifts | 16/05/2018 | 15/05/2019 | 37.05 | 33.96 (Apr'19) | 94.00 % (Apr'19) | Swastik Electrotech Pvt. Ltd. | Work transferred and in progress |
Detail Report
Graph / Photo |
293 | Providing Replacing and fixing MS gates and construction of Sentry Posts at various location in MAMC Campus and laying of CC paver block at Central Park (Rose Garden) (Re Call) | 05/08/2021 | 02/11/2021 | 37.00 | 10.96 (Jul'22) | 0.00 (Jul'22) | Deep Const. | work completed |
Detail Report
Graph / Photo |
294 | Construction of Cold Storage Room in Forensic Science Laboratory, Rohini, Delhi | 06/04/2022 | 05/06/2022 | 36.96 | 18.24 (Jun'22) | 0.00 (Jun'22) | M/s Cascade |
Detail Report
Graph / Photo |
|
295 | Comprehensive maintenance of LAN and EPBAX System installed at Mandoli Prison Complex | 29/03/2022 | 28/03/2023 | 36.92 | TRACOM ENTERPRISES | Work in progress |
Detail Report
Graph / Photo |
||
296 | RMO of various Electrical & Mechanical services Mandoli Prison Complex Delhi. (SH: Comprehensive maintenance of LAN & EPBAX System installed at Mandoli Prison Complex). | 29/03/2022 | 28/03/2023 | 36.92 | TRACOM ENTERPRISES | Work in progress |
Detail Report
Graph / Photo |
||
297 | EOR to EI and Fans and PA System at Govt. GSSS No.1 Ghonda Delhi-110053 (School ID- 1104025). | 14/01/2019 | 13/03/2019 | 36.91 | 48.49 (Jan'20) | 0.00 (Jan'20) | V K Electrical Works | Work in progress |
Detail Report
Graph / Photo |
298 | Day to day Maintenance of Elect. and Mechanical Services | 16/10/2021 | 15/10/2023 | 36.82 | 12.59 (Jun'22) | 0.00 (Jun'22) | SEHRA ELECTRIC works |
Detail Report
Graph / Photo |
|
299 | A/R & M/O to various building under Division M-222 Delhi dg 2021-22 (SH: Providing Services of Data Entry/ Computer Operator, Messenger cum MTS and Clerk.). | 31/08/2021 | 30/08/2022 | 36.67 | 24.86 (Jul'22) | 0.00 (Jul'22) | TRENDY SECURITY SERVICES |
Detail Report
Graph / Photo |
|
300 | Comprehensive Maintenance and Operation of Lifts installed in Main Court Building, Lawyers Block and residential block at District Court, Saket, New Delhi. (SH- Comprehensive maintenance of Johnson make lift) | 27/01/2019 | 26/01/2020 | 36.66 | 56.90 (Jul'22) | 0.00 (Jul'22) | Johnson Lifts Pvt. Ltd. |
Detail Report
Graph / Photo |
|
301 | Water Proofing Treatment in Planters for Preventing Seepage in Basement Floor, Replacing the Damaged C.I./CPVC Pipes and Other Miscellaneous Works | 04/02/2022 | 03/02/2023 | 36.49 | 25.54 (Jul'22) | 0.00 (Jul'22) | BHUPESH KUMAR |
Detail Report
Graph / Photo |
|
302 | Structural repair and Up gradation of Residential quarters at Police Quarters under Mehrauli police station (Type B-8 nos. and type C-4 nos.), under South Building (M), PTS colony, Malviya Nagar New Delhi. | 27/06/2018 | 26/12/2018 | 36.43 | 33.72 (Jun'19) | 0.00 (Jun'19) | Datta Krupa Enterprises | work in progress |
Detail Report
Graph / Photo |
303 | Renovation of office area of Pay and Accounts Office -IV and Pay and Accounts Office-VI in Treasury Building, Tis Hazari Court Complex, Delhi. (Civil Work) | 16/04/2022 | 14/06/2022 | 36.42 | D.S. Construction Co |
Detail Report
Graph / Photo |
|||
304 | Providing LAN System and All in One Desktop at Acharya Shree Bhikshu Govt. Hospital, Moti Nagar, New Delhi | 30/11/2018 | 29/01/2019 | 36.40 | DYNAMIC SYSTEMS |
Detail Report
Graph / Photo |
|||
305 | Operation and Comprehensive Maintenance of 500 KLD ETP having BMW and OLMS system | 01/05/2020 | 30/04/2022 | 36.30 | Wellkome engineers | Work in progress by M/s Wellkome Engineer |
Detail Report
Graph / Photo |
||
306 | Replacement of Defective/ Burnt-out fittings with new LED fittings ceiling fans fresh air fan power points etc. in Flats Type-II Type-III Type-IV Type-V Type-VI and Duplex in O block residential Complex at District Court Karkardooma Delhi | 05/09/2018 | 04/12/2018 | 36.23 | 35.80 (Oct'19) | 0.00 (Oct'19) | Krishna Electreical Works |
Detail Report
Graph / Photo |
|
307 | Providing and Installation of 500 KVA capacity Silent type DG Set for MSO Building, New Delhi. | 12/09/2017 | 11/01/2018 | 36.23 | Himalaya Generators |
Detail Report
Graph / Photo |
|||
308 | Compr Maint of DBSOLX devel Compl Track Sys at L.N.H | 12/10/2019 | 11/10/2022 | 36.21 | DBSOLX | work in progress by DB SOLX |
Detail Report
Graph / Photo |
||
309 | Replacement of wooden damage Alimrah shutter, frames, sanitary fittings and others Misc. work in Judges flats | 02/09/2021 | 01/06/2022 | 36.21 | 18.36 (May'22) | 0.00 (May'22) | Bhawani Constructions |
Detail Report
Graph / Photo |
|
310 | Renovation work at 7th floor in New surgical block at L.N H SH S I T C of modular type Var. Refr. Flow/Var. Refr. Volume air cooled outdoor units | 26/06/2020 | 25/08/2020 | 36.12 | Royel Electricals | work in progress by M/s Royel Electrical. |
Detail Report
Graph / Photo |
||
311 | Providing and fixing MS window and aluminium cabins in workshop and Polycarbonate sheet and G.I gutter in north face truss workshop other misc. repair work | 06/08/2022 | 05/11/2022 | 36.07 | Samsad |
Detail Report
Graph / Photo |
|||
312 | Maintenance and operation of Panasonic CCTV Cameras System | 11/03/2022 | 10/02/2024 | 36.04 | Media Tele Communication |
Detail Report
Graph / Photo |
|||
313 | (i) SITC of CCTV Cameras in Admin Block and Various offices of Saket Court Complex New Delhi-110017 (ii) SITC of CCTV Surveillance system in the Residential Complex at District Court saket New Delhi-110017. | 24/01/2019 | 23/04/2019 | 35.83 | 65.01 (May'21) | 0.00 (May'21) | San Infotech Services |
Detail Report
Graph / Photo |
|
314 | Strengthening of Beam, Slab and Repair of Tank (Remaining work- Renewing of Damaged Chajja and Windows) | 20/03/2022 | 19/06/2022 | 35.66 | BHUPESH KUMAR |
Detail Report
Graph / Photo |
|||
315 | 1). RMO of Central AC Plant/ Package Unit at DDUH, Hari Nagar, ND for the yr 18-19, 2). RMO of Central AC Plant Screw Type at Trauma Block at DDUH, Hari Nagar, New Delhi for the year 2018-2019 (SH Operation and Maintenance of Central AC Plant) | 17/06/2018 | 16/06/2019 | 35.58 | PMG ENGINEERS |
Detail Report
Graph / Photo |
|||
316 | Providing and Installation Mono Block submerisble pump set | 12/02/2022 | 11/02/2024 | 35.54 | A.K. Machinery Tools | WORK COMPLETED |
Detail Report
Graph / Photo |
||
317 | Cleaning, mopping of common area, like lift lobby, staircase, basement, community centre, footpath area, terrace, servant qtr. etc. by mopping machine at Residential Complex Saket Court, New Delhi | 07/10/2021 | 06/10/2022 | 35.40 | 20.21 (Jul'22) | 0.00 (Jul'22) | R.K. Jain& Sons Hospitality Servies (P) Ltd. |
Detail Report
Graph / Photo |
|
318 | Routine Operation and Maintenance of Wellkome Make 1250 KLD ETP based on EBR Technology | 22/05/2022 | 21/05/2023 | 35.16 | Wellkome engineers |
Detail Report
Graph / Photo |
|||
319 | Rewinding of wornout 2000/1600 KVA HT AVR Transformer of Andrew Yule Make and providing of protection accessories of HT AVR and HT Panel at Sub-Station No. 1, 3, and 4 L.N. Hospital | 07/05/2022 | 06/08/2022 | 35.03 | Harsh India Enterprises |
Detail Report
Graph / Photo |
|||
320 | (A) Repair to damaged floor of classroom & corridor and fixing wall tiles & C-B in all rooms. (B) Providing/renovation/repair of ramps, railing, tactile tiles, signage etc. to make school building and environment barrier free & accessible. (Sch ID-1310031) (Bldg. ID-13101515) (EOR ID-20211054/20211032) | 20/02/2022 | 26/06/2022 | 34.80 | Aayan Construction Co. | Work in progress |
Detail Report
Graph / Photo |
||
321 | Renovation of Bathroom cum toilet blocks of RAC and Sikkim Police Officers | 12/03/2019 | 11/05/2019 | 34.66 | 32.69 (Jul'20) | 0.00 (Jul'20) | Saeed Builders | work completed |
Detail Report
Graph / Photo |
322 | E.O.R. to S.K.V. No. 1 (Hindi Medium) at Jama Masjid, Delhi. Dg. 2018-19 (School ID-2127024). (SH: Renovation of toilet, kota stone flooring in court yard and class rooms under SRD Division-I, Sub-Division-III). | 07/09/2018 | 06/01/2019 | 34.65 | 0.00 (Jan'19) | 43.28 % (Jan'19) | Kamal Construction Co. | wORK COMPLETED FINAL BILL PAID |
Detail Report
Graph / Photo |
323 | Providing Services for Running the Computer, Messengers and Watch and Ward for Sub Division Office-1, 2, 3, 6 | 01/04/2022 | 31/03/2023 | 34.47 | V R INDIA SECURITY SERVICES PVT. LTD. |
Detail Report
Graph / Photo |
|||
324 | Providing Cable Cover to Cover the haphazard wiring system at various places at DDU Hospital, Hari Nagar, New Delhi | 18/04/2019 | 17/05/2019 | 34.37 | M/s Kalsi Engineers |
Detail Report
Graph / Photo |
|||
325 | Renovation of Sick room, counselling room, Reception and Staircase in Ground floor and C/o superintended room, class room and toilet on First floor etc. and Electrical works | 16/12/2018 | 15/04/2019 | 34.29 | 17.78 (Aug'19) | 28.00 % (Aug'19) | Ikram Ali | Work in progress |
Detail Report
Graph / Photo |
326 | Renovation of Old Boys Hostel (Mathura Block) (MAMC) | 05/11/2021 | 04/03/2022 | 34.05 | 3.20 (Jun'22) | 0.00 (Jun'22) | MOHD AFTAB | work completed |
Detail Report
Graph / Photo |
327 | A/R and M/O to Various Buildings under NWB-3, Delhi during 2021-22 SH: Day to Day Maintenance of Rohini Court, Lawyers Chamber | 07/10/2021 | 06/10/2022 | 33.90 | 17.44 (Jun'22) | 0.00 (Jun'22) | S. KUMAR & CO. |
Detail Report
Graph / Photo |
|
328 | Running and maintenance of Air-conditioning System at GTB Hospital Complex, Shahdara, Delhi. Sub Head Operation, maintenance and charging of water softening plants for 4x550 and 4x300 TR capacity AC Plants | 03/08/2019 | 02/08/2021 | 33.88 | M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 | Cancelled |
Detail Report
Graph / Photo |
||
329 | Remodeling of drain on Nightingle apartment under Sub-Division WR-14, Division WR-1 during 2022-23 | 26/05/2022 | 22/09/2022 | 33.61 | Dushyant Enterprises |
Detail Report
Graph / Photo |
|||
330 | Upgradation & Augmentation of existing Cisco Make LAN System | 12/06/2022 | 11/08/2022 | 33.46 | 28.76 (Aug'22) | 0.00 (Aug'22) | Star Enterprises |
Detail Report
Graph / Photo |
|
331 | Operation, routine maintenance of 4x420TR and 1x150TR capacity AC Plant installed at RGSS Hospital, Tahirpur, Delhi | 17/03/2022 | 16/03/2024 | 33.39 | Altone Aircon |
Detail Report
Graph / Photo |
|||
332 | Renovation of electrical installation of 2 nos. Courtrooms no. 315 and 316, 3rd floor at District Court, Rohini, Delhi. | 12/05/2022 | 11/06/2022 | 33.37 | 19.19 (Jul'22) | 0.00 (Jul'22) | R S ELECTRICALS |
Detail Report
Graph / Photo |
|
333 | Construction of 1st floor of Union Office at Lok Nayak Hospital, New Delhi due to Covid 19 | 27/08/2021 | 25/10/2021 | 33.35 | 15.57 (Jun'22) | 0.00 (Jun'22) | Aar Kay Builders | work completed |
Detail Report
Graph / Photo |
334 | Replacement of old out dated 380 KVA DG Set with silent type 500 KVA DG Set at DDUH Hari Nagar New Delhi | 18/01/2019 | 17/04/2019 | 33.31 | Himalaya Generators |
Detail Report
Graph / Photo |
|||
335 | Comprehensive Operation and Maintenance of Complaint Tracker System | 09/10/2021 | 08/10/2023 | 33.19 | DBSOLX |
Detail Report
Graph / Photo |
|||
336 | (SH- Operation of EI and Fans including compound light substation DG set Water supply and Dewatering system Fire Fighting and Sprinkler System Lifts Fire Alarm and PA System.) | 21/01/2019 | 20/01/2020 | 33.07 | 37.67 (Jun'21) | 0.00 (Jun'21) | M/s. A G ENTERPRISES |
Detail Report
Graph / Photo |
|
337 | Operation of EI and fans, lifts, fire fighting & fire alarm system, PA system, water supply pump set & D.G Set | 21/04/2014 | 20/04/2015 | 32.99 | A.G. Enterprises |
Detail Report
Graph / Photo |
|||
338 | Repair and renovation work in Flat No. A-12 Type-VI, Flat No. C-04, Type V and other various flats at D-II Flats, Vasant Kunj, New Delhi | 07/06/2022 | 06/09/2022 | 32.89 | Vision Constructions |
Detail Report
Graph / Photo |
|||
339 | Replacement of Defective/Burnt-out Air-Conditioning Units installed in Hostel Block at UTCS Bldg. Vishwas Nagar, Shahdara Delhi. | 25/02/2019 | 24/04/2019 | 32.84 | 8.33 (Sep'19) | 0.00 (Sep'19) | S K Engineers |
Detail Report
Graph / Photo |
|
340 | Repair/Renovation of main Hall ceiling and misc. work at Thyagraj Stadium, INA, New Delhi | 27/07/2019 | 26/09/2019 | 32.83 | Paras Nath Singh |
Detail Report
Graph / Photo |
|||
341 | Running maintenance and Operation of Medical and Gas Manifold plant installed at RGSS Hospital Tahirpur, Delhi-110093 during the remaining financial year of 2021-22 and complete financial year of 2022-23 | 16/04/2022 | 15/04/2023 | 32.73 | MDD Medical System (INDIA) Pvt. Ltd |
Detail Report
Graph / Photo |
|||
342 | Supplying and Placing of Furniture Items For E Library at Lawyer Chamber G block GF Karkardooma Court Delhi | 17/12/2021 | 14/02/2022 | 32.43 | Royal safe company (KB) | In progress. |
Detail Report
Graph / Photo |
||
343 | Emergent addition/ Alteration Electrical works in Endoscopy and Colonoscopy area at Block-6, RGSS Hospital, Tahirpur, Delhi-110093 | 06/04/2022 | 05/06/2022 | 32.15 | M/s Shri Durga Electricals |
Detail Report
Graph / Photo |
|||
344 | RMO E and M services at New Delhi District Court Complex at Rouse Avenue, DDU Marg, New Delhi. (SH Comprehensive Annual Maintenance of 3x120 KVA UPS system). | 23/06/2019 | 22/06/2022 | 32.00 | 0.00 (Jan'21) | 55.00 % (Jan'21) | POWER HOUSE | Work in Progress |
Detail Report
Graph / Photo |
345 | Replacement of 2 number 15 passenger 1020 kg lifts at S.T.C.9 Metcalf Road Delhi | 01/01/2021 | 31/05/2021 | 31.98 | Thyssenkrupp Elevator (India) Pvt. Ltd. | Work in progress by M/s Thyssenkrupp Elevator (P) Ltd. |
Detail Report
Graph / Photo |
||
346 | Supplying, installation, testing and commissioning of laundry equipments at JPCH Shastri Park Delhi | 08/04/2018 | 07/04/2022 | 31.84 | 31.64 (Jun'22) | 0.00 (Jun'22) | Lucky Engineering Works | Work in Progress 2ND RA 767530 |
Detail Report
Graph / Photo |
347 | 1). Prosn of New Air Conditioners and Rep of Old ACs with Energy Efficient Air Conditioners GGSGH 2) EOR SVBPH (SH Rep of Old ACs with Energy Efficient Air Conditioners at SVBPH) 3) EOR SVBPH (SH SITC of Air Conditioners in IEC Room and DOT Centre) | 17/05/2019 | 16/07/2019 | 31.78 | MATHARU ELECTRIC WORKS |
Detail Report
Graph / Photo |
|||
348 | Day to day maintenance of all E and M installations | 02/08/2021 | 01/08/2023 | 31.77 | A K Electric Works |
Detail Report
Graph / Photo |
|||
349 | RMO E and M services at New Delhi District Court Complex at Rouse Avenue, DDU Marg, New Delhi (SH: Operation of EI and fans and Centralized air conditioning system and Johnson make 16 passenger lifts) | 10/06/2021 | 09/06/2022 | 31.67 | M/s Parasar Electricals & Refrigeration | Work in Progress |
Detail Report
Graph / Photo |
||
350 | SITC of Water Coolers at Various locations at Lok Nayak Hospital, New Delhi | 02/09/2019 | 01/11/2019 | 31.67 | M/s Vivek Associates | work in progress by Vivek Associates |
Detail Report
Graph / Photo |
||
351 | A/R and M/O Residential Building under Sub Division North-West B-6, PWD during 2021-22 SH: (A) Attending Day to Day Labour Complaints And Other Misc Work. at D.A. Flats, Nimri Colony, Ashok Vihar, Delhi. (B) Attending Day to Day Labour Complaints at Aryabhatt Enclave, Sawan Park Colony, Ashok Vihar, Delhi) | 13/09/2021 | 12/09/2022 | 31.57 | 16.76 (Jun'22) | 0.00 (Jun'22) | RAJIV RANJAN |
Detail Report
Graph / Photo |
|
352 | RMO Electrical and Mechanical services at MV Hospital Pooth Khurd Delhi SH Operation Routine Maintenance and preventive maintenance of IBR approved Steam Boiler | 25/06/2019 | 24/05/2020 | 31.31 | Kamal Engineers | Work in progress |
Detail Report
Graph / Photo |
||
353 | SH- Repair and Up-gradation of Electrical Installation of residential quarters and toilet block at police station | 06/08/2018 | 05/10/2018 | 31.30 | 13.02 (Nov'19) | 0.00 (Nov'19) | Prem And KP Electric Co. |
Detail Report
Graph / Photo |
|
354 | SH- Maintenance and Operation of split AC, Pressurization and Ventilation at Delhi Sachivalaya, New Delhi | 05/07/2018 | 04/07/2019 | 31.26 | 6.04 (Sep'19) | 0.00 (Sep'19) | KELVIN ASSOCIATES |
Detail Report
Graph / Photo |
|
355 | Urgent repair work for FRRO Building, Lampur, Delhi-110040 | 21/07/2022 | 19/10/2022 | 31.23 | Ankur Bhardwaj |
Detail Report
Graph / Photo |
|||
356 | Renovation of TCPC (Rehabilitation Complex) Block No.-1, Lajpat Nagar-II, New Delhi during 2019-20. | 25/07/2019 | 24/10/2019 | 30.89 | SABUR ALAM |
Detail Report
Graph / Photo |
|||
357 | RMO CCTV, sub-station, DG sets, UPS system, RO and compressed air system at MAIDS, New Delhi. SH CMC of 3x200KVA UPS at MAIDS | 26/12/2017 | 25/12/2020 | 30.87 | 8.00 (Jan'19) | 25.92 % (Jan'19) | POWER HOUSE | Work in progress by M/s Power House |
Detail Report
Graph / Photo |
358 | Providing Services of Carpenter, Plumber, Enquiry Clerk, Sewerman , Mason and Beldar at PWD Service Centre M-3212, Tis Hazari Court, Delhi | 01/01/2022 | 26/12/2022 | 30.82 | D.S. Construction Co |
Detail Report
Graph / Photo |
|||
359 | Reconstruction of Collapsed Boundary wall PL vitrified floor tiles and PF SS railing on staircase | 30/09/2021 | 28/12/2021 | 30.71 | 28.28 (Mar'22) | 0.00 (Mar'22) | N.M. CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
360 | (SH- Routine maintenance and Operation of EI and Fans, Fountains and Pump Sets, DG Sets, Fire Alarm System and Fire Fighting System ). | 19/03/2019 | 18/03/2020 | 30.69 | 26.51 (Feb'20) | 0.00 (Feb'20) | Kamal Electrical Works |
Detail Report
Graph / Photo |
|
361 | Operation and maintenance of Pelco Make CCTV surveillance system at Rouse Avenue Court Complex, DDU Marg, New Delhi | 31/03/2022 | 30/03/2023 | 30.55 | Sonal Enterpries Pvt. Ltd. | Work in Progress |
Detail Report
Graph / Photo |
||
362 | Mechanized Cleaning of over head tank and underground tank. | 20/06/2019 | 19/06/2020 | 30.29 | 18.31 (Aug'20) | 0.00 (Aug'20) | UNITECH WATER SLOUTIONS | work in progress |
Detail Report
Graph / Photo |
363 | Pdg.fixing solar hybrid street light system for existing 90 to 120 watt street light Supported by solar Photo Voltaic Power generation System | 20/02/2022 | 19/03/2022 | 30.24 | 10.32 (Apr'22) | 0.00 (Apr'22) | Electric India Control Devices |
Detail Report
Graph / Photo |
|
364 | Providing centralized air conditioning by VRV System in Mortuary complex at MAMC New Delhi. | 15/05/2022 | 14/07/2022 | 30.19 | Sai Aircon Engineers |
Detail Report
Graph / Photo |
|||
365 | A/R & M/O to various Building under jurisdiction of Sub Divn. M-2221 D.C. office Nand Nagari, Delhi & Sub Divn.M-2222, Dilshad Garden, Delhi dg 2021-22 .( SH: Attending day to day complaints) | 14/09/2021 | 13/09/2022 | 30.05 | 15.23 (May'22) | 0.00 (May'22) | R R Realtors |
Detail Report
Graph / Photo |
|
366 | Relocation of School Gates by Raising the Height with S.S. Gates. Construction of Planters, Renovation of School Libraries and Computer Lab alongwith HOS Toilet and White Wash in School Building with Minor Repair Work. Railing and Ramps for CWSN Students in Ist, IInd and IIIrd Floors. | 02/05/2022 | 01/09/2022 | 29.90 | 17.19 (Jul'22) | 0.00 (Jul'22) | N Y Construction |
Detail Report
Graph / Photo |
|
367 | Provision of barrier free environment as per Accessible Audit Report for MAIDS | 11/01/2020 | 08/07/2020 | 29.82 | 5.21 (Jun'22) | 0.00 (Jun'22) | Shabab Khan | work completed |
Detail Report
Graph / Photo |
368 | Providing Services of Computer Operator, Office Assistant & MTS in the Office of Executive Engineer(E), PWD EMD South East (M-452) & Sub –Division-I, Thyagraj Stadium, New Delhi | 26/07/2022 | 23/07/2023 | 29.64 | R. DIAMOND ENTREPRISES |
Detail Report
Graph / Photo |
|||
369 | Upgradation of EBR based ETP plant at Dada Dev Child and Maternity Hospital. Nasirpur, New Delhi. | 15/06/2019 | 14/08/2019 | 29.55 | Wellkome engineers |
Detail Report
Graph / Photo |
|||
370 | Internal and external repair/maintenance like Grit wash plaster and renovation of Flat No. 661, 666 and 667, Delhi Govt. Officers Flats, Asian Games Village, New Delhi | 04/12/2021 | 03/04/2022 | 29.47 | S.B.Constructions |
Detail Report
Graph / Photo |
|||
371 | Providing work station in Room No.104 first floor and Room No.201 second floor, Administration Block District Court Complex Saket, New Delhi | 07/04/2021 | 06/06/2021 | 29.32 | 11.67 (Aug'22) | 0.00 (Aug'22) | Delite Hi- Tech Furniture India Pvt. Ltd. |
Detail Report
Graph / Photo |
|
372 | Rewinding of wornout 1500 KVA HT AVR Transformer Andrew Yule make and providing of protection accessories of HT AVR and HT panel at Sub-Station No.1,2 3 GIPMER | 18/03/2022 | 17/06/2022 | 29.32 | 36.52 (Jun'22) | 0.00 (Jun'22) | Harsh India Enterprises |
Detail Report
Graph / Photo |
|
373 | Providing and fixing Solar Hybrid street light system supported by Solar photo voltaic power Generation System | 23/05/2022 | 22/06/2022 | 29.31 | 36.54 (Jul'22) | 0.00 (Jul'22) | SAFTY Engineers, PAN: AARPW4473E, Address: 1836/3F, Shp No. 8, Bhagirath Place, New Delhi-72 |
Detail Report
Graph / Photo |
|
374 | Annual Comprehensive Maintenance Contract of Johnson Make lift installed at Police Housing Complex, Mandoli Delhi.. | 07/11/2021 | 06/11/2022 | 29.23 | 22.51 (Jun'22) | 0.00 (Jun'22) | Johnson Lift Pvt Ltd | Work is in progress |
Detail Report
Graph / Photo |
375 | Renovation of room & class room at 6th floor, surgical Block and replacement of old damaged flush door of surgical Block at Lok Nayak Hospital,New Delhi | 09/05/2022 | 06/09/2022 | 29.22 | 15.11 (Jun'22) | 0.00 (Jun'22) | sabur alam | work completed |
Detail Report
Graph / Photo |
376 | (A) Repairing of Toilet Block, Repairing & Leveling of corridor, Painting & Repairing of Classroom doors, Water proofing of sunken portion and tank platform (B) Interior and exterior painting work with minor repair (Sch. ID- 1310458), (Bldg. ID-13101923) & (EOR ID-20221344) | 07/07/2022 | 05/10/2022 | 29.20 | Suresh Kumar and Sons |
Detail Report
Graph / Photo |
|||
377 | Replacement of old rusted/worn out Condenser lines and valves of Central A.C plants at L. N. Hospital, New Delhi | 01/06/2022 | 31/07/2022 | 29.19 | G D Enterprises |
Detail Report
Graph / Photo |
|||
378 | RMO Fire Alarm and Fire Fighting system Water Purification System RO CCTV and Audio Visual system of College building and Hostel building at MAMC, New Delhi . SHComprehensive maintenance and Operation of CCTV Surveillance system installed at vario | 15/06/2019 | 14/06/2022 | 29.09 | Pan Intellecom Ltd | work in progress by M/s Pan Intellecom Ltd. |
Detail Report
Graph / Photo |
||
379 | 1.RMO EI Fans Pump Set, Wet Riser sub-station, Pumps, DG SetAC Equip Central AC Plant Sys.at AAA Govt. Hosp.2 RMO Electr Mech Service at STC-9 Metcafe Road, Delhi SHComprehensive Operation and Maint. of Complaint Tracker System | 03/09/2019 | 02/09/2021 | 29.07 | SCS Technologies | Work in progress by SCS Technologies |
Detail Report
Graph / Photo |
||
380 | Additional office space and other facilities to Prosecution Branch and Renovations in Prosecution Branch at Saket Court Complex, New Delhi | 28/03/2022 | 27/06/2022 | 29.04 | Rajesh Sethi |
Detail Report
Graph / Photo |
|||
381 | Operation and Maintenance of Electrical Installation and Pumps | 14/09/2021 | 13/09/2022 | 28.83 | SEHRA ELECTRIC works |
Detail Report
Graph / Photo |
|||
382 | Replacement of existing ACs and fitting at various zone offices at MSO Building, I.P Estate, New Delhi. | 08/07/2017 | 07/10/2017 | 28.77 | Cool Rays |
Detail Report
Graph / Photo |
|||
383 | Renovation of Mess and all toilets in New Wing Sanjeevani Hostel (OGH) MAMC | 19/11/2021 | 17/01/2022 | 28.75 | 6.98 (Jun'22) | 0.00 (Jun'22) | MOHD AFTAB | work completed |
Detail Report
Graph / Photo |
384 | Comprehensive Annual Maintenance of HVAC Plant at DDU Court Complex, Rouse Avenue, New Delhi. | 10/11/2021 | 09/11/2022 | 28.71 | 9.57 (Aug'22) | 0.00 (Aug'22) | Voltas Ltd. | Work in progress |
Detail Report
Graph / Photo |
385 | Supply and replacement of old outlived transformers at Sub-Station No. 1 in GIPMER New Delhi. Sh SITC of Cast resin dry type transformer 1000 KVA | 09/09/2019 | 08/12/2019 | 28.71 | AVON ELECTRICALS | Work in progress by Avon Electrical |
Detail Report
Graph / Photo |
||
386 | Providing and fixing work station at A Block Basement, RKD Branch and Vth floor, Administrative Block i/c providing of chambers for Joint Registrars and Assistant Registrars, Delhi High Court, New Delhi | 20/01/2022 | 20/03/2022 | 28.32 | 27.73 (Jun'22) | 0.00 (Jun'22) | R L WADHWA | Work progress |
Detail Report
Graph / Photo |
387 | ARMO various Electrical and mechanical services at District Court Rohini, Delhi. dg 2021-22 | 28/02/2022 | 22/05/2022 | 28.28 | LAXMI ELECTRICALS |
Detail Report
Graph / Photo |
|||
388 | Non -Comprehensive Annual Maintenance of CARRIER CHILLER | 26/03/2022 | 25/03/2023 | 28.23 | 5.95 (Jul'22) | 0.00 (Jul'22) | G D Enterprises |
Detail Report
Graph / Photo |
|
389 | Providing and fixing of M.S. Tubular window with acrylic plastic sheet and covering of staircase by IRC fabric, Balance Work (Recall of Tender) | 23/07/2021 | 20/11/2021 | 28.22 | 26.97 (Mar'22) | 0.00 (Mar'22) | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
390 | ARMO various Electrical and mechanical services at NCC Bhawan, Home for Mentally Retarted Asha Kiran Complex, Avantika Rohini Delhi. dg 2021 22 | 24/02/2022 | 23/02/2023 | 28.12 | LAXMI ELECTRICALS |
Detail Report
Graph / Photo |
|||
391 | Replacement of Two Passengers Lift having capacity to carry 8 persons installed in Lawyers Chamber Parking Block H at District Court Karkardooma Courts Delhi. | 28/07/2018 | 27/03/2019 | 28.10 | 13.09 (Oct'19) | 0.00 (Oct'19) | Johnson Lifts Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
392 | Replacement of damaged / rusted Fire Fighting pipeline and various other accessories of fire fighting System | 10/06/2022 | 09/08/2022 | 28.00 | M/s Royale Meridian India Pvt Ltd |
Detail Report
Graph / Photo |
|||
393 | Repair and Maintenance of all shafts in A, C, B & Academic block G.B. Pant Hospital | 20/05/2022 | 16/09/2022 | 27.99 | Shashank Shekhar Singh | work completed |
Detail Report
Graph / Photo |
||
394 | Repair of roof, renovation of toilet blocks and providing stair case for connecting with other misc. work | 04/08/2022 | 02/11/2022 | 27.95 | M H Builders |
Detail Report
Graph / Photo |
|||
395 | Repairing and replacement of sagged ceiling at 6th floor of court rooms | 12/05/2022 | 11/08/2022 | 27.94 | Rajesh Sethi |
Detail Report
Graph / Photo |
|||
396 | Replacement of Damaged Water Pipe Line in KIT Campus | 16/05/2022 | 15/06/2022 | 27.80 | UR Construction |
Detail Report
Graph / Photo |
|||
397 | Providing and replacement of maintenance free battery with UPS for DEM Block and UCMS College Block for costly equipments and computer system only at GTB Hospital, Shahdara, Delhi | 13/04/2019 | 12/06/2019 | 27.78 | 25.00 (May'19) | 0.00 (May'19) | M/s Vivek Associates | Work completed |
Detail Report
Graph / Photo |
398 | Provision of additional RCC stair Case For Fire NOC in newly constructed building from ground floor to terrace level, minimum 1.5 meter wide and Related Works | 25/12/2021 | 24/06/2022 | 27.77 | 2.67 (Mar'22) | 0.00 (Mar'22) | Friends Constructions |
Detail Report
Graph / Photo |
|
399 | (A) Pvdg./ren./rep. of ramps, railing, tactile tiles, signage etc. to make school bldg. and environment barrier free and accessible. (B) Affixing acrylic sheets in place of broken/missing window pans at SBV Narela, Delhi-110040. | 15/08/2022 | 14/11/2022 | 27.62 | ES TEE SOLUTIONS |
Detail Report
Graph / Photo |
|||
400 | SITC of Fire alarm system in Gynae ward Block at Lok Nayak Hospital, New Delhi. | 21/05/2022 | 20/07/2022 | 27.57 | R.C.C. Enterprises |
Detail Report
Graph / Photo |
|||
401 | A/R & M/O to Saket Court Complex (Non - Residential) under Sub-Division-I, BMSD-1, PWD During 2021-22. Saket, New Delhi.(SH:- Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc | 08/10/2021 | 07/04/2022 | 27.50 | RAKSHAK SECURITAS PVT. LTD. |
Detail Report
Graph / Photo |
|||
402 | Repair of boundary wall waterproofing treatment on roof and replacement of damaged sewer | 11/07/2021 | 09/11/2021 | 27.31 | 33.90 (Mar'22) | 0.00 (Mar'22) | M T Builders |
Detail Report
Graph / Photo |
|
403 | RMO various electrical mechanical services at RTRM Hospital, Jaffarpur, New Delhi (SH Annual routine maintenance of 10000 LPH RO Plant) | 14/06/2019 | 13/06/2021 | 27.29 | Graphite Works |
Detail Report
Graph / Photo |
|||
404 | Upgradation of EBR based ETP Plant at RTRM Hospital, Jaffarpur, New Delhi | 03/07/2019 | 02/09/2019 | 27.24 | Wellkome engineers |
Detail Report
Graph / Photo |
|||
405 | EOR to EI AND Fans Air Conditioners Security Lighting and PA System at Govt. Girls Sr. Sec. School Jhilmil Colony Delhi. School ID- 1001111 | 17/08/2018 | 16/10/2018 | 27.23 | 15.03 (Jan'20) | 0.00 (Jan'20) | CHETAN ENTERPRISES |
Detail Report
Graph / Photo |
|
406 | Civil Work and Electrical Work in Rohini, Rithala, Tri Nagar, Shalimar Bagh and Wazirpur Total 41 Nos. Schools of NWB-1 (Remaining Work). (Composite Work Civil and Electrical) | 07/02/2022 | 06/06/2022 | 27.17 | Laxman |
Detail Report
Graph / Photo |
|||
407 | RMO E & M Services in Lawyers chambers Block D,E,F,G and H at District Court Karkardooma Delhi. (SH:- Providing, Data Entry/Computer Operators, Messengers cum Peon etc. for Division and Sub Division office) | 18/10/2018 | 17/10/2019 | 27.11 | 30.54 (Feb'20) | 0.00 (Feb'20) | RAKSHAK SECURITAS PVT. LTD. |
Detail Report
Graph / Photo |
|
408 | Augmentation and Modification of Effluent Treatment Plant 50 KLD capacity for processing, controlling and online transfer and correction of transfer of data based on MBR technology at Pt. Madan Mohan Malviya Hospital, Malviya Nagar, New Delhi | 03/07/2019 | 02/09/2019 | 26.95 | Texol Engineers |
Detail Report
Graph / Photo |
|||
409 | Sh Providing and replacing of M-PACT series unserviceable ACB of GE Make in Main LT panel in Delhi Sachivalaya, New Delhi | 01/10/2018 | 30/11/2018 | 26.88 | Master Engineering Services |
Detail Report
Graph / Photo |
|||
410 | Providing Services of Computing and official work. | 27/09/2018 | 26/09/2019 | 26.88 | 32.88 (Aug'21) | 0.00 (Aug'21) | Krishna Electreical Works |
Detail Report
Graph / Photo |
|
411 | Repair and Renovation of Toilets) (Balance work) | 16/05/2022 | 15/01/2023 | 26.87 | A R CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|||
412 | Replacement of 2 Nos old outlived lifts in New Medical block at L.N.H ND | 27/01/2022 | 26/07/2022 | 26.43 | NEUTECH ELEVATOR SYSTEM |
Detail Report
Graph / Photo |
|||
413 | Providing & Laying of Cellulose system i/c operation & maintenance for 2 years after completion of work | 10/07/2022 | 08/08/2022 | 26.20 | 26.26 (Jul'22) | 0.00 (Jul'22) | Ever Green Enterprises |
Detail Report
Graph / Photo |
|
414 | SH-Providing EI and AC Plant | 30/08/2018 | 29/09/2018 | 26.10 | 32.60 (Jan'22) | 0.00 (Jan'22) | Krishna Electrical Works |
Detail Report
Graph / Photo |
|
415 | Providing Covered passage between A Block Master Amir Chand Block removing the dome at roof level and covering the passages for preventing entrance of pigeons in the wards OTs at all seven etc | 15/10/2020 | 15/12/2020 | 26.09 | Aar Kay Builders | work completed |
Detail Report
Graph / Photo |
||
416 | Pdg. , fixing of electrical accessories, Water Cooler, RO system, PA System, CCTV system , DG Set in proposed conference room, TIP room, Kharja room at JJB-II, OHB-I, department of women, child development, Delhi Gate, New Delhi. | 14/09/2017 | 13/11/2017 | 26.03 | Image Communication System |
Detail Report
Graph / Photo |
|||
417 | SITC and Replacement of unserviceable/condemned Air Conditioning Units at JPCH Shastri Park, Delhi | 13/04/2019 | 12/06/2019 | 25.97 | Honey Collection, Address : B-3/105, Paschim Vihar, New Delhi-63 | Work completed |
Detail Report
Graph / Photo |
||
418 | Supply installation testing commissioning of CCTV surveillance system Boom barrier at Hospital Gate L.N.H ND (SITC of CCTV) | 02/03/2022 | 01/05/2022 | 25.80 | SANSQUARE AUTOMATION PVT. LTD. |
Detail Report
Graph / Photo |
|||
419 | Renovation of Incubation Centre in old Administrative Block, IGDTUW, Kashmere Gate, Delhi. | 20/08/2017 | 19/11/2017 | 25.74 | Sehra Electric Works |
Detail Report
Graph / Photo |
|||
420 | Routine Maintenance of EI , Fans, compound light and Routine maintenance and operation of Drinking water supply pump set, electrical sub-station, DG Set , fire fighting system | 07/09/2017 | 06/09/2018 | 25.68 | Krishna Electrical Works |
Detail Report
Graph / Photo |
|||
421 | Constructing Sitting Area in Basket Ball Ground and Laying Interlocking Tiles in School | 22/07/2022 | 21/09/2022 | 25.67 | A R CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|||
422 | (A) Providing/renovation/repair of ramps, railing, tactile tiles, signage etc. to make school building and environment barrier free & accessible. (B) Affixing acrylic sheets in place of broken/ missing window pans at SBV Narela, Delhi - 110040. (Sch Id. 1310017) (Bldg. Id. 13101207) (EOR Id -20191761 / 20211053) | 18/04/2022 | 16/07/2022 | 25.56 | MOHD FIROZ KHAN | Work in Progress |
Detail Report
Graph / Photo |
||
423 | Providing and fixing APP sheet, i/c repair of expansion gap all height with false ceiling & gypsum board, calcium silicate tiles, replacement of damaged flooring with marble stone and vitrified tiles i/c replacement of damaged G.I. main water supply line at terrace and other misc. works at Saket Court Complex | 10/11/2021 | 09/05/2022 | 25.48 | Afjal Construction |
Detail Report
Graph / Photo |
|||
424 | 1) Providing facilities for person with disability at CAW CELL Building, Sector-3, Rohini, New Delhi. 2) Providing facilities for person with disability at Police station South Rohini, Sector-3, New Delhi. (SITC of Lifts) | 25/04/2022 | 24/06/2022 | 25.47 | Escon Elevator Pvt. Ltd |
Detail Report
Graph / Photo |
|||
425 | Comprehensive Maintenance Contract of Johnson Make Lifts at Casualty Block OPD Block | 04/12/2021 | 03/12/2022 | 25.41 | Johnson Lifts Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
426 | Comprehensive maintenance and RMO of AV system | 07/02/2022 | 06/02/2023 | 25.35 | RST Technologies Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
427 | Providing & Fixing M.S Wire Gauge Doors & Windows, Parking Shed & Other Misc. Work | 12/06/2022 | 11/09/2022 | 25.16 | Mohd. Mairaj |
Detail Report
Graph / Photo |
|||
428 | RMO of Sub station DG Set and EI Work | 26/06/2018 | 25/06/2019 | 25.03 | 23.51 (Apr'19) | 90.00 % (Apr'19) | Swastik Electrotech Pvt. Ltd. | Work transferred and in progress |
Detail Report
Graph / Photo |
429 | MOEI and fans, fire alarm system and lifts at B.L. Taneja Block, MAMC, New Delhi. SH Comprehensive Maintenance of OTIS make Lifts | 06/03/2018 | 05/03/2021 | 25.01 | 5.88 (Apr'19) | 0.00 (Apr'19) | Otis Elevator Company (India) Ltd. | Work in progress |
Detail Report
Graph / Photo |
430 | Finishing work | 21/07/2022 | 17/03/2023 | 24.91 | SHRI BHAGWAN MITTAL |
Detail Report
Graph / Photo |
|||
431 | Providing LED Display Board, Smart LED TV, Video Conferencing System and various Electronic accessories at Acharya Shree Bhikshu Govt. Hospital, Moti Nagar, New Delhi | 23/03/2019 | 22/06/2019 | 24.90 | PRAGATI ENGINEERS |
Detail Report
Graph / Photo |
|||
432 | Comprehensive Maintenance/SITC of Network Booster System | 08/07/2022 | 07/07/2023 | 24.88 | R. DIAMOND ENTREPRISES |
Detail Report
Graph / Photo |
|||
433 | Day to day running, maintenance and operation of all E&M installations | 12/05/2022 | 11/05/2023 | 24.88 | 2.53 (Jun'22) | 0.00 (Jun'22) | M/s Parasar Electricals & Refrigeration |
Detail Report
Graph / Photo |
|
434 | Providing One No. Goods/ Services Lift (Ground +7th Floor) in Residential Block O at District Court Karkardooma Delhi. | 04/01/2019 | 03/07/2019 | 24.81 | 17.21 (Oct'19) | 0.00 (Oct'19) | Johnson Lifts Pvt. Ltd. |
Detail Report
Graph / Photo |
|
435 | SITC of Network Booster System Left Wing Side & Other Remaining Locations | 16/07/2022 | 15/08/2022 | 24.80 | R. DIAMOND ENTREPRISES |
Detail Report
Graph / Photo |
|||
436 | 1 Operation Maintenance and watch and ward of Pumps S/Stn DG Set EI and Fans and RUB Sub Way underneath of the flyover and Vrs locations under M-251. 2 MOEI Fans and RMO P/Set at Dr. B R Ambedkar College and Resi. complex. 3 RMO E and M Services at PTS Wazirabad. 4 EOR to Pdg. and repairing of Existing F/F System at SKV DDA Flats East of Loni Road (Sch ID- 1106024) (SH- Painting of Pumps DG Sets Panels and Transformer etc and Pdg. and Fixing of E.I. at Vrs Storm Water Pump House at Trans Yamuna area) | 27/11/2018 | 26/03/2019 | 24.78 | A K Electric Works | Work in progress |
Detail Report
Graph / Photo |
||
437 | Rain Water Harvesting | 17/08/2018 | 16/10/2018 | 24.70 | 23.10 (Nov'19) | 0.00 (Nov'19) | Shekhar | work completed |
Detail Report
Graph / Photo |
438 | Renovation of Administration Block ground and 1st floor at DDU Hospital, Hari Nagar, New Delhi | 09/04/2019 | 08/07/2019 | 24.66 | Electro Mech Engineers |
Detail Report
Graph / Photo |
|||
439 | Providing and fixing Bus trunking power tracking system in room No. 213, 219 and 224 at UCMS of GTBH Shahdara, Delhi | 15/09/2017 | 14/11/2017 | 24.58 | 18.43 (Mar'18) | 50.00 % (Mar'18) | Flair Tech | Work in progress..3RD RA 2501802 |
Detail Report
Graph / Photo |
440 | Misc. Civil repair works in Court Rooms, Chambers and Branches . | 29/06/2022 | 27/09/2022 | 24.58 | Shyam Sundar Tyagi |
Detail Report
Graph / Photo |
|||
441 | Comprehensive Maintenance of UPS System | 20/05/2022 | 19/05/2023 | 24.53 | Labotek |
Detail Report
Graph / Photo |
|||
442 | Comprehensive maintenance of 10 Nos. Johnson make lifts at DDU Court complex, new delhi | 05/11/2021 | 04/11/2022 | 24.50 | Johnson Lifts Pvt. Ltd. | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||
443 | Construction of shed with Polycarbonate sheet around the building, construction of sps type pantry and convert the toilet into store Room at DIP Campus Delhi | 27/06/2022 | 25/08/2022 | 24.42 | SHRI BHAGWAN MITTAL |
Detail Report
Graph / Photo |
|||
444 | RMO various Electrical and Mechanical Services installed at CNBC, Geeta Colony, Delhi Sub Head Operation and annual comprehensive maintenance of ETP plant of 100KLD | 17/05/2018 | 16/05/2020 | 24.36 | 10.79 (May'19) | 20.00 % (May'19) | Green Way Technologies | Work in Progress (IInd RA) |
Detail Report
Graph / Photo |
445 | RMO sub-Station including DG sets sub station at MAMC, New Delhi. (Comprehensive maintenance of 1500 KVA HT AVR Andrew Yule make) | 01/06/2022 | 31/05/2025 | 24.30 | Harsh India Enterprises |
Detail Report
Graph / Photo |
|||
446 | EOR at GGSSS, Mandoli Extn. Delhi (School ID: 1106259). (SH: Raising of boundary wall, Renovation of Principal rooms of both shifts & C/o attached toilet with Principal room, P/f doors of classroom, replacement of window panes & misc. civil works) | 02/04/2022 | 30/06/2022 | 24.27 | Krishan Azad |
Detail Report
Graph / Photo |
|||
447 | Comprehensive maintenance of buildings including supply of materials and engaging labours for day to day maintenance | 15/07/2022 | 14/07/2023 | 24.21 | N.M. CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|||
448 | Providing the services of Skilled, Semi-Skilled and Un-Skilled staff for day to day maintenance at DIPSAR Complex. | 26/06/2019 | 25/12/2019 | 24.20 | 15.58 (Feb'21) | 0.00 (Feb'21) | RAKSHAK SECURITAS PVT. LTD. | work in progress |
Detail Report
Graph / Photo |
449 | Routine Operation and Maintenance of Wellkome Make 600 KLD ETP based on EBR Technology at Orthopedic Block | 09/04/2022 | 08/04/2023 | 24.15 | Wellkome engineers |
Detail Report
Graph / Photo |
|||
450 | RMO of UPS and Boiler at GIPMER, NDShComprehensive maintenance of APC make UPS | 19/08/2019 | 18/08/2022 | 24.10 | power house | Work in progress by Power House |
Detail Report
Graph / Photo |
||
451 | RMO of AC Plant and AHUs installed in the Main Court Building at District Court Complex, Saket, ND -17. (SH- Annual Comprehensive maintenance of High Side HVAC Plant of 5x400 TR Capacity Mequay i.e. Daikin Make Central Air Conditioning Plant). | 09/05/2018 | 08/02/2019 | 24.10 | 30.08 (Aug'19) | 70.00 % (Aug'19) | Daikin Airconditioning India Private Limited |
Detail Report
Graph / Photo |
|
452 | Rain Water Harvesting for Ortho Block OT MRD Block PG womens Hostel and B L Taneja Block at Lok Nayak Hospital New Delhi | 24/07/2021 | 21/09/2021 | 24.04 | 16.32 (Jul'22) | 0.00 (Jul'22) | NATIONAL BUILDERS | work completed |
Detail Report
Graph / Photo |
453 | 1) Comprehensive Maintenance Contract of ECE make lifts at Surgical Ward and Special Ward, 2) Comprehensive Maintenance of ECE Make Lifts at MAIDS | 27/10/2021 | 26/10/2023 | 23.94 | ECE INDUSTRIES LIMITED |
Detail Report
Graph / Photo |
|||
454 | Renovation of Electrical Installations, Wiring, Switch Board etc. at Forensic Science Lab., Madhuban Chowk, Sector - 14, Rohini, Delhi dg. 2021-22 | 17/03/2022 | 16/06/2022 | 23.94 | 6.69 (Jul'22) | 0.00 (Jul'22) | M/s R S Electric Co. |
Detail Report
Graph / Photo |
|
455 | Annual Maintenance of cummins make DG sets and Kirloskar make DG set at L.N. Hospital | 30/10/2019 | 29/10/2021 | 23.89 | OVN TRADING ENGINEERS PVT LTD | work in progress by OVN Trading Engineers Pvt. Ltd |
Detail Report
Graph / Photo |
||
456 | (Providing and fixing of iron profile shed over mud houses) 3rd call | 09/03/2019 | 08/04/2019 | 23.86 | 11.26 (Mar'21) | 0.00 (Mar'21) | Shekhar | work completed |
Detail Report
Graph / Photo |
457 | RMO EI, Compound Lights, Lifts, Water supply pumps, Fire Fighting system, Fire Alarm System, Sub-Station and 500 KVA DG sets at Delhi Police Station & attached staff qtrs sector-17, Dwarka, New Delhi. | 17/01/2019 | 16/01/2020 | 23.85 | Azad Electricals |
Detail Report
Graph / Photo |
|||
458 | Routine maintenance and operation of Fire Fighting, Water supply and Fire Alarm system | 16/05/2018 | 15/05/2019 | 23.83 | 23.44 (Apr'19) | 98.00 % (Apr'19) | Swastik Electrotech Pvt. Ltd. | Work transferred and in progress |
Detail Report
Graph / Photo |
459 | EOR for Upgradation of Casualty Block and Dental Department of RTRM Hospital, Jaffarpur, New Delhi | 17/06/2021 | 14/10/2021 | 23.79 | Rajesh Sethi | Work is under progress. |
Detail Report
Graph / Photo |
||
460 | Development of 2 wheeler parking for judicial staff at back side courtyard of Annexe II building and renovation of waiting room near Lock Up at Tis Hazari Court,Delhi | 17/04/2022 | 31/05/2022 | 23.71 | D.S. Construction Co |
Detail Report
Graph / Photo |
|||
461 | Comprehensive maintenance operation of BOSCH make IP based CCTV installed at D Block | 03/04/2022 | 02/04/2023 | 23.63 | Pan Intellecom Ltd |
Detail Report
Graph / Photo |
|||
462 | Replacement of unserviceable and out dated cold storage body cabinets by New Walk in cold store with SS Rack in Mortuary at MAMC, ND | 08/04/2022 | 07/07/2022 | 23.54 | 19.57 (May'22) | 0.00 (May'22) | G D Enterprises |
Detail Report
Graph / Photo |
|
463 | EI and Fan Works | 22/02/2022 | 23/08/2022 | 23.53 | R S ELECTRICALS |
Detail Report
Graph / Photo |
|||
464 | Renovation of Main ICU at GTB Hospital complex, Shahdara, Delhi. | 12/06/2020 | 11/06/2022 | 23.49 | Labotek |
Detail Report
Graph / Photo |
|||
465 | RMO RO Plants, Water Softening Plants and Comprehensive Maintenance of Water Coolers, Water Purifiers installed at GGSGH, Raghubir Nagar (SH Running Operation and Maintenance of 100000LPD Water Softening Plant, 4000 LPH and 3000 LPH RO Plants) | 16/06/2019 | 15/06/2021 | 23.45 | A TO Z Engineering Works |
Detail Report
Graph / Photo |
|||
466 | Supply and replacement of existing old and unserviceable Air Circuit Breaker and MCCB by enhanced capacity at Sub station No. 3 and 4 at L.N. Hospital New Delhi. | 22/12/2019 | 21/02/2020 | 23.45 | AVON ELECTRICALS | work in progress by Avon ELectrical |
Detail Report
Graph / Photo |
||
467 | Repair and Renovation of Toilets (Balance work) | 23/01/2022 | 22/09/2022 | 23.41 | Pankaj Gureja |
Detail Report
Graph / Photo |
|||
468 | Repair and Renovation in Flat No. A-03, Type-VI and Other Misc. repair works in Flats at D-II Flats Vasant Kunj, New Delhi | 13/03/2022 | 25/04/2022 | 23.39 | 12.09 (Jul'22) | 0.00 (Jul'22) | BABU LAL GUPTA |
Detail Report
Graph / Photo |
|
469 | Comprehensive Maintenance of vinitec make Automatic Voltage Stabilizer | 04/10/2020 | 03/10/2022 | 23.24 | 17.30 (Jun'22) | 0.00 (Jun'22) | Harsh India Enterprises | Work in progress by M/s Harsh India Enterprises |
Detail Report
Graph / Photo |
470 | 1).RMO of central AC plant/ Package unit at DDU Hospital, Hari Nagar, New Delhi, 2). RMO A.C. Plant/ Screw type at Trauma Block at DDU Hospital, Hari Nagar, New Delhi (SH Maintenance of Servicing of Package Units and Central AC Equipment) | 11/04/2019 | 10/06/2019 | 23.17 | PMG ENGINEERS |
Detail Report
Graph / Photo |
|||
471 | Comprehensive Maintenance of OTIS makes Lifts | 18/02/2021 | 17/02/2023 | 23.16 | Otis Elevator Company (India) Ltd. | Work in progress by M/s Otis Elevator Company (India) Ltd. |
Detail Report
Graph / Photo |
||
472 | Fencing of 11 Nos. AAMC under construction under South District. | 11/01/2020 | 10/05/2020 | 23.14 | 17.68 (Mar'21) | 0.00 (Mar'21) | Sanjeev Kumar Goel | work in progress |
Detail Report
Graph / Photo |
473 | Construction of boundary wall, Parking Shed and development of ground etc. | 23/02/2019 | 22/04/2019 | 23.09 | 11.45 (Aug'20) | 0.00 (Aug'20) | Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 | work completed |
Detail Report
Graph / Photo |
474 | Comprehensive Maintenance of Johnson make Lifts | 05/01/2022 | 04/01/2024 | 23.05 | 4.69 (Aug'22) | 0.00 (Aug'22) | Johnson Lifts Pvt Ltd |
Detail Report
Graph / Photo |
|
475 | Demolition of existing old/ dilapidated single storey class room/ building (55 year old) in the GBSSS, Katewara, Delhi (School ID 1310010) | 15/07/2022 | 13/09/2022 | 23.01 | M I BUILDERS |
Detail Report
Graph / Photo |
|||
476 | Operation of PA System Committee Room No. 1,2 and MLA Lounge. Annual Comprehensive Maintenance of PA System Committee Room No. 1, MLA Lounge No. 2 and DIP | 25/06/2020 | 24/06/2022 | 22.97 | 25.51 (Jun'22) | 0.00 (Jun'22) | Ambica Electricals | Work in Progress |
Detail Report
Graph / Photo |
477 | (SH-Servicing/Maintenance of WTAC/STAC/Hot and Cold Split A.C and Water Coolers situated in different buildings under the different sub divisions) | 25/02/2019 | 24/02/2020 | 22.91 | 27.25 (May'20) | 0.00 (May'20) | Krishna Electrical works |
Detail Report
Graph / Photo |
|
478 | Providing and placing compactor storage unit & furniture items at 1st floor of E Block, DC Office Complex, Nand Nagri, Shahdara, Delhi - 110093 | 27/05/2022 | 25/06/2022 | 22.90 | Modern Office System |
Detail Report
Graph / Photo |
|||
479 | Providing and fixing Bipolar Ionizer based Air Purification System in Surgical Block ground to 4th Floor | 18/06/2022 | 17/09/2022 | 22.80 | 28.74 (Jul'22) | 0.00 (Jul'22) | V A Associates |
Detail Report
Graph / Photo |
|
480 | A/R and M/O to Saket Court Complex (Residential) under Sub-Division-I, BMSD-1, PWD During 2021-22. Saket, New Delhi(ID : 70268) | 12/10/2021 | 11/04/2022 | 22.80 | 15.20 (May'22) | 0.00 (May'22) | RAHUL CONSTRUCTION |
Detail Report
Graph / Photo |
|
481 | Annual Service contract of 4 Nos. x 1010 KVA and 2 Nos. x 500 KVA DG Sets installed at Mandoli Prison Complex, including B Check. | 11/11/2021 | 10/11/2022 | 22.78 | 0.89 (May'22) | 0.00 (May'22) | Lanvs Greek India Private Limited | work is in progress |
Detail Report
Graph / Photo |
482 | Conversion of Barracks into Special Security Wards & Other Misc. Work | 25/06/2022 | 24/10/2022 | 22.74 | RAJIV RANJAN |
Detail Report
Graph / Photo |
|||
483 | Upgradation of 3 Nos staff rooms of GNCTD Schools under Jurisdiction of DHC Division PWD dg 2018 19 | 25/12/2018 | 22/02/2019 | 22.73 | 17.72 (Nov'20) | 0.00 (Nov'20) | Sher Singh | Work in progress |
Detail Report
Graph / Photo |
484 | Provision for RO plant for drinking water supply in various Hostels at MAMC New Delhi. | 01/01/2020 | 29/02/2020 | 22.71 | M/s Vivek Associates | work in progress by agency |
Detail Report
Graph / Photo |
||
485 | Comprehensive maintenance of Microprocessor based security calling display system at New Medical Block Children ward,OT Bloc, Surgical Block at L.NH ND | 21/02/2022 | 20/02/2024 | 22.68 | AKOUSTIK COMMUNICATIONS |
Detail Report
Graph / Photo |
|||
486 | Renovation of Main Entry Gate, Sign Board, Provision of Shed, Renovation of Gents/Boys Toilet, Replacement of Window/Door and Other Misc. Work | 25/06/2022 | 24/10/2022 | 22.67 | BHARAT SINGH |
Detail Report
Graph / Photo |
|||
487 | Renovation of Dressing Room in Casualty, Waterproofing at OPD block terrace and providing and fixing wall mounted lockers / cupboards in Doctors duty room, Pediatrics OPD and Minor OT | 14/04/2022 | 12/06/2022 | 22.62 | 8.03 (Jul'22) | 0.00 (Jul'22) | Waqaruddin | Work is under progress. |
Detail Report
Graph / Photo |
488 | Comprehensive Maintenance of Topaz make Lift Voice Announcement system | 13/09/2020 | 12/09/2022 | 22.62 | M/s TOPAZ SERVICES CORPORATION | Work in progress by M/s Topaz Services Corporation |
Detail Report
Graph / Photo |
||
489 | RMO EI and Fans Lifts Pumps Water Supply Sub Station DG Set HVAC Fire Fighting and Fire Alarm at DDU College at Sec3 Dwarka New Delhi SH Comprehensive maintenance of Central AC System and RMO of Central AC and VRV System | 26/07/2018 | 25/07/2019 | 22.61 | 21.32 (Jul'19) | 65.00 % (Jul'19) | M/s Snowmex Engineers Ltd. | Work transferred and in progress |
Detail Report
Graph / Photo |
490 | Extension of existing PA System of FBT make in Children ward,gynae ward burn ward at L.N. Hospital, New Delhi. | 05/07/2022 | 04/09/2022 | 22.59 | AKOUSTIK COMMUNICATIONS |
Detail Report
Graph / Photo |
|||
491 | RMO Works AC Installed at Delhi Sachivalaya, New Delhi. | 13/12/2018 | 12/02/2019 | 22.58 | 0.56 (May'22) | 0.00 (May'22) | AirTemp Engineers |
Detail Report
Graph / Photo |
|
492 | Provision for Rain Water Harvesting Systems in SBV Gokhle Marg, GGSSS Nicholson Road Mori Gate, GGSSS Diwan Hall Chandni Chowk and Govt. Co Education Sec. School Sushila Mohan Marg Naya Bazar under SRD Project Division-I, Sub-Division-III, New Delhi | 09/08/2018 | 08/10/2019 | 22.52 | 14.43 (Sep'20) | 0.00 (Sep'20) | Munzareen Ahmed | Work in progress |
Detail Report
Graph / Photo |
493 | RMO Electrical and Mechanical in Karkardooma Court Court Block ACI B and JKL at District Court Karkardooma Delhi. SH- Comprehensive Maintenance of Voltas make PTAC plant and equipments installed in A B and C Block | 02/08/2018 | 01/08/2019 | 22.52 | 21.20 (Aug'19) | 0.00 (Aug'19) | Voltas Ltd. |
Detail Report
Graph / Photo |
|
494 | Repairing of Fire Alarm System at District Courts Karkardooma Delhi. | 12/02/2019 | 11/06/2019 | 22.48 | 5.87 (Sep'20) | 0.00 (Sep'20) | SK Engineers |
Detail Report
Graph / Photo |
|
495 | Comprehensive annual maintenance of UPS system installed in GTB Hospital | 21/02/2022 | 20/02/2024 | 22.46 | Shraddha Electricals |
Detail Report
Graph / Photo |
|||
496 | Repair/replacement of old brokened/damaged sunshade | 30/04/2022 | 29/08/2022 | 22.44 | S M Construction | Work in Progress |
Detail Report
Graph / Photo |
||
497 | SITC of Air Conditioning System for Medicine and ENT OPD Section at JPCH, Shastri Park, Delhi | 06/11/2017 | 05/01/2018 | 22.28 | 22.95 (Oct'18) | 80.00 % (Oct'18) | Jai Shri Bhairo Electricals | work completed |
Detail Report
Graph / Photo |
498 | SH-Operation of Integrated Audio Visual System and Digital Conferencing System installed in different hall at Delhi Sachivalaya, New Delhi. | 19/08/2018 | 18/08/2019 | 22.20 | 5.92 (Nov'19) | 0.00 (Nov'19) | R.C. Enterprises |
Detail Report
Graph / Photo |
|
499 | Provision of Tactile Tiles, Correction of Ramp Slopes and Provision of Reserved Parking, Toilet and Lift Structure for Person with Disability (PWD) and Other Related Misc. Works | 07/02/2022 | 06/06/2022 | 22.20 | Anshika Construction Co. |
Detail Report
Graph / Photo |
|||
500 | Replacement of Door frame with other repairing work in Judges Flat Residential Complex | 01/08/2022 | 30/10/2022 | 22.13 | ARSHAD |
Detail Report
Graph / Photo |
|||
501 | Comprehensive Maintenance of Kone Make Lifts | 06/05/2022 | 05/05/2023 | 22.09 | KONE ELEVATOR INDIA PRIVATE LIMITED |
Detail Report
Graph / Photo |
|||
502 | Comprehensive maintenance and Operation of CCTV System Bosch, Hikvision, Sony, Panasonic, Pelco make and Honeywell make | 26/08/2021 | 25/08/2022 | 22.08 | 0.10 (Jun'22) | 0.00 (Jun'22) | Media Tele Communication |
Detail Report
Graph / Photo |
|
503 | Tender Detail (Call of Tender) 1. SH Routine Maintenance of EI , Fans in flats 2. SH Replacement of faulty electrical installation and providing of down comers , PA system | 24/06/2017 | 23/08/2017 | 22.01 | 10.60 (Jul'20) | 0.00 (Jul'20) | Shaka Electrical India |
Detail Report
Graph / Photo |
|
504 | Raising height of Boundary Wall of District Court Complex, Saket, New Delhi | 08/02/2022 | 07/04/2022 | 21.88 | SUDHIR KUMAR SHARMA |
Detail Report
Graph / Photo |
|||
505 | Operation and comprehensive Maintenance of Panasonic make CCTV system at Gynae Surgical Casualty ward 13 andChildren Block | 08/01/2022 | 07/01/2023 | 21.81 | Deesan Systems |
Detail Report
Graph / Photo |
|||
506 | Addition and Alteration work in Main Court Building and Lawyers Block as per report received by the Delhi fire service at District Court Complex, Saket, New Delhi. | 10/10/2018 | 23/11/2018 | 21.79 | Sanjeev Kumar Goel | work in progress |
Detail Report
Graph / Photo |
||
507 | Operation and Maintenance of 600 KLD ETP based on EBR Technology at Orthopedic Block, Lok Nayak Hospital, New Delhi. | 17/09/2019 | 16/06/2020 | 21.72 | Texol Engineers | work in progress by Texol Engineers |
Detail Report
Graph / Photo |
||
508 | Water Proofing Treatment of Roof and Replacement of Rusted G.I. Pipes at Terrace | 16/05/2022 | 15/11/2022 | 21.71 | Kavit Gulati |
Detail Report
Graph / Photo |
|||
509 | Annual comprehensive maintenance of various capacity Online UPS systems | 13/11/2021 | 12/11/2022 | 21.67 | OM VAISHNO ENTERPRISES |
Detail Report
Graph / Photo |
|||
510 | A/R & M/O to various Govt. AAMCs Under Division M-222 (NE) Delhi dg 2021-22 (SH:- Providing & fixing interior wall digital print graphics on self-adhesive vinyl)(Balance Work) | 15/12/2021 | 14/01/2022 | 21.49 | 9.98 (Jan'22) | 0.00 (Jan'22) | Unique AD Agency |
Detail Report
Graph / Photo |
|
511 | Providing Services for Day to Day Maintenance | 04/06/2022 | 03/06/2023 | 21.44 | M/s Planet Security Group | Work in Progress |
Detail Report
Graph / Photo |
||
512 | Running maintenance of lifts in non-residential area at GTB Hospital Shahdara, Delhi (SH: Comprehensive maintenance of 9Nos. TKE make passenger cum bed elevator) | 09/12/2018 | 08/12/2019 | 21.35 | Thyssenkrupp Elevator (India) Pvt. Ltd. | Work completed |
Detail Report
Graph / Photo |
||
513 | Running Comprehensive Maintenance and Semi comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV/ RO Systems, Water Dispensers with Inbuilt RO Systems, RO Water Purifiers and Aquaguards | 08/01/2020 | 07/01/2022 | 21.35 | ADITI ENTERPRISES | work in progress by Aditi Enterprises |
Detail Report
Graph / Photo |
||
514 | EOR to GGSSS Vijay park Maujpur, Delhi during 2022-23 (SH:-Upgradation of existing building and other misc. repair works) (Balance Work) | 27/05/2022 | 25/07/2022 | 21.33 | Manuvar Hussain |
Detail Report
Graph / Photo |
|||
515 | EOR at GGSSS, Mandoli Extn. Delhi (School ID: 1106259). (SH: Raising of boundary wall, Renovation of Principal rooms of both shifts & C/o attached toilet with Principal room, P/f doors of classroom, replacement of window panes & misc. civil works) | 24/02/2022 | 23/05/2022 | 21.26 | M/S DEVDUTT SHARMA |
Detail Report
Graph / Photo |
|||
516 | Water Proofing Treatment of Terrace | 12/06/2022 | 11/08/2022 | 21.21 | Shivam Enterprises |
Detail Report
Graph / Photo |
|||
517 | Com Main ofCMosM.SerVol stab instat diff loc | 18/12/2019 | 17/12/2022 | 21.19 | S.S. Sales and Services | work in progress by S.S. Sales & Services |
Detail Report
Graph / Photo |
||
518 | Providing of services of Computer Operator, Peon, Messenger Supervisor | 07/07/2021 | 06/07/2022 | 21.16 | DEVINE SECURITY SERVICES |
Detail Report
Graph / Photo |
|||
519 | Renovation/Repair work in SDM (Election) office-District Shahdara at A-Block, D.C Office Complex, Nand Nagri, Delhi-110093. (Balance Work) | 17/03/2022 | 15/05/2022 | 21.08 | JABIR HUSSAIN |
Detail Report
Graph / Photo |
|||
520 | AMC for comprehensive maintenance of various capacity UPS system | 10/02/2018 | 09/02/2019 | 21.08 | 6.25 (Dec'19) | 0.00 (Dec'19) | Labotek |
Detail Report
Graph / Photo |
|
521 | 1. SH- Annual Semi Comprehensive Maintenance of 50 LPH capacity RO System. 2. SH- Annual Comprehensive and semi comprehensive maintenance of 60,80 PSS RO and 80,120 PSS UV storage cooler cum purifier. | 17/06/2017 | 16/06/2018 | 21.04 | Aditi Enterprises |
Detail Report
Graph / Photo |